Post A Status 2
Post A Status 2
SITE OVERVIEW
Site LRD Site Name
SXDD SH PETALING JAYA SEKSYEN 17
State Region
SELANGOR CENTRAL
Solution LOS Status
FWA+LTE / FIBER+LTE NLOS
Special Arrangement
Photo(s) Statement Details
Site Survey Report
TABLE OF CONTENTS
1. OBJECTIVE
2. SITE INFORMATION
2.1 CLIENT SITE
2.2 MASTER SITE
2.3 LINK PROFILE
4. DEVELOPMENT INFORMATION
4.1 MASTER SITE
4.2 CLIENT SITE
5. PHOTOS
6. ADDIOTIONAL COMMENTS
7. ACCEPTANCE MEMORANDUM
Site Survey Report
1. OBJECTIVE
A site survey was carried out at SH PETALING JAYA SEKSYEN 17. The survey
includes the gathering of information for cabling routes and antenna mounting
together with all other necessary information to ensure a successful wireless
installation.
2. SITE INFORMATION
2.1 Client Site
GPS
No Site Name and Address Distance
Coordinates
LRD: SETO
3.12936,
2 Address: 0.55KM
101.635
Line of Sight
Near Line of Sight
No Line of Sight
3.2 Cabling
3.7 Grounding
TANA
Master Site
SXDD
Client Site
Site Survey Report
4. DEPLOYMENT INFORMATION
4.1 Master Site
5. PHOTOS
5.1 NLOS View
NLOS PHOTO
NLOS PHOTO
6. ADDITIONAL COMMENTS
Site Survey Report
7. BILL OF MATERIALS
Description Master Site Client Site
Wireless Model BREEZEAIR BREEZEAIR
PoE Adapter / PIDU DC POE AC POE
Surge Suppressor / LPU BREEZE GUARD BREEZE GUARD
Outdoor Cat6 Length (m) 20M 25M
Conduit Type (GI/PCV) - GI
Conduit Length (m) - 25M
Fiber No of Core, Length - -
Fiber Type (SM/MM) - -
Fiber Connector Type - -
Rack Size (6U/9U/12U/24U/42U) - 6U
Rack Mount (Wall/Floor) - -
Rack Type (Indoor/Outdoor) - -
Bracket Type, Length Reuse Existing 1m Proposed new 3m
Tower Mounted Wall Mounted
Boom Boom
Power Cable Length 6 6
RJ45 - -
Patch Cord 10M 10M
Grounding Cable (16mm2) 6 6
Grounding Cable Lug (16mm) 15M 15M
Power Cable R/B (2.5mm2) 6 6
DC Breaker 6A - -
Others: 10M 10M
Others: - -
Others: - -
Others: - -
Site Survey Report
8. ACCEPTANCE MEMORANDUM
Description:
To be completed by client’s representative(s) and Telefina Partners in all
applicable fields, to certify that all tests in the form were successfully completed
and the supplied equipment and/or system conform to the contractual
specifications.
CONTRACT
INDENT NO
REGION
STATION
DATE
VERIFIED BY:
COMPANY
NAME: ____________________________________
DESIGNATION: ____________________________________
SIGNATURE: ____________________________________
DATE: ____________________________________
COMPANY
NAME: ____________________________________
DESIGNATION: ____________________________________
SIGNATURE: ____________________________________
DATE: ____________________________________
COMPANY
NAME: ____________________________________
DESIGNATION: ____________________________________
SIGNATURE: ____________________________________
DATE: ____________________________________
COMPANY
NAME: ____________________________________
DESIGNATION: ____________________________________
SIGNATURE: ____________________________________
DATE: ____________________________________