0% found this document useful (0 votes)
23 views

Govt. Schemes Supported For FPOs

The document outlines various schemes run by the Indian government that provide reservations and assistance for farmer producer organizations (FPOs). It lists 9 schemes across different sections that allocate funds, subsidies, loans or other benefits specifically for FPOs to utilize for activities like irrigation, post-harvest management, infrastructure development, and more.

Uploaded by

swastik
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
23 views

Govt. Schemes Supported For FPOs

The document outlines various schemes run by the Indian government that provide reservations and assistance for farmer producer organizations (FPOs). It lists 9 schemes across different sections that allocate funds, subsidies, loans or other benefits specifically for FPOs to utilize for activities like irrigation, post-harvest management, infrastructure development, and more.

Uploaded by

swastik
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 17

Convergence

Opportunities for
FPOs
Reservation made for FPOs under the
existing Schemes of the Departmant.
Ministry Of Agriculture & Farmers
1 Welfare

3
Reservation Made for FPOs under Existing Scheme
# Section Scheme Assistance for FPOs

• Financial Assistance of 140 Crore (BE).


• Physical allocation of 55,000 Ha (under Micro Irrigation) through Cluster & PPP approach
for FPOs.
• Beneficiary contribution stipulated under the scheme would be 55% of the cost of Micro-
Rainfed Farming Per Drop More Crop (PDMC) Irrigation system.
1
System under RKVY • Administrative institutional charges @3% of the cost of the project.
• https://www.myscheme.gov.in/schemes/pmksypdmc

• Overall Financial allocation – Rs 1534.73 Cr for 2023-24


• Targeted allocation for FPOs made under the scheme are decided and approved by the
2 RKVY Division RKVY-DPR Components
SLSC of the State
• https://www.myscheme.gov.in/schemes/rkvy

• Post-harvest management and marketing infrastructure accessible via state-led


schemes. States to decide on activities and provisions in the Annual Action Plan (AAP).
• A minimum of 5% of physical and financial targets in the approved AAP 2023-24 should
Mission on Integrated
be allocated to FPOs.
3 MIDH division Development of
• Assistance will be provided @ 100% of total cost to public sector where estimated cost of
Horticulture (MIDH)
vegetable seed production is Rs. 35,000 per ha for open pollinated crops and Rs. 1.50
lakh per ha for hybrid vegetable seeds.
• https://www.myscheme.gov.in/schemes/midh
Page 4 4 March 2024 Presentation title
Reservation Made for FPOs under Existing Scheme
# Section Scheme Assistance for FPOs

• Financial target grant aid of Rs 14 crore from overall Rs 280 Cr as a subsidy component.
• Physical target storage component- 50,000 MT (4 projects) from 10 Lakh MT.
• Eligibility- Individuals, agripreneurs, farmers, FPOs, cooperatives, and state agencies.
Agricultural Marketing
Marketing FPOs can receive 33.33% subsidy for developing AMI projects.
4 Infrastructure (AMI) sub-scheme
Division • FPOs Beneficiary contribution-
of ISAM
Minimum promoters- 20% of project cost (may vary from 20-50% of the TFO))
Minimum term loan – 50% of project cost (may vary 50-80% of the TFO)
FPOs can availed maximum Rs 50 lakh for storage & Rs 30 Lakh for non-storage
https://www.myscheme.gov.in/schemes/ami
• Rs. 5,000.00 Cr. (5% of the total loan amount of Rs. 1 lakh Crore) is earmarked for FPOs.
Farmer Agriculture Infrastructure Fund • FPOs can access credit guarantee loans up to Rs. 2.0 Cr with an interest subvention of 3%
5
Welfare (AIF) per annum
• https://www.myscheme.gov.in/schemes/aif
• Bamboo Nursery- 100% of cost to Govt. sector and 50% of cost to private sector as credit
linked back ended subsidy
• High density Bamboo plantation- 100% of cost to Govt. sector and 50% of the cost up to 2
6 NBM National Bamboo Mission ha, 20% of the cost for 2 - 4 Ha (up to 10,000 plants) over 3 years (50:30:20).
(NBM) • Additional 10% assistance for NE States.
• https://www.myscheme.gov.in/schemes/nbm
• The marketing infrastructure shall be within the radius of 25 Km from clusters developed
Mission Organic Value Chain and registered under MOVCDNER. Financial assistance restricted to 75% of total financial
7 MOVCDNER Development for North Eastern outlay (TFO) or maximum budget allocation (Rs. 11.25 lakh per unit).
Region (MOVCDNER) • https://asfac.assam.gov.in/portlets/mission-organic-value-chain-development-for-north-
Page 5 4 March 2024 Presentation title east-region TFO – Total Financial Outlay
Reservation Made for FPOs under Existing Scheme
# Section Scheme Assistance for FPOs

• State Government will be supported for setting up of state BHM to FPOs.


National Beekeeping & Honey Mission
• The subsidy approved is 75% in case of FPOs & FPCs, (for NE States 90%)
(NBHM)
• https://www.myscheme.gov.in/schemes/nbhm
• The assistance for RoI states is Rs 40.00 lakh as one time grant and Rs. 40.00 lakhs
for fund of Rs. 20.00 lakh in the 1st year and Rs. 20.00 lakh in the 2nd year to sustain
National Mission For Edible Oil- Palm Oil
the seed garden.
• https://nmeo.dac.gov.in/aboutus.aspx
Schemes
• Federation of farmers into FPOs (500 FPOs allocated for natural farming under
For
8 National Mission on Natural Farming 10,000 FPO scheme) in contiguous clusters of 1000- 2000 Ha.
Special
• https://naturalfarming.dac.gov.in/
FPOs
• Assistance percentage – 50%-75% of the eligible project cost
Integrated Cold Chain and Value
Maximum Grant amount – Rs. 10 Cr. For FPOs
Addition Infrastructure
• https://www.mofpi.gov.in/Schemes/cold-chain
• Assistance percentage – 35%-50% of the eligible project cost
Creation / Expansion of Food Maximum Grant amount – Rs. 5 Cr. For FPOs
Processing & Preservation Capacities • https://www.mofpi.gov.in/Schemes/creation-expansion-food-processing-
preservation-capacities-unit-scheme
• Financial assistance for FPO
o CHC/Hi-Tech Hubs - 24.59 Cr out of 491.75 Cr
o FMB – 6.10 Cr out of 121.92 Cr
Sub Mission on Agriculture
9 M &T o FMB in NER- 1.33 Cr out of 26.62 Cr
Mechanization (SMAM)
• FPOs contribution stipulated under the scheme for CHC/Hi- Tech Hubs- 60%, FMB-
Page 6 4 March 2024 Presentation title
20%, FMB in NER-5%
• https://www.myscheme.gov.in/schemes/smam
2 Ministry of Food Processing
Reservation Made for FPOs under Existing Scheme
# Section Scheme Assistance for FPOs

Credit linked grant @35% for the for micro food processing enterprises
PM Formalisation of Micro •
subject to a maximum of Rs.10 lakh.
Food Processing Enterprises
• One District One Product (ODOP) approach.
Scheme (PM FME Scheme)
• https://pmfme.mofpi.gov.in/pmfme/#/Home

• Subsidy provided @50 % of the cost


Schemes to • Transportation of Eligible Crops from Eligible Production Cluster
Support Operation Green • Hiring of appropriate storage facilities for Eligible Crops (for maximum
10 Processing
period of 3 months)
Units • https://www.mofpi.gov.in/Schemes/about-operation-greens

• Assistance percentage – 50%-75% of the eligible project cost


Integrated Cold Chain and
• Maximum Grant amount – Rs. 10 Cr. For FPOs
Value Addition Infrastructure
• https://www.mofpi.gov.in/Schemes/cold-chain

Assistance percentage – 35%-50% of the eligible project cost


Creation / Expansion of Food •
• Maximum Grant amount – Rs. 5 Cr. For FPOs
Processing & Preservation
• https://www.mofpi.gov.in/Schemes/creation-expansion-food-processing-
Capacities
Page 8 4 March 2024 Presentation title
preservation-capacities-unit-scheme
3 Ministry of Micro & Small Enterprises
# Section Scheme Assistance for FPOs

• Estimated 100 %scheme funding. Ceiling: 10% of the amount of


Schemes For Scheme of Fund for Hard Intervention (HI) or Rs. 25 lakh, whichever is less.
setting -up Regeneration of
11
enterprises Traditional Industries • Hard Interventions (HI) including CFCs, RMBs, training centres, etc.
(SFURTI) Scheme Funding: 90 %
• https://sfurti.msme.gov.in/SFURTI/Home.aspx

Page 10 4 March 2024 Presentation title


Ministry of Fisheries, Animal
4 Husbandry and Dairying Government of
India
Ministry/
# Departmen Section Scheme Assistance for FPOs
t

Ministry of
Fisheries, • Financial support up to a maximum of Rs. 18 lakh/FFPO
Animal or actual, whichever is less.
Schemes to Formation &
Husbandry
12 Support Promotion of Fish
and • Shall be provided for three years from the year of
Fisheries Farmer Producer
Dairying formation.
Governmen Organization https://pmmsy.dof.gov.in/new-download
t of India

Page 12 4 March 2024 Presentation title


APEDA- Agricultural & Processed Food
5 Products Export Development
Authority
# Section Scheme Assistance for FPOs

• APEDA registered Exporters are eligible to apply for assistance under Central
Financial Assistance
Scheme • State government institutions and public sector enterprises are eligible to apply
for assistance.

13 APEDA
• The assistance will be up to 50% of the total cost subject to a ceiling of Rs. 25
Lakh per beneficiary. (FPOs with supply agreement)

(Atmanirbhar Bharat) • The scheme is for new sub-component- For implementation of special activities
to enhance quality of the produce and to meet the SPS requirements of
importing countries
• https://apeda.gov.in/apedawebsite/Announcements/FAS_Guidelines_05102021
.pdf?v=1

Page 14 4 March 2024 Presentation title


6 SPICES Board
# Section Scheme Assistance for FPOs

Infrastructure Development-
• Assistance to exporters for Rapid Food Testing Devices and Kits- 75% of Rapid quality, safety
testing device and kits subject to maximum of Rs.15 lakhs for FPO exporters.
• Assistance for implementation of food safety and quality assurance mechanisms/
certifications- 75% of the cost of certification subject to a maximum of Rs.7.50 lakhs for FPO
exporters
• Adoption of Hi- Tech/Technology Upgradation & Setting up/ upgradation of in-house labs- 75%
of the cost of machinery & accessories subject to a maximum of Rs.1.50 crore for FPO
exporters

Special • Assistance To Exporters For Installing Primary Processing Equipment For Spices- 75% of the
Export Development & cost of equipment & accessories subject to maximum of Rs.15 lakhs for FPO exporters.
14 FPOs for
Promotion for Spices
Spices
Trade Promotion-
• Assistance for exporters for sending business samples abroad- 75% of the courier charges
subject to a maximum of Rs. 2.25 lakhs FPO exporters
• Packaging development, Bar Coding, QR code, EPC / RFID- 75% of the cost as assistance
subject to a maximum of Rs.2.25 lakhs for FPO exporters
• Participation in International fairs/meetings/ seminars/ Trainings- 75 % of the cost of air fare
subject to a maximum of Rs.2.25 lakhs per annum & 75 % of the cost of stall rent, subject to a
maximum of Rs 7.50 lakh per annum as cost of stall rent for FPO exporters
• https://www.indianspices.com/box5_programmes_schemes.html

Page 16 4 March 2024 Presentation title


Thank You!

Page 17 4 March 2024 Presentation title

You might also like