RA For Irrigation Network
RA For Irrigation Network
1. RISK ASSESSMENT
MAIN ACTIVITY: Irrigation Network
POTENTIAL HAZARDS / CONDITIONS CONSIDERED (TICK BOX) PERSONS AT RISK (TICK BOX)
☒EMPLOYEES ☐PUBLIC
☐WORKING FROM HEIGHT ☒ ELECTRICITY ☒ HAND TOOLS ☒MATERIAL HANDLING ☐CONFINED SPACE ☒EXCAVATION/BACK FILLING
☒FALLING MATERIALS ☒ MANUAL HANDLING ☒PEDESTRIAN ☒FATIGUE ☒NOISE & VIBRATION ☒ HAZARDOUS SUBSTANCES ☒SUBCONTRACTORS ☐VISITORS
☒ADEQUATE PPE
☒SAFETY INDUCTION ☒WORK PERMIT ☒PROPER TOOLS / EQUIPMENT ☒SUPERVISION
☐ VENTILATION
☒TOOLBOX TALK ☐TASK LIGHTING ☒TASK SPECIFIC PPE ☒BARRICADES, WARNING SIGN IN THE AFFECTED AREA
☒DUST CONTROL
Resid
ual
Demonstrated
Risk
Potential Risk
Existing Barrier or H/M/
ALARP
Hazard Consequences H/M/L
Job Step Cause Controls Recommended Controls L
With no controls in
Sequence of with
The potential to The harm which place Action By
working Possible causes Describe all existing Describe additional controls that control
cause harm. Health, could possibly s in
activities that will potentially barriers /controls for are required
Injury, Property occur place
release a hazard each hazard
damage,
environment etc. R Yes
S P PR S P
R No
Ensure job-oriented training
to the workforce and
mandatory HSE induction for
Personnel entire crew.
unaware about Enforce the use of Personal
the site condition,
Protective Equipment as per
welfare facilities
requirements of tasks.
and etc.,
Pre start briefing prior to
start the activity.
Never allow personnel to use
Non-Compliance Major and Minor
New Workers Site safety induction any equipment which they
with site PPE injuries.
is conducted prior to are not familiar with and
1. Code. PE/SE/
deploying the workers appropriately trained in its Yes
Mobilization Heat Stress, Heat Sup/FM
Lack of at site. use.
NOCs/Authorities Exhaustion
During summer-worker(s)
Permits Un-acclimatized 4 4 16 4 1 4
should be acclimatized prior
workers
to mobilize in extremely hot
environment.
Ensure all necessary
permits/NOCs are obtained
prior to commence the
work.
Poor storage of
spoil may
increase the
surcharge load on
the side of the
excavation and
access blockage
Obtain necessary work
permits to work next to live
Employees may roads.
get hit by vehicles Maintain a copy of
NOCs/Permits at work
Vehicle Collision locations
or other kind of
Ensure to assign trained
vehicular incident
Minor/Major operatives to control traffic.
Access blockage Injuries Ensure the work area is
Flagman assigned to all
Working next to live properly demarcated at
Lack of traffic Fracture moving vehicles at site SUP/SE/
roads/site vehicular 4 4 16 locations where exist 4 1 4 Yes
access control persons. PE/CM
Property moving vehicle hazards.
Non-Compliance Damage Inform all the interested
with site traffic parties through main
rules contractor before blocking
the access.
Ensure alternative access is
available for emergency
purposes.
Comply site traffic
rules/speed limits strictly.
Direct exposure
to skin. Ensure to use
Ensure the Geo textiles
Respiratory appropriate gloves and
Usage and storage bundles are properly SUP/SE/
Prolonged expose diseases 3 3 9 masks. 3 1 3 Yes
of Geotextile fabric stacked and stored in the PE/CM
to geo textile
dust. Allergic Reaction designated storage area.
Poor Disposal of Skin irritation Ensure proper disposal Keep sufficient number of
waste of waste to main suitable fire extinguishers at
Other contractor waste the storage.
Occupational segregation area. Don’t store the geotextile
diseases
bundles next to the edge of
the trenches.
Always use wedges or
stoppers while stacking geo
textile bundles.
Ensure to have periodical
medical screening for the
users.
and numbness to commencing work each Ensure all task related PPE as
operatives. day. recommended by
manufacturer are effectively
Contact with Before concreting, form
worn by operatives, during
cementitious work approval from
products. power tools usage.
consultant shall be
sought.
Loose Clothing
may lead to
entanglement.
Horseplay/Shortc
uts
Operatives
accessing
underneath area
of suspended
load.
Entrapment of
body parts of
operatives may
lead to crush
injuries
RISK LEVEL
H (HIGH-Potential to cause death, permanent injury or M (MEDIUM – Potential to cause loss time injury or Long Term L (LOW – An injury treatable with First Aid or Short Term Environmental Impact)
Severe Permanent Environmental Harm) Environmental Impact)
SEVERITY (S)
LIKELIHOOD (L) CLASS OF RISK (L X S) RISK MATRIX
Health & Safety Environmental Impact
5 5 10 15 20 25
0 = Impossible 0 = No injury
LIKELIHOOD (L)
Short Term < less than 1 month
4 4 8 12 16 20
1 = Improbable 1 = Minor – (FAC) 0 = No harm HIGH = 15 – 25 3 3 6 9 12 15
2 = Remote 2 = Major - (MTC) 3 = Minor 2 2 4 6 8 10
3 = Probable 3 = LTI (Lost Time Incident) Long Term > Greater than 1 Month MEDIUM = 07 – 14 1 1 2 3 4 5
NOTE: 1. Risk assessment must be addressed to workers by work in charge before starting job.
2. Risk assessment is a continuous process hence to be reviewed depending on activity and risk involved