Contractor: DPR No: Date: Day:: Weather
Contractor: DPR No: Date: Day:: Weather
Weather
Contractor:
Time Morning 9:00 PM Afternoon 1:00 PM Evening 5:00PM
DPR No:
Temp. (°C)
Date: Wind
Day: Precipitation(mm)
Condition
Manpower Indirect
No Total B2 No Total
A Management & Supervision Personnel 1 Store Assistants
1 Country Representative 2 First Aider
2 Construction Manager 3 Electricians
3 Procurement Manager 4 Plumber
4 Contract Manager 5 Office Boy
5 Planning Engineer 6 Others
6 Chief Engineer Total
7 Project Manager
8 Safety Manager
9 Safety Supervisor Construction Equipment & vehicles
10 Quality Controller 1 Survey equipment
11 Rebar Detailer 2 Cutter machine
12 Quantity Surveyor 3 Welding Machines
13 Document Controllers 4 Bar-cutting machines
14 Project Engineer 5 Bar-bending machines
15 Site Engineer 6 Vibrator
16 Surveyor 7 Air Compressor
17 Survey Assistant
18 Others Sub Contractors on Site
Total
Workmen
B1 Direct Day Night Total
Night work up to
1 Foreman
2 Rebar Fabricator Visitors on Site
3 Rebar Mason Major Manpower Heads Allocated in Zone A,B & C
4 Unskilled Rebar Worker Zone Carp+Help+Fomn Fit+Help+Fomn Masn+Hel+Fomr
5 Carpenter A
6 Carpenter Helper C
7 Scaffolder B
8 Others
Manpower Allocation
Workmen Type Nos Location Work Description Remarks
Retail building
Pour -01
Pour-04
Tower- 01
Pour -02
Pour -07
Pour -08
Pour -09
Tower- 02
Pour -03
Pour -05
Pour -06
Project: Civil Work in Ananta Terrace Client: Anata Real State ltd.
Consultant: Ascentis Contractor: China Construction Second Engineering Bureau
4
5
6
7
8
9
10
11
12
Major Quantities
Description UoM BOQ Qty Cumm. up Achieved Cumulative Planned for Remarks
to Today till Date next day
previous
day
1 Concrete Cum
1.1 PCC Cum
1.2 Rebar Fixing Tons
1.3 Rebar Transport Tons
1.4 Shuttering Sqm
Safety Issues
Description Fatal Non-Fatal Quantity Loss
Time
Other Issues
Description Date Completed
Remarks: