Contractor: DPR No: Date: Day:: Weather

Uploaded by

ccsebananta
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
6 views

Contractor: DPR No: Date: Day:: Weather

Uploaded by

ccsebananta
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Project: Civil Work in Ananta Terrace Client: Anata Real State ltd.

Consultant: Ascentis Contractor: China Construction Second Engineering Bureau

Daily Progress Report (DPR)

Weather
Contractor:
Time Morning 9:00 PM Afternoon 1:00 PM Evening 5:00PM
DPR No:
Temp. (°C)
Date: Wind
Day: Precipitation(mm)
Condition

Manpower Indirect
No Total B2 No Total
A Management & Supervision Personnel 1 Store Assistants
1 Country Representative 2 First Aider
2 Construction Manager 3 Electricians
3 Procurement Manager 4 Plumber
4 Contract Manager 5 Office Boy
5 Planning Engineer 6 Others
6 Chief Engineer Total
7 Project Manager
8 Safety Manager
9 Safety Supervisor Construction Equipment & vehicles
10 Quality Controller 1 Survey equipment
11 Rebar Detailer 2 Cutter machine
12 Quantity Surveyor 3 Welding Machines
13 Document Controllers 4 Bar-cutting machines
14 Project Engineer 5 Bar-bending machines
15 Site Engineer 6 Vibrator
16 Surveyor 7 Air Compressor
17 Survey Assistant
18 Others Sub Contractors on Site
Total

Workmen
B1 Direct Day Night Total
Night work up to
1 Foreman
2 Rebar Fabricator Visitors on Site
3 Rebar Mason Major Manpower Heads Allocated in Zone A,B & C
4 Unskilled Rebar Worker Zone Carp+Help+Fomn Fit+Help+Fomn Masn+Hel+Fomr
5 Carpenter A
6 Carpenter Helper C
7 Scaffolder B
8 Others

TOTAL - MANPOWER (A+B1+B2) =

Workmen for Infra= Workmen for Cluster 1=


Project: Civil Work in Ananta Terrace Client: Anata Real State ltd.
Consultant: Ascentis Contractor: China Construction Second Engineering Bureau

Daily Progress Report (DPR)

Manpower Allocation
Workmen Type Nos Location Work Description Remarks
Retail building
Pour -01

Pour-04

Tower- 01
Pour -02

Pour -07

Pour -08

Pour -09

Tower- 02
Pour -03

Pour -05

Pour -06

Project: Civil Work in Ananta Terrace Client: Anata Real State ltd.
Consultant: Ascentis Contractor: China Construction Second Engineering Bureau

Daily Progress Report (DPR)


Work in Progress
Sr.no. Description and Location of Work in Progress Remarks
1
2
3

4
5
6
7
8
9
10
11
12

Major Quantities
Description UoM BOQ Qty Cumm. up Achieved Cumulative Planned for Remarks
to Today till Date next day
previous
day
1 Concrete Cum
1.1 PCC Cum
1.2 Rebar Fixing Tons
1.3 Rebar Transport Tons
1.4 Shuttering Sqm

Safety Issues
Description Fatal Non-Fatal Quantity Loss
Time

Other Issues
Description Date Completed

Remarks:

Name: Signature: Date / Time: