0% found this document useful (0 votes)
34 views1 page

IP-1066 Daily Progress Report No.49

Uploaded by

shinkada
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
34 views1 page

IP-1066 Daily Progress Report No.49

Uploaded by

shinkada
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

DAILY PROGRESS REPORT

AKAKUS OIL OPERATIONS


Project / Work Title New Sewage Treatment Plant
AOO Project / Work Ref. Number EPC-23-02
Location / Field & Equipment Tag Number GOSP-B NC115 - El-Sharara Field
Contractor’s Project / Work Ref. Number IP-1066
Report Number 49
Report Date 18-05-2024
I – MANPOWER AND EQUIPMENT AVAILABILITY
Manpower Equipment
Position / Discipline Number Description Number
Project Supervisor 1 Tool Container 2
Civil Engineer 0 Loader (Bobcat) 1
Mechanical Supervisor 1 Compactor 1
Technician 3 Concrete Mixer 1
Labor 3 Excavator 1
Civil Foreman 1 Loader 1
Car (KIA-MPV) 1
II – Executed Work for today
S/N Description of Works
1 Irrigation Tank final tightening of the bolts, preparation for final inspection
2 The Plant room equipment marking, and position layout activities are in progress
3 Soakaway Pit work is in progress
4
III – Notes / Comments and Important Issues
1
VII – Works / Activities Planned for Next Day
1 Irrigation Tank final tightening of the bolts, preparation for final inspection
2 Plant room’s equipment marking and position layout activities are in progress
3 Soakaway Pit work is in progress
4 Installation of Pop-ups and Bubblers (Irrigation system)
progress Images / Photos

IX – Review / Approval
AKAKUS OIL OPERATIONS ZULAL WATER TECHNOLOGY
Name Name Muhammad Ishtiaq Awan
Date Date 18/05/2024
Signature Signature

Page 1 of 1