Question Bank 2023-24 MCQ On Business Continuity Planning Policy

This document contains a question bank with 20 multiple choice questions related to business continuity planning policy. The questions cover topics like the process-oriented approach of BCP, business impact analysis, RTO, RPO, disaster recovery sites, and testing disaster recovery plans.

Uploaded by

SREEKANTH
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
246 views4 pages

Question Bank 2023-24 MCQ On Business Continuity Planning Policy

This document contains a question bank with 20 multiple choice questions related to business continuity planning policy. The questions cover topics like the process-oriented approach of BCP, business impact analysis, RTO, RPO, disaster recovery sites, and testing disaster recovery plans.

Uploaded by

SREEKANTH
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Question Bank 2023-24

MCQ on Business Continuity Planning Policy

Q.1 Which of the following are the process-oriented approach of BCP :-


A. Business Impact Analysis B. Risk Assessment
C. Risk Management D. All of the above

ANS: D

-------------------------------------------------------------------------------------------------------------------------------------

Q.2 What are the Business Impact Analysis of BCP-


A. Cost to operate the process B. Cost of process downtime
C. A&B D. RPO (Recovery Point Objective)

ANS: C

-------------------------------------------------------------------------------------------------------------------------------------

RTO may vary from zero hour to --- hour, two hours, 3 hours depending
Q.3
upon the readiness of disaster recovery system and the distance of alternate location ?
A. One B. Half
C. A&B D. None of these

ANS: A

-------------------------------------------------------------------------------------------------------------------------------------

Failures involving direct loss of Rs. ---- and above need to be reported incident-wise to the
Q.4
controlling office on their occurrence. ?
A. 20000 B. 10000
C. 25000 D. 50000

ANS: B

-------------------------------------------------------------------------------------------------------------------------------------

Q.5 What is the business impact rating for Direct loss up to Rs. 10,000 ?
A. Insignificant B. Moderate
C. Minor D. Major

ANS: A

-------------------------------------------------------------------------------------------------------------------------------------
Question Bank 2023-24
MCQ on Business Continuity Planning Policy

Q.7 What is the full form of RTO in the context of Disaster Recovery Plan ?
A. Recovery Time Objective B. Road Transport Office
C. Real Time Objective D. Recovery Time Office

ANS: A

-------------------------------------------------------------------------------------------------------------------------------------

Q.8 A Disaster Recovery Site has been established at --- which is in a different seismic zone ?
A. Chennai B. Mumbai
C. Kolkata D. Lucknow

ANS: B

-------------------------------------------------------------------------------------------------------------------------------------

Q.9 When CBS is down, all channels are affected, Impact of customer service is called ---
A. Low B. Medium
C. High D. Very High

ANS: D

-------------------------------------------------------------------------------------------------------------------------------------

The Business Continuity Planning Committee will normally meet once in a --- and as and when
Q.10
exigencies arise?
A. Yearly B. Half Yearly
C. quarter D. Monthly

ANS: C

-------------------------------------------------------------------------------------------------------------------------------------

On an -- basis walk thorough test is conducted and recorded for verification during Zonal
Q.11
Manager visit/Internal and external auditors ?
A. Yearly B. Half Yearly
C. quarter D. Monthly

ANS: A

-------------------------------------------------------------------------------------------------------------------------------------
Question Bank 2023-24
MCQ on Business Continuity Planning Policy

-- is the total downtime that can be afforded which


Q.13
includes the Recovery Time also ?
A. RPM B. MTD
C. RPO D. RTO

ANS: B

-------------------------------------------------------------------------------------------------------------------------------------

Who will depute an auditor who will oversee the DR Drill activities and certify that the drills are
Q.14
conducted as per the plan ?
A. IS Audit Cell B. ITD
C. Drill Cell D. Disaster Recovery Cell

ANS: A

-------------------------------------------------------------------------------------------------------------------------------------

Who is the owner and custodian of Business Continuity Planning & Disaster Recovery
Q.15
Management policy ?
A. General Manager (ITD) B. General Manager (Recovery)
C. General Manager/DH (BOD) D. General Manager (Risk Management)

ANS: C

-------------------------------------------------------------------------------------------------------------------------------------

Q.16 Disaster Recovery Management has --- levels ?


A. 1 B. 2
C. 3 D. 5

ANS: C

-------------------------------------------------------------------------------------------------------------------------------------

The drills being conducted are --- ,DR drills i.e. Drills are conducted by only informing to
Q.17
minimum stakeholders without informing to business team.
A. unplanned B. Planned
C. Both A & B D. None of these

ANS: A

-------------------------------------------------------------------------------------------------------------------------------------

Q.19 What is the full form of RPO in the context of Disaster Recovery Plan ?
A. Recovery Person Officer B. Recovery Point Officer
Question Bank 2023-24
MCQ on Business Continuity Planning Policy

C. Recovery Point Objective D. Recovery Program Officer

ANS: C

-------------------------------------------------------------------------------------------------------------------------------------

Q.20 What is the business impact rating for Direct loss in excess of Rs.1,00,00,000 ?
A. Insignificant B. Massive
C. Major D. None of these