Basic Introduction To Points Pages 8 To 12 of 12
Basic Introduction To Points Pages 8 To 12 of 12
The detector blades are also fixed to the switch rail brackets, these detect the points locked via an
adjustable cam and microswitches housed in the bodies. Another fixed cam on the drive lock slide
also detects the lock arms in the correct position. A pump unit mounted away from the track pumps
hydraulic fluid into the hydraulic actuators via two pipes, one for normal and one for reverse.
Up to 78 separate parts make up one Clamplock plain lead set of points, so not all are listed here.
Also Clamplocks can be fitted to all types of rail and different configurations such as double slips,
switch diamonds etc. for these, many other different parts are needed. The Clamplock handbook
lists all these parts and specifications.
The pump unit available in 50 & 110 volts has a snorkel valve which prevents air entering through
the filler port if the fluid drops dangerously low. It also has a Pilot operated check valve (POCV),
which will not allow fluid to enter one hydraulic actuator without detecting fluid leaving the other
which double checks the points are actually wanting to move.
Various actuators are now available, the new type have coloured bands signifying what they are,
these are as follows:
Standard (red band): Small diameter, self bleeding. Used on Bull-head rail only.
Large diameter (green band): 45% more thrust than above and self-bleeding.
Largest diameter (blue band): 75% more thrust than green band NOT self-bleeding (switch
diamonds only).
Green, blue and blue & red banded actuators MUST not be used on Bull-head type rail.
Mechanical points:
Mechanical points are operated purely by human physical strength via a complex arrangement of
rodding, cranks, compensators, and rollers.
Mechanical points require a lot more care and attention than other more modern sets of points as
there is a vast amount of moving parts.
Any amount of wear in the fittings will almost amount to systematic failure especially during warmer
weather as rodding expands in hot temperatures and contracts again at night when it cools.
The rodding direction is constantly being changed from a push to a pull via cranks and
compensators.
The rodding is set-up originally so that the amount of push equals pull exactly to the nearest mm.
The compensators are positioned exactly where required, so that during hot weather, when the
rodding expands they will open or close and equal the push/pull again so the points will remain in
sync.
Some mechanical points are fitted with a facing point lock (FPL), this physically locks the points
either normal or reverse. A 998 type detector gives the signaller (and the interlocking) a normal or
reverse indication only when the FPL is fully locked.
The lock fender has two notches cut out, these are cut-out by the signalling technician on
installation. It is vitally important that these notches are worked out with precision as they are not
adjustable and if the FPL lock fails the FPL test a new lock fender will have to be cut, bearing in mind
they cost around £300-400!
Page 9 of 12
This is a diagram of a basic mechanical set of points and fittings.
Drive crank; this is the only place Accommodating Crank (A.K.A Half moon crank); used only to
where drive is gained. Adjust sleeve send rodding round bends, non-adjustable. If crank is placed a
to give more or less drive. certain way round it will change direction of rodding.
Under the Signalbox: Vertical Crank; this crank is always under the box and
basically changes the rodding from a vertical to horizontal
direction. The rodding above will connect to the end of the
lever tail.
Accomodating cranks.
Other mechanical points are controlled by a ground frame (GF). These are basically the same as a set
of mechanical points operated by the signalbox, except the levers are outside in a small frame and a
electric release is needed from the signaller or a special key called a Annetts key which unlocks the
points. The points are unlikely to have a FPL or detector box as they are usually for engineering work
or emergencies, are trailing and required to be secured with a clamp for every movement.
Other points:
There are many other types of point operating devices/methods, these are as follows:
M3 & M3a machines; these are very old and are still in use. They are a very heavy machine with a
sump full of oil and have brass contacts to detect normal or reverse.
SGE (HB) machines; these again are old and are still in use. Known as crocodile points because of the
markings on the lid, they too are very heavy. The motor is mounted on the outside and the detection
and motor contacts are mounted in separate compartments. They are extremely slow as they move
a very large crown wheel at just 30 volts.
The SGE (HA) machines actually operates its own facing point lock which goes through a lock fender
similar to a mechanical set of points.
The HPSS (high performance switch system); the UK railways newest points system. This is state-of
the-art technology and is a totally new innovation to previous systems. It uses a motor and torsion
bar to moves the points, and has sensors which detect the switch blade position. It is set-up using a
LCD handheld device.
Page 11 of 12
‘TOPS’ (train operated points); these are basically a hydraulic actuator which holds a set of points in
one position. The train can go over these points in either direction but no more than 15mph. The
points are detected by two 998 detectors and display a yellow (or similar) light to the driver to state
the points are set for him to proceed. There is no indication for the signaller whatsoever.
The train passes over the points in a facing direction without any intervention from the points, but
the returning train now travelling in a trailing direction pushes over the points by force of the
wheels. The whole train passes through the points, and the hydraulic actuator pushes them back for
the next move. The detection circuit also passes through the hydraulic system to check there is
enough pressure to hold the points closed (for facing moves only), this must be above 50 bar to
display the proceed indication.
IBCL (in-bearer Clamplocks); these are virtually the same as normal Clamplocks, except the equipment is
mounted actually in the first sleeper, which is made of metal and is hollow. The fittings do vary considerably.
Air points; these are very old and are operated by air. Inside the point machine there is a ram which
when filled with air depending on which way the points will move extends or retracts and drives the
point blades normal or reverse.
The air pressure is around 50-60 bar and when operated they are extremely fast.
Detection is normally detected in a separate unit with brass contacts.
Points Gauges:
All sets of points that have detection or a facing point lock need gauges to set them up.
Here is a run-down of some of the gauges and what they do. Not all are shown.
3.5mm ‘flat’ gauge; this is used to check all FPL’s to make sure it doesn’t lock with this
inserted between switch blade and stock rail. Also used to check
depth & width of notch on lock fender.
5mm ‘flat’ gauge; shared with the 3.5mm above, it is not normally used anymore in
this format. The gauge is 50mm wide and could be used to check
minimum FWC.
1.5mm ‘finger’ gauge; this is used to check the FPL WILL enter with this inserted between
switch blade and stock rail, to ensure a FPL has a slight lee-way and
will not shave the lock blades.
This is also used on clamplock detection to set the microswitch,
detection made.
5mm ‘U’ gauge; used to set the detection on machine points. Detection broken.
3.5mm ‘U’ gauge; used to set the detection on machine points. Detection made.
2mm ‘finger’ gauge; used to set detection on clamplocks to set microswitch, Detection
breaks.
6/8mm gauge; used to set the detection on additional 998 detectors on adjustable
stretcher configured points.
4mm insulated gauge; used on clamplocks to check distance between lock arm and drive
lock slide, to ensure correct height and will not short circuit the
track circuit if the lock arm touches the drive lock slide.
3mm ‘curved’ gauge (x2); used to check distance of lock arm on clamplocks to drive
lock slides underneath to ensure they are fully locked.
2mm ‘hook’ gauge; used to set detection on clamplocks (placed behind detector blade),
detection made.
Page 12 of 13
4mm ‘hook’ gauge; used to set detection on clamplocks (placed behind detector blade),
detection broken.
Batter gauge; has multiple settings to check the residual switch openings on the
rear stretcher.
The HW contact set-up kit comes with around ten more gauges to set up each individual contact and
also a weigher to weigh each contact.
A hydraulic fluid pressure gauge is also available to check the pressure of a clamplock hydraulic
system.
Switch openings:
Each set of points require a switch opening to be in tolerance, these figures are below:
Clamplock (exc IBCL) plain lead: 105-110mm (measured over the lock arm)
Machine (exc HPSS) operated points: 102-120mm (measured over first Pway bolt)
Machine operated switch diamonds: 102-120mm (measured over first Pway bolt)
FWC measurements:
The FWC is measured over the last rear stretcher. No measurement can be written here as it has to
be worked out individually using a formula.
This formula takes into consideration the track gauge and residual switch opening.
So for instance a set of points is measured for track gauge and it is 1440mm, the points are a vertical
D switch, so nominal FWC is 56mm (taken from TRK1202), adjustment factor does not apply, the
normal RSO is 1.5mm and the nominal track gauge is 1432mm.
So…………
1440mm + 56mm +1.5mm – 1432mm = 65.5mm (this is the required FWC that the stretcher will
have to be fitted to).
If the switch was an ‘F’ switch on vertical rail it would work out at:
1440mm + 67mm + 1.5mm + 2mm (adjustment factor now applies) – 1432mm = 78.5mm
Document NR/TRK/1202 covers all different configurations and measurements required to work out
the required FWC. An incorrect FWC can result in FBC (flange-back contact) where the gap is too
small and the train wheels hit the rear of the switch rail which may result with broken stretchers and
possible derailment.
**This document is for information only. It is NOT to be used for testing or commissioning purposes nor as a training aid. It
does NOT replace Network Rail’s own documents. It is the technician’s own responsibility to make sure they are
appropriately trained before touching or altering signalling equipment. The writer of this document cannot accept
responsibility for any incidents arising whether this document was followed or not.
Written by F.M. Spowart, Retford S&T dept May 2010 Version One.