CJV#1909
300HP Sour
National 300Q
Pump Package
FOR IMMEDIATE SALE
Despite being NEW in 1999, this package has less than 6 years run time on it! How? This Renaissance/BDR
Engineering standard package was installed and ran until 2004. In early 2007 it was sold to another small oil
company who installed new plungers, boxes, and packing along with an auxiliary oil lube pump and ran it for
only 1 year! Look at the clamps on page #10 – hardly used! This site was included in a company sale and the
current owner has not re-activated the site since they took over. Perhaps an unneeded deep-dive into its
history, but just to stress that the star of the show, the National 300Q, is nowhere near reflective of its vintage
and the price will make this be a simple decision for you. As always, any modifications or custom
requirements can be handled by us or can be done by your own crew. We’re here to help where you need us.
FOR IMMEDIATE SALE
CJV#1909
300HP Sour National 300Q Pump Package
Field Ready &/or Minor Repair. The pump itself has run for less
Condition than 6 years in total since new. Crusader can perform an internal
inspection for interested parties
Manufactured Westfab 1999
Pump National Oilwell 300Q-5M
Location West Central, AB
Availability 2-3 weeks
Service Sour – water Injection, 2 1/4" plungers
Piping Carbon Steel 1500 ANSI
Electrical Building fully wired to JB's skid edge
Dimensions 22''9" L x 19'9" W x 13'10"H
Take a 3D walkthrough at https://bit.ly/3mLKUhf
403-263-8040 [email protected]
Pump & Accessories
MAIN PUMP, MOTOR AND EQUIPMENT
Quintuplex Pump:
• Rated for 300HP Continuous Duty
• One (1) NOV 300Q-5M Quintuplex Pump
• Sheave Kit and V-Belt Drive
• Aluminum Bronze (M) Fluid Ends
• Carbon Steel Belt Guard
• Maximum Continuous RPM Rating: 450RPM
• 5 Feed Lubricator w/ 55 Gal Oil Reservoir
• 6" NSD Suction, 3" NSD Discharge Connections
• HYDRIL Discharge Stabilizers
• Motor/pump/drive mounted on subbase
and bolted to main skid
100 RPM 200 RPM 250 RPM 300 RPM 350 RPM 400 RPM
Model Plunger Gal/Rev Max PSI Max kPa m³/d GPM m³/d GPM m³/d GPM m³/d GPM m³/d GPM m³/d GPM
4.0'' 1.36 851 5867 741 136 1483 272 1853 340 2224 408 2595 476 2965 544
3.75'' 1.1953 969 6681 651 120 1303 239 1629 299 1955 359 2281 418 2606 478
National 3.5'' 1.0412 1112 7667 567 104 1135 208 1419 260 1703 312 1986 364 2270 417
300Q-5L 3.25'' 0.8978 1290 8894 489 89.8 979 180 1224 225 1468 269 1713 314 1957 359
3.0'' 0.765 1514 10439 417 76.5 834 153 1042 191 1251 230 1459 268 1668 306
2.75'' 0.6428 1650 11376 350 64.3 701 129 876 161 1051 193 1226 225 1401 257
2.75'' 0.6428 1801 12417 350 64.3 701 129 876 161 1051 193 1226 225 1401 257
National 2.5'' 0.5312 2180 15031 289 53.1 579 106 724 133 869 159 1013 186 1158 213
300Q-5M 2.25'' 0.4303 2691 18554 234 43 469 86.1 587 108 704 129 821 151 938 172
2.0'' 0.34 3000 20684 185 34 371 68 463 85 556 102 649 119 741 136
2.0'' 0.34 3406 23484 185 34 371 68 463 85 556 102 649 119 741 136
National
1.75'' 0.2603 4449 30675 142 26 284 52.1 355 65.1 426 78.1 497 91.1 567 104
300Q-5H
1.5'' 0.1912 5000 34474 104 19.1 208 38.2 261 47.8 313 57.4 365 66.9 417 76.5
Brake HP Required 76 151 188 225 263 300
Quintuplex Pump Drive Motor:
• One (1) TECO Westinghouse 300 HP Electric Motor
• TEFC; 1200RPM
• VFD Rated, Constant torque
• 480/3/60VAC
403-263-8040 [email protected]
Instrumentation & Piping
INSTRUMENTATION
• Pressure Indicators: Suction (0-300 PSI) and Discharge (0-3000 PSI)
• Pressure Transmitters: Rosemount 3051 Suction and Discharge Transmitters
• Pressure Differential Transmitter: Rosemount 3051 Filter Differential Transmitter
• Vibration Switch: Murphy VS2-EX mounted on main pump
• Low Oil Level: Murphy EL150-EX mounted on main pump
• Startup Bypass Valve and controller: Main pump discharge piping
• LEL Gas Detection: Net Safety
• 2" 1500# RF x 2" 300# RF Farris PSV on discharge piped to the skid edge
PIPING
Suction Piping:
• 4” 300# Suction Inlet at skid edge
• 4" 300# inlet/outlet of filter vessel
• Remainder for Suction Piping 4" & 6" to Pump
The current unit's suction piping has been reconfigured to fully bypass fluid around the main pump (possibly the
disposal well was on vacuum). The pipe spools and process valves are all inside the building and can be
reassembled with new gaskets/studs/nuts.
The filter vessel is a 3 bag, P2 basket size rated at 673 PSI@ 200F/-20F, includes AB CRN and is equipped with 4"
300# RF Inlet/Discharge Nozzles. There is room enough to add a second vessel as well.
The unit was originally designed without a charge pump but there is plenty of space to add in either a vertical or
horizontal pump/motor assembly and tie it in with the overall system.
Drain Piping
• All process piping drains go to sealed sump via threaded drain piping
• Filter drain piping currently in place (absent of filters)
• Pump stuffing boxes drain into open sump
403-263-8040 [email protected]
Piping, Building & Electrical
Discharge Piping:
• Discharge line exits the plunger pump into a 2” 1500 ANSI rated line. The discharge stabilizer is located directly
after the plunger pump discharge.
• The PSV and automated startup bypass valve are located on a 2" pipe teed off of the main discharge line
before the flow meter. There is a block and check valve prior to connecting to the discharge header
• After the meter run a 3” check and a ball valve are included before leaving to skid edge.
• Drain valves to drain sump
• All supports are mounted on structural skid members
• All supports are secured by clamp style tie-downs
The discharge piping is missing the turbine flow meter and totalizer, but the flanges and reduced piping size
spools are all there for assembly. The main discharge ball valve and check valves are inside the building.
SKID BUILDING
• 19' 9" W x 22' 9’ L Skid and Building • Gable Style Building
• ¼” Checker Plate Flooring • 19' 9" W x 22' 9’ L x 9' EH
• W12 WF Main Structural & Crossmembers • Two (2) 12” x 12” Louvers w/ closers
• 4 lifting lugs • Three (3) 36" x 36" Windows w/
• 3” Spray Foam Under skid Insulation sliders/screens
• Drain sump in floor piped to skid edge w/2" MNPT • Two (2) Single Man Door
• 7' x 7' Rollup door
ELECTRICAL
• Two (2) Interior Lights w/ Switches
• Two (2) Exterior Lights w/ Switches
• Two (2) Exhaust Fans w/ switches/thermostats
• Two HOA switches
• One (1) 120V Electrical Receptacle
• Two (2) ESD Buttons Exterior/Interior
• LEL Gas Detection
• One (1) 25 kw Ruffneck XP heaters w/ wall thermostat
• 1 HP motor and PC pump for Sump Draining
403-263-8040 [email protected]
Electrical
END DEVICES CONNECTED TO JB’S
Descretes/Analog Junction box
• Two (2) pressure transmitters Suction/Discharge
• One (1) differential pressure transmitter
• One (1) vibration switch
• One (1) low oil level switch
• One (1) sump level switch
• Included: Rigid aluminum conduit and steel unistrut used throughout
• Lamicoids for all switches, junction box’s, and ESD’s
• Startup Bypass choke/control
• LEL Gas Detection
120 VAC Junction Box
• Two (2) Interior Lights w/ Switch es
• Two (2) Exterior Lights w/ Switches
• Two (2) Exhaust Fans w/ switches
• One (1) 120V Electrical Receptacle
• Two (2) HOA Switches
• Two (2) ESD Buttons External/Internal
480 VAC Junction Box
• Main drive motor
• Ruffneck Heater
• Sump pump
403-263-8040 [email protected]
403-263-8040 [email protected]
403-263-8040 [email protected]
403-263-8040 [email protected]
Does this look like a highly used pump!?! Paint is still on the clamps.
403-263-8040 [email protected]
403-263-8040 [email protected]
Take a 3D walkthrough at https://bit.ly/3mLKUhf
403-263-8040 [email protected]