Cal Pipe Staging
Cal Pipe Staging
2 kN/m Unfactored
2m
x x
Dia = 326 mm
Es = 170000 Mpa
Axx = 7207.4304 mm2
Ixx = 91611197.29 mm4
Iyy = 91611197.29 mm4
Zxx = 562031.8852 mm3
Zyy = 562031.8852 mm3
Ybar = 163 mm
Xbar = 163 mm
Wu = 3 kN/m
Mu = 1.5 kN-m
Zxx req = 6.6 cm3
Zxx prov = 562.0 cm3 Hence safe in Bending
a 1.3
1.6 3 Kn
b c
δ +
0 +