HSE-20 Loading Unloading of Pipe Inspection Checklist For
HSE-20 Loading Unloading of Pipe Inspection Checklist For
KPTL/HSE/F-0020
LOADING UNLOADING OF PIPE INSPECTION CHECKLIST
Rev.0
Hazard identification and Risk assessment (HIRA) is carried out and records
1.
available at site for daily review
2. All probable hazards are identified and all control measures are implemented
Banks man wearing high visibility vest appointed for signalling the crane
9.
operator
Are loading/unloading activities carried out on ground that is flat, firm and free
11.
from potholes?
Ensure that the trailer operator is not present inside his cabin when pipes are
14.
unloaded for the trailer
Are webbing belts used for lifting of appropriately load baring capacity and
15.
protected from contact with any sharp edges
16. Are the load, trailer, lifting crane and equipment matching the load capacity
Page 1 of 2
Laying & Construction of Steel Gas Pipeline And
Terminals For North East Gas Grid (NEGG)
Pipeline Project Section-1 Part A & B
KPTL/HSE/F-0020
LOADING UNLOADING OF PIPE INSPECTION CHECKLIST
Rev.0
All riggers provided with protective hand glove to prevent injury while
19.
handling wire rope and slings
Ensure that the crane or hoist is positioned directly over the load to prevent
20.
the load from swinging as it clears the floor or ground
Are there any obstruction around the loading unloading area i.e. OHE line,
22.
live facility, heavy traffic movement, parked vehicle etc.
Is the length of the trailer sufficient to carry the entire length and width of the
23.
pipe stack
Are there any dimensions of the loaded pipe protruding beyond the trailer
24.
length
REMARK/CONCLUSION
Page 2 of 2