The document provides a checklist for inspecting loading and unloading of pipes during a pipeline construction project. It lists 26 items to check including conducting risk assessments, using proper lifting equipment and rigging, using protective equipment, ensuring safe loading and unloading areas, and complying with transportation requirements for oversized cargo.

Uploaded by

R Sahadeo Reddy
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
173 views

HSE-20 Loading Unloading of Pipe Inspection Checklist For

The document provides a checklist for inspecting loading and unloading of pipes during a pipeline construction project. It lists 26 items to check including conducting risk assessments, using proper lifting equipment and rigging, using protective equipment, ensuring safe loading and unloading areas, and complying with transportation requirements for oversized cargo.

Uploaded by

R Sahadeo Reddy
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Laying & Construction of Steel Gas Pipeline And

Terminals For North East Gas Grid (NEGG)


Pipeline Project Section-1 Part A & B

KPTL/HSE/F-0020
LOADING UNLOADING OF PIPE INSPECTION CHECKLIST
Rev.0

INSPECTED BY: __________________________________________________________ DATE: __________________

SPREAD / LOCATION: ______________________________________________________________________________

SR.NO ITEMS INSPECTED YES NO N/A REMARK

Hazard identification and Risk assessment (HIRA) is carried out and records
1.
available at site for daily review

2. All probable hazards are identified and all control measures are implemented

3. Tool Box Talk (TBT) is conducted daily

4. Emergency Rescue plan available at site and understood by all

5. Vehicle Crane/Side Boom/Hydra thoroughly inspection and checklist filled

6. Do trailer/crane operator have suitable and valid license

Lifting / Rigging plan is in place and communicated to all persons involved in


7.
the activity

Inspection certificates of lifting tackles (slings, ropes) and machines are


8.
examined and tested, statutory records available for verification

Banks man wearing high visibility vest appointed for signalling the crane
9.
operator

Are loading/unloading operations carried out in an area away from passing


10.
traffic, pedestrians and others not involved in the loading/unloading operation

Are loading/unloading activities carried out on ground that is flat, firm and free
11.
from potholes?

Are parking brakes always used on trailers to prevent unwanted movement


12.
while the load is mounted or lifted from trailer bed

Safety features in trailer including head board, sufficient no. of lashing,


13. adequate capacity & condition of lashing belts, warning lights & alarm,
wooden stoppers and wedges available

Ensure that the trailer operator is not present inside his cabin when pipes are
14.
unloaded for the trailer

Are webbing belts used for lifting of appropriately load baring capacity and
15.
protected from contact with any sharp edges

16. Are the load, trailer, lifting crane and equipment matching the load capacity

Page 1 of 2
Laying & Construction of Steel Gas Pipeline And
Terminals For North East Gas Grid (NEGG)
Pipeline Project Section-1 Part A & B

KPTL/HSE/F-0020
LOADING UNLOADING OF PIPE INSPECTION CHECKLIST
Rev.0

Competent riggers under the guidance of rigging foreman employed to


17.
carryout rigging activity

Proper PPEs (Safety Helmets, Hand gloves, earplug, safety goggles,


18.
respiratory protection) are used

All riggers provided with protective hand glove to prevent injury while
19.
handling wire rope and slings

Ensure that the crane or hoist is positioned directly over the load to prevent
20.
the load from swinging as it clears the floor or ground

Loading unloading area barricaded with warning tape to avoid unauthorised


21.
person form entering inside the lifting zone at inhabited area

Are there any obstruction around the loading unloading area i.e. OHE line,
22.
live facility, heavy traffic movement, parked vehicle etc.

Is the length of the trailer sufficient to carry the entire length and width of the
23.
pipe stack

Are there any dimensions of the loaded pipe protruding beyond the trailer
24.
length

Necessary permission and compliance as required by the road traffic


25.
authority acquired for transportation of ODC (Over dimension cargo)

Safety arrangements including escort vehicles, horns and flash lights,


26.
adequate warning lights across the perimeter of the load done