SPRY Basic Modul 2 - Pit Scenario

The document describes the processes, equipment, dependencies, and constraints involved in simulating a pit scenario using modular software. It outlines setting the scenario, reserving sample areas, equipment specifications, mining processes, source paths to direct equipment, dependency relationships, and constraints to direct equipment movement. Animation of the scheduling and adjustment of animation speed are also mentioned.

Uploaded by

Buha Mangerbang
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views

SPRY Basic Modul 2 - Pit Scenario

The document describes the processes, equipment, dependencies, and constraints involved in simulating a pit scenario using modular software. It outlines setting the scenario, reserving sample areas, equipment specifications, mining processes, source paths to direct equipment, dependency relationships, and constraints to direct equipment movement. Animation of the scheduling and adjustment of animation speed are also mentioned.

Uploaded by

Buha Mangerbang
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 10

PIT SCENARIO MODUL SPRY - BASIC

A. MODUL SPRY – SCENARIO SETTING


1. General

Simulations : Source Scheduling (Pit Sched)


Data : Source Table PIT ; Calender Table
Scheduling : Start Date ; End Date

P a g e 1 | 10
PIT SCENARIO MODUL SPRY - BASIC

B. MODUL SPRY – SCENARIO PROCESSES

1. Reserve Sample Polygon / Solid

Process
Productive :
a) Waste : Volume Source Quantity ; Waste Solid ; Waste Floor Centroid
b) Coal : Volume Source Quantity ; Coal Solid ; Coal Floor Centroid
Non Productive : Delay Time

P a g e 2 | 10
PIT SCENARIO MODUL SPRY - BASIC

C. MODUL SPRY – SCENARIO EQUIPMENT

1. Equipment Set

Specifications :
Image at Source : Image for Equipment
Inactive Process : Nonproductive
Delays : Delay time Equipment Set.
Availability : PA Equipment
Utilisation : UA Equipment (EWH)
Equipment Count : Quantity Equipment
Priority : Priority Equipment

P a g e 3 | 10
PIT SCENARIO MODUL SPRY - BASIC

2. Processes

Processes
Equipment Mining Material
Source Quantity Field = Database Volume pada Scenario Set.
Hourly Rate = Productivity Equipment.

P a g e 4 | 10
PIT SCENARIO MODUL SPRY - BASIC

3. Source Path

Source Path
Dilakukan untuk mengarahkan Equipment pada pembuatan Sequence.

Node = Mengatur arah penambang equipment secara manual berdasarkan block, strip, bench,
material, seam.
Process = Mengatur mining material untuk Equipment.
Order = Mengatur arah penambangan dengan mining material.
Date/Time Delay = Mengatur delay time alat (kedatangan alat, dll).
In/Not Range = Mengatur area penambangan equipment.
Allow Advance = Mengatur equipment sesuai/tidak sesuai arah penambangan.
Ignore Constraints = Mengatur equipment sesuai/tidak sesuai dengan hambatan/batasan yang ada.
Ignore Dependencies = Mengatur equipment sesuai/tidak sesuai dengan arah penambangan.

P a g e 5 | 10
PIT SCENARIO MODUL SPRY - BASIC

D. MODUL SPRY – SCENARIO DEPENDENCIES

1. Dependencies

P a g e 6 | 10
PIT SCENARIO MODUL SPRY - BASIC

Dependencies (Arah Penambangan)


Dilakukan untuk mengarahkan Equipment pada penambangan.

Range Depend. = Mengatur arah penambang equipment secara manual berdasarkan block, strip, bench,
material, seam.
Process Order Depend. = Mengatur mining material untuk Equipment (Topsoil – Overburden – Coal).
Sequence Depend. = Mengatur konseptual penambangan (PIT – Block – Strip – Maaterial – Bench – Seam).
Offset Depend. = Mengatur equipment dalam arah penambangan.

P a g e 7 | 10
PIT SCENARIO MODUL SPRY - BASIC

E. MODUL SPRY – SCENARIO CONSTRAINTS

1. Constraint

P a g e 8 | 10
PIT SCENARIO MODUL SPRY - BASIC

Constraints (Hambatan/Batasan Penambangan)


Dilakukan untuk mengarahkan Equipment pada penambangan.

Capacity = Mengatur capacity hasil scheduling (Cap. Maximal).


Proximity = Mengatur fleet setting per-block/strip/bench/material/seam.
Time = Mengatur waktu kerja equipment pada suatu area kerja (Range).

P a g e 9 | 10
PIT SCENARIO MODUL SPRY - BASIC

F. MODUL SPRY – ANIMATION

1. Animation Scheduling

2. Adjustment Speed Animation

P a g e 10 | 10