Large-Scale PV Plant Project Operation
Large-Scale PV Plant Project Operation
Security Level:
Learning Objectives
4 Expanding weapons
Business Model Core of Large PV Power Plant: Low LCOE
The business model of PV power plants is to sell electricity to power companies.
The owners of PV power plants reduce electricity consumption costs and increase profits.
LCOE
Electricity Cost
Cumulative energy generation
over life cycle
4 Huawei Confidential
Solution Overview of Large-Scale PV Power Plants
high efficiency power generation Intelligent O&M Secure and reliable Grid friendly
Current "Intelligent Machine" Era: Power Conversion + Full Digitalization, Intelligentization, and Automation
AI Boost Kit
intelligent subarray
controller
SACU2000D
` MBUS
MBUS
Component and tracking bracket intelligent photovoltaic controller box transformer booster station Power grid
Huawei Confidential
Content
4 Expanding weapons
6 Huawei Confidential
Large-scale power plant project involves many parties, and key customers
need to be identified.
Direct
Owner: project investor, bid EPC, and EPC: responsible for
Customer
some owners independently procurement, design, and
purchase key equipment construction of project
equipment
7 Huawei Confidential
Different customers have different requirements
Under the background of continuous low electricity prices, reduce the electricity cost LCOE and require
high ROI.
Owner/Developer Reduced O&M costs and manpower investment, requiring unattended remote O&M
The distance between power stations is long, requiring high inverter availability and quick fault recovery.
Short time for grid-coming project and short construction period
Electric Power
Mature technology and friendly power grid
Company
8 Huawei Confidential
Content
4 Expanding weapons
9 Huawei Confidential
Why do we need to operate the project?
The project analysis meeting shall be held in time
when the following situations occur during project
Improve the standard operation level.
operation:
Unify standards and regulations, improve When the project encounters obstacles and
the overall project operation level and quality, progress is set back
and strengthen project control.
When the plan cannot be completed on time
11 Huawei Confidential
Key points throughout the operation process
Insist on the implementation of the "three axes" and transfer the value to the CEO.
Value Transfer of the Cloud-pipe-terminal Overall Solution -
Efficient power generation, intelligent operation and maintenance, safe, reliable, safe, and reliable,
pass and friendly power grid
Cooperate with the industry chain to build ecological cooperation and form an overall solution.
Global delivery platform
Delivery
12 Huawei Confidential
Difficulties in the Operation Process
clarifying discriminating
Customer relationship Valid Information
boosting
Understand the customer
Key customer
Responding to requirements
relationships
13 Huawei Confidential
Key point 1: Clarified the customer's decision-making chain and obtain
more customer support.
Chairman of the
A: Approver
Confirm the customer's decision-making chain and Board
D: decision maker
power map, implement different expansion S: decision supporter
solutions based on different influences, and win E: Evaluator
support at different levels. CEO I: affects
Project
Technical Director Power Plant Sales Procurement
Development
Director Director
Director
14 Huawei Confidential
Key point 2: KR improvement and the final decision maker
EDXX in Brazil
200 MW project
EDXX visits Brazil AES Boa Hora power EDXX visits Huawei HQ and Three rounds of workshops in Sao Paulo to Intersolar SA Second High-level talks in Madrid, four rounds
station, Brazil's first clustered ground talks with XX president discuss the technology development and High Level Meeting
of workshops, and in-depth technical
power station trend of the PV market, and the advantages of details clarification
Huawei's solution. Winning
bid
February 2019 April to July 2019 August 2019 September to November
March 2019 2019
15 Huawei Confidential
Key point 3: Project progress tracking and information validity identification
Manage all roles involved in the project by customer group, role For cross-region projects, information channels are extensive.
group, and ecosystem in a matrix. Independent information sources need to be expanded and
the obtained information needs to be identified.
CustomerA component
A
ecological group
Customer segment
Owners
Role Group B C
EPC TA D Independent information source
16 Huawei Confidential
Key point 4: Understand, communicate, and respond to customer requirements and
help customers continuously optimize solutions.
Customers have different requirements in different phases of project operation. Therefore, they need to
continuously understand, communicate, and respond to customer requirements.
•Help customers optimize •Help customers optimize •Assist customer optimize the
CAPEX/Electricity generation/OPEX supply and grid-connected Problem of Unqualified
issues. Generation and High Failure
Rate
组串式
POC AC voltage
箱变
Output current of
other string inverter
4 Expanding weapons
18 Huawei Confidential
Expanding Weapons
POC test
Standard
guidance
Comparison
demo site
Marketing
communication
TA report
19 Huawei Confidential
1. Expanding weapon: Guide customers to perform POC tests
Use POC to fight fakes and shield low- Establish the admission mechanism for key
priced competitors. customers and increase the admission threshold.
No. Item Standard to follow
1 Efficiency Test EN50530
Independent third-party
2 Power quality test VDE4120
XXXX test organization No standard, based
3 Output capacity
on the self-declared POC guidance and
Key Weakness Competitors
PQ curve at selection of third-
Transfer shield and
4 different AC VDE4120 party test
ferment
voltage organizations
XX 110KTL XX 250KTL No standard, based
test test 5 SCR on actual
application
6 LVRT VDE4120
7 HVRT VDE4120
8 EMC IEC61000
20 Huawei Confidential
2. Expanding Weapon: Build a Competition Showcase
Select sites for competition and Collect the energy yield data Obtain onsite project confirmation
Provide site training and
obtain the customer's confirmation through the electricity meter. emails or letters and transfer them to
enablement and maintain good
to ensure project delivery. The energy yield advantage in the customer's decision-making
communication with the
this case is over 4%. layer in time.
customer's site team.
21 Huawei Confidential
3. Expanding Weapon: Technical Advisor (TA) Report
3 Advanced Yield Report (Project: Labrit) KiloWattsol France Higher energy yield Lower OPEX
22 Huawei Confidential
4. Expanding Weapon: Standard Guidance, Establishing Industry Thresholds
Guide our value features into industry standards, establish industry entry thresholds, and promote the technical development of the industry.
Frontline marketing is the front line of standard work. It is necessary to have a keen insight, understand local standards, get into the local
standards and guide them early, gain the standard commanding points, and develop projects under the protection of standards.
Region Key point Progress
ANTI-PID IEC 62548: Demonstrate Huawei's ANTI-PID solution and proposal at the IEC TC82 meeting.
Global
(Anti-RSD) IEC 63257: Collect RSD standards to prevent competitors' patent risks.
Communicated with the REE of the Spanish power grid to find the decision makers of key criteria for pilot implantation.
Spain (Acting) grid friendly
Plan to influence PO12.2. 1. Reactive. 2. Simulation; 3. SCR.
India (Accounting) grid friendly MNRE: Huawei has submitted the first round of comments on the change of India grid standards.
National Standard Fire Protection and Electrical Protection Requirements for Photovoltaic Power Generation Systems: 2019/11
Approved and Waiting for Release
National Standard Photovoltaic System Integration: Outline Submitted
distributed security Technical Specification for Integrated Intelligent System and O&M of Photoelectric Buildings: Draft for Comments has been
feedback
China
Landmark "Technical Standard for Application of Solar Photovoltaic Power Generation in Shanghai Engineering Construction
Specification": Request for Comments Draft Feedback
GB/T 37408 Technical Requirements for Grid-connected Inverters for Photovoltaic Power Generation: Released 2019
(Acting) Grid Friendly Technical Requirements for Impedance Characteristics of Wind Farms and Photovoltaic Power Plants: 2019 Approved
23 Huawei Confidential
5. Expanding Weapon: Marketing Communication
Media and Analysts Social media Web site
24 Huawei Confidential 24
Course Summary
Takeaways
1 LCOEIt is the most important core of the success of PV projects.
5 Key customer relationship improvement, three measures reach the final decision-maker
25 Huawei Confidential