CS605 Highlighted Handouts by Masters

Uploaded by

Faisal Maqsood
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
46 views

CS605 Highlighted Handouts by Masters

Uploaded by

Faisal Maqsood
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 85

CS605

Software Engineering-II
CS605 Software Engineering-II VU

Table of Content
Table of Content...................................................................................................................2
Lecture No. 1........................................................................................................................4
Lecture No. 2......................................................................................................................12
Lecture No. 3......................................................................................................................14
Lecture No. 4......................................................................................................................18
Lecture No. 5......................................................................................................................23
Lecture No. 6......................................................................................................................27
Lecture No. 7......................................................................................................................32
Lecture No. 8......................................................................................................................35
Lecture No. 9.....................................................................................................................37
Lecture No. 10....................................................................................................................41
Lecture No. 11....................................................................................................................46
Lecture No. 12....................................................................................................................65
Measures, Metrics and Indicators...................................................................................... 65
Metrics for software quality...............................................................................................66
Lecture No. 13....................................................................................................................67
Lecture No. 14....................................................................................................................71
Baseline..............................................................................................................................72
Metrics for small organizations..........................................................................................72
Lecture No. 15....................................................................................................................75
Lecture No. 16....................................................................................................................78
Lecture No. 17....................................................................................................................80
Lecture No. 18....................................................................................................................84
Lecture No. 19....................................................................................................................85
Lecture No. 20....................................................................................................................88
Lecture No. 21....................................................................................................................92
Lecture No. 22....................................................................................................................95
Lecture No. 23....................................................................................................................99
Lecture No. 24..................................................................................................................100
Lecture No. 25..................................................................................................................102
Lecture No. 26..................................................................................................................104
Lecture No. 27..................................................................................................................106
Lecture No. 28..................................................................................................................109
Lecture No. 29..................................................................................................................112
Lecture No. 30..................................................................................................................114
Lecture No. 31..................................................................................................................117
Lecture No. 32..................................................................................................................118
Lecture No. 33..................................................................................................................119
Lecture No. 34..................................................................................................................122
Release Numbering..........................................................................................................122
Internal Release Numbering.............................................................................................122
Lecture No. 35..................................................................................................................124
Lecture No. 36..................................................................................................................127
Lecture No. 37..................................................................................................................132
Lecture No. 38..................................................................................................................134
Lecture No. 39..................................................................................................................137
Lecture No. 40..................................................................................................................140

© Copy Right Virtual University of Pakistan 2


CS605 Software Engineering-II VU

Lecture No. 41..................................................................................................................141


Lecture No. 42..................................................................................................................142
Lecture No. 43..................................................................................................................153
Lecture No. 44..................................................................................................................168
Lecture No. 45..................................................................................................................172

© Copy Right Virtual University of Pakistan 3


CS605 Software Engineering-II VU

Lecture No. 1
Introduction to Software Engineering
This course is a continuation of the first course on Software Engineering. In order to set
the context of our discussion, let us first look at some of the definitions of software
engineering.

Software Engineering is the set of processes and tools to develop software. Software
Engineering is the combination of all the tools, techniques, and processes that used in
software production. Therefore Software Engineering encompasses all those things that
are used in software production like:

• Programming Language
• Programming Language Design
• Software Design Techniques
• Tools
• Testing
• Maintenance
• Development etc.

So all those thing that are related to software are also related to software engineering.

Some of you might have thought that how programming language design could be related
to software engineering. If you look more closely at the software engineering definitions
described above then you will definitely see that software engineering is related to all
those things that are helpful in software development. So is the case with programming
language design. Programming language design is one of the major successes in last fifty
years. The design of Ada language was considered as the considerable effort in software
engineering.
MCQ
These days object-oriented programming is widely being used. If programming languages
will not support object-orientation then it will be very difficult to implement object-
oriented design using object-oriented principles. All these efforts made the basis of
software engineering.

Well-Engineered Software

Let’s talk something about what is well-engineered software. Well-engineered software is


one that has the following characteristics.

• It is reliable
• It has good user-interface
• It has acceptable performance
• It is of good quality
• It is cost-effective

© Copy Right Virtual University of Pakistan 4


CS605 Software Engineering-II VU

Every company can build software with unlimited resources but well-engineered software
is one that conforms to all characteristics listed above.
MCQ
Software has very close relationship with economics. When ever we talk about
engineering systems we always first analyze whether this is economically feasible or not.
Therefore you have to engineer all the activities of software development while keeping
its economical feasibility intact.
MCQ
The major challenges for a software engineer is that he has to build software within
limited time and budget in a cost-effective way and with good quality

Therefore well-engineered software has the following characteristics.

• Provides the required functionality


• Maintainable
• Reliable
• Efficient
• User-friendly
• Cost-effective

But most of the times software engineers ends up in conflict among all these goals. It is
also a big challenge for a software engineer to resolve all these conflicts.

The Balancing Act!

Software Engineering is actually the balancing act. You have to balance many things like
cost, user friendliness, Efficiency, Reliability etc. You have to analyze which one is the
more important feature for your software is it reliability, efficiency, user friendliness or
something else. There is always a trade-off among all these requirements of software. It
may be the case that if you try to make it more user-friendly then the efficiency may
suffer. And if you try to make it more cost-effective then reliability may suffer. Therefore
there is always a trade-off between these characteristics of software.

These requirements may be conflicting. For example, there may be tension among the
following:

• Cost vs. Efficiency


• Cost vs. Reliability
• Efficiency vs. User-interface

A
Software Engineer is required to analyze these conflicting entities and tries to strike a
balance.

Challenge is to balance these requirements.

Software Engineers always confront with the challenge to make a good balance of all
these tings depending on the requirements of the particular software system at hand. He

© Copy Right Virtual University of Pakistan 5


CS605 Software Engineering-II VU

should analyze how much weight should all these things get such that it will have
acceptable quality, acceptable performance and will have acceptable user-interface.

In some software the efficiency is more important and desirable. For example if we talk
about a cruise missile or a nuclear reactor controller that are droved by the software
systems then performance and reliability is far more important than the cost-effectiveness
and user-friendliness. In these cases if your software does not react within a certain
amount of time then it may result in the disaster like Chernobyl accident.

Therefore software development is a process of balancing among different characteristics


of software described in the previous section. And it is an art to come up with such a good
balance and that art can be learned from experience.

Law of diminishing returns

In order to understand this concept lets take a look at an example. Most of you have
noticed that if you dissolve sugar in a glass of water then the sweetness of water will
increase gradually. But at a certain level of saturation no more sugar will dissolved into
water. Therefore at that point of saturation the sweetness of water will not increase even if
you add more sugar into it.

The law of diminishing act describes the same phenomenon. Similar is the case with
software engineering. Whenever you perform any task like improving the efficiency of
the system, try to improve its quality or user friendliness then all these things involves an
element of cost. If the quality of your system is not acceptable then with the investment of
little money it could be improved to a higher degree. But after reaching at a certain level
of quality the return on investment on the system’s quality will become reduced. Meaning
that the return on investment on quality of software will be less than the effort or money
we invest. Therefore, in most of the cases, after reaching at a reasonable level of quality
we do not try to improve the quality of software any further. This phenomenon is shown
in the figure below.
cost

benefit

Software Background

© Copy Right Virtual University of Pakistan 6


CS605 Software Engineering-II VU

Caper Jones a renounced practitioner and researcher in the filed of Software Engineering,
had made immense research in software team productivity, software quality, software
cost factors and other fields relate to software engineering. He made a company named
MCQ Software Productivity Research in which they analyzed many projects and published the
results in the form of books. Let’s look at the summary of these results.

MCQ He divided software related activities into about twenty-five different categories listed in
the table below. They have analyzed around 10000 software projects to come up with
such a categorization. But here to cut down the discussion we will only describe nine of
them that are listed below.

• Project Management
• Requirement Engineering
• Design
• Coding
• Testing
• Software Quality Assurance
• Software Configuration Management
• Software Integration and
• Rest of the activities

One thing to note here is that you cannot say that anyone of these activities is dominant
among others in terms of effort putted into it. Here the point that we want to emphasize is
that, though coding is very important but it is not more than 13-14% of the whole effort of
software development. MCQ
MCQFred Brook is a renowned software engineer; he wrote a great book related to software
engineering named “A Mythical Man Month”. He combined all his articles in this book.
Here we will discuss one of his articles named “No Silver Bullet” which he included in
the book.

An excerpt from “No Silver Bullet” – Fred Brooks


Of all the monsters that fill the nightmares of our folklore, none terrify more than
werewolves, because they transform unexpectedly from the familiar into horrors.
For these we seek bullets of silver that can magically lay them to rest. The
familiar software project has something of this character (at least as seen by the
non-technical manager), usually innocent and straight forward, but capable of
becoming a monster of missed schedules, blown budgets, and flawed projects. So
we hear desperate cries for a silver bullet, something to make software costs drop
as rapidly as computer hardware costs do. Scepticism is not pessimism, however.
Although we see no startling breakthroughs, and indeed, such to be inconsistent
with the nature of the software, many encouraging innovations are under way. A
disciplined, consistent effort to develop, propagate and exploit them should
indeed yield an order of magnitude improvement. There is no royal road, but
there is a road. The first step towards the management of disease was
replacement of demon theories and humours theories by the germ theory. The
very first step, the beginning of hope, in itself dashed all hopes of magical
solutions. It told workers that progress would be made stepwise, at great effort,

© Copy Right Virtual University of Pakistan 7


CS605 Software Engineering-II VU

and that a persistent, unremitting care would have to be paid to a discipline of


cleanliness. So it is with software engineering today.

So, according to Fred Brook, in the eye of an unsophisticated manager software is like a
giant. Sometimes it reveals as an unscheduled delay and sometimes it shows up in the
form of cost overrun. To kill this giant the managers look for magical solutions. But
unfortunately magic is not a reality. We do not have any magic to defeat this giant. There
is only one solution and that is to follow a disciplined approach to build software. We can
defeat the giant named software by using disciplined and engineered approach towards
software development.

Therefore, Software Engineering is nothing but a disciplined and systematic approach to


software development.

Now we will look at some of the activities involved in the course of software
development. The activities involved in software development can broadly be divided
into two major categories first is construction and second is management.
Software Development

The construction activities are those that are directly related to the construction or
development of the software. While the management activities are those that complement
the process of construction in order to perform construction activities smoothly and
effectively. A greater detail of the activities involved in the construction and management
categories is presented below.
Construction

The construction activities are those that directly related to the development of software,
e.g. gathering the requirements of the software, develop design, implement and test the
software etc. Some of the major construction activities are listed below.

• Requirement Gathering
• Design Development
• Coding
• Testing

Management

Management activities are kind of umbrella activities that are used to smoothly and
successfully perform the construction activities e.g. project planning, software quality
assurance etc. Some of the major management activities are listed below.

• Project Planning and Management


• Configuration Management
• Software Quality Assurance
• Installation and Training

© Copy Right Virtual University of Pakistan 8


CS605 Software Engineering-II VU

Project Planning and Management


Configuration Management
Quality Assurance
Management
Installation and Training

Construction

Requirements
Design
Coding
Testing
Maintenance

Figure1
Development Activities

As we have said earlier that management activities are kind of umbrella activities that
surround the construction activities so that the construction process may proceed
smoothly. This fact is empathized in the Figure1. The figure shows that construction is
surrounded by management activities. That is, certain processes and rules govern all
construction activities. These processes and rules are related to the management of the
construction activities and not the construction itself.

A Software Engineering Framework

The software development organization must have special focus on quality while
performing the software engineering activities. Based on this commitment to quality by
the organization, a software engineering framework is proposed that is shown in Figure 2.
The major components of this framework are described below.

As we have said earlier, the given framework is based on the organizational


Quality Focus:
commitment to quality. The quality focus demands that processes be defined for rational
and timely development of software. And quality should be emphasized while executing
these processes.

The processes are set of key process areas (KPAs) for effectively manage and
Processes:
deliver quality software in a cost effective manner. The processes define the tasks to be
performed and the order in which they are to be performed. Every task has some
deliverables and every deliverable should be delivered at a particular milestone.

level= Methods:Methods provide the technical “how-to’s” to carryout these tasks. There could be
more than one technique to perform a task and different techniques could be used in
different situations.

level= Tools provide automated or semi-automated support for software processes,


Tools:
methods, and quality control.

© Copy Right Virtual University of Pakistan 9


CS605 Software Engineering-II VU

Method T
O
O
Task Set Process
L
S
Quality Focus

Figure 2

Software Engineering Framework

Software Development Loop

Let’s now look at software engineering activities from a different perspective. Software
development activities could be performed in a cyclic and that cycle is called software
development loop which is shown in Figure3. The major stages of software development
loop are described below.

In this stage we determine what is the problem against which we are


Problem Definition:
going to develop software. Here we try to completely comprehend the issues and
requirements of the software system to build.

In this stage we try to find the solution of the problem on technical


Technical Development:
grounds and base our actual implementation on it. This is the stage where a new system is
actually developed that solves the problem defined in the first stage.

If there are already developed system(s) available with which our new
Solution Integration:
system has to interact then those systems should also be the part of our new system. All
those existing system(s) integrate with our new system at this stage.

After going through the previous three stages successfully, when we actually
Status Quo:
deployed the new system at the user site then that situation is called status quo. But once
we get new requirements then we need to change the status quo.

After getting new requirements we perform all the steps in the software development loop
again. The software developed through this process has the property that this could be
evolved and integrated easily with the existing systems.

© Copy Right Virtual University of Pakistan 10


CS605 Software Engineering-II VU

Problem
Definition

Technical
Status Quo Development

Solution
Integration

Figure3
Software Development Loop

Overview of the course contents

In the first course we studied the technical processes of software development to build
industrial strength software. That includes requirement gathering and analysis, software
design, coding, testing, and debugging. In this course our focus will be on the second part
of Software Engineering, that is, the activities related to managing the technical
development. This course will therefore include the following topics:

1. Software development process


2. Software process models
3. Project Management Concepts
4. Software Project Planning
5. Risk Analysis and Management
6. Project Schedules and Tracking
7. Software Quality Assurance
8. Software Configuration Management
9. Software Process and Project Metrics
10. Requirement Engineering Processes
11. Verification and Validation
12. Process Improvement
13. Legacy Systems
14. Software Change
15. Software Re-engineering

© Copy Right Virtual University of Pakistan 11


CS605 Software Engineering-II VU

Lecture No. 2
Software Process
A software process is a road map that helps you create a timely, high quality result. It is
the way we produce software and it provides stability and control. Each process defines
certain deliverables known as the work products. These include programs, documents,
and data produced as a consequence of the software engineering activities.

Process Maturity and CMM

The Software Engineering Institute (SEI) has developed a framework to judge the process
maturity level of an organization. This framework is known as the Capability Maturity
Model (CMM). This framework has 5 different levels and an organization is placed into
one of these 5 levels. The following figure shows the CMM framework.

These levels are briefly described as follows”

1. Level 1 – Initial: The software process is characterized as ad hoc and occasionally


even chaotic. Few processes are defined, and success depends upon individual
effort. By default every organization would be at level 1.
2. Level 2 – Repeatable: Basic project management processes are established to
track cost, schedule, and functionality. The necessary project discipline is in place
to repeat earlier successes on projects with similar applications.
3. Level 3 – Defined: The software process for both management and engineering
activities is documented, standardized, and integrated into an organizational
software process. All projects use a documented and approved version of the
organization’s process for developing and supporting software.
4. Level 4 – Managed: Detailed measures for software process and product quality
are controlled. Both the software process and products are quantitatively
understood and controlled using detailed measures.
5. Level 5 – Optimizing: Continuous process improvement is enabled by qualitative
feedback from the process and from testing innovative ideas and technologies.

SEI has associated key process areas with each maturity level. The KPAs describe those
software engineering functions that must be present to satisfy good practice at a particular
level. Each KPA is described by identifying the following characteristics:

© Copy Right Virtual University of Pakistan 12


CS605 Software Engineering-II VU

1. Goals: the overall objectives that the KPA must achieve.


2. Commitments: requirements imposed on the organization that must be met to
achieve the goals or provide proof of intent to comply with the goals.
3. Abilities: those things that must be in place – organizationally and technically – to
enable the organization to meet the commitments.
4. Activities: the specific tasks required to achieve the KPA function
5. Methods for monitoring implementation: the manner in which the activities are
monitored as they are put into place.
6. Methods for verifying implementation: the manner in which proper practice for
the KPA can be verified.

Each of the KPA is defined by a set of practices that contribute to satisfying its goals. The
key practices are policies, procedures, and activities that must occur before a key process
area has been fully instituted.

The following table summarizes the KPAs defined for each level. long question in mid term 2023

Level KPAs
1 No KPA is defined as organizations at this level follow ad-hoc
processes
2 • Software Configuration Management
• Software Quality Assurance
• Software subcontract Management
• Software project tracking and oversight
• Software project planning
• Requirement management
3 • Peer reviews
• Inter-group coordination
• Software product Engineering
• Integrated software management
• Training program
• Organization process management
• Organization process focus
4 • Software quality management
• Quantitative process management
5 • Process change management
• Technology change management
• Defect prevention

© Copy Right Virtual University of Pakistan 13


CS605 Software Engineering-II VU

Lecture No. 3
Software Lifecycle Models
Recalling from our first course, a software system passes through the following phases:
Mid Term: mcqs
1. Vision – focus on why
2. Definition – focus on what
3. Development – focus on how
4. Maintenance – focus on change

During these phases, a number of activities are performed. A lifecycle model is a


series of steps through which the product progresses. These include requirements
phase, specification phase, design phase, implementation phase, integration phase,
maintenance phase, and retirement. Software Development Lifecycle Models depict
the way you organize your activities.

There are a number of Software Development Lifecycle Models, each having its
strengths and weaknesses and suitable in different situations and project types. The
list of models includes the following:

• Build-and-fix model
• Waterfall model
• Rapid prototyping model
• Incremental model
• Extreme programming
• Synchronize-and-stabilize model
• Spiral model
• Object-oriented life-cycle models

In the following sections we shall study these models in detail and discuss their
strengths and weaknesses.

Build and Fix Model

This model is depicted in the following diagram:

© Copy Right Virtual University of Pakistan 14


CS605 Software Engineering-II VU

It is unfortunate that many products are developed using what is known as the build-and-
fix model. In this model the product is constructed without specification or any attempt at
design. The developers simply build a product that is reworked as many times as
necessary to satisfy the client. This model may work for small projects but is totally
unsatisfactory for products of any reasonable size. The cost of build-and fix is actually far
greater than the cost of properly specified and carefully designed product.
Maintenance of the product can be extremely in the absence of any documentation. mcq

Waterfall Model

The first published model of the software development process was derived from other
engineering processes. Because of the cascade from one phase to another, this model is
known as the waterfall model. This model is also known as linear sequential model. This
model is depicted in the following diagram.

The principal stages of the model map directly onto fundamental development activities.

It suggests a systematic, sequential approach to software development that begins at the


system level and progresses through the analysis, design, coding, testing, and
maintenance.

In the literature, people have identified from 5 to 8 stages of software development.

The five stages above are as follows:


1. Requirement Analysis and Definition: What - The systems services, constraints
and goals are established by consultation with system users. They are then defined
in detail and serve as a system specification.
2. System and Software Design: How – The system design process partitions the
requirements to either hardware of software systems. It establishes and overall
system architecture. Software design involves fundamental system abstractions
and their relationships.

© Copy Right Virtual University of Pakistan 15


CS605 Software Engineering-II VU

3. Implementation and Unit Testing: - How – During this stage the software design
is realized as a set of programs or program units. Unit testing involves verifying
that each unit meets its specifications.
4. Integration and system testing: The individual program unit or programs are
integrated and tested as a complete system to ensure that the software
requirements have been met. After testing, the software system is delivered to the
customer.
5. Operation and Maintenance: Normally this is the longest phase of the software life
cycle. The system is installed and put into practical use. Maintenance involves
correcting errors which were not discovered in earlier stages of the life-cycle,
improving the implementation of system units and enhancing the system’s
services as new requirements are discovered.

In principle, the result of each phase is one or more documents which are approved. No mcqs
phase is complete until the documentation for that phase has been completed and products
of that phase have been approved. The following phase should not start until the previous
phase has finished.

Real projects rarely follow the sequential flow that the model proposes. In general these
phases overlap and feed information to each other. Hence there should be an element of
iteration and feedback. A mistake caught any stage should be referred back to the source
and all the subsequent stages need to be revisited and corresponding documents should be
updated accordingly. This feedback path is shown in the following diagram.

Because of the costs of producing and approving documents, iterations are costly and
require significant rework.

MCQThe Waterfall Model is a documentation-driven model. It therefore generates complete


and comprehensive documentation and hence makes the maintenance task much easier. It
however suffers from the fact that the client feedback is received when the product is MCQ
finally delivered and hence any errors in the requirement specification are not discovered
until the product is sent to the client after completion. This therefore has major time and
cost related consequences. MCQ

© Copy Right Virtual University of Pakistan 16


CS605 Software Engineering-II VU

Rapid Prototyping Model

The Rapid Prototyping Model is used to overcome issues related to understanding and
capturing of user requirements. In this model a mock-up application is created “rapidly”
to solicit feedback from the user. Once the user requirements are captured in the
prototype to the satisfaction of the user, a proper requirement specification document is
developed and the product is developed from scratch.

An essential aspect of rapid prototype is embedded in the word “rapid”. The developer
should endeavour to construct the prototype as quickly as possible to speedup the
software development process. It must always be kept in mind that the sole purpose of the
MCQrapid prototype is to capture the client’s needs; once this has been determined, the rapid
prototype is effectively discarded. For this reason, the internal structure of the rapid
prototype is not relevant.

Integrating the Waterfall and Rapid Prototyping Models

Despite the many successes of the waterfall model, it has a major drawback in that the
delivered product may not fulfil the client’s needs. One solution to this is to combine
rapid prototyping with the waterfall model. In this approach, rapid prototyping can be
used as a requirement gathering technique which would then be followed by the activities
performed in the waterfall model.

© Copy Right Virtual University of Pakistan 17


CS605 Software Engineering-II VU

Lecture No. 4
Incremental Models
As discussed above, the major drawbacks of the waterfall model are due to the fact that
the entire product is developed and delivered to the client in one package. This results in
delayed feedback from the client. Because of the long elapsed time, a huge new
investment of time and money may be required to fix any errors of omission or
commission or to accommodate any new requirements cropping up during this period.
This may render the product as unusable. Incremental model may be used to overcome
these issues.

In the incremental models, as opposed to the waterfall model, the product is partitioned
into smaller pieces which are then built and delivered to the client in increments at regular
intervals. Since each piece is much smaller than the whole, it can be built and sent to the
client quickly. This results in quick feedback from the client and any requirement related
errors or changes can be incorporated at a much lesser cost. It is therefore less traumatic
as compared to the waterfall model. It also required smaller capital outlay and yield a

rapid return on investment. However, this model needs and open architecture to allow
integration of subsequent builds to yield the bigger product. A number of variations are
used in object-oriented life cycle models.

There are two fundamental approaches to the incremental development. In the first case,
the requirements, specifications, and architectural design for the whole product are
completed before implementation of the various builds commences.

© Copy Right Virtual University of Pakistan 18


CS605 Software Engineering-II VU

In a more risky version, once the user requirements have been elicited, the specifications
of the first build are drawn up. When this has been completed, the specification team
Build 1
Implementation,
Specification Design Deliver to client
integration

Build 2
Implementation,
Specification Design Deliver to client
integration

Build 3
Implementation,
Specification Design Deliver to client
integration

Build n
Implementation,
Specification Design Deliver to client
integration

Specification team Implementation,


Design team integration team

turns to the specification of the second build while the design team designs the first build.
Thus the various builds are constructed in parallel, with each team making use of the
information gained in the all the previous builds.

This approach incurs the risk that the resulting build will not fit together and hence
requires careful monitoring.

Rapid Application Development (RAD)

Rapid application development is another form of incremental model. It is a high speed


adaptation of the linear sequential model in which fully functional system in a very short
time (2-3 months). This model is only applicable in the projects where requirements are
MCQwell understood and project scope is constrained. Because of this reason it is used
primarily for information systems.

Synchronize and Stabilize Model

This is yet another form of incremental model adopted by Microsoft. In this model,
during the requirements analysis interviews of potential customers are conducted and
requirements document is developed. Once these requirements have been captured,
specifications are drawn up. The project is then divided into 3 or 4 builds. Each build is
carried out by small teams working in parallel. At the end of each day the code is
synchronized (test and debug) and at the end of the build it is stabilized by freezing the
build and removing any remaining defects. Because of the synchronizations, components
always work together. The presence of an executable provides early insights into
operation of product.

© Copy Right Virtual University of Pakistan 19


CS605 Software Engineering-II VU

Spiral Model
This model was developed by Barry Boehm. The main idea of this model is to avert risk
as there is always an element of risk in development of software. For example, key
personnel may resign at a critical juncture, the manufacturer of the software development
may go bankrupt, etc.

In its simplified form, the Spiral Model is Waterfall model plus risk analysis. In this case
each stage is preceded by identification of alternatives and risk analysis and is then
followed by evaluation and planning for the next phase. If risks cannot be resolved,
project is immediately terminated. This is depicted in the following diagram.

Risk Analysis

Rapid Prototype
Specification
Design
Verify Implementation

As can be seen, a Spiral Model has two dimensions. Radial dimension represents the MCQ
cumulative cost to date and the angular dimension represents the progress through the
spiral. Each phase begins by determining objectives of that phase and at each phase a new
process model may be followed.

© Copy Right Virtual University of Pakistan 20


CS605 Software Engineering-II VU

A full version of the Spiral Model is shown below:

MCQ
The main strength of the Spiral Model comes from the fact that it is very sensitive to the
risk. Because of the spiral nature of development it is easy to judge how much to test and
there is no distinction between development and maintenance. It however can only be MCQ
used for large-scale software development and that too for internal (in-house) software
only.

© Copy Right Virtual University of Pakistan 21


CS605 Software Engineering-II VU

Determine Identify and


objectives, resolve risks
alternatives,
constraints

Develop
and verify
Plan Next next-level
Phase product

© Copy Right Virtual University of Pakistan 22


CS605 Software Engineering-II VU

Lecture No. 5
Object-Oriented Lifecycle Models
Object-oriented lifecycle models appreciate the need for iteration within and between
phases. There are a number of these models. All of these models incorporate some form
of iteration, parallelism, and incremental development.

eXtreme Programming

It is a somewhat controversial new approach. In this approach user requirements are


captured through stories which are the scenarios presenting the features needed by the
client? Estimate for duration and cost of each story is then carried out. Stories for the next
build are selected. Then each build is divided into tasks. Test cases for task are drawn up
first before and development and continuous testing is performed throughout the
development process.

Architectural User stories


spike

Release Iteration Acceptance


Planning test

Spike Small release

One very important feature of eXtreme programming is the concept of pair programming. MCQ
In this, a team of two developers develop the software, working in team as a pair to the
extent that they even share a single computer.

In eXtereme Programming model, computers are put in center of large room lined with
cubicles and client representative is always present. One very important restriction
imposed in the model is that no team is allowed to work overtime for 2 successive weeks.MCQ

XP has had some successes. It is good when requirements are vague or changing and the
overall scope of the project is limited. It is however too soon to evaluate XP.

Fountain Model

Fountain model is another object-oriented lifecycle model. This is depicted in the


following diagram.

© Copy Right Virtual University of Pakistan 23


CS605 Software Engineering-II VU

Maintenance
Further development

Operations

Implementation and
integration

Implementation

Object-oriented design

Object-oriented analysis

Requirement

In this model the circles representing the various phases overlap, explicitly representing
an overlap between activities. The arrows within a phase represent iteration within the
phase. The maintenance cycle is smaller, to symbolize reduced maintenance effort when
the object oriented paradigm is used.

Rational Unified Process (RUP)

Rational Unified Process is very closely associated with UML and Krutchen’s
architectural model.

In this model a software product is designed and built in a succession of incremental


iterations. It incorporates early testing and validation of design ideas and early risk
mitigation. The horizontal dimension represents the dynamic aspect of the process. This
includes cycles, phases, iterations, and milestones. The vertical dimension represents the
static aspect of the process described in terms of process components which include
activities, disciplines, artifacts, and roles. The process emphasizes that during
development, all activities are performed in parallel, however, and at a given time one
activity may have more emphasis than the other.

The following figure depicting RUP is taken from Krutchen’s paper.

© Copy Right Virtual University of Pakistan 24


CS605 Software Engineering-II VU

assignment question 2023 + Mid term question


Comparison of Lifecycle Models

As discussed above, each lifecycle model has some strengths and weaknesses. These are
summarized in the following table:

The criteria to be used for deciding on a model include the organization, its management,
skills of the employees, and the nature of the product. No single model may fulfill the
needs in a given situation. It may therefore be best to devise a lifecycle model tuned to
your own needs by creating a “Mix-and-match” life-cycle model.

Quality Assurance and Documentation

It may be noted that there is no separate QA or documentation phase. QA is an activity


performed throughout software production. It involves verification and validation.

© Copy Right Virtual University of Pakistan 25


CS605 Software Engineering-II VU

Verification is performed at the end of each phase whereas validation is performed before
delivering the product to the client.

Similarly, every phase must be fully documented before starting the next phase. It is
important to note that postponed documentation may never be completed as the
responsible individual may leave. Documentation is important as the product is constantly
changing—we need the documentation to do this. The design (for example) will be
modified during development, but the original designers may not be available to
document it.

The following table shows the QA and documentation activities associated with each
stage.

Phase Documents QA
Requirement • Rapid prototype, or • Rapid prototype
Definition • Requirements document • Reviews

Functional • Specification document (specifications) • Traceability


Specification • Software Product Management Plan • FS Review
• Check the SPMP
Design • Architectural Design • Traceability
• Detailed Design • Review
Coding • Source code • Traceability
• Test cases • Review
• Testing
Integration • Source code • Integration testing
• Test cases • Acceptance testing
Maintenance • Change record • Regression testing
• Regression test cases

© Copy Right Virtual University of Pakistan 26


CS605 Software Engineering-II VU

Lecture No. 6
Software Project Management Concepts
Software project management is a very important activity for successful projects. In fact,
in an organization at CMM Level basic project management processes are established to
track cost, schedule, and functionality. That is, it is characterized by basic project
management practices. It also implies that without project management not much can be
achieved. Capers Jones, in his book on Software Best Practices, notes that, for the
projects they have analyzed, good project management was associated with 100% of the
successful project and bad project management was associated with 100% of the
unsuccessful projects. Therefore, understanding of good project management principles
and practices is essential for all project managers and software engineers.

Software project management involves that planning, organization, monitoring, and


control of the people and the processes.

Software Project Management: Factors that influence results

The first step towards better project management is the comprehension of the factors that
influence results of a project. Among these, the most important factors are:
Q: What are the duties/responsibilities of project manager. Q In 2023
– Project size
As the project size increases, the complexity of the problem also increases and therefore
its management also becomes more difficult.

– Delivery deadline
Delivery deadline directly influences the resources and quality. With a realistic deadline,
chances of delivering the product with high quality and reasonable resources increase
tremendously as compared to an unrealistic deadline. So a project manager has to first
determine a realistic and reasonable deadline and then monitor the project progress and
ensure timely delivery.

– Budgets and costs


A project manager is responsible for ensuring delivery of the project within the allocated
budget and schedule. A good estimate of budget, cost and schedule is essential for any
successful project. It is therefore imperative that the project manager understand and
learns the techniques and principle needed to develop these estimates.

– Application domain
Application domain also plays an important role in the success of a project. The chances
of success of a project in a well-known application domain would be much better than of
a project in a relatively unknown domain. The project manager thus needs to implement
measures to handle unforeseen problems that may arise during the project lifecycle.

– Technology to be implemented
Technology also plays a very significant role in the success or failure of a project. One
the one hand, a new “state-of-the-art” technology may increase the productivity of the
team and quality of the product. On the other hand, it may prove to be unstable and hence

© Copy Right Virtual University of Pakistan 27


CS605 Software Engineering-II VU

prove to be difficult to handle. Resultantly, it may totally blow you off the track. So, the
project manager should be careful in choosing the implementation technology and must
take proper safeguard measures.

– System constraints
The non-functional requirement or system constraints specify the conditions and the
restrictions imposed on the system. A system that fulfils all its functional requirements
but does not satisfy the non-functional requirements would be rejected by the user.

– User requirements
A system has to satisfy its user requirements. Failing to do so would render this system
unusable.

– Available resources
A project has to be developed using the available resources who know the domain as well
as the technology. The project manager has to ensure that the required number of
resources with appropriate skill-set is available to the project.

Project Management Concerns

In order to plan and run a project successfully, a project manager needs to worry about
the following issues: Q In 2023

1. Product quality: what would be the acceptable quality level for this particular project
and how could it be ensured?
2. Risk assessment: what would be the potential problems that could jeopardize the
project and how could they be mitigated?
3. Measurement: how could the size, productivity, quality and other important factors be
measured and benchmarked?
4. Cost estimation: how could cost of the project be estimated?
5. Project schedule: how could the schedule for the project be computed and estimated?
6. Customer communication: what kind of communication with the customer would be
needed and how could it be established and maintained consistently?
7. Staffing: how many people with what kind of resources would be needed and how
that requirement could be fulfilled?
8. Other resources: what other hardware and software resources would be needed for the
project?
9. Project monitoring: how the progress of the project could be monitored?

Thorough understanding and appreciation of these issues leads to the quest for finding
satisfactory answers to these problems and improves the chances for success of a project.

Why Projects Fail?

A project manager is tasked to ensure the successful development of a product. Success


cannot be attained without understanding the reasons for failure. The main reasons for the
failure of software projects are:

1. changing customer requirements


2. ambiguous/incomplete requirements

© Copy Right Virtual University of Pakistan 28


CS605 Software Engineering-II VU

3. unrealistic deadline
4. an honest underestimate of effort
5. predictable and/or unpredictable risks
6. technical difficulties
7. miscommunication among project staff
8. failure in project management

The first two points relate to good requirement engineering practices. Unstable user
requirements and continuous requirement creep has been identified as the top most reason
for project failure. Ambiguous and incomplete requirements lead to undesirable product
that is rejected by the user.

As discussed earlier, delivery deadline directly influences the resources and quality. With
a realistic deadline, chances of delivering the product with high quality and reasonable
resources increase tremendously as compared to an unrealistic deadline. An unrealistic
deadline could be enforced by the management or the client or it could be due to error in
estimation. In both these cases it often results in disaster for the project.

A project manager who is not prepared and without a contingency plan for all sorts of
predictable and unpredictable risks would put the project in jeopardy if such a risk should
happen. Risk assessment and anticipation of technical and other difficulties allows the
project manager to cope with these situations.

Miscommunication among the project staff is another very important reason for project
failure. Lack of proper coordination and communication in a project results in wastage of
resources and chaos.

The Management Spectrum

Effective project management focuses on four aspects of the project known as the 4 P’s.
These are: people, product, process, and project.

People
Software development is a highly people intensive activity. In this business, the software
factory comprises of the people working there. Hence taking care of the first P, that is
people, should take the highest priority on a project manager’s agenda.

Product
The product is the outcome of the project. It includes all kinds of the software systems.
No meaningful planning for a project can be carried-out until all the dimensions of the
product including its functional as well as non-functional requirements are understood
and all technical and management constraints are identified.

Process
Once the product objectives and scope have been determined, a proper software
development process and lifecycle model must be chosen to identify the required work
products and define the milestones in order to ensure streamlined development activities.
It includes the set of all the framework activities and software engineering tasks to get the
job done.

© Copy Right Virtual University of Pakistan 29


CS605 Software Engineering-II VU

Project
A project comprises of all work the required to make the product a reality. In order to
avoid failure, a project manager and software engineer is required to build the software
product in a controlled and organized fashion and run it like other projects found in more
concrete domains.

We now discuss these 4 in more detail.

People

In a study published by IEEE, the project team was identified by the senior executives as
the most important contributor to a successful software project. However, unfortunately,
people are often taken for granted and do no get the attention and focus they deserve.
There are a number of players that participate in software process and influence the
outcome of the project. These include senior managers, project (technical) managers,
practitioners, customers, and end-users. Senior managers define the business vision
whereas the project managers plan, motivate, organize and control the practitioners who
work to develop the software product. To be effective, the project team must be organized
to use each individual to the best of his/her abilities. This job is carried out by the team
leader.

Team Leader
Project management is a people intensive activity. It needs the right mix of people skills.
Therefore, competent practitioners often make poor team leaders.

Leaders should apply a problem solving management style. That is, a project manager
should concentrate on understanding the problem to be solved, managing the flow of
ideas, and at the same time, letting everyone on the team know that quality counts and
that it will not be compromised.
MOI model of leadership developed by Weinberg suggest that a leadership needs
Motivation, Organization, and Innovation.

Motivation is the ability to encourage technical people to produce to their best.


Organization is the ability to mold the existing processes (or invent new ones) that will
enable the initial concept to be translated into a final product, and Idea or Innovation is
the ability to encourage people to create and feel creative.

It is suggested that successful project managers apply a problem solving management


style. This involves developing an understanding of the problem and motivating the team
to generate ideas to solve the problem.

Edgemon suggests that the following characteristics are needed to become an effective
project manager:

• Problem Solving
– Should be able to diagnose technical and organizational issues and be willing
to change direction if needed.
• Managerial Identity
– Must have the confidence to take control when necessary

© Copy Right Virtual University of Pakistan 30


CS605 Software Engineering-II VU

• Achievement
– Reward initiative (controlled risk taking) and accomplishment
• Influence and team building
– Must remain under control in high stress conditions. Should be able to read
signals and address peoples’ needs.
Q In 2023
DeMarco says that a good leader possesses the following four characteristics:
– Heart: the leader should have a big heart.
– Nose: the leader should have good nose to spot the trouble and bad smell in the
project.
– Gut: the leader should have the ability to make quick decisions on gut feeling.
– Soul: the leader should be the soul of the team.

If analyzed closely, all these researchers seem to say essentially the same thing and they
actually complement each other’s point of view.

© Copy Right Virtual University of Pakistan 31


CS605 Software Engineering-II VU

Lecture No. 7
The Software Team
There are many possible organizational structures. In order to identify the most suitable
structure, the following factors must be considered:

• the difficulty of the problem to be solved


• the size of the resultant program(s) in lines of code or function points
• the time that the team will stay together (team lifetime)
• the degree to which the problem can be modularized
• the required quality and reliability of the system to be built
• the rigidity of the delivery date
• the degree of sociability (communication) required for the project

Constantine suggests that teams could be organized in the following generic structural
paradigms:
mcqs
• closed paradigm—structures a team along a traditional hierarchy of authority
• random paradigm—structures a team loosely and depends on individual initiative of
the team members
• open paradigm—attempts to structure a team in a manner that achieves some of the
controls associated with the closed paradigm but also much of the innovation that
occurs when using the random paradigm
• synchronous paradigm—relies on the natural compartmentalization of a problem
and organizes team members to work on pieces of the problem with little active
communication among themselves

Mantei suggests the following three generic team organizations:


• Democratic decentralized (DD)
In this organization there is no permanent leader and task coordinators are appointed for
short duration. Decisions on problems and approach are made by group consensus and
communication among team is horizontal.

• Controlled decentralized (CD)


In CD, there is a defined leader who coordinates specific tasks. However, problem
solving remains a group activity and communication among subgroups and individuals is
horizontal. Vertical communication along the control hierarchy also occurs.

• Controlled centralized (CC)


In a Controlled Centralized structure, top level problem solving and internal team
coordination are managed by the team leader and communication between the leader and
team members is vertical.

Centralized structures complete tasks faster and are most useful for handling simple
problems. On the other hand, decentralized teams generate more and better solutions than
individuals and are most useful for complex problems
For the team morale point of view, DD is better.

© Copy Right Virtual University of Pakistan 32


CS605 Software Engineering-II VU

Coordination and Communication Issues

Lack of coordination results in confusion and uncertainty. On the other hand,


performance is inversely proportional to the amount of communication and hence too
much communication and coordination is also not healthy for the project. Very large
projects are best addressed with CC or CD when sub-grouping can be easily
accommodated.

Kraul and Steeter categorize the project coordination techniques as follows:

• Formal, impersonal approaches


In these approaches, coordination is achieved through impersonal and formal mechanism
such as SE documents, technical memos, schedules, error tracking reports.
• Formal, interpersonal procedures
In this case, the approaches are interpersonal and formal. These include QA activities,
design and code reviews, and status meetings.
• Informal, interpersonal procedures
This approach employs informal interpersonal procedures and includes group meetings
and collocating different groups together.
• Electronic communication includes emails and bulletin boards.
• Interpersonal networking includes informal discussions with group members

The effectiveness of these approaches has been summarized in the following diagram:

Techniques that fall above the regression line yield more value to use ratio as compared
to the ones below the line.

The Product: Defining the Problem

© Copy Right Virtual University of Pakistan 33


CS605 Software Engineering-II VU

In order to develop an estimate and plan for the project, the scope of the problem must be
established. This includes context, information objectives, and function and performance
requirements. The estimate and plan is then developed by decomposing the problem and
establishing a functional partitioning.

The Process

The next step is to decide which process model to pick. The project manager has to look
at the characteristics of the product to be built and the project environment. For examples,
for a relatively small project that is similar to past efforts, degree of uncertainty is
minimized and hence Waterfall or linear sequential model could be used. For tight
timelines, heavily compartmentalized, and known domain, RAD model would be more
suitable. Projects with large functionality, quick turn around time are best developed
incrementally and for a project in which requirements are uncertain, prototyping model
will be more suitable.

© Copy Right Virtual University of Pakistan 34


CS605 Software Engineering-II VU

Lecture No. 8
The Project Management
As discussed earlier, a project manager must understand what can go wrong and how to
do it right. Reel has defined a 5 step process to improve the chances of success. These
are: Q In 2023

– Start on the right foot: this is accomplished by putting in the required effort to
understand the problem, set realistic objectives, build the right team, and provide the
needed infrastructure.
– Maintain momentum: many projects, after starting on the right, loose focus and
momentum. The initial momentum must be maintained till the very end.
– Track progress: no planning is useful if the progress is not tracked. Tracking ensures
timely delivery and remedial action, if needed, in a suitable manner.
– Make smart decisions
– Conduct a postmortem analysis: in order to learn from the mistakes and improve the
process continuously, a project postmortem must be conducted.

W5HH Principle Q In 2023

Barry Boehm has suggested a systematic approach to project management. It is known as


the WWWWWHH principle. It comprises of 7 questions. Finding the answers to these 7
questions is essentially all a project manager has to do. These are:
• WHY is the system being developed?
• WHAT will be done?
• By WHEN?
• WHO is responsible for a function?
• WHERE they are organizationally located?
• HOW will the job be done technically and managerially?
• HOW MUCH of each resource (e.g., people, software, tools, database) will be
needed?

Boehm’s W5HH principle is applicable, regardless of the size and complexity of the
project and provide excellent planning outline.

Critical Practices

The Airlie Council has developed a list of critical success practices that must be present
for successful project management. These are:
• Formal risk analysis
• Empirical cost and schedule estimation
• Metrics-based project management
• Earned value tracking
• Defect tracking against quality targets
• People aware project management

© Copy Right Virtual University of Pakistan 35


CS605 Software Engineering-II VU

Finding the solution to these practices is the key to successful projects. We’ll therefore
spend a considerable amount of time in elaborating these practices.

© Copy Right Virtual University of Pakistan 36


CS605 Software Engineering-II VU

Lecture No. 9
Software Size Estimation
The size of the software needs to be estimated to figure out the time needed in terms of
calendar and man months as well as the number and type of resources required carrying
out the job. The time and resources estimation eventually plays a significant role in
determining the cost of the project.

Most organizations use their previous experience to estimate the size and hence the
resource and time requirements for the project. If not quantified, this estimate is
subjective and is as good as the person who is conducting this exercise. At times this
makes it highly contentious. It is therefore imperative for a government organization to
adopt an estimation mechanism that is:

1. Objective in nature.
2. It should be an acceptable standard with wide spread use and acceptance level.
3. It should serve as a single yardstick to measure and make comparisons.
4. Must be based upon a deliverable that is meaningful to the intended audience.
5. It should be independent of the tool and technology used for the developing the
software.

A number of techniques and tools can be used in estimating the size of the software.
These include:
1. Lines of code (LOC)
2. Number of objects
3. Number of GUIs
4. Number of document pages
5. Functional points (FP)

Comparison of LOC and FPA

Out of these 5, the two most widely used metrics for the measurement of software size are
FP and LOC. LOC metric suffer from the following shortcomings:
1. There are a number of questions regarding the definition for lines of code. These
include:
a. Whether to count physical line or logical lines?
b. What type of lines should be counted? For example, should the comments,
data definitions, and blank lines be counted or not?
2. LOC is heavily dependent upon the individual programming style.
3. It is dependent upon the technology and hence it is difficult to compare
applications developed in two different languages. This is true for even seemingly
very close languages like in C++ and Java.
4. If a mixture of languages and tools is used then the comparison is even more
difficult. For example, it is not possible to compare a project that delivers a
100,000-line mixture of Assembly, C++, SQL and Visual Basic to one that
delivers 100,000 lines of COBOL.

© Copy Right Virtual University of Pakistan 37


CS605 Software Engineering-II VU

FP measures the size of the functionality provided by the software. The functionally is
measured as a function of the data and the operations performed on that data. The
measure is independent of the tool and technology used and hence provides a consistent
measure for comparison between various organizations and projects.

The biggest advantage of FP over LOC is that LOC can be counted only AFTER the code
has been developed while FP can be counted even at the requirement phase and hence can
be used for planning and estimation while the LOC cannot be used for this purpose.

Another major distinction between the FP and LOC is that the LOC measures the
application from a developer's perspective while the FP is a measure of the size of the
functionality from the user's perspective. The user's view, as defined by IFPUG, is as
follows:

A user view is a description of the business functions and is approved by the


user. It represents a formal description of the user’s business needs in the
user’s language. It can vary in physical form (e.g., catalog of transactions,
proposals, requirements document, external specifications, detailed
specifications, user handbook). Developers translate the user information into
information technology language in order to provide a solution. Function point
counts the application size from the user’s point of view. It is accomplished
using the information in a language that is common to both user(s) and
developers.

Therefore, Function Point Analysis measures the size of the functionality


delivered and used by the end user as opposed to the volume of the artifacts and
code.

© Copy Right Virtual University of Pakistan 38


CS605 Software Engineering-II VU

Assembler
Version Ada Version Difference
Source Code Size 100,000 25,000 -75,000
Activity - in person months
Requirements 10 10 0
Design 25 25 0
Coding 100 20 -80
Documentation 15 15 0
Integration and Testing 25 15 -10
Management 25 15 -10
Total Effort 200 100 -100
Total Cost $1,000,000 $500,000 -$500,000
Cost Per Line $10 $20 $10
Lines Per Person-Month 500 250 -250

The Paradox of Reversed Productivity for High-Level Languages


Consider the following example:
In this example, it is assumed that the same functionality is implemented in Assembly and
Ada. As coding in Assembly is much more difficult and time consuming as compared to
Ada, it takes more time and it is also lengthy. Because there is a huge difference in the
code size in terms of Lines of Code, the cost per line in case of Assembly is much less as
compared to Ada. Hence coding in Assembly appears to be more cost effective than Ada
while in reality it is not. This is a paradox!

Function Point Analysis - A Brief History and Usage

In the mid 70's, IBM felt the need to establish a more effective and better measure of
system size to predict the delivery of software. It commissioned Allan Albrecht to lead
this effort. As a result he developed this approach which today known as the Function
Point Analysis. After several years of internal use, Albrecht introduced the methodology
at a joint/share conference. From 1979 to 1984 continued statistical analysis was
performed on the method and refinements were made. At that point, a non-profit
organization by the name of International Function Point User Group (IFPUG) was
formed which formally took onto itself the role of refining and defining the counting
rules. The result is the function point methodology that we use today.

Since 1979, when Albrecht published his first paper on FP, its popularity and use has
been increasing consistently and today it is being used as a de facto standard for software
measurement. Following is a short list of organizations using FP for estimation:

1. IEEE recommends it for use in productivity measurement and reporting.


2. Several governments including UK, Canada, and Hong Kong have been using it
and it has been recommended to these governments that all public sector project
use FP as a standard for the measurement of the software size.

© Copy Right Virtual University of Pakistan 39


CS605 Software Engineering-II VU

3. Government of the Australian state Victoria has been using FP since 1997 for
managing and outsourcing projects to the tune of US$ 50 Million every year.
4. In the US several large government departments including IRS have adopted FP
analysis as a standard for outsourcing, measurement, and control of software
projects.
5. A number of big organizations including Digital Corporation and IBM have been
using FP for their internal use for the last many years.

Usage of FP includes:
• Effort Scope Estimation
• Project Planning
• Determine the impact of additional or changed requirements
• Resource Planning/Allocation
• Benchmarking and target setting
• Contract Negotiations

Following is a list of some of the FP based metrics used for these purposes:
• Size – Function Points
• Defects – Per Function Point
• Effort – Staff-Months
• Productivity – Function Points per Staff-Month
• Duration – Schedule (Calendar) Months
• Time Efficiency – Function Points per Month
• Cost – Per Function

© Copy Right Virtual University of Pakistan 40


CS605 Software Engineering-II VU

Lecture No. 10
Function Point Counting Process
The following diagram depicts the function point counting process.

Determine the type of


count
Enhancement
Development
Application

Define the application


boundary

Count Transactional Count Data Calculate Value

Functions Functions Adjustment Factor


EI ILF
EO EIF (VAF)
EQ Calculate Unadjusted FP
Count (UFP)
Contribution of 14
Transactional Functions + Data Functions
general system
Calculate Adjusted
characteristics
FP Count

UFP * VAF
These steps are elaborated in the following subsections. The terms and definitions are the
ones used by IFPUG and have been taken directly from the IFPUG Function Point
Counting Practices Manual (CPM) Release 4.1. The following can therefore be treated as
an abridged version of the IFPUG CPM Release 4.1.

Determining the type of count


A Function Point count may be divided into the following types:

1. Development Count: A development function point count includes all functions


impacted (built or customized) by the project activities.
2. Enhancement Count: An enhancement function point count includes all the
functions being added, changed and deleted. The boundary of the application(s)
impacted remains the same. The functionality of the application(s) reflects the impact
of the functions being added, changed or deleted.
3. Application Count: An application function point count may include, depending on
the purpose (e.g., provide a package as the software solution):
a) only the functions being used by the user

© Copy Right Virtual University of Pakistan 41


CS605 Software Engineering-II VU

b) all the functions delivered


c) The application boundary of the two counts is the same and is independent of the
scope.

Defining the Application Boundary

The application boundary is basically the system context diagram and determines the
scope of the count. It indicates the border between the software being measured and the
user. It is the conceptual interface between the ‘internal’ application and the ‘external’
user world. It depends upon the user’s external view of the system and is independent of
the tool and technology used to accomplish the task.

The position of the application boundary is important because it impacts the result of the
function point count. The application boundary assists in identifying the data entering the
application that will be included in the scope of the count.

Count Data Functions

Count of the data functions is contribution of the data manipulated and used by the
application towards the final function point count. The data is divided into two categories:
the Internal Logical Files (ILF) and the External Interface Files (EIF). These and the
related concepts are defined and explained as follows.

Internal Logical Files (ILF)

An internal logical file (ILF) is a user identifiable group of logically related data or
control information maintained within the boundary of the application. The primary intent
of an ILF is to hold data maintained through one or more elementary processes of the
application being counted.

External Interface Files

An external interface file (EIF) is a user identifiable group of logically related data or
control information referenced by the application, but maintained within the boundary of
another application. The primary intent of an EIF is to hold data referenced through one
or more elementary processes within the boundary of the application counted. This means
an EIF counted for an application must be in an ILF in another application.

Difference between ILFs and EIFs

The primary difference between an internal logical file and an external interface file is
that an EIF is not maintained by the application being counted, while an ILF is.

Definitions for Embedded Terms

The following paragraphs further define ILFs and EIFs by defining embedded terms
within the definitions.

Control Information

© Copy Right Virtual University of Pakistan 42


CS605 Software Engineering-II VU

Control Information is data that influences an elementary process of the application being
counted. It specifies what, when, or how data is to be processed. For example, someone in
the payroll department establishes payment cycles to schedule when the employees for
each location are to be paid. The payment cycle, or schedule, contains timing information
that affects when the elementary process of paying employees occurs.

User Identifiable

The term user identifiable refers to defined requirements for processes and/or groups of
data that are agreed upon, and understood by, both the user(s) and software developer(s).
For example, users and software developers agree that a Human Resources Application
will maintain and store Employee information in the application.

Maintained

The term maintained is the ability to modify data through an elementary process.
Examples include, but are not limited to, add, change, delete, populate, revise, update,
assign, and create.

Elementary Process

An elementary process is the smallest unit of activity that is meaningful to the user(s). For
example, a user requires the ability to add a new employee to the application. The user
definition of employee includes salary and dependent information. From the user
perspective, the smallest unit of activity is to add a new employee. Adding one of the
pieces of information, such as salary or dependent, is not an activity that would qualify as
an elementary process. The elementary process must be self-contained and leave the
business of the application being counted in a consistent state. For example, the user
requirements to add an employee include setting up salary and dependent information. If
all the employee information is not added, an employee has not yet been created. Adding
some of the information alone leaves the business of adding an employee in an
inconsistent state. If both the employee salary and dependent information is added, this
unit of activity is completed and the business is left in a consistent state.

ILF/EIF Counting Rules

This section defines the rules that apply when counting internal logical files and external
interface files.

Summary of Counting Procedures

The ILF and EIF counting procedures include the following two activities:
1) Identify the ILFs and EIFs.
2) Determine the ILF or EIF complexity and their contribution to the unadjusted function
point count. ILF and EIF counting rules are used for each activity.

There are two types of rules:


Identification rules
Complexity and contribution rules

© Copy Right Virtual University of Pakistan 43


CS605 Software Engineering-II VU

The following list outlines how the rules are presented:


ILF identification rules
EIF identification rules
Complexity and contribution rules, which include:
Data element types (DETs)
Record element types (RETs)

ILF Identification Rules

To identify ILFs, look for groups of data or control information that satisfy the definition
of an ILF. All of the following counting rules must apply for the information to be
counted as an ILF.
• The group of data or control information is logical and user identifiable.
• The group of data is maintained through an elementary process within the application
boundary being counted.

EIF Identification Rules

To identify EIFs, look for groups of data or control information that satisfy the definition
of an EIF. All of the following counting rules must apply for the information to be
counted as an EIF.

• The group of data or control information is logical and user identifiable.


• The group of data is referenced by, and external to, the application being counted.
• The group of data is not maintained by the application being counted.
• The group of data is maintained in an ILF of another application.

Complexity and Contribution Definitions and Rules

The number of ILFs, EIFs, and their relative functional complexity determine the
contribution of the data functions to the unadjusted function point count. Assign each
identified ILF and EIF a functional complexity based on the number of data element types
(DETs) and record element types (RETs) associated with the ILF or EIF. This section
defines DETs and RETs and includes the counting rules for each.

DET Definition

A data element type is a unique user recognizable, non-repeated field.

DET Rules

The following rules apply when counting DETs:


1. Count a DET for each unique user recognizable, non-repeated field maintained in or
retrieved from the ILF or EIF through the execution of an elementary process. For
example:
• An account number that is stored in multiple fields is counted as one DET.

© Copy Right Virtual University of Pakistan 44


CS605 Software Engineering-II VU

• A before or after image for a group of 10 fields maintained for audit purposes
would count as one DET for the before image (all 10 fields) and as one DET for
the after image (all 10 fields) for a total of 2 DETs.
• The result(s) of a calculation from an elementary process, such as calculated sales
tax value for a customer order maintained on an ILF is counted as one DET on the
customer order ILF.
• Accessing the price of an item which is saved to a billing file or fields such as a
time stamp if required by the user(s) are counted as DETs.
• If an employee number which appears twice in an ILF or EIF as (1) the key of the
employee record and (2) a foreign key in the dependent record, count the DET
only once.
• Within an ILF or EIF, count one DET for the 12 Monthly Budget Amount fields.
Count one additional field to identify the applicable month. For Example:
2. When two applications maintain and/or reference the same ILF/EIF, but each
maintains/references separate DETs, count only the DETs being used by each
application to size the ILF/EIF. For Example:
• Application A may specifically identify and use an address as street address, city,
state and zip code. Application B may see the address as one block of data without
regard to individual components. Application A would count four DETs;
Application B would count one DET.
• Application X maintains and/or references an ILF that contains a SSN, Name,
Street Name, Mail Stop, City, State, and Zip. Application Z maintains and/or
references the Name, City, and State. Application X would count seven DETs;
Application Z would count three DETs.
3. Count a DET for each piece of data required by the user to establish a relationship
with another ILF or EIF.
• In an HR application, an employee's information is maintained on an ILF. The
employee’s job name is included as part of the employee's information. This DET
is counted because it is required to relate an employee to a job that exists in the
organization. This type of data element is referred to as a foreign key.
• In an object oriented (OO) application, the user requires an association between
object classes, which have been identified as separate ILFs. Location name is a
DET in the Location EIF. The location name is required when processing
employee information; consequently, it is also counted as a DET within the
Employee ILF.

© Copy Right Virtual University of Pakistan 45


CS605 Software Engineering-II VU

Lecture No. 11
Function Point Counting Process (cont.)
RET Definition

A record element type (RET) is a user recognizable subgroup of data elements within an
ILF or EIF. There are two types of subgroups:
• Optional
• Mandatory
Optional subgroups are those that the user has the option of using one or none of the
subgroups during an elementary process that adds or creates an instance of the data.
Mandatory subgroups are subgroups where the user must use at least one. For example, in
a Human Resources Application, information for an employee is added by entering some
general information. In addition to the general information, the employee is a salaried or
hourly employee. The user has determined that an employee must be either salaried or
hourly. Either type can have information about dependents. For this example, there are
three subgroups or RETs as shown below:
• Salaried employee (mandatory); includes general information
• Hourly employee (mandatory); includes general information
• Dependent (optional)

RET Rules
One of the following rules applies when counting RETs:
• Count a RET for each optional or mandatory subgroup of the ILF or EIF.
Or
• If there are no subgroups, count the ILF or EIF as one RET.

Hints to Help with Counting


The following hints may help you apply the ILF and EIF counting rules.
Caution: These hints are not rules and should not be used as rules.
1. Is the data a logical group that supports specific user requirements?
a) An application can use an ILF or EIF in multiple processes, but the ILF or EIF is
counted only once. mcq
b) A logical file cannot be counted as both an ILF and EIF for the same application. mcq
If the data group satisfies both rules, count as an ILF.
c) If a group of data was not counted as an ILF or EIF itself, count its data elements
as DETs for the ILF or EIF, which includes that group of data.
d) Do not assume that one physical file, table or object class equals one logical file
when viewing data logically from the user perspective.
e) Although some storage technologies such as tables in a relational DBMS or
sequential flat file or object classes relate closely to ILFs or EIFs, do not assume
that this always equals a one-to-one physical-logical relationship. mcq
f) Do not assume all physical files must be counted or included as part of an ILF or
EIF. mcq
2. Where is data maintained? Inside or outside the application boundary?
a) Look at the workflow.

© Copy Right Virtual University of Pakistan 46


CS605 Software Engineering-II VU

b) In the process functional decomposition, identify where interfaces occur with the
user and other applications.
c) Work through the process diagram to get hints.
d) Credit ILFs maintained by more than one application to each application at the
time the application is counted. Only the DETs being used by each application
being counted should be used to size the ILF/EIF.
3. Is the data in an ILF maintained through an elementary process of the application?
a) An application can use an ILF or EIF multiple times, but you count the ILF or EIF
only once.
b) An elementary process can maintain more than one ILF. mcq
c) Work through the process diagram to get hints.
d) Credit ILFs maintained by more than one application to each application at the
time the application is counted.

Hints to Help with Identifying ILFs, EIFs, and RETs

Differentiating RETs from ILFs and EIFs is one of the most activities in FP analysis.
Different concepts regarding entities play a pivotal role in this regards. Let us therefore
understand what an entity is and what different types of entities are.

Entity
An entity is defined by different people as follows:

• A thing that can be distinctly identified. (Chen)


• Any distinguishable object that is to be represented in the database. (Date)
• Any distinguishable person, place, thing, event or concept about which
information is kept. (Bruce)
• A data entity represents some "thing" that is to be stored for later reference. The
term entity refers to the logical representation of data. (Finkelstein)
mcq • An entity may also represent the relationship between two or more entities, called
associative entity. (Reingruber)
• An entity may represent a subset of information relevant to an instance of an
entity, called subtype entity. (Reingruber)

That is, an entity is a principal data object about which information is collected that is a
fundamental thing of relevance to the user, about which a collection of facts is kept.
imp
An entity can be a weak entity or a strong entity. A weak entity is the one which does not
have any role in the problem domain without some other entity. Weak entities are RETs
and strong entities are ILFs and EIFs. Identification of weak entities is therefore
important for distinguishing between RETs and logical files.

Weak Entities imp


There are three types of weak entities: Associative entity types, attributive entity type,
and entity subtype. These are elaborated as follows:

• Associative Entity Type – An entity which defines many-to-many relationship


between two or more entities.
– Student – course
– Part – dealer

© Copy Right Virtual University of Pakistan 47


CS605 Software Engineering-II VU

• Attributive Entity Type – An entity type which further describes one or more
characteristics of another entity.
– Product – Part
– Product – Product Price Information
• Entity Subtype – A subdivision of entity. A subtype inherits all the attributes of its
parent entity type, and may have additional, unique attributes.
– Employee
Permanent Employee
Contract Employee

– Employee
Married Employee
Single Employee

Logical Files
Grouping of data into logical files is the result of combined effect of two grouping
methods:
• How data is accessed as a group by elementary processes? (process driven)
• The relationship between the entities and their interdependency based on business
rules. (data driven)

The following guideline can be used for this purpose:


• Process Driven Approach
• Data Driven Approach

Process Driven Approach


If several entities are always created together and deleted together then this is a strong
indication that they should be grouped into a single logical file.

• A customer PO is a single group of data from a user business perspective.


• It consists of a header and items information.
• From a business perspective, an order cannot be created unless it has at least one item
and if the order is deleted both the order header and items are deleted. However the
header and the items may have independent maintenance transactions.

Data Driven Approach

Entity Independence: an entity has significance to the business in and of itself without
the presence of other entities. This is a logical file.

Entity Dependence: an entity is not meaningful, has no significance to the business in


and of itself without the presence of other entities. This is an RET.

• Given two linked entities A and B, whether B is dependent or independent:


– Is B significant to the business apart from the occurrence of A linked to it?
– If we delete an occurrence "a" of A, what happens to occurrence "b" of B
linked to "a"?

For example in the following scenarios, the first one is the example of entity dependence
while the second one is the example of entity independence.

© Copy Right Virtual University of Pakistan 48


CS605 Software Engineering-II VU

– Employee – Child
– Employee - Company Adopted Child
These concepts are summarized in the following table:

E/R Concept E/R Term FPA Term IFPUG CPM 4.1 Definition
Principal data objects about which Entity or ILF or EIF File refers to a logically related
information is collected Entity Type group of data and not the
physical implementation of those
groups of data.
An entity type which contains Associative Optional or User recognizable subgroup of
attributes which further describe entity type mandatory data elements within an ILF or
relationships between other entities subgroup EIF
An entity type that further Attributive Optional or User recognizable subgroup of
describes one or more entity type mandatory data elements within an ILF or
characteristics of another entity subgroup EIF
type
A division of an entity type, which Entity Optional or User recognizable subgroup of
inherits all the attributes and subtype mandatory data elements within an ILF or
relationships of its parent entity subgroup EIF
type; may have additional, unique
attributes and relationships

Definitions: EIs, EOs and EQs


This section includes the definitions of EIs, EOs and EQs. Embedded terms within the
definitions are defined, and examples are included throughout this definition section.

External Inputs
An external input (EI) is an elementary process that processes data or control information
that comes from outside the application boundary. The primary intent of an EI is to
maintain one or more ILFs and/or to alter the behavior of the system.

External Outputs
An external output (EO) is an elementary process that sends data or control information
outside the application boundary. The primary intent of an external output is to present
information to a user through processing logic other than, or in addition to, the retrieval of
data or control information . The processing logic must contain at least one mathematical
formula or calculation, or create derived data. An external output may also maintain one
or more ILFs and/or alter the behavior of the system.

External Inquiry
An external inquiry (EQ) is an elementary process that sends data or control information
outside the application boundary. The primary intent of an external inquiry is to present
information to a user through the retrieval of data or control information from an ILF or
EIF. The processing logic contains no mathematical formulas or calculations, and creates
no derived data. No ILF is maintained during the processing, nor is the behavior of the
system altered.

Summary of the Functions Performed by EIs, EOs, and EQs


The main difference between the transactional function types is their primary intent. The
table below summarizes functions that may be performed by each transactional function
type, and specifies the primary intent of each. Note the primary intent for an EI—this is

© Copy Right Virtual University of Pakistan 49


CS605 Software Engineering-II VU

the main difference from EOs and EQs. Some of the differences between EOs and EQs
are that an EO may perform the functions of altering the behavior of the system or
maintaining one or more ILFs when performing the primary intent of presenting
information to the user. Other differences are identified in the section below that
summarizes forms of processing logic used by each transactional function.

Transactional Function Type


Function EI EO EQ
Alter the behavior of the system PI F N/A
Maintain one or more ILFs PI F N/A
Present information to a user F PI PI

Legend:
PI The primary intent of the transactional function type
F A function of the transactional function type, but is not the primary intent and is
sometimes present
N/A The function is not allowed by the transactional function type.

Processing Logic
Processing logic is defined as requirements specifically requested by the user to complete
an elementary process. Those requirements may include the following actions:
1. Validations are performed.
For example, when adding a new employee to an organization, the employee process has
processing logic that validates the information being added.
2. Mathematical formulas and calculations are performed.
For example, when reporting on all employees within an organization the process
includes calculating the total number of salaried employees, hourly employees and all
employees.
3. Equivalent values are converted
For example, an elementary process references currency conversion rates from US dollars
to other currencies. The conversion is accomplished by retrieving values from tables, so
calculations need not be performed.
4. Data is filtered and selected by using specified criteria to compare multiple sets of
data.
For example, to generate a list of employees by assignment, an elementary process
compares the job number of a job assignment to select and lists the appropriate employees
with that assignment.
5. Conditions are analyzed to determine which are applicable.
For example, processing logic exercised by the elementary process when an employee is
added and will depend on whether an employee is paid based on salary or hours worked.
6. One or more ILFs are updated.
For example, when adding an employee, the elementary process updates the employee
ILF to maintain the employee data.
7. One or more ILFs or EIFs are referenced.
For example, when adding an employee, the currency EIF is referenced to use the correct
US dollar conversion rate to determine an employee’s hourly rate.
8. Data or control information is retrieved.
a) For example, to view a list of possible pay grades, pay grade information is retrieved.
9. Derived data is created by transforming existing data to create additional data.

© Copy Right Virtual University of Pakistan 50


CS605 Software Engineering-II VU

For example, to determine (derive) a patient’s registration number (e.g., SMIJO01), the
following data is concatenated:
a) the first three letters of the patient’s last name (e.g., SMI for Smith)
b) the first two letter of the patient’s first name (e.g., JO for John)
c) a unique two-digit sequence number (starting with 01)
10. Behavior of the system is altered.
For example, the behavior of the elementary process of paying employees is altered when
a change is made to pay them every other Friday versus on the 15th and the last day of the
month.
11. Prepare and present information outside the boundary.
For example, a list of employees displayed for the user.
12. Capability exists to accept data or control information that enters the application
boundary.
For example, a user enters several pieces of information to add a customer order to the
system.
13. Data is resorted or rearranged.
For example, a user requests the list of employees in alphabetical order.
Note: Resorting or rearranging a set of data does not impact the identification of the
type or uniqueness of a transactional function.

Summary of Processing Logic Used by EIs, EOs and EQs

The following table summarizes which forms of g logic may be performed by EIs, Eos,
and EQs. Foe each transactional function type, certain types of processing logic must be
performed to accomplish the primary intent of that type.

Transactional Functional Type


Form of Processing Logic EI EO EQ
1. Validations are performed c can c can c can
2. Mathematical Formula and calculations are c m* n
not
performed
3. Equivalent Values are converted c c c
4. Data is filtered and selected by using specified c c c
criteria to compare multiple sets of data.
5. Conditions are analyzed to determine which c c c
are applicable
6. At least one ILF is updated m* m* n
7. At least one ILF or EIF is referenced c c m
8. Data or control information is retrieved c c m
9. Derived data is created c m* n
10. Behavior of system is altered m* m* n
11. Prepare and present information outside the c m m
boundary
12. Capability to accept data or control m* c c
information that enters the application
boundary
13. Resorting or rearranging a set of data c c c

Legend

© Copy Right Virtual University of Pakistan 51


CS605 Software Engineering-II VU

m it is mandatory that the function type perform the form of processing logic.
m* it is mandatory that the function type perform at least on of these (m*) forms of
processing logic
c the function type can perform the form of processing logic, but it is not
mandatory.
n function type cannot perform the form of processing logic

EI/EO/EQ Counting Rules

This section defines the rules that apply when counting EIs, EOs and EQs.

Elementary Process Identification Rules

To identify elementary processes, look for user activities occurring in the application.
All of the following counting rules must apply for the process to be identified as an
elementary process.
• The process is the smallest unit of activity that is meaningful to the user.
• The process is self-contained and leaves the business of the application in a consistent
state.

Transactional Functions Counting Rules

To classify each elementary process, determine which of the primary intent descriptions
apply, and use the associated rules to identify a specific transactional function type.

Primary Intent Description for EIs

The primary intent of an elementary process is to maintain an ILF or alter the behavior of
the system.

External Input Counting Rules

For each elementary process that has a primary intent to maintain one or more ILFs or to
alter the behavior of the system, apply the following rules to determine if the function
should be classified as an external input. All of the rules must apply for the elementary
process to be counted as a unique occurrence of an external input.
• The data or control information is received from outside the application boundary.
• At least one ILF is maintained if the data entering the boundary is not control
information that alters the behavior of the system.
• For the identified process, one of the following three statements must apply:
o Processing logic is unique from the processing logic performed by other
external inputs for the application.
o The set of data elements identified is different from the sets identified for
other external inputs for the application.
o The ILFs or EIFs referenced are different from the files referenced by
other external inputs in the application.

Primary Intent Description for EOs and Eqs

© Copy Right Virtual University of Pakistan 52


CS605 Software Engineering-II VU

The primary intent of the elementary process is to present information to a user.

Shared EO and EQ Counting Rules

For each elementary process that has a primary intent to present information to a user,
apply the following rules to determine if the process may be classified as an external
output or external inquiry. All of the rules must apply for the elementary process to be
counted as a unique occurrence of an external output or external inquiry.
• The function sends data or control information external to the application
boundary.
• For the identified process, one of the following three statements must apply:
o Processing logic is unique from the processing logic performed by other
external outputs or external inquiries for the application.
o The set of data elements identified is different from the sets identified for
other external outputs and external inquiries in the application.
o The ILFs or EIFs referenced are different from the files referenced by
other external outputs and external inquiries in the application.

Additional External Output Counting Rules

In addition to adhering to all shared EO and EQ rules, one of the following rules must
apply for the elementary process to be counted as a unique external output.
• The processing logic of the elementary process contains at least one mathematical
formula or calculation.
• The processing logic of the elementary process creates derived data.
• The processing logic of the elementary process maintains at least one ILF.
• The processing logic of the elementary process alters the behavior of the system.

Additional External Inquiry Counting Rules

In addition to adhering to all shared EO and EQ rules, all of the following rules must
apply for the elementary process to be counted as a unique external inquiry.
• The processing logic of the elementary process retrieves data or control
information from an ILF or EIF.
• The processing logic of the elementary process does not contain a mathematical
formula or calculation.
• The processing logic of the elementary process does not create derived data.
• The processing logic of the elementary process does not maintain an ILF.
• The processing logic of the elementary process does not alter the behavior of the
system.

Complexity and Contribution Definitions and Rules

The number of EIs, EOs, and EQs and their relative functional complexities determine the
contribution of the transactional functions to the unadjusted function point count.
Assign each identified EI, EO and EQ a functional complexity based on the number of
file types referenced (FTRs) and data element types (DETs).

© Copy Right Virtual University of Pakistan 53


CS605 Software Engineering-II VU

FTR Definition

A file type referenced is


An internal logical file read or maintained by a transactional function or
An external interface file read by a transactional function

DET Definition

A data element type is a unique user recognizable, non-repeated field.


EI Complexity and Contribution Rules

This section defines FTR and DET rules used to determine the complexity and
contribution of external inputs.

FTR Rules for an EI


The following rules apply when counting FTRs:
• Count an FTR for each ILF maintained.
• Count an FTR for each ILF or EIF read during the processing of the external
input.
• Count only one FTR for each ILF that is both maintained and read.

DET Rules for an EI


The following rules apply when counting DETs:
• Count one DET for each user recognizable, non-repeated field that enters or exits
the application boundary and is required to complete the external input. For
example, job name and pay grade are two fields that the user provides when
adding a job.
• Do not count fields that are retrieved or derived by the system and stored on an
ILF during the elementary process if the fields did not cross the application
boundary.
For example, when the customer order is added to the system, the unit price is automatically retrieved for each ordered item and
stored on the billing record. The unit price would not be counted as a DET for the EI because it did not cross the boundary when
the user adds the customer order.

For example, in order to maintain the US hourly rate for hourly employees
working in other countries with other currencies, the local hourly rate is provided
by the user. During the processing of all the pieces of data provided to add an
employee, a conversion rate is retrieved from the currency system to calculate the
US hourly rate. The calculated US hourly rate is maintained on the employee ILF
as a result of adding the employee. The US hourly rate would not be counted as a
DET for the EI because it does not enter the boundary, but is internally calculated
(i.e., it is derived data).

• Count one DET for the capability to send a system response message outside the
application boundary to indicate an error occurred during processing, confirm that
processing is complete or verify that processing should continue.

© Copy Right Virtual University of Pakistan 54


CS605 Software Engineering-II VU

For example, if a user tries to add an existing employee to a Human Resources


application, the system generates one of several error messages and the incorrect field
is highlighted. Count one DET that includes all the system responses which indicate
the error conditions, confirm that processing is complete or verify that processing
should continue.

• Count one DET for the ability to specify an action to be taken even if there are
multiple methods for invoking the same logical process.

For example, if the user can initiate the adding of an employee clicking on the OK
button or by pressing a PF key, count one DET for the ability to initiate the process.

EO/EQ Complexity and Contribution Rules


This section defines FTR and DET rules used to determine the complexity and
contribution of external outputs and external inquiries.

Shared FTR Rules for EOs and EQs


The following rule applies when counting FTRs for both EOs and EQs:
• Count one FTR for each ILF or EIF read during the processing of the elementary
process.

Additional FTR Rules for an EO


The following additional rules apply when counting FTRs for EOs:
• Count one FTR for each ILF maintained during the processing of the elementary
process.
• Count only one FTR for each ILF that is both maintained and read during the
elementary process.

Shared DET Rules for EOs and EQs


The following rules apply when counting DETs for both EOs and EQs.
• Count one DET for each user recognizable, non-repeated field that enters the
application boundary and is required to specify when, what and/or how the data is
to be retrieved or generated by the elementary process. For example (EO/EQ), to
generate a list of employees, employee name is a field the user provides when
indicating which employees to list.
• Count one DET for each user recognizable, non-repeated field that exits the
boundary.

For example (EO/EQ), a text message may be a single word, sentence, or phrase—a
line or paragraph included on a report to indicate an explanatory comment counts as a
single DET.

For example (EO/EQ), an account number or date physically stored in multiple fields
is counted as one DET when it is required as a single piece of information.

© Copy Right Virtual University of Pakistan 55


CS605 Software Engineering-II VU

For example (EO/EQ), a pie chart might have a category label and a numerical
equivalent in a graphical output. Count two DETs —one for designating the category
and one for the numerical value.

• If a DET both enters and exits the boundary, count it only once for the elementary
process.
• Count one DET for the capability to send a system response message outside the
application boundary to indicate an error occurred during processing, confirm that
processing is complete or verify that processing should continue.

For example (EO/EQ), if a user tries to request a listing, but does not have access to
the information, count one DET for the system response.

• Count one DET for the ability to specify an action to be taken even if there are
multiple methods for invoking the same logical process.

For example (EO/EQ), if the user can initiate the generation of a report by clicking on
the OK button or by pressing a PF key, count one DET for the ability to initiate the
report.

• Do not count fields that are retrieved or derived by the system and stored on
an ILF during the elementary process if the fields did not cross the application
boundary.

For example (EO), when a paycheck is printed, a status field on the employee ILF
is updated to indicate that the check has been printed. Do not count the status field
as a DET since it did not cross the boundary.

• Do not count literals as DETs.

For example (EO/EQ), literals include report titles, screen or panel identification,
column headings, and field titles.

• Do not count paging variables or system-generated stamps.

For example (EO/EQ), system-generated variables and stamps include


• Page numbers
• Positioning information such as "Rows 37 to 54 of 211"
• Paging commands such as previous, next, and paging arrows on a GUI
application
• Date and time fields if they are displayed.

Hints to Help with Counting EIs, EOs and EQs


The following hints may help you apply the EI, EO and EQ counting rules.
Caution: The hints are not rules and should not be used as rules.

© Copy Right Virtual University of Pakistan 56


CS605 Software Engineering-II VU

• Is data received from outside the application boundary?


o Look at the work flow.
o Identify where the user and other application interfaces occur in the process
functional decomposition.
• Is the process the smallest unit of activity from the user perspective?
o Look at the different paper or on-line forms used.
o Review the ILFs to identify how the user groups the information.
o Identify where the user and other application interfaces occur in the process
functional decomposition.
o Look at what happened in the manual system.
o Note that one physical input or transaction file or screen can, when viewed
logically, correspond to a number of EIs, EOs or EQs.
o Note that two or more physical input or transaction files or screens can
correspond to one EI, EO or EQ if the processing logic is identical.
• Is the process self-contained and does it leave the business in a consistent state?
o Review other external inputs, external outputs and external inquiries to
understand how the user works with the information.
o Work through the process diagram to get hints.
o Look at what happened in the manual system.
o Check for consistency with other decisions.
• Is the processing logic unique from other EIs, EOs and EQs?
o Identify batch inputs or outputs based on the processing logic required.
o Remember that sorting or rearranging a set of data does not make processing
logic unique.
• Are the data elements different from those for other EIs, EOs or EQs?
o If the data elements appear to be a subset of the data elements of another EI,
EO, or EQ, be sure two elementary processes are required by the user – one
for the main data elements and one for the subsets.
• Identify the primary intent of the elementary process before classifying it as an EI,
EO, or EQ.
• Identification of the elementary process(es) is based on a joint understanding or
interpretation of the requirements between the user and the developers.
• Each element in a functional decomposition may not map to a unique elementary
process.
• The identification of the elementary processes requires interpretation of the user
requirements. Count only one FTR for each ILF/EIF referenced even if the ILF/EIF
has multiple RETs.

Additional Hints to Help Counting EOs and EQs


• Is the process the smallest unit of activity from the user perspective?
o An EO or EQ can be triggered by a process inside the application boundary. For
example, the user requires that a report of all changed employee pay rates be sent to
the budgeting area every 8 hours based on an internal clock. Situation A. The report
contains employee name, SSN, and hourly pay rate which are all retrieved from the
employee file. This is the smallest unit of activity from the user’s perspective,
contains no mathematical formulas or calculations, and no ILF is maintained in the
process. This is one EQ. Situation B. The report contains employee name, SSN, and
hourly pay rate which are all retrieved from the employee file. The report also

© Copy Right Virtual University of Pakistan 57


CS605 Software Engineering-II VU

includes the percentage pay change for the employee which is calculated from the
data on the employee file. This is the smallest unit of activity from the user’s
perspective, and no ILF is maintained in the process. However, since the process
contains a mathematical formula, this is one EO.
o Derived data for an EO does not have to be displayed on the output. For example,
each month, a report is generated listing all employees due for appraisal in the next
30 days. The records are selected by calculating next appraisal date based on the
employee’s last appraisal date, which is a field on the employee file, and the current
date plus 30 days. This would be counted as one EO, and not as an EQ.

General System Characteristics

The Unadjusted Function Point count is multiplied by an adjustment factor called the
Value Adjustment Factor (VAF). This factor considers the system's technical and
operational characteristics and is calculated by answering 14 questions. The factors are:

1. DATA COMMUNICATIONS
The data and control information used in the application are sent or received over communication facilities.
Terminals connected locally to the control unit are considered to use communication facilities. Protocol is a
set of conventions which permit the transfer or exchange of information between two systems or devices.
All data communication links require some type of protocol.

Score As:
0 Application is pure batch processing or a standalone PC.
1 Application is batch but has remote data entry or remote printing.
2 Application is batch but has remote data entry and remote printing.
3 Application includes online data collection or TP (teleprocessing) front end to a batch
process or query system.
4 Application is more than a front-end, but supports only one type of TP
communications protocol.
5 Application is more than a front-end, and supports more than one type of TP
communications protocol.

2. DISTRIBUTED DATA PROCESSING


Distributed data or processing functions are a characteristic of the application within the application
boundary.

Score As:
0 Application does not aid the transfer of data or processing function between
components of the system.
1 Application prepares data for end user processing on another component of the system
such as PC spreadsheets and PC DBMS.
2 Data is prepared for transfer, then is transferred and processed on another component
of the system (not for end-user processing).
3 Distributed processing and data transfer are online and in one direction only.
4 Distributed processing and data transfer are online and in both directions.
5 Processing functions are dynamically performed on the most appropriate component
of the system.

© Copy Right Virtual University of Pakistan 58


CS605 Software Engineering-II VU

3. PERFORMANCE
Application performance objectives, stated or approved by the user, in either response or
throughput, influence (or will influence) the design, development, installation, and
support of the application.

Score As:
0 No special performance requirements were stated by the user.
1 Performance and design requirements were stated and reviewed but no special actions
were required.
2 Response time or throughput is critical during peak hours. No special design for CPU
utilization was required. Processing deadline is for the next business day.
3 Response time or throughput is critical during all business hours. No special design
for CPU utilization was required. Processing deadline requirements with interfacing
systems are constraining.
4 In addition, stated user performance requirements are stringent enough to require
performance analysis tasks in the design phase.
5 In addition, performance analysis tools were used in the design, development, and/or
implementation phases to meet the stated user performance requirements.

4. HEAVILY USED CONFIGURATION


A heavily used operational configuration, requiring special design considerations, is a
characteristic of the application. For example, the user wants to run the application on
existing or committed equipment that will be heavily used.

Score As:

0 No explicit or implicit operational restrictions are included.


1 Operational restrictions do exist, but are less restrictive than a typical application. No
special effort is needed to meet the restrictions.
2 Some security or timing considerations are included.
3 Specific processor requirements for a specific piece of the application are included.
4 Stated operation restrictions require special constraints on the application in the
central processor or a dedicated processor.
5 In addition, there are special constraints on the application in the distributed
components of the system.

5. TRANSACTION RATE
The transaction rate is high and it influenced the design, development, installation, and
support of the application.

Score As:

1 Peak transaction period (e.g., monthly, quarterly, seasonally, annually) is anticipated.


2 Weekly peak transaction period is anticipated.
3 Daily peak transaction period is anticipated.
4 High transaction rate(s) stated by the user in the application requirements or service
level agreements are high enough to require performance analysis tasks in the design
phase.

© Copy Right Virtual University of Pakistan 59


CS605 Software Engineering-II VU

5 High transaction rate(s) stated by the user in the application requirements or service
level agreements are high enough to require performance analysis tasks and, in
addition, require the use of performance analysis tools in the design, development,
and/or installation phases. Online data entry and control functions are provided in the
application.

6. ONLINE DATA ENTRY


On-line data entry and control information functions are provided in the application.

Score As:

0 All transactions are processed in batch mode.


1 1% to 7% of transactions are interactive data entry.
2 8% to 15% of transactions are interactive data entry.
3 16% to 23% of transactions are interactive data entry.
4 24% to 30% of transactions are interactive data entry.
5 More than 30% of transactions are interactive data entry.

7. END-USER EFFICIENCY
The online functions provided emphasize a design for end-user efficiency. The design
includes:

• Navigational aids (for example, function keys, jumps, dynamically generated menus)
• Menus
• Online help and documents
• Automated cursor movement
• Scrolling
• Remote printing (via online transactions)
• Pre-assigned function keys
• Batch jobs submitted from online transactions
• Cursor selection of screen data
• Heavy use of reverse video, highlighting, colors underlining, and other indicators
• Hard copy user documentation of online transactions
• Mouse interface
• Pop-up windows.
• As few screens as possible to accomplish a business function
• Bilingual support (supports two languages; count as four items)
• Multilingual support (supports more than two languages; count as six items)

Score As:

0 None of the above.


1 One to three of the above.
2 Four to five of the above.
3 Six or more of the above, but there are no specific user requirements related to
efficiency.

© Copy Right Virtual University of Pakistan 60


CS605 Software Engineering-II VU

4 Six or more of the above, and stated requirements for end user efficiency are strong
enough to require design tasks for human factors to be included (for example,
minimize key strokes, maximize defaults, use of templates).
5 Six or more of the above, and stated requirements for end user efficiency are strong
enough to require use of special tools and processes to demonstrate that the objectives
have been achieved.

8. ONLINE UPDATE
The application provides online update for the internal logical files.

Score As:

0 None.
1 Online update of one to three control files is included. Volume of updating is low and
recovery is easy.
2 Online update of four or more control files is included. Volume of updating is low and
recovery easy.
3 Online update of major internal logical files is included.
4 In addition, protection against data lost is essential and has been specially designed
and programmed in the system.
5 In addition, high volumes bring cost considerations into the recovery process. Highly
automated recovery procedures with minimum operator intervention are included.

9. COMPLEX PROCESSING
Complex processing is a characteristic of the application. The following components are
present:

• Sensitive control (for example, special audit processing) and/or application specific
security processing
• Extensive logical processing
• Extensive mathematical processing
• Much exception processing resulting in incomplete transactions that must be
processed again, for example, incomplete ATM transactions caused by TP
interruption, missing data values, or failed validations
• Complex processing to handle multiple input/output possibilities, for example,
multimedia, or device independence

Score As:

0 None of the above.


1 Any one of the above.
2 Any two of the above.
3 Any three of the above.
4 Any four of the above.
5 All five of the above.

© Copy Right Virtual University of Pakistan 61


CS605 Software Engineering-II VU

10. REUSABILITY
The application and the code in the application have been specifically designed,
developed, and supported to be usable in other applications.

Score As:

0 No reusable code.
1 Reusable code is used within the application.
2 Less than 10% of the application considered more than one user's needs.
3 Ten percent (10%) or more of the application considered more than one user's needs.
4 The application was specifically packaged and/or documented to ease re-use, and the
application is customized by the user at source code level.
5 The application was specifically packaged and/or documented to ease re-use, and the
application is customized for use by means of user parameter maintenance.

11. INSTALLATION EASE


Conversion and installation ease are characteristics of the application. A conversion and
installation plan and/or conversion tools were provided and tested during the system test
phase.

Score As:

0 No special considerations were stated by the user, and no special setup is required for
installation.
1 No special considerations were stated by the user but special setup is required for
installation.
2 Conversion and installation requirements were stated by the user, and conversion and
installation guides were provided and tested. The impact of conversion on the project
is not considered to be important.
3 Conversion and installation requirements were stated by the user, and conversion and
installation guides were provided and tested. The impact of conversion on the project
is considered to be important.
4 In addition to 2 above, automated conversion and installation tools were provided and
tested.
5 In addition to 3 above, automated conversion and installation tools were provided and
tested.

12. OPERATIONAL EASE


Operational ease is characteristic of the application. Effective start-up, back-up, and
recovery procedures were provided and tested during the system test phase. The
application minimizes the need for manual activities, such as tape mounts, paper
handling, and direct on-location manual intervention.

Score As:

0 No special operational considerations other than the normal back-up procedures were
stated by the user.

© Copy Right Virtual University of Pakistan 62


CS605 Software Engineering-II VU

1 - 4 One, some, or all of the following items apply to the application. Select all that
apply. Each item has a point value of one, except as noted otherwise.

• Effective start-up, back-up, and recovery processes were provided, but operator
intervention is required.
• Effective start-up, back-up, and recovery processes were provided, but no operator
intervention is required (count as two items).
• The application minimizes the need for tape mounts.
• The application minimizes the need for paper handling.
5 The application is designed for unattended operation. Unattended operation means no
operator intervention is required to operate the system other than to start up or shut
down the application. Automatic error recovery is a feature of the application.

13. MULTIPLE SITES


The application has been specifically designed, developed, and supported to be installed at multiple sites for
multiple organizations.

Score As:
0 User requirements do not require considering the needs of more than one
user/installation site.
1 Needs of multiple sites were considered in the design, and the application is designed
to operate only under identical hardware and software environments.
2 Needs of multiple sites were considered in the design, and the application is designed
to operate only under similar hardware and/or software environments.
3 Needs of multiple sites were considered in the design, and the application is designed
to operate under different hardware and/or software environments.
4 Documentation and support plan are provided and tested to support the application at
multiple sites and the application is as described by 1 or 2.
5 Documentation and support plan are provided and tested to support the application at
multiple sites and the application is as described by 3.

14. FACILITATE CHANGE


The application has been specifically designed, developed, and supported to facilitate
change.
The following characteristics can apply for the application:

• Flexible query and report facility is provided that can handle simple requests; for
example, and/or logic applied to only one internal logical file (count as one item).
• Flexible query and report facility is provided that can handle requests of average
complexity, for example, and/or logic applied to more than one internal logical file
(count as two items).
• Flexible query and report facility is provided that can handle complex requests, for
example, and/or logic combinations on one or more internal logical files (count as
three items).
• Business control data is kept in tables that are maintained by the user with online
interactive processes, but changes take effect only on the next business day.
• Business control data is kept in tables that are maintained by the user with online
interactive processes, and the changes take effect immediately (count as two items).

© Copy Right Virtual University of Pakistan 63


CS605 Software Engineering-II VU

Score As:

0 None of the above.


1 Any one of the above.
2 Any two of the above.
3 Any three of the above.
4 Any four of the above.
5 All five of the above.

Adjusted FP Count
Each of these factors is scored based between 0-5 on their influence on the system being
counted. The resulting score will increase or decrease the Unadjusted Function Point
count by 35%. This calculation provides us with the Adjusted Function Point count.

Degree of Influence (DI) = sum of scores of 14 general system characteristics

Value Adjustment Factor (VAF) = 0.65 + DI / 100


The final Function Point Count is obtained by multiplying the VAF times the Unadjusted
Function Point (UFP).

FP = UFP * VAF

© Copy Right Virtual University of Pakistan 64


CS605 Software Engineering-II VU

Lecture No. 12
Software Process and Project Metrics
Everyone asks this question: how do I identify the problem? The answer is measure your
process. Measurement helps in identification of the problem as well as in determining the
effectiveness of the remedy.

Measurement is fundamental for providing mechanisms for objective evaluation of any


process or activity. According to Lord Kelvin:

When you can measure what you are speaking about and express it in numbers,
you know something about it; but when you cannot measure, when you cannot
express it in numbers, your knowledge is of a meager and unsatisfactory kind: it
may be the beginning of knowledge, but you have scarcely, in your thoughts,
advanced to the stage of a science.

In order to understand what your problems are, you need to measure. Only then a remedy
can be applied. Take the example of a doctor. He measures and monitors different types
of readings from a patient (temperature, heart beat, blood pressure, blood chemistry, etc)
before proposing a medicine. After giving the medicine, the doctor monitors the effect of
the medicine through the follow-up visits and makes the necessary adjustments. This
process of measurement, correction and feedback is inherent in all kinds of systems.
Software is no exception!

The idea is to measure your product and process to improve it continuously. Now the
question is: how can we measure the quality of a software process and system?

Software project management primarily deals with metrics related to productivity and
quality. For planning and estimation purposes, we look at the historic data – productivity
of our team and the quality of their deliverables in the past projects. This data from the
previous efforts is used to determine and estimate the effort required in our current project
to deliver a product with a predictable quality. This data is also used to analyze the
system bottlenecks and helps us in improving the productivity of our team and the quality
of our product.

Measures, Metrics and Indicators


Before we can talk about the measurement process, we first need to understand the terms
measure, metrics, and indicators. The terms measure, measurement, and metrics are often
used interchangeable but there are significant differences among them. Within the
software engineering domain, a measure provides a quantitative value of some attribute of
a process or a product. For example, size is one measure of a software product.
Measurement is the process or mechanism through which the measure is taken. For
example, FP analysis is a mechanism to measure the size of software. Measurement
involves taking one or more data points related to some aspect of the product or process.
Software metric relates individual software measures to provide a normalized view. For
example, defects per function point are one metric which relates two individual measures,
that is, defects and size, into one metric.

© Copy Right Virtual University of Pakistan 65


CS605 Software Engineering-II VU

Metrics give you a better insight into the state of the process or product. These insights
are not the problems but just the indicators of problems. A software engineers collects
measures and develops metrics and indicators.

Tom Gilb says, “Anything that you need to quantify can be measured in some way that is
superior to not measuring at all!” This quote has two messages:

1. Anything can be measured


2. It is always better to measure than not doing it even if you do not have a good
measuring device; it always gives you some information that you can use.

Metrics for software quality


The most important objective of any engineering activity is to produce high quality
product with limited resources and time. The quality of the product cannot be determined
if it is be measured.

The quality of the end result depends upon the quality of the intermediate work products.
If the requirements, design, code, and testing functions are of high quality, then the
chances are that the end product will also be of good quality. So, a good software
engineer would adopt mechanisms to measure the quality of the analysis and design
models, the source code, and the test cases.
mcqs
At the project level, the primary focus is to measure errors and defects and derive relevant
metrics such as requirement or design errors per function point, errors uncovered per
review hour, errors per thousand lines of code. These metrics provide an insight into the
effectiveness of the quality assurance activities at the team as well as individual level.

© Copy Right Virtual University of Pakistan 66


CS605 Software Engineering-II VU

Lecture No. 13
Software Quality Factors
mcqs
In 1978, McCall identified factors that could be used to develop metrics for the software
quality. These factors try to assess the inner quality of software from factors that can be
observed from outside. The basic idea is that the quality of the software can be inferred if
we measure certain attributes once the product is put to actual use. Once completed and
implemented, it goes through three phases: operation (when it is used), during revisions
(when it goes through changes), and during transitions (when it is ported to different
environments and platforms). three phases short question

During each one of these phases, different types of data can be collected to measure the
quality of the product. McCall’s model is depicted and explained as follows.

quiz Factorsrelated with operation most important


• Correctness
– The extent to which a program satisfies its specifications and fulfills the
customer’s mission objectives

• Reliability
– The extent to which a program can be expected to perform its intended
function with required precision.

• Efficiency
– The amount of computing resources required by a program to perform its
function

• Integrity
– Extent to which access to software or data by unauthorized persons can be
controlled.

• Usability
– Effort required to learn, operate, prepare input, and interpret output of a
program

© Copy Right Virtual University of Pakistan 67


CS605 Software Engineering-II VU

Factors related with revision

• Maintainability
– Effort required to locate and fix an error in a program

• Flexibility
– Effort required to modify an operational program

• Testability
– Effort required to test a program to ensure that it performs its intended
function

Factors related with adaptation

• Portability
– Effort required transferring the program from one hardware and/or
software system environment to another.

• Reusability
– Extent to which a program can be reused in other applications

• Interoperability
– Effort required to couple one system to another.

It is interesting to note that the field of computing and its theoretical have gone through
phenomenal changes but McCall’s quality factors are still as relevant as they were almost
25 years ago. mcqs

Measuring Quality
Gilb extends McCall’s idea and proposes that the quality can be measured if we measure
mcqs
the correctness, maintainability, integrity, and usability of the product.

Correctness is defined as the degree to which software performs its function. It can be
measured in defects/KLOC or defects/FP where defects are defined as verified lack of
conformance to requirements. These are the problems reported by the user after release.
These are counted over a standard period of time which is typically during the first year
of operation.

Maintainability is defined as the ease with which a program can be corrected if an error is
encountered, adapted if environment changes, enhanced if the customer requires an
enhancement in functionality. It is an indirect measure of the quality.
A simple time oriented metric to gauge the maintainability is known as MMTC – mean
time to change. It is defined as the time it takes to analyze the change request, design an
appropriate modification, implement the change, test it, and implement it.

A cost oriented metric used to assess maintainability is called Spoilage. It is defined as


the cost to correct defects encountered after the software has been released to the users.
Spoilage cost is plotted against the overall project cost as a function of time to determine
whether the overall maintainability of software produced by the organization is
improving.

© Copy Right Virtual University of Pakistan 68


CS605 Software Engineering-II VU

Integrity is an extremely important measure especially in today’s context when the system
is exposed to all sorts to attacks because of the internet phenomenon. It is defined as
software’s ability to withstand attack (both accidental and intentional) to its security. It
includes integrity of program, data, and documents. To measure integrity, two additional
attributes are needed. These are: threat and security.

Threat is the probability (derived or measured from empirical evidence) that an attack of a
specific type will occur within a given time and security is the probability that an attack
of a specific type will be repelled. So the integrity of a system is defined as the sum of all
the probability that the threat of a specific type will not take place and the probability that
if that threat does take place, it will not be repelled.

Integrity = ∑ [(1-threat) x (1-security)] mcq


Finally, usability is a measure of user friendliness – the ease with which a system can be
used. It can be measured in terms of 4 characteristics:

• Physical or intellectual skill required learn the system


• The time required to become moderately efficient in the use of system
• The net increase in productivity
• A subjective assessment

It is important to note that except for the usability, the other three factors are essentially
the same as proposed by McCall.

Defect Removal Efficiency


Defect removal efficiency is the measure of how many defects are removed by the quality
assurance processes before the product is shipped for operation. It is therefore a measure
that determines the effectiveness of the QA processes during development. It is useful at
both the project and process level.
Defect removal efficiency is calculated as the number of defect removed before shipment
as a percentage of total defects

DRE = E/(E+D) mcqs + Short numerical


Where
• E – errors found before delivery
• D – errors found after delivery (typically within the first year of operation)

Regarding the effectiveness of various QA activities, Capers Jones published some data
in 1997 which is summarized in the following table.

Design Inspection
Code Inspection
Quality Assurance
Testing
Worst
In 30% to
this research, they tried 37% 50% the
measure 55%effectiveness
65% 75% of 77% 85% 95%
4 different activities namely
Medianinspection, code40%
design 53% 65%
inspection, 70%
quality 80% 87%
assurance 90% and
function, 97%testing.
99%It is important
Best
to 50%
note that testing alone 60%
only 75%
yields 80% of87%
a DRE 40%93%on the95% 99% However,
average. 99.9% when it is
combined with design and code inspection, the DRE reaches 97%. That means, code and

© Copy Right Virtual University of Pakistan 69


CS605 Software Engineering-II VU

design inspection are extremely important activates that are unfortunately not given their
due importance.

© Copy Right Virtual University of Pakistan 70


CS605 Software Engineering-II VU

Lecture No. 14
Metrics for specification quality
As mentioned earlier, the quality of the software specification is of extreme importance as
the entire building of software is built on this foundation. A requirement specification
document is measured in terms of lack of ambiguity, completeness, consistency,
correctness; understand ability, verifiability, achievability, concision, traceability,
modifiability, precision, and reusability.

Metrics to assess the quality of the analysis models and the corresponding software
specification were proposed by Davis in 1993 for these seemingly qualitative
characteristics.

For example, the numbers of requirements are calculated as:

nr = nf + nnf mcqs
where
nr – total number of requirements
nf – functional requirements
nnf – non-functional requirements

Now lack of ambiguity in the requirements is calculated as:

Q1 = nui/nr

Where
nui – number of requirements for which all reviewers had identical interpretation (i.e.
unambiguous requirements)

Similarly, completeness is measures as follows:

Q2 = nu/ [ni x ns]

nu – unique functional requirements


ni – number of inputs (stimuli)
ns – number of states specified

On the similar lines, the quality of design is also measured quantitatively.


The quality of the architectural design can be measured by measuring its complexity as
shown below:
fanout means that on how many system it is
– Structural complexity S = (fout)2
depend.more means more couple with
– Data complexity D = v/(fout + 1) others
• ‘v’ is the number of input and output variables

– System complexity C = ∑ (Si + Di)

© Copy Right Virtual University of Pakistan 71


CS605 Software Engineering-II VU

Baseline
In order to use the data for estimation and drawing conclusions, it must be base-lined. In
the baseline, data from past projects is collected, cleaned, and put in a database. Such
metrics baseline is used to reap benefits at the process, project, and product level.

As mentioned above, the metrics baseline consists of data collected from past project over
a period of time. To be effective, the data must be reasonably accurate, it should be
collected over many projects, measures must be consistent – same technique or yardstick
for data collection should have been used, applications should be similar to work that is to
be estimated, and feedback to improve baseline’s quality.

Metrics for small organizations


The metric program can be quite complex and extensive. Small organization would find it
difficult to implement a full-fledged metrics program as it may require quite a number of
resources. However, it is important to appreciate that a metrics program of even a smaller
scale would also be of immense value and therefore all organizations of all sizes should
have should have one. It can be a very simple and can be implemented with the help of
simple and inexpensive tools and methods.

Small organizations – around 20 or so people – must measure in a cost effective manner.


In order for it to be effective, it should be simple and value-oriented and should focus on
result rather than measurement. It is important to establish the objectives of measurement.

This is illustrated by the following example.

Let us assume that we wanted to reduce the time to evaluate and implement change
requests in our organization. In order to achieve this objective, we needed to measure the
following:

• Time (in hours or days) elapsed from the time a request is made until evaluation is
complete - tqueue
• Size (fp) of the change request
• Effort (in person months) to perform the evaluation- Weval
• Time elapsed from completion of evaluation to assignment of change order – teval
• Effort required to make the change – Wchange
• Time required to make the change – tchange
• Errors uncovered during work to make change – Echange
• Defects uncovered after change is released – Dchange

This data was then collected and stored in a simple database as shown below.

© Copy Right Virtual University of Pakistan 72


CS605 Software Engineering-II VU

Project Size Effort Cost Rs.Pages ofPre- Post- People


(FP) (Pm) (000) documentation shipment shipment
errors defects

abc 120 24 168000 365 134 29 3

def 270 62 440000 1224 321 86 5

ghi 200 43 314000 1050 256 64 6

This data is then normalized on per function point basis as follows:

Project Size Effort Cost Rs.Pages ofPre- Post- People


(FP) (Pm) (000) documentation shipment shipment
errors defects

abc 120 3
0.2 1400 3.04 1.12 0.24
def 270 5
0.23 1629 4.53 1.19 0.32
ghi 200 6
0.22 1570 5.25 1.28 0.32

We are now ready to use this data to analyze the results of process changes and their
impact on the time to implement change requests.

© Copy Right Virtual University of Pakistan 73


CS605 Software Engineering-II VU

In order to do that, we need to employ some statistical techniques and plot the result
graphically. This is known as statistical control techniques. mcqs

© Copy Right Virtual University of Pakistan 74


CS605 Software Engineering-II VU

Lecture No. 15
Statistical Control Techniques – control charts
Same process metrics vary from project to project. We have to determine whether the
trend is statistically valid or not. We also need to determine what changes are meaningful.
mcq A graphical technique known as control charts is used to determine this.

This technique was initially developed for manufacturing processes in the 1920’s by
Walter Shewart and is still very applicable even in disciples like software engineering.
mcq Control charts are of two types: moving range control chart and individual control chart.
This technique enables individuals interested in software process improvement to
determine whether the dispersion (variability) and “location” (moving average) of process
metrics are stable (i.e. the process exhibits only natural or controlled changes) or unstable
(i.e. the process exhibits out-of-control changes and metrics cannot be used to predict
performance).

Let us now demonstrate the use of these control charts with the help of an example.
Let us assume that the data shown in the following table regarding the average change
implementation time was collected over the last 15 months for 20 small projects in the
same general software domain 20 projects. To improve the effectiveness of reviews, the
software organization provided training and mentoring to all project team members
beginning with project 11.

Time /change
Project implementation
1 3
2 4.5
3 1.2
4 5
5 3.5
6 4.8
7 2
8 4.5
9 4.75
10 2.25
11 3.75
12 5.75
13 4.6
14 3.25
15 4
16 5.5
17 5.9
18 4
19 3.3
20 5.8

© Copy Right Virtual University of Pakistan 75


CS605 Software Engineering-II VU

In order to determine whether our change in process had any impact, we use control
charts.

This data is first presented in the graph form as follows:


Errors found per review

7
6
5
4
hour

3
2
1
0
1 3 5 7 9 11 13 15 17 19
Projects

We now develop the Moving Range Control Chart as follows:

1. Calculate the moving ranges: the absolute values of the successive differences
between each pair of data point. Plot these moving ranges on your chart. (the dark
blue line)
2. Calculate the mean of the moving ranges. Plot this on the chart. (the red line)
3. Multiply the mean with 3.268. Plot this as the Upper Control Line (UCL). This
line is 3 standard deviations above the line. (the light blue line)
4. To determine whether the process metrics description is stable, a simple question
is asked: are the moving ranges values inside the UCL? If the answer is yes then
the process is stable otherwise it is unstable.

This chart is shown in the following diagram:

7
successive values

6
Differences in

5
4
3
2
1
0
1 3 5 7 9 11 13 15 17 19
Projects

© Copy Right Virtual University of Pakistan 76


CS605 Software Engineering-II VU

This chart is then used to develop the individual control chart as follows:
1. Plot individual metric values
2. Compute the average value for the metrics values - Am
3. Multiply the mean of moving average by 2.66 and add average computed in step 2
above. The result is Upper Natural Process Limit (UNPL) mcqs
4. Multiply the mean of moving average by 2.66 and subtract average computed in
step 2 above. The result is Lower Natural Process Limit (LNPL)
5. Plot UNPL and LNPL. If LNPL is less than zero than it need not be plotted unless
the metric being evaluated takes on values that are less than 0.
6. Compute a standard deviation as (UNPL – Am)/3.
7. Plot lines 1 and 2 standard deviations above and below Am.
8. Applying these steps we derive an individual control chart.

This chart may be used to evaluate whether the changes represented by metrics
indicate a process that is in control or out of control. For this, the following 4 criteria
zone rules are used.

1. A single metrics value lies outside UNPL


2. Two out of three successive values lay more than 2 standards deviations away
from Am.
3. Four out of five successive values lay more than one standard deviation away.
4. Eight consecutive values lie on one side of Am.

If any of these tests passes, the process is out of control otherwise the process is
within control. mcq

Since none of the test passes for the data in our example, our process is in control and
this data can be used for inference.

We now analyze our results. It can be seen that the variability decreased after project
10. By computing the mean value of the first 10 and last 10 projects, it can be shown
that the remedial measure taken was successful and resulted in 29% improvement in
efficiency of the process. Hence the process changes incorporated were useful and
bore fruit.

© Copy Right Virtual University of Pakistan 77


CS605 Software Engineering-II VU

Lecture No. 16
Interpreting Measurements
MCQ

A good metric system is the one which is simple and cheap and at the same time adds a
lot of value for the management. Following are some of the examples that can be used for
effective project control and management.

We can collect data about the defects reported, and defects fixed and plot them in the
following manner, with their difference showing the defects yet to be fixed. This can give
us useful information about the state of the product. If the gap between the defects
reported and defects fixed is increasing, then it means that the product is in unstable
condition. On the other hand if this gap is decreasing then we can say that the product is
MCQS
in a stable condition and we can plan for shipment.

gap between defects increases= unstable product Total Defects


reported fixed to
gap between defects decreseas= stable product defects date

Defects
Defects
yet to be
fixed

Time

Similarly, we can gain useful information by plotting the defects reported against the
number of use cases run. We can use control lines from our previous data and see if the
actual defects are within those control limits. If the defects at any given point in time are
less than the lower limit then it may mean that out testing team is not doing a good job
and coverage is not adequate. On the other hand, if it crosses the upper line then it
indicates that the design and coding is not up to mark and we perhaps need to check it.

Upper limit

Defects Actual
defects Lower limit

Test cases

© Copy Right Virtual University of Pakistan 78


CS605 Software Engineering-II VU

in 2023
Another very simple graph as shown below can give a lot of insight into the design
quality. In this case, if the frequency of ripple defects is too large, then it means that then
there is tight coupling and hence the design is not maintainable.

4 Three new defects


- appeared as a
consequence of
3 fixing defect 5
-
Defect
2
Ripple
-

1
-
1 2 3 4 5 6 7 8 9
0 Defect Fixed
-

The following is yet another very simple and effective way of getting insight into the
4
-

3
Not - A - Defect

2
-

1
-

0
-
Time

quality of the requirements. If a number of defects that are reported by the testing team
are ultimately resolved as not-a-defect then there may be a sever problem with the
requirements document as two teams (development and testing) are interpreting it
differently and hence coming to different conclusions.

© Copy Right Virtual University of Pakistan 79


CS605 Software Engineering-II VU

Lecture No. 17
Software Project Planning
Software project planning is an activity carried out by the project manager to estimate and
address the following points:

1. Software scope estimation


2. Resources requirements
3. Time requirements
4. Structural decomposition
5. Risk analysis and planning

Software scope estimation


Software scope describes the data and control to be processed, function, performance,
constraints, interfaces, and reliability. Determination of the software scope is a pre-
requisite of all sorts of estimates, including, resources, time, and budget.
MCQ
In order to understand the scope, a meeting with the client should be arranged. The
analyst should start with developing a relationship with the client representative and start
with context-free questions. An understanding of the project background should also be
developed. This includes understanding:

• Who is behind the request (sponsor)?


• Who will use the solution (users)?
• What are the economic benefits (why)?

Now is the time to address the find out the more about the product. In this context, the
following questions may be asked:

• How would you characterize good output?


• What problems will the solution address?
• Can you show me the environment in which the solution will be used?
• Will any special performance issues or constraints affect the way the solution is
approached?
• Are you the right person to answer these questions? Are answers “official”?
• Are my questions relevant to the problem that you have?
• Am I asking too many questions?
• Can anyone else provide additional information?
• Should I be asking you anything else?
full form of fast MCQ in 2023
In this regards, a technique known as Facilitated Application Specification Techniques
or simply FAST can be used. This is a team-oriented approach to requirement gathering
that is used during early stages of analysis and specification. In this case joint team of
customers and developers work together to identify the problem, propose elements of the
solution, negotiate different approaches, and specify a preliminary set of requirements.

© Copy Right Virtual University of Pakistan 80


CS605 Software Engineering-II VU

Feasibility
The purpose of the feasibility analysis is to determine can we build software to meet the
scope? For this purpose, the project is analyzed on the following 4 dimensions:

Technology
• Is the project technically feasible?
• Is it within the state of the art?
• Can defects be reduced to a level matching the application needs?

Finance
• Is it financially feasible?
• Can development be completed at a cost that software organization, its client, or
the market can afford?

Time
• Will the project time to market beat the competition?
• Can we complete the project in the given amount of time?

Resources
• Does the organization have resources needed to succeed? The resources include:
• HW/SW tools
• Reusable software components
• People

Software Project Estimation


Once the project feasibility has been determined, the project manager starts the estimation
activity. It is a relatively difficult exercise and has not become an exact science. It is
influenced by human, technical, environmental, political factors.

For software project estimation, a project manager can use historic data about its
organizations previous projects, decomposition techniques, and/or empirical models
developed by different researchers.

Empirical Models

Empirical models are statistical models and are based upon historic data. Although there
are many different models developed by different researchers, all of them share the
following basic structure:

E = A + B * (ev)C MCQS

where
A, B, c are empirical constants,
‘ev’ is the effort in terms of lines of code or FP, and
‘E’ is the effort in terms of person months.
MCQS
The most famous of these models is the COCOMO - COnstructive COst MOdel – model.
It also has many different versions. The simplest of these versions is given below:
E = 3.2 (KLOC)1.05

© Copy Right Virtual University of Pakistan 81


CS605 Software Engineering-II VU

Some of these models take into account the project adjustment components including
problem complexity, staff experience, and development environment.

It is important to note that there are a number of models with each yielding a different
result. This means that any model must be calibrated for local needs before it can be
effectively used.

The Software Equation

The software equation shown below is dynamic multivariable estimation model. It


assumes a specific distribution of effort over the life of the software development project
and is derived from productivity data collected for over 4000 projects.

E = [LOC x B0.333/P]3 x (1/t4) MCQS

Where:
• E – effort in person months or person years
• t – project duration in months or years
• B – special skill factor
– Increases slowly as the need for integration, testing, QA, documentation,
and management skills grow
• P – productivity parameter
– Overall process maturity and management practices
– The extent to which good SE practices are used
– The level of programming language used
– The state of the software environment
– The skills and experience of the software team
– The complexity of the application

Buy versus build

It is often more cost-effective to acquire than to build. There may be several different
options available. These include:

• Off-the-shelf licensed software


• Software components to be modified and integrated into the application
• Sub-contract

The final decision depends upon the criticality of the software to be purchased and the
end cost. The buy versus build decision process involves the following steps:

• Develop specification for function and performance of the desired software.


Define measurable characteristics whenever possible.
• Estimate internal cost and time to develop
• Select 3-4 candidate applications that best meet your specifications
• Select reusable software components that will assist in constructing the required
application
• Develop comparison matrix that presents a head-to-head comparison of key
function. Alternatively, conduct benchmark tests to compare candidate software.

© Copy Right Virtual University of Pakistan 82


CS605 Software Engineering-II VU

• Evaluate each software package or component based on past product quality,


vendor support, product direction, reputation, etc.
• Contact other users of the software and ask for opinion.

The following key considerations must always be kept in the perspective:


• Delivery date
• Development Cost
– Acquisition + customization
• Maintenance Cost

A decision tree can be built to analyze different options in this regards. As an example of
this, let us consider the following. In this case, we have four different options, namely,
build, reuse, buy, and contract. We analyze each one of these with the help of a decision
tree. Each node of the tree is further partitioned a probability is assigned to each branch.
At the end, cost for each path in the tree, from root to a leaf, is estimated and associated
with that path. This process is shown in the following diagram.
buy=minor+major
build=simple+diffiult - 380,000
Simple (0.30) contract=without change+ with
reuse=minor+major change
ild

Difficult (0.70) - 450,000


Bu

Minor changes (0.40) - 275,000

e Simple (0.20) - 310,000


us Major
Re changes Complex (0.80) - 490,000
(0.60)
Bu Minor changes (0.70) - 210,000
y
C

Major changes (0.30) - 400,000


on
tra

Without changes (0.80) - 350,000


ct

With changes (0.20) - 500,000

Once the information in the tree is complete, it is used to determine the most viable
option. For each option the expected cost is determined as follows:

Expected cost = ∑ (path probability)I x (estimated path cost)

Using this formula, we calculate the expected cost of each option as follows:

Build = 0.30*380 + 0.70*450000 = 429000


Reuse = 0.4*275000 + 0.6*0.2*310000 + 0.6*0.8*490000 = 382400

The expected cost of Buy and Contract can also be calculated in a similar fashion and
comes out to be:

Buy = 267000
Contract = 380000

Therefore, according to this analysis, it is most viable to buy than any other option.

© Copy Right Virtual University of Pakistan 83


CS605 Software Engineering-II VU

Lecture No. 18
Risk analysis and management

Analysis and management of project risks is also a very important activity that a project
manager must perform in order to improve the chances for the project. Robert Charette
defines risk as follows:

Risk concerns future happenings. Today and yesterday are beyond active concern.
The question is, can we, therefore, by changing our action today create and
opportunity for a different and hopefully better situation for ourselves tomorrow.
This means, second, that risk involves change, such as changes in mind, opinion,
action, or places. … [Third,] risks involve choice, and the uncertainty that choice
itself entails.
Q in 2022
Risk analysis and management involves addressing the following concerns:

1. Future – what risks might cause the project to go awry


2. Change – what change might cause the risk to strike
• How changes in requirements, technology, personnel and other entities
connected to the project affect the project
3. Choice – what options do we have for each risk

In Peter Drucker words:

while it is futile to try to eliminate risk, and questionable to try to minimize it, it is
essential that the risk taken be the right risk.

There are two basic risk management philosophies, reactive and proactive.

• Reactive – Indiana Jones school of risk management


– Never worrying about problems until they happened, and then reacting in
Q in 2023 some heroic way – Indiana Jones style.
• Proactive
– Begins long before technical work starts
– Risks are identified, their probability and impact are analyzed, and they are
ranked by importance.
– Risk management plan it prepared
• Primary objective is to avoid risk
• Since all risks cannot be avoided, a contingency plan is prepared
that will enable it to respond in a controlled and effective manner

Unfortunately, Indiana Jones style is more suitable for fiction and has a rare chance of
success in real life situations. It is therefore imperative that we manage risk proactively.

A risk has two characteristics: Important


• Uncertainty – the risk may or may not happen
• Loss – if the risk becomes a reality, unwanted consequences or losses will occur.

© Copy Right Virtual University of Pakistan 84


CS605 Software Engineering-II VU

A risk analysis involves quantifying degree of uncertainty of the risk and loss associate
with it. In this regards, the PM tries to find answers to the following questions:

• What can go wrong?


• What is the likelihood of it going wrong?
• What will the damage be?
• What can we do about it?

Lecture No. 19
Types of Risks

© Copy Right Virtual University of Pakistan 85