GGBS Credentials 1
GGBS Credentials 1
Stock is maintained asper business plan and closely monitored by the Production
head.
1.Slag- Slag is received from JSW steel plant through stacker and additional slag is
kept in the open area. (BC03 side)
2.Clinker-Stored in clinker silo. -Emergency stock is maintained at Jetty area.
3.Gyspsum- It is stored in the Gypsum Shed and ensure sufficient stock for
emergency.
2.2 Procedure of product, process and control:
The plant has a grinding and packing facility and has the portfolio of following
products:
1.Portland Slag Cement (PSC): - 50 to 52 % slag addition along with clinker and
gypsum.
2.Ordinary Portland Cement (OPC): No slag addition -95 % clinker & 5 % Gypsum
3.Ground Granulated Blast Furnace Slag (GGBS). :100% slag
The plant receives high quality Slag from JSW Steel Limited and procures Clinker
and Gypsum from other industries. Grinding and Packing is done through a state of
the art facility fully controlled from the Central Control Room, PLC Based system.
The Blast Furnace Gas and Coke Oven gases are used as fuel for the drying of raw
material in place of coal to reduce carbon footprints.
The quality is tested by quality control department each hour and final products are
stored in respective silos.
JSW Cement Limited has set up the 2.2 MTPA cement plant at Dolvi, Major
equipments are VRM-Vertical Roller mills and Roller Press (RP), both are designed
for optimum heat and energy consumption.
The plant has two types of mills, Roller press and Vertical Roller mills, one is for
grinding the clinker with 3-5% of gypsum and another for grinding the blast furnace
slag. After grinding, both the products are kept separately in silos. Both the
products are then mixed in a suitable proportion to make Portland Slag Cement
(PSC).
VRM: The JSW Dolvi unit has the two Vertical Roller Mills supplied by UBE Japan.
One VRM which is having capacity of 72 TPH was commissioned in the year of 1999
and another one was commissioned in the year of 2016 with 43 TPH for PSC &
GGBS grinding facility.
The ground slag with about 370 M²/ Kg. Blaine (fineness) in GGBS is separated from
the separator and stored in cement silo of 5500 MT capacity.
For manufacturing Portland Slag Cement (PSC), both OPC and GGBS (Granulated
Ground Blast-furnace Slag) are fed into the blender in pre-determined quantities.
Slag Mills-RP
Recently 2 Roller presses are commissioned in year of 2018-19 operating in the
combined circuit for Slag grinding. JSW Cement Ltd. is the first company in the
Indian Cement Industry to install this type of circuit.
JSW Cement plant is designed for manufacturing 100% Portland Slag Cement
(PSC), eco-friendly green cement highly useful in coastal areas. PSC is very popular
in other countries for last several years but in India it is now gradually becoming
popular in construction industry.
The Company has installed 03 nos. of latest technology Roto packers (02 nos FLS
Ventomatic), with 90 TPH capacity and new 01 nos. Beumer make 120 tph. The
bags, having filled with predetermined quantity, are discharged on to the conveyor
and carried to the loading machine. In between, an online printer is installed for
printing of MRP, Week No. & Year on every bag. Bags are loaded in the trucks in a
systematic way just like palletization. The operators of the truck loader can fix the
loading pattern on the truck. JSW cement Dolvi also has the 05 bulk loading stations
having 150 tph capacity
Logistic department ensures the order execution and timely delivery of products.
4 ,5 ,6,7. Flow Chart: The flow chart for the entire process:
4.Raw
material
Business Plan Procurement Procurement Receiving - process
of raw of raw stores
material
material- material-
Storage of
raw material
Process Control –VRM-1-Procedure
Process Control: VRM-2
Process Control: Roller Press-procedure
Flow chart Roller press:
Storage and packing/loading:
Production planning /process planning
MIXER
15 Chemical Moduli
(A) (CaO + MgO + 1/3Al2O3) / SiO2+2/3Al2O3 1.00 (Min) 1.07
(B) CaO + MgO + Al2O3 / SiO2 1.00 (Min) 1.79
Note : Slag activity index (SAI) shall be determined using blend of 50 % GGBS and 50 % control OPC 43 conforming to IS
269, having total alkalies (Na2O+0.658 K2O not less than 0.6 % and not more than 0.9 % ). The blend shall be tested in
accordance with IS 4031 ( Part 6), for determining compressive strength of mortar.
SAI shall be determined as: Compressive strength of the mortar cube using blend
*100
Compressive strength of control OPC mortar cube
Week No.: 16 Month: 4 Year: 2022
Address:
JSW CEMENT LIMITED
Village- Khar Karavi, Post - Gadab Head-Quality Assurance
Taluka- Pen, District- Raigad
402107, Maharashtra. +91 2143 277601/2
TEST CERTIFICATE
Ground Granulated Blast Furnace Slag
THE LEADERS' CHOICE
15 Chemical Moduli
(A) (CaO + MgO + 1/3Al2O3) / SiO2+2/3Al2O3 1.00 (Min) 1.06
(B) CaO + MgO + Al2O3 / SiO2 1.00 (Min) 1.78
Note : Slag activity index (SAI) shall be determined using blend of 50 % GGBS and 50 % control OPC 43 conforming to IS
269, having total alkalies (Na2O+0.658 K2O not less than 0.6 % and not more than 0.9 % ). The blend shall be tested in
accordance with IS 4031 ( Part 6), for determining compressive strength of mortar.
SAI shall be determined as: Compressive strength of the mortar cube using blend
*100
Compressive strength of control OPC mortar cube
Week No.: 19 Month: 5 Year: 2022
Address:
JSW CEMENT LIMITED
Village- Khar Karavi, Post - Gadab Head-Quality Assurance
Taluka- Pen, District- Raigad
402107, Maharashtra. +91 2143 277601/2
JSW Cement Limited-Dolvi
List of laboratory Calibration
Next Due
Valid Date of
Sr.No Test Equipments / Chemicals Identification No. Least count & Range Test Used Clause reference Remarks date of
Calibration Calibration
Calibration
L.C-0.1 Range 1 to 500KN Yes For CTM Calibrations IS:4169-1988 1 24.01.2022 23.01.2024
1 Proving Ring 272.98. 500 KN Make: Malik Engg. 272.98
2 Digital Tensile Tester Machine DRX-5KN Make : Deepak Polyplast DRX-5KN L.C.-0.1 Max cap 2500 N Yes For bags strength Testing IS:1828(1):2015 1 22.07.2021 21.07.2022
Range upto 1200deg.Cent. Yes To cross check the temperature IS:4031 1 01.12.2021 30.11.2022
4 Digital Temperature Indicator Model:K Type. 6853 Make : Fourtech NA
0 to 24 Hr L.C 0.1 Sec Yes To check the time IS:4031(Part 6) 1988 1 01.12.2021 30.11.2022
5 Stop Watch Digital I.D.SW-01 Make: Racer .SW-01
Range 0 – 250 deg.cent. Yes For moisture testing. IS:4031 2 01.12.2021 30.11.2022
10 Laboratory Hot Air oven KI-03-05-01 & 02 Make :kumar KI-03-05
Range 10 – 60◦ C. L.C. 0.1/1%RH Yes For cube mould storage as per IS IS:4031 2 01.12.2021 30.11.2022
11 Environmental Test chamber 2X-07-74 & 2K9-08-116 Make :kumar 2X-07-74 & 2K9-08-116
Range 0-1200 deg.Cent. LC.1◦C Yes Testing at diff.temperature IS:4031 01.12.2021 30.11.2022
12 Furnace GPC 1200 Make :Carbolite GPC 1200 1
Range 0-1200 deg.Cent. L.C 1◦C Yes Testing at diff.temperature IS:4031 01.12.2021 30.11.2022
13 Muffle Furnace MF-01 Make :Thereleck MF 01 1
B137245931 L.C 0.1 mg Cap. 0.1mg to 220 mg. Yes Sample weighing purpose. IS:4031/ IS:4032 29.12.2021 28.12.2022
14 Electronic Balance -220 gm ML204/A01 Make : Mettler Toledo 1
1121183043 L.C 0.1 mg Cap. 0.1mg to 220 mg. Yes Sample weighing purpose. IS:4031/ IS:4032 29.12.2021 28.12.2022
15 Electronic Balance -220 gm AB 204-S Make : Mettler Toledo 1
22104066 L.C. 0.1 mg Cap. 1 gm to 3.0 kg Yes Sample weighing purpose. IS:4031 29.12.2021 28.12.2022
16 Electronic Balance 3.0Kg EWT3000 Make : EUREKA 1
22104067 L.C. 0.1 mg Cap. 1 gm to 3.0 kg Yes Sample weighing purpose. IS:4031 29.12.2021 28.12.2022
17 Electronic Balance 3.0Kg EWT3000 Make : EUREKA 1
180455743 L.C. 0.1 mg Cap. 1 gm to 3.0 kg Yes Sample weighing purpose. IS:4031 29.12.2021 28.12.2022
18 Electronic Balance 3.0Kg SW/II-30ED Make : CAS 1
Yes To check the Humidity & Temp. IS:4031(Part 6) 1988 01.12.2021 30.11.2022
20 Dry & Wet bulb Thermometer Make : Zeal DWB-01 L.C.-1 deg.cent. Range 10 to 50◦C 1
Scope: The QC is equipped with full-fledged Grinding Unit laboratory for consisting of
a) Chemical Lab
b) Physical Lab
c) Instrument X‐Ray Lab
d) Shift Lab
e) Sampling Rooms
Purpose
Inspection, measuring and test equipment are calibrated at prescribed intervals and maintained to
demonstrate the conformance of product
Criteria and methods of operation of processes are defined, adequate controls are in place and
actions are taken in case of any nonconformity
Timely corrective and preventive actions are taken for actual and potential nonconformities/ deviations
Ensure that those operations having significant effect on environment, Energy Use, OHS at work
place are carried out under controlled conditions.
Scope
All products i.e. raw materials, in‐process and finished products in JSW Cement Plant at Dolvi.
All equipment used in the Quality Control Department at JSW Cement plant at Dolvi.
Organization structure
To keep the consistency of JSW Cement considering various factors like different weather, clinker / slag quality
etc. , we propose to adopt the action plan as follows.
Control Factors :
1. The above action plan is based on the clinker being received presently from Japan, Iran, UAE Cement.
However, in case of the change in the source/quality of clinker receipt, timely appropriate corrective action
plan will be implemented as deem fit.
3. Filling & dispatch of product from the same silo at a time will be avoided to give consistent product. CCR &
Quality Control Department to take necessary action.
4. Mixing of PSC, CHD will be started after filling of minimum 50 % of rated capacity of intermediate GC silo
to ensure consistency of product. CCR to take necessary action.
5. Frequent Change over of PSC to GGBS CHD to GGBS & vice versa in packing machine is to be avoided.
Quality Control / logistic departments to ensure at the time of change over.
Remarks:
With the above action plan we have taken care of giving consistent product to the consumer throughout the
year maintaining over all 50 - 52 % slag addition.
QC Head.
Annexure-1
Various raw materials like clinker, chemical gypsum, anhydrite gypsum & granulated slag are being used
for manufacture of OPC ( Ordinary Portland Cement) , GGBS (Ground granulated blast furnace slag ) & PSC
(Portland Slag Cement).
a) Clinker :
Unloading the trucks at JSW site shed/ yard . HOD (Stores & HOD ..
(QC)
Sampling during unloading & mixing separately supplier wise to make Shift Chemist ..
a day average sample .The samples are tested for moisture & purity as
per IS/10170.
c) Anhydrite Gypsum:
Unloading the trucks at JSW site shed HOD (Stores & HOD ..
(QC)
Sampling during unloading & mixing separately supplier wise to make Shift Chemist ..
a day average sample .The samples are tested for moisture & purity as
per IS/10170
d) Granulated slag:
a) GC (Ground Clinker )
During VRM running, samples are collected hourly from auto sampler Shift Chemist ..
which is cooled for 15 minutes in a desicator & tested for Blaine &
Residue 45 micron wet basis. Results are informed to CCR to control
Blaine& residue value as per quality requirement.
Collection of weigh feeder clinker & gypsum samples twice in a shift Shift Chemist ..
& testing for moisture content.
Time setting of auto sampler as given below; Manager (Instrument) ..
1. On time: 8 seconds
2. Off time: 10 minute
Consumption of all GC for mixing of PSC & CHD Officer-CCR ..
Diverter to be cross checked Officer-CCR ..
a 1) OPC (Ordinary Portland Cement)
During VRM running, samples are collected hourly from auto sampler Shift Chemist ..
which is cooled for 15 minutes in a desicator & tested for Blaine &
Residue 45 micron wet basis. Results are informed to CCR to control
Blaine& residue value as per quality requirement.
Collection of weigh feeder clinker & gypsum samples twice in a shift Shift Chemist ..
& testing for moisture content.
Time setting of auto sampler as given below; Manager (Instrument) ..
1. On time: 8 seconds
2. Off time: 10 minute
Ground OPC stored in a steel silo. Officer-CCR ..
A day average composite sample is prepared by mixing of hourly Asst.Manager (QC) ..
samples & analyzed physical properties.
Consumption of GS for mixing of PSC & CHD & some part is Officer-CCR ..
transferred to product silo no. 1 as per requirement.
Diverter to be cross checked Officer-CCR ..
A day average composite sample is prepared by mixing of hourly Asst.Manager (QC)
samples & analyzed physical properties.
Test:
Tests Frequencies
Mixed PSC,CHD is transferred to Product silo no.2 CHD & 3 PSC Officer-CCR ..
Silos separately diverters cross checking.
OPC (Ordinary Portland Cement)
Above samples are tested for hourly Blaine & Residue on 45 micron
passing % & LOI, CaO % twice time in a shift.
A day average composite sample is prepared by mixing of hourly Asst.Manager (QC) ..
samples & analyzed physical properties.
Test:
LOI, IR, SO3, CaO, MgO, SiO2, Al2O3, Fe2O3, Chloride,
Sulphide Sulphur, Manganese Oxide and Moisture Content.
Care is being taken to avoid filling & dispatch of product from the Officer-Packing ..
same silo . Plant.
During packing, samples are collected from packer, alternate hour. Shift Chemist ..
About 50 gm from every four hours of samples is cooled in a
desiccator for 15 minutes & tested for Blaine, CaO & SO3 and
remaining part is kept in a container for making day average sample
A day average composite sample is prepared by thoroughly mixing of Shift Chemist ..
sample of container for full chemical analysis as per IS 4032 (LOI, IR,
SiO2, Al2O3, Fe2O3, CaO, MgO, Na2O, K2O, SO3, Chloride).
Day average sample is analyses for physical as given below: Asst.Manager (QC) ..
IHJ(C)lUJI~~~ MIO)
~~~l(C)f~!!Mf~l\Jlffl@minf ~
't'l51
& -
APPROVAL LEITER No: CE-I/EE-1/A/eT-IJ3 /2021
Date: '2..6! O'l-/'2--0 '").-f
0s'w
JSW Centre
Cement Ltd. \
\
\
Bandra Kurla Complex
Bandra(East)
Mumbai - 400 098.
1) The validity of the enlistment shall be for TWO YEARS from issue of this
letter. However, the MHADA reserves the right to cancel the same.
1fcR, ~ . (wf), ¥t · 'dOO O~~- Griha Ninnan ehavan, Kalanagar, Bandra (East), Mumbai • 400 051.
: &.&.'do~ooo Phone : 66405000
Qfcffi;j_: Fax No.: 022-26592058
D:\Vishal\Product Approval\Final_Letter\JSW _ GGSC 26-2-21.docx Website : www.rilhada.maharashtra.gov.in
2 -
4) The registration shall not bind MHADA to give the vendor any priority or _
preference in the issue of enquiry and placement of purchase orders and
does not guarantee that all or any of the enquiries for the above items
would necessarily be sent to vendor.
5) The vendor shall arrange for
visit for MHADA Engineers for inspection of
sites, where the products are used/being used, at its own cost, as and
when intimated by MHADA.
6) The Change in Postal address, contact Phone No., Fax No., in the
Constitutions or working of the firm, if any, shall be intimated to
approving Authority immediately.
7) The vendor has to obtain the revalidation by applying 30 days prior to
expiry of this registration. Else, revalidation of product renewal shall not
be considered. Company shall pay applicable renewal fees before any
renewal of renewal, as applicable.
8) During the warranty period, the prospective purchaser's complaint for
defective material shall be attended by the vendor free of cost within a
month's time from date of complaint.