0% found this document useful (0 votes)
12 views

LAYOUT

The document provides dimensions for a site plan layout. It includes labels for various areas and notes about dimensions and measurements that should be verified on site prior to execution.

Uploaded by

ARUL SANKARAN
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
12 views

LAYOUT

The document provides dimensions for a site plan layout. It includes labels for various areas and notes about dimensions and measurements that should be verified on site prior to execution.

Uploaded by

ARUL SANKARAN
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

NOTE:

-450mmFFL 1. DIMENSIONS ARE NOT TO BE SCALED FROM THIS DRAWING.


-300mmFFL 2. ALL DIMENSIONS ARE IN MILLIMETER UNLESS OTHERWISE STATED.
3. ALL MEASUREMENTS TO BE VERIFIED ON SITE PRIOR TO
-150mmFFL EXECUTION
DN DN
NORTH :
LVL:+0.0M
A' A B C D E F G H J K L M N
3900 1500 3600 3200 3300 900 1800 4000 1800 900 600 7100 1000
N
GREEN AREA GREEN AREA
GREEN AREA

1 UP UP UP UP
1
CDP LEGEND
1800

SYMBOL DESCRIPTION
CONCRETE PRECAST
STEPPING STONE FAN COIL UNIT
CDP-CONDENSATE DRAIN PIPE
2 2
CDP U-TRAP
1450

WC Ø25MM CDP @ H/L


CO H/L HIGH LEVEL
CO T/B TO BELOW
3 3
SHELF
GAC - 08

GAC - 06
SHELF

UP
CONCRETE PRECAST

SHELF
2550

UP
All drain pipe make
STEPPING STONE

1 2 3 SHOW LIVING AREA SHELF


KITCHEN

INFORMAL LOUNGE
proper slope to
DINING AREA make proper flow.
4 4 Mark All drain point
SHOWER
Ø25MM CDP T/B & CONNECTED TO
FLOOR TRAP
SLAB EDGE ABOVE
routing on site and
75" LED TV UNIT
co-ordinate with
3550

NICHE
main contractor.
HOOD/HOB
SERVICE CORRIDOR

PUMP ROOM
OVEN
MW/

MAIN KITCHEN CONCRETE


LIFT PRECAST
DOUBLE

UP
FRIDGE
DOOR

BAR AREA STEPPING


SLAB EDGE ABOVE STONE
WINE COOLER

5 SHELF 5
UP CO HOME THEATRE

1 2 3 4
Ø25MM CDP T/B & CONNECTED TO5
2250

LAUNDRY 6
SAC - 01 CO
GAC - 01
WASTE PIPE
UP
CO
GAC - 07 LOBBY
STORE BATH
Ø25MM CDP @ H/L 27-10-2023 ISSUED FOR APPROVAL EX

6 Ø25MM CDP T/B & CONNECTED


TO WASTE PIPE
6 REV. NO DATE REVISION DESCRIPTION
REV
BY
DISPLAY SHELF

CO CO
GAC - 09 ENTRANCE LOBBY LED SCREEN (SIZE TBC)
DISPLAY
Project :
SEEN BELOW SHELF
Ø25MM CDP T/B & CONNECTED TO (DOUBLE HEIGHT SPACE)
Ø25MM CDP T/B & CONNECTED TO
WASTE PIPE GAC - 02
WASTEHOME
PIPE OFFICE POWDER
ROOM
L-154
3000

Ø25MM CDP T/B & CONNECTED TO


4 GAC - 02A SEATING AREA Palm Jumeirah, Dubai ,UAE

GAC - 03
FLOOR TRAP STAFF ROOM
STAFF ROOM Ø25MM CDP T/B & CONNECTED TO
3 BATHTRAP
NEAREST FLOOR
2
SHOWER
1 DESIGN CONSULTANTS:
UP
CO

7 Ø25MM CDP T/B & CONNECTED TO


Ø25MM CDP @ H/L

WALK-IN
7
Ø25MM CDP T/B & CONNECTED TO
GAC - WC
05

GAC - 04
WASTE PIPE WASH ROOM

WARDROBE
FLOOR TRAP

LOBBY
2100

GREEN AREA OPEN


SHELF

CONSULTANT:

8 8
SARAB
ENGINEERING CONSULTANCY
GUEST BEDROOM

75" LED TV UNIT


GARAGE
CONCRETE PRECAST
4400

STEPPING STONE MAIN CONTRACTOR :

CONCRETE
PRECAST
STEPPING

SHELF
EXI. STONE
GARBAGE

9 9 MEP CONTRACTOR:
1700

LIGHT WEIGHT
PERGOLA
10 10
Drawing Title :

FEEDER FE
PILLAR PI PROPOSED
ELEC. E GROUND FLOOR
METERS A B C D E F G H J K L M N ME CDP LAYOUT
SHEET SIZE: A2
Scale: NTS
Date: 27-10-2023

Drawn: ACR Checked: ABUBAKER


Approved: -

UP Drawing No: CDP-01 Rev: 01


LOT LIMIT
NOTE:
1. DIMENSIONS ARE NOT TO BE SCALED FROM THIS DRAWING.
2. ALL DIMENSIONS ARE IN MILLIMETER UNLESS OTHERWISE STATED.
3. ALL MEASUREMENTS TO BE VERIFIED ON SITE PRIOR TO
EXECUTION

NORTH :

A' A B C D E F G H J K L M N
3900 1500 3600 3200 3300 900 1800 4000 1800 900 600 7100 1000 N

1 1 CDP LEGEND
SYMBOL DESCRIPTION
1800

FAN COIL UNIT


CDP-CONDENSATE DRAIN PIPE
2 2
CDP U-TRAP
1450

H/L HIGH LEVEL


T/B TO BELOW
3 ISLAND
3
DRESSER
SEEN BELOW FAMILY LOUNGE

75" LED TV UNIT


2550

PASSAGE MASTER
BEDROOM

65" LED TV UNIT


CO BEDROOM-1
Ø25MM CDP T/B & CONNECTED TO WC.CO
NEAREST FLOOR TRAP
CO
4 4
FAC - 01A
G L A Z E D H A N D R A I L
FAC - 01B

FAC - 07
SH.
3550

LOBBY
CO
FAC - 05
WALK-IN WARDROBE
LIFT LIFT
STORAGE PANTRY LOBBY WALK-IN
FAC - 08 Ø25MM CDP @ H/L
CO
G L A Z E D H A N D R A I L
5 5
Ø40MM CDP T/B & CONNECTED TO
WASTE PIPE
CORRIDOR FAC - 06 24 25 26 27
2250

LOBBY 28 29
30 NICHE
UP 8

DUMBBELL
STORAGE
9 CO

Ø25MM CDP @ H/L


FAC - 02 27-10-2023 ISSUED FOR APPROVAL EX
WC SHOWER
DUMBBELL
STAND

10 WASHROOM REV
6 SEEN BELOW
11 6 REV. NO DATE REVISION DESCRIPTION
BY
Project :
FAC - 04

BEDROOM 3
GYM
WC.
NICHE
L-154
65" LED TV

12
Palm Jumeirah, Dubai ,UAE
3000

13 DRESSER Ø25MM CDP T/B & CONNECTED TO


BATH
14 WASTE PIPE
CO SH. 15 WC. SH.
DN 16
DESIGN CONSULTANTS:
Ø25MM CDP T/B & CONNECTED TO 17
WASTE PIPE 23 22 21 20 19 18

7 ISLAND
DRESSER FAC - 03
CO
7
BATH
WALK-IN
2100

LOBBY
CONSULTANT:

8 8
Ø25MM CDP T/B & CONNECTED TO
WASTE
BEDROOM 2 PIPE
SARAB
ENGINEERING CONSULTANCY
4400

MAIN CONTRACTOR :

9 9 MEP CONTRACTOR:
1700

BALCONY

10 10
Drawing Title :

PROPOSED
FIRST FLOOR
CDP LAYOUT
A B C D E F G H J K L M N
SHEET SIZE: A2
Scale: NTS
Date: 27-10-2023

Drawn: ACR Checked: ABUBAKER


Approved: -

Drawing No: CDP-02 Rev: 01


NOTE:
1. DIMENSIONS ARE NOT TO BE SCALED FROM THIS DRAWING.
2. ALL DIMENSIONS ARE IN MILLIMETER UNLESS OTHERWISE STATED.
3. ALL MEASUREMENTS TO BE VERIFIED ON SITE PRIOR TO
EXECUTION

NORTH :

A' A B C D E F G H J K L M N
3900 1500 3600 3200 3300 900 1800 4000 1800 900 600 7100 1000
N

1 1
CDP LEGEND
1800

SYMBOL DESCRIPTION
FAN COIL UNIT
CDP-CONDENSATE DRAIN PIPE
2 2
CDP U-TRAP
1450

H/L HIGH LEVEL


T/B TO BELOW
3 3
ACCESSABLE TERRACE
2550

4 4
CO CO

Ø25MM CDP @ H/L


ELECTRICAL
WC.

RAC - 01
CO ROOM
75" LED TV UNIT RAC - 02
SERVICE BLOCK BATH TUB FAHU
SH.
3550

NON-ACCESSABLE TERRACE Ø25MM CDP T/B & CONNECTED

Ø25MM CDP @ H/L


TO WASTE PIPE NON-ACCESSABLE TERRACE

WASH AREA
LIFT

5 5
CO
WARDROBE
24 25 26 27 28
2250

MASTER BEDROOM 29
Ø25MM CDP T/B & CONNECTED TO 30
WASTE PIPE 31
DRESSING
TABLE 32
27-10-2023 ISSUED FOR APPROVAL EX
33 Ø25MM CDP T/B & CONNECTED TO

6 34
WASTE PIPE
6 REV. NO DATE REVISION DESCRIPTION
REV
BY
Project :

EXISTING WATER TANK 35 L-154


3000

ACCESSABLE TERRACE
36 Palm Jumeirah, Dubai ,UAE
37
38
DN 39
40 DESIGN CONSULTANTS:
46 45 44 43 42 41

7 7
2100

CONSULTANT:

8 8
SARAB
ENGINEERING CONSULTANCY
NON-ACCESSABLE TERRACE
4400

MAIN CONTRACTOR :

9 9 MEP CONTRACTOR:
1700

10 10
Drawing Title :

PROPOSED
SECOND FLOOR
A B C D E F G H J K L M N CDP LAYOUT
SHEET SIZE: A2
Scale: NTS
Date: 27-10-2023

Drawn: ACR Checked: ABUBAKER


Approved: -

Drawing No: CDP-03 Rev: 01