Riaz Mydeen Nassar Project Controls Planning Engineer

The document provides a curriculum vitae for Riaz Mydeen N, who has over 5 years of experience in project controls and planning for oil and gas projects. The CV details his roles, responsibilities, skills, and experience on various shutdown and maintenance projects for companies like PDO, Indian Oil Corporation, and others.

Uploaded by

Eyoh Effiong
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
81 views9 pages

Riaz Mydeen Nassar Project Controls Planning Engineer

The document provides a curriculum vitae for Riaz Mydeen N, who has over 5 years of experience in project controls and planning for oil and gas projects. The CV details his roles, responsibilities, skills, and experience on various shutdown and maintenance projects for companies like PDO, Indian Oil Corporation, and others.

Uploaded by

Eyoh Effiong
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

CURRICULUM VITAE

RIAZ MYDEEN N

Project Controls & Planning Engineer


Turnaround Shutdown Projects, EMC,EPCC – Oil & Gas

E-mail: [email protected] Phone: +91 97901 67684


+211 922348247

CAREER OBJECTIVE:
I seek an opportunity to work in the area of project controls management with Engineering,
Maintenance and Construction projects and build a strong career in oil & gas domain.

SKILL’S SUMMARY:

 A young professional with over 5 years of experience and truly a good team player also a
quick learner. A go-getter, can able to work under pressure situations, with minimal
supervision and support.

 Based at refinery division handled Maintenance Planner role for 45 days Indian Oil
Corporation Ltd – Maintenance & Inspection Shutdown Sep’15-Oct’15

 Based in coastal office handled brownfield projects planning/ scheduling of Nimr Cluster
Projects of PDO South EMC Contract. Build overall plans and schedules for conceptual,
front-end designs and for the execution phase of projects, provide plans and schedules for
integrated maintenance projects.

 Handled around 1000 maintenance work orders and 250 construction service jobs in the
Greater Birba & Harweel area as per the 90D & 14D plans. Based at Harweel Site,
experienced with maintenance planning working on SAP ERP R/3 PM module. Managed
and coordinated all discipline maintenance activities.

 Handled site planner role for 65 Days Harweel Turnaround Shutdown from 31 October to
15 December 2014. S/D execution is for 88000 Man hours of work with peak manpower
of 450 persons and 150+ equipment, 30+ sub-contractor and third party vendor services.

 Can read Engineering drawings – Process Engineering Flow Scheme (PEFS), Piping &
Instrumentation drawings (P&ID), Equipment drawings, Plot plans, Process plant
layouts, Piping fabrication isometrics, welding, Erection related construction & testing
packs.

 Academically learnt and gained knowledge on Piping designs, pipe routing and plant
design models (PDMS 11.6), Piping Stress Analysis (CAESAR II), Mechanical/
Structural Designs (AutoCAD R14), Office literacy (MS office)

1
 Project Coordination, Manpower & Equipment Estimation / Mobilization Plan, Project
Schedule Generation & Critical Path Analysis, Tracking of the Schedule, Progress
Measurement & Management reporting experience with EPCC and SHUTDOWN
Projects
 General understanding on the importance of the designs and methods used with the
prescribed codes and standards. Familiar with International Design codes & Dimensional
standards (ANSI/ASME, API, BS, ASTM) basics & their use in design, analysis and
calculation.

DAR PETROLEUM OPERATING COMPANY EXPERIENCE – SOUTH SUDAN:

Synopsis:

Having site and coastal working experience as Planning Engineer with Dar Petroleum Operating
Company’s EPCC projects in FIELD SURFACE FACILITY (FSF), FIELD PRODUCTION
FACILITY (FPF), OVER HEAD LINE (OHL)

STAR CONTRACTING OIL & GAS COMPANY LTD. Juba, South Sudan.
Nov 2015 – Present

INDIAN OIL CORPORATIONS LTD EXPERIENCE:

Synopsis:

Having site working experience as Shutdown Planning Engineer with Indian Oil Corporation
ltd.’s two major M&I Shutdown 2015, India.

Indian Oil Corporations Ltd., (Refineries Division) –Haldia Refinery


Sept 2015 – Oct 2015

Project 1: Shutdown planning for units VDU –II, ARU, SWS, and SRU

Scope of Work:-
 12 no’s column maintenance work (Packing replacement for 7 beds)
 90 no’s Heat exchangers maintenance work
 21 no’s Vessels maintenance work
 3 no’s Furnace and APH work
 12 no’s Air Fin Cooler maintenance work

Chennai Petroleum Corporations Ltd., (Refineries Division) – CPCL


Jun 2015 – Aug 2015

Project 1: Execution of Plant 208,209,210 SRU Units Shutdown

2
PDO EXPERIENCE:

Synopsis:

Having site working experience as field Project Control and Planning Engineer with Petroleum
Development Oman’s one of the most prestigious Shutdown project of Harweel Main Production
Station, Harweel.

WOODGROUP-CCC LTD. Muscat, Oman. Aug 2014 – May 2015

Project 1: Harweel Turn around Shutdown Project, Harweel, Oman.


(Aug’2014 – Dec’2014)

Client – Petroleum Development Oman, Oman.

Scope of Work: -
 Three New Separator vessels Installation.
 Associated piping spool modification and installation.
 34 no’s Valves Installation

Designation: Site Project Control and Planning Engineer

As a Planning Engineer,

 Project planning, scheduling & control based on master plan using MSP 2007 & P6
planning tools
 Working in close co-operation with Company Engineering & Operations planning
department for engineering, procurement, construction and CSU planning inclusive
reporting, Primavera P6 entry, SAP daily service entry.
 Generating Daily/Weekly Progress Report along with deployed Manpower & Equipment
Status.
 Resource optimization and prioritization in conjunction with Project Engineers /
Construction and Maintenance Coordinators.
 Early warning of plan delays and proposals for mitigation to Project Engineers /
Construction and Maintenance Coordinators for resolutions.
 Capture minutes of Shutdown meeting and preparing MOM
 Regular participation in YTT meeting in regard of service jobs and to follow up in SAP
PM.

Project 2: Integrated Maintenance and Service Jobs for Greater Birba and Harweel
Cluster

Roles and Responsibilities:

 To manage and coordinate all discipline maintenance activities as per 90DP and 14DP
taking into account of operational requirements and constraints.
 To manage all activities under the work centers and Planner group for the GB & Harweel
area of operation.

3
 Prepare a plan list with Original Due Dates(ODD), Latest Allowed Start Dates|(LASD)
and Latest Allowed Finish Date(LAFD)
 Prepare a resource requirement plan based on the year’s work load.
 Prioritize notifications in CMPT meeting and schedule work orders before freezing the 14
and 90 days plan.
 Set Partial Confirmation (PCNF) for the activity operation in the work order when the job
has started.
 Set Confirmation (CNF) for the activity operation in the work order when the job has
completed.
 Input equipment history in the notification after the job has been completed.
 Input of actual man-hours spent on the job into the work orders.
 Input of actual start and finish times & dates for the job in the work order.
 Populate Purchase Orders (PO) with Service Entries (SE).

Project 3: EPC for NIMR Cluster Projects

Roles and Responsibilities:

Schedules preparation, progress collection from Site & update in P6, prepare biweekly project
status reports, prepare OSE pre-read files.

 Nimr - Oil recovery from NWTP


 Nimr - NRPS AP Flare Recovery
 Nimr - Field Metering Upgrade
 Construction of Storage Shed at NIMR
 Autoreclosing for 132kV OHL for PDO South
 Nimr- C-Field Water Injection
 NRPS DCS and F&G Upgrade Works
 NRPS Control Room Extension
 Nimr Sub-Station 4 Modification Work

PRAMILA PROJECTS PVT. LTD.Odisha, INDIA. June 2012 –Aug 2014

Projects Involved In:

Project 1: India Yamaha Motors ltd, Chennai. (Mar’14 – Aug’ 14)


Client – Yamaha Motors Ltd.

Scope of Work:-
 Fabrication and Erection of India Yamaha Motors Manufacturing Plant and its
multiple vendor park buildings

Designation: Project Planning Engineer

As a Planning Engineer,

 Project planning, scheduling & control based on master plan using MSP 2007 & P6 planning
tools

4
 Generating Daily/Weekly Progress Report along with deployed Manpower & Equipment
Status.
 Identifying the un-spelled items in the original BOQ and preparation of the extra work
claims.
 Man power allotment, Work allocation and target achievement. Site coordination with
Contractors, Consultants and Client.
 Ensure the work is in accordance with the schedule and in compliance with Project
Objectives, Specifications, Procedures Plans, Requirements and Directives

Project 2: Hitachi Automotive Systems, Chennai. (Feb’14 – Apr’14)

Client - Hitachi Automotive Systems


Consultant - Hitachi Plant Technologies India Pvt.Ltd.

Scope of Work:-

 Fabrication and Erection of Air Handling Unit (AHU) Platform – 100 MT


 Fabrication, Assembling and Erection of Internal & External pipe racks

Project 3: Manufacturing Plant (PEB) SMS-SEIMAG INDIA, khordha, Odisha.


(Jan’13 – Feb’14)

Client – SMS-SEIMAG INDIA.

Scope of Work: -
 Installation of Cladding sheets (Track Deck Hi rib metal sheets and fiber reinforced
plastic sheets) - 33000 sq.mtr
 Erection of Pre Engineered Building structural members – 4300 MT

Designation: Site Mechanical Engineer

As a Mechanical Engineer,

 Site Execution of Mechanical works like Fabrication & Erection of Piping, Structures.
 Man power allotment, Work allocation and target achievement. Site coordination with
Contractors, Consultants and Client.
 To control the Quality of the job and work man ship to satisfy the customer.

ACADEMIC & TECHNICAL QUALIFICATION:

Bachelor of Engineering in Mechanical Engineering – Anna University, Chennai.

CERTIFICATION / SOFTWARES:

DESCRIPTION DURATION INSTITUTE CONTENTS


Advanced Diploma in 2 months ImageGrafix Piping theories,
PIPING DESIGN & Engineering Piping softwares.
ENGINEERING Solutions,

5
Chennai

Plant design : PDMS 11.6 1 month ImageGrafix Design & Detail Engineering of Equipment
Engineering Piping layouts using 3D Modeling PDMS.
Solutions, Design the Pipe Supports and model as per
Chennai the Pipe Support Standard.
Extracting Equipment GAD`s & Piping
GAD`s from the PDMS Module using Draft
Module.
Piping Stress Analysis : 1 month ImageGrafix Checking pipe deflection under load.
CAESAR II Engineering Verifying loads on connected equipments.
Solutions, Evaluating pipe stress.
Chennai
Auto desk Products: 1 month ImageGrafix (2D & 3D Drafting, 3d Modeling with
AutoCAD R14. Engineering perspective View). AutoCAD (2D & 3D
Solutions, Drafting, Adv 3D Modeling with
Chennai perspective View).

MS Project, Primavera P6, SAP PM

Safety Training Courses 1. HSE induction


2. Permit To Work (PTW) Training
3. Confined Space Training
4. Working At Heights Training
5. H2S Awareness & Escape Training
6. Job Hazard Analysis Training
7. Initial Fire Response
8. Dealing with Hazards and Risks

6
7
References:

1. Mr. Mubarak Al Maskari - OSGOH


Delivery Team Leader – Harweel HMPS,
Petroleum Development Oman, Oman.
+968 9932 0454 [email protected]

2. Mr. Hamed Al Nammani – OSO5H


Planning Engineer – Harweel ,
Petroleum Development Oman, Oman.
+968 9213 7234 [email protected]

3. Mr. Abu Backer Dawood


Lead Project Controls & Planning Engineer,
WoodGroup-CCC ltd, Oman.
+968 9617 8439 [email protected]

8
PERSONAL DETAILS:

Father's Name : Nassar.I


Sex : Male
Nationality : Indian
Marital Status : Single
Language known : Tamil, Hindi & English
Passport No. : K8609879

(RIAZMYDEEN N)

You might also like