Embedded EWM CLASS 41 - Scrapping Process
Embedded EWM CLASS 41 - Scrapping Process
Process Steps
II. Create Warehouse Task to Move the material into SCRAP BIN (SCRAP-ZONE)
1. Create Warehouse Task = /N/SCWM/ADPROD
Warehouse task Created
Warehouse order Confirmed
2. Check in Warehouse Monitor - /N/SCWM/MON
No Stock Type changes
Only BIN to BIN Transfer
No Stock Movement in ECC (Because we are not changing stock type in EWM)
Create + Save
Warehouse Order = 6000000047
II. Create Warehouse Task to Move the material into SCRAP BIN (SCRAP-ZONE)
Note:
Only BIN TO BIN Movement & No Stock type change
No Stock Movement in ECC (Because we are not changing stock type in EWM)
WAREHOUSE = E102
Storage type – 0100 (Fixed Bin Cold Storage)
SCRAP-ZONE
Fixed Bin – 0100-01-01
Storage Type – 1040
Storage Type Search Seq – 0100, Putaway control indicator-0100
Bin – SCRAP-ZONE
WPT – 1020
Avl Group – 002
STORAGE TYPE – 0150 (General Storage - High Rack Storage) Stock Type – S6
Activity Area – AA15 & Assigned to Storage type 0150
Activity – PICK & PTWY
Availability Group-002, Stock type-F2 (SL Assigned AF02)
Storage type search sequence-P150, Putaway control indicator-P150
Storage type – 9060, Storage type – 9099,
Storage section-0001, Bin – Storage section-0001,
RAIL-DOOR Storage Section – 0001 Storage Section – 0002 Bin – EXPEDIATE AREA GI
(Product can be received (Fast Moving) (Slow Moving) (Product picked for
from Rail) emergency deliveries)
Bin – 0150-01-01 Bin – 0150-11-01
Warehouse Process Type-9060 Bin – 0150-01-02 Bin – 0150-11-02 Warehouse Process Type-
WPT Control Indicator – 60 Bin – 0150-01-03 Bin – 0150-11-03 2099
Availability Group-002, Bin – 0150-11-04 WPT Control Indicator - 61
Bin – 0150-01-04
Stock type-F2 (SL Bin – 0150-11-05
Bin – 0150-01-05
Assigned AF02) Bin – 0150-11-06
Bin – 0150-01-06