Weekly Progress - Agrakaja Villa (w24) .XLSX - Google Spreadsheet

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
41 views9 pages

Weekly Progress - Agrakaja Villa (w24) .XLSX - Google Spreadsheet

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

PROGRESS REPORT AGRAKAJA VILLA Prepared by :

31 May 2024 Sekotong, Lombok Barat UPADANA SEMESTA


WEEKLY PROGRESS REPORT RECAPITULATION

Project : Agrakaja Villa


Period : 26 Mei 2024 - 31 Mei 2024 Week : 24
Location : Jalan Raya Sekotong, Sekotong Barat, Lombok Barat - NTB
Year : 2024- 2025

Bobot Prestasi Pekerjaan (%)


No Penjelasan Progress Progress Total Progress
Minggu Lalu Minggu Ini Minggu Ini

PEKERJAAN STRUKTUR
I PEKERJAAN PERSIAPAN 0.90 0.00 0.90
II PEKERJAAN PONDASI 6.19 0.00 6.19
III PEKERJAAN STRUKTUR LANTAI DASAR 9.17 0.84 10.01
IV PEKERJAAN STRUKTUR LANTAI ATAP 1 15.59 0.39 16.25
V PEKERJAAN STRUKTUR LANTAI ATAP 2 2.02 0.00 2.02
VI PEKERJAAN STRUKTUR KOLAM RENANG 0.50 0.28 0.78
VII PEKERJAAN STRUKTUR PUMP ROOM 0.00 0.00 0.00

PEKERJAAN ARSITEKTUR
I PEKERJAAN DINDING 6.51 0.48 6.99
II PEKERJAAN KUSEN, PINTU & JENDELA 0.00 0.00 0.00
III PEKERJAAN PLAFOND 0.00 0.00 0.00
IV PEKERJAAN LANTAI 0.00 0.00 0.00
V PEKERJAAN PENGECATAN 0.00 0.00 0.00
VI PEKERJAAN SANITARY (BY OWNER) 0.00 0.00 0.00
VII PEKERJAAN LAIN - LAIN 0.00 0.00 0.00

Total 40.88 1.99 43.14

Sekotong, 31 May 2024


Submitted by, Known by,
Quantity Surveyor Site Supervisor

Devia Utami Sauqi Afrian A.


WEEKLY PROGRESS
PROYEK : AGRAKAJA VILLA
LOKASI : SEKOTONG, LOMBOK, NUSA TENGGARA BARAT
OWNER : ARIEF SUSANTO
TAHUN 27 Mei 2024

BOBOT MINGGU LALU MINGGU INI TOTAL MINGGU INI


NO PENJELASAN VOLUME SAT
(%) % BOBOT % BOBOT % BOBOT

I PEKERJAAN PERSIAPAN
1 Pengukuran & bouwplank papan borneo ( 226.30) m¹ ( 0.32) 100.00% 0.32 0.00% 0.00 100.00% 0.32
2 Pembersihan lahan (by owner) ( 5,339.86) m² ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
3 Direksi keet ( 12.00) m² ( 0.13) 100.00% 0.13 0.00% 0.00 100.00% 0.13
4 Gudang + Bedeng Pekerja ( 35.52) m² ( 0.44) 100.00% 0.44 0.00% 0.00 100.00% 0.44
5 Pagar proyek seng gelombang BJLS 20 (by owner) ( 308.34) m¹ ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
6 Listrik & air kerja (by owner) ( 1.00) ls ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
7 Keamanan (by owner) ( 12.00) bulan ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00

Sub Total Pekerjaan Persiapan ( 0.90) 100.00% 0.90 0.00% 0.00 100.00% 0.90

II PEKERJAAN PONDASI
1 Mobilisasi / demobilisasi mesin bor strauss pile ( 1.00) unit ( 0.05) 100.00% 0.05 0.00% 0.00 100.00% 0.05
2 Pondasi strauss PC13 (21 buah) : asumsi kedalaman tanah keras 5,00 m
- galian pondasi strauss Æ 300 ( 105.00) m¹ ( 0.21) 100.00% 0.21 0.00% 0.00 100.00% 0.21
- besi beton ( 813.14) kg ( 0.20) 100.00% 0.20 0.00% 0.00 100.00% 0.20
- beton sitemix 1pc : 2ps : 3sp setara K-225 ( 7.43) m³ ( 0.12) 100.00% 0.12 0.00% 0.00 100.00% 0.12
3 Pondasi strauss type PC14 (45 buah) : asumsi kedalaman tanah keras 5,00 m
- galian pondasi strauss Æ 400 ( 225.00) m¹ ( 0.64) 100.00% 0.64 0.00% 0.00 100.00% 0.64
- besi beton ( 2,494.94) kg ( 0.61) 100.00% 0.61 0.00% 0.00 100.00% 0.61
- beton sitemix 1pc : 2ps : 3sp setara K-225 ( 15.91) m³ ( 0.26) 100.00% 0.26 0.00% 0.00 100.00% 0.26
4 Pondasi strauss type PC24 (11 buah) : asumsi kedalaman tanah keras 5,00 m
- galian pondasi strauss Æ 400 ( 110.00) m¹ ( 0.31) 100.00% 0.31 0.00% 0.00 100.00% 0.31
- besi beton ( 1,219.75) kg ( 0.30) 100.00% 0.30 0.00% 0.00 100.00% 0.30
- beton sitemix 1pc : 2ps : 3sp setara K-225 ( 7.78) m³ ( 0.13) 100.00% 0.13 0.00% 0.00 100.00% 0.13
5 Pondasi strauss type PC34 (4 buah) : VE asumsi kedalaman tanah keras 5,00 m
- galian pondasi strauss Æ 400 ( - ) m¹ ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- besi beton ( - ) kg ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- beton sitemix 1pc : 2ps : 3sp setara K-225 ( - ) m³ ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
6 Pilecap type PC13 (21 buah) :
- galian tanah ( 3.78) m³ ( 0.01) 100.00% 0.01 0.00% 0.00 100.00% 0.01
- lantai kerja t = 5 cm ( 5.25) m² ( 0.00) 100.00% 0.00 0.00% 0.00 100.00% 0.00
- bekisting multipleks 9 mm ( 16.80) m² ( 0.05) 100.00% 0.05 0.00% 0.00 100.00% 0.05
- besi beton ( 258.70) kg ( 0.06) 100.00% 0.06 0.00% 0.00 100.00% 0.06
- beton sitemix 1pc : 2ps : 3sp setara K-225 ( 2.10) m³ ( 0.03) 100.00% 0.03 0.00% 0.00 100.00% 0.03
- urugan tanah kembali ( 1.16) m³ ( 0.00) 100.00% 0.00 0.00% 0.00 100.00% 0.00
7 Pilecap type PC14 (45 buah) :
- galian tanah ( 11.03) m³ ( 0.02) 100.00% 0.02 0.00% 0.00 100.00% 0.02
- lantai kerja t = 5 cm ( 16.20) m² ( 0.01) 100.00% 0.01 0.00% 0.00 100.00% 0.01
- bekisting multipleks 9 mm ( 43.20) m² ( 0.12) 100.00% 0.12 0.00% 0.00 100.00% 0.12
- besi beton ( 786.73) kg ( 0.19) 100.00% 0.19 0.00% 0.00 100.00% 0.19
- beton sitemix 1pc : 2ps : 3sp setara K-225 ( 6.48) m³ ( 0.11) 100.00% 0.11 0.00% 0.00 100.00% 0.11
- urugan tanah kembali ( 2.93) m³ ( 0.00) 100.00% 0.00 0.00% 0.00 100.00% 0.00
8 Pilecap type PC24 (11 buah) :
- galian tanah ( 5.01) m³ ( 0.01) 100.00% 0.01 0.00% 0.00 100.00% 0.01
- lantai kerja t = 5 cm ( 7.92) m² ( 0.01) 100.00% 0.01 0.00% 0.00 100.00% 0.01
- bekisting multipleks 9 mm ( 15.84) m² ( 0.04) 100.00% 0.04 0.00% 0.00 100.00% 0.04
- besi beton ( 338.00) kg ( 0.08) 100.00% 0.08 0.00% 0.00 100.00% 0.08
- beton sitemix 1pc : 2ps : 3sp setara K-225 ( 3.17) m³ ( 0.05) 100.00% 0.05 0.00% 0.00 100.00% 0.05
- urugan tanah kembali ( 1.05) m³ ( 0.00) 100.00% 0.00 0.00% 0.00 100.00% 0.00
9 Pilecap type PC34 (4 buah) : VE
- galian tanah ( - ) m³ ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- lantai kerja t = 5 cm ( - ) m² ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- bekisting multipleks 9 mm ( - ) m² ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- besi beton ( - ) kg ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- beton sitemix 1pc : 2ps : 3sp setara K-225 ( - ) m³ ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- urugan tanah kembali ( - ) m³ ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
10 Pondasi batu belah 1pc : 5ps type P1 :
- galian tanah ( 4.87) m³ ( 0.01) 100.00% 0.01 0.00% 0.00 100.00% 0.01
- urugan pasir bawah pondasi t = 10 cm ( 6.09) m² ( 0.00) 100.00% 0.00 0.00% 0.00 100.00% 0.00
- pondasi batu belah 1pc : 5ps ( 3.05) m³ ( 0.04) 100.00% 0.04 0.00% 0.00 100.00% 0.04
- urugan tanah kembali ( 1.83) m³ ( 0.00) 100.00% 0.00 0.00% 0.00 100.00% 0.00
11 Pondasi batu belah 1pc : 5ps type P2 :
- galian tanah ( 206.06) m³ ( 0.43) 100.00% 0.43 0.00% 0.00 100.00% 0.43
- urugan pasir bawah pondasi t = 10 cm ( 257.58) m² ( 0.21) 100.00% 0.21 0.00% 0.00 100.00% 0.21
- pondasi batu belah 1pc : 5ps ( 128.79) m³ ( 1.81) 100.00% 1.81 0.00% 0.00 100.00% 1.81
- urugan tanah kembali ( 77.27) m³ ( 0.06) 100.00% 0.06 0.00% 0.00 100.00% 0.06

Sub Total Pekerjaan Pondasi ( 6.19) 100.00% 6.19 0.00% 0.00 100.00% 6.19

III PEKERJAAN STRUKTUR LANTAI DASAR


1 Sloof type S35 300 x 500 : VE
- galian tanah ( - ) m³ ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- lantai kerja t = 5 cm ( - ) m² ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- bekisting multipleks 9 mm ( - ) m² ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- besi beton ( - ) kg ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- beton sitemix 1pc : 2ps : 3sp setara K-225 ( - ) m³ ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
2 Sloof type S25 200 x 500 :
- galian tanah ( 42.69) m³ ( 0.09) 100.00% 0.09 0.00% 0.00 100.00% 0.09
- lantai kerja t = 5 cm ( 43.78) m² ( 0.04) 100.00% 0.04 0.00% 0.00 100.00% 0.04
- bekisting multipleks 9 mm ( 183.88) m² ( 0.37) 100.00% 0.37 0.00% 0.00 100.00% 0.37
- besi beton ( 3,183.94) kg ( 0.78) 100.00% 0.78 0.00% 0.00 100.00% 0.78
- beton sitemix 1pc : 2ps : 3sp setara K-225 ( 18.39) m³ ( 0.30) 100.00% 0.30 0.00% 0.00 100.00% 0.30
3 Sloof type S24 200 x 400 :
- galian tanah ( 65.32) m³ ( 0.14) 100.00% 0.14 0.00% 0.00 100.00% 0.14
- lantai kerja t = 5 cm ( 79.18) m² ( 0.07) 100.00% 0.07 0.00% 0.00 100.00% 0.07
- bekisting multipleks 9 mm ( 253.36) m² ( 0.51) 100.00% 0.51 0.00% 0.00 100.00% 0.51
- besi beton ( 3,393.37) kg ( 0.83) 100.00% 0.83 0.00% 0.00 100.00% 0.83
- beton sitemix 1pc : 2ps : 3sp setara K-225 ( 25.34) m³ ( 0.41) 100.00% 0.41 0.00% 0.00 100.00% 0.41
4 Sloof type S14 150 x 400 :
- galian tanah ( 10.36) m³ ( 0.02) 100.00% 0.02 0.00% 0.00 100.00% 0.02
- lantai kerja t = 5 cm ( 11.30) m² ( 0.01) 100.00% 0.01 0.00% 0.00 100.00% 0.01
- bekisting multipleks 9 mm ( 48.21) m² ( 0.10) 100.00% 0.10 0.00% 0.00 100.00% 0.10
- besi beton ( 622.76) kg ( 0.15) 100.00% 0.15 0.00% 0.00 100.00% 0.15
- beton sitemix 1pc : 2ps : 3sp setara K-225 ( 3.62) m³ ( 0.06) 100.00% 0.06 0.00% 0.00 100.00% 0.06
5 Sloof type S13 150 x 300 :
- galian tanah ( 3.58) m³ ( 0.01) 100.00% 0.01 0.00% 0.00 100.00% 0.01
- lantai kerja t = 5 cm ( 3.91) m² ( 0.00) 100.00% 0.00 0.00% 0.00 100.00% 0.00
- bekisting multipleks 9 mm ( 16.67) m² ( 0.03) 100.00% 0.03 0.00% 0.00 100.00% 0.03
- besi beton ( 213.61) kg ( 0.05) 100.00% 0.05 0.00% 0.00 100.00% 0.05
- beton sitemix 1pc : 2ps : 3sp setara K-225 ( 1.25) m³ ( 0.02) 100.00% 0.02 0.00% 0.00 100.00% 0.02
6 Pelat beton sitemix + wiremesh M-6 t = 80 mm :
- pemadatan ( 320.33) m² ( 0.12) 50.00% 0.06 0.00% 0.00 50.00% 0.06
- plastik cor ( 320.33) m² ( 0.06) 30.00% 0.02 0.00% 0.00 30.00% 0.02
- wiremesh M-6 ( 320.33) m² ( 0.40) 50.00% 0.20 0.00% 0.00 50.00% 0.20
- beton sitemix 1pc : 2ps : 3sp setara K-225 ( 25.63) m³ ( 0.42) 30.00% 0.13 0.00% 0.00 30.00% 0.13
7 Pelat rabat beton t = 80 mm :
- pemadatan ( 1,083.97) m² ( 0.40) 0.00% 0.00 25.00% 0.10 25.00% 0.10
- plastik cor ( 1,083.97) m² ( 0.21) 0.00% 0.00 25.00% 0.05 25.00% 0.05
- wiremesh M-6 (Prov Sum) ( 1,083.97) m² ( 1.34) 0.00% 0.00 25.00% 0.33 25.00% 0.33
- beton sitemix 1pc : 2ps : 3sp setara K-225 ( 86.72) m³ ( 1.41) 0.00% 0.00 25.00% 0.35 25.00% 0.35
8 Kolom type K27 200 x 700 (2 buah) :
- bekisting multipleks 9 mm ( 14.04) m¹ ( 0.04) 100.00% 0.04 0.00% 0.00 100.00% 0.04
- besi beton ( 190.10) kg ( 0.05) 100.00% 0.05 0.00% 0.00 100.00% 0.05
- beton sitemix 1pc : 2ps : 3sp setara K-225 ( 1.09) m³ ( 0.02) 100.00% 0.02 0.00% 0.00 100.00% 0.02
9 Kolom type K25 200 x 500 (1 buah) : VE
- bekisting multipleks 9 mm ( - ) m² ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- besi beton ( - ) kg ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- beton sitemix 1pc : 2ps : 3sp setara K-225 ( - ) m³ ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
10 Kolom type K18 150 x 800 (2 buah) :
- bekisting multipleks 9 mm ( 14.44) m² ( 0.04) 100.00% 0.04 0.00% 0.00 100.00% 0.04
- besi beton ( 207.02) kg ( 0.05) 100.00% 0.05 0.00% 0.00 100.00% 0.05
- beton sitemix 1pc : 2ps : 3sp setara K-225 ( 0.91) m³ ( 0.01) 100.00% 0.01 0.00% 0.00 100.00% 0.01
11 Kolom type K17 150 x 700 (1 buah) :
- bekisting multipleks 9 mm ( 7.48) m² ( 0.02) 100.00% 0.02 0.00% 0.00 100.00% 0.02
- besi beton ( 103.21) kg ( 0.03) 100.00% 0.03 0.00% 0.00 100.00% 0.03
- beton sitemix 1pc : 2ps : 3sp setara K-225 ( 0.46) m³ ( 0.01) 100.00% 0.01 0.00% 0.00 100.00% 0.01
12 Kolom type K16 150 x 600 (3 buah) :
- bekisting multipleks 9 mm ( 13.20) m² ( 0.04) 100.00% 0.04 0.00% 0.00 100.00% 0.04
- besi beton ( 179.19) kg ( 0.04) 100.00% 0.04 0.00% 0.00 100.00% 0.04
- beton sitemix 1pc : 2ps : 3sp setara K-225 ( 0.79) m³ ( 0.01) 100.00% 0.01 0.00% 0.00 100.00% 0.01
13 Kolom type K15 150 x 500 (13 buah) :
- bekisting multipleks 9 mm ( 66.43) m² ( 0.18) 100.00% 0.18 0.00% 0.00 100.00% 0.18
- besi beton ( 896.27) kg ( 0.22) 100.00% 0.22 0.00% 0.00 100.00% 0.22
- beton sitemix 1pc : 2ps : 3sp setara K-225 ( 3.83) m³ ( 0.06) 100.00% 0.06 0.00% 0.00 100.00% 0.06
14 Kolom type K14 150 x 400 (30 buah) :
- bekisting multipleks 9 mm ( 134.70) m² ( 0.36) 100.00% 0.36 0.00% 0.00 100.00% 0.36
- besi beton ( 1,753.26) kg ( 0.43) 100.00% 0.43 0.00% 0.00 100.00% 0.43
- beton sitemix 1pc : 2ps : 3sp setara K-225 ( 7.35) m³ ( 0.12) 100.00% 0.12 0.00% 0.00 100.00% 0.12
15 Kolom type K13 150 x 300 (12 buah) :
- bekisting multipleks 9 mm ( 42.66) m² ( 0.11) 100.00% 0.11 0.00% 0.00 100.00% 0.11
- besi beton ( 530.32) kg ( 0.13) 100.00% 0.13 0.00% 0.00 100.00% 0.13
- beton sitemix 1pc : 2ps : 3sp setara K-225 ( 2.13) m³ ( 0.03) 100.00% 0.03 0.00% 0.00 100.00% 0.03
16 Kolom type KB3 Æ 300 (3 buah) :
- bekisting multipleks 9 mm ( 11.17) m² ( 0.03) 100.00% 0.03 0.00% 0.00 100.00% 0.03
- besi beton ( 128.01) kg ( 0.03) 100.00% 0.03 0.00% 0.00 100.00% 0.03
- beton sitemix 1pc : 2ps : 3sp setara K-225 ( 0.84) m³ ( 0.01) 100.00% 0.01 0.00% 0.00 100.00% 0.01
17 Kolom pedestal type KS1 500 x 500 (4 buah) : VE
- bekisting multipleks 9 mm ( - ) m² ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- besi beton ( - ) kg ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- beton sitemix 1pc : 2ps : 3sp setara K-225 ( - ) m³ ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
18 Kolom pedestal type KS2 300 x 300 (6 buah) :
- bekisting multipleks 9 mm ( 3.24) m² ( 0.01) 90.00% 0.01 0.00% 0.00 90.00% 0.01
- besi beton ( 84.58) kg ( 0.02) 100.00% 0.02 0.00% 0.00 100.00% 0.02
- beton sitemix 1pc : 2ps : 3sp setara K-225 ( 0.24) m³ ( 0.00) 0.00% 0.00 0.00% 0.00 0.00% 0.00
19 Kolom pedestal type CS300 400 x 400 (8 buah) :
- bekisting multipleks 9 mm ( 5.76) m² ( 0.02) 100.00% 0.02 0.00% 0.00 100.00% 0.02
- besi beton ( 197.93) kg ( 0.05) 100.00% 0.05 0.00% 0.00 100.00% 0.05
- beton sitemix 1pc : 2ps : 3sp setara K-225 ( 0.58) m³ ( 0.01) 100.00% 0.01 0.00% 0.00 100.00% 0.01
19 Kolom type KS1 H-400.400.13.21 (4 buah) : VE
- H-BEAM 400.400.13.21 ( - ) kg ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- base plate & angkur ( - ) kg ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- meni zinchromate + cat SEIV ( - ) kg ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
20 Kolom type KS2 H-175.175.7,5.11 / CS300 H-175.175.7,5.11 (6
-buah) :
H-BEAM 175.175.7,5.11 ( 964.00) kg ( 0.48) 100.00% 0.48 0.00% 0.00 100.00% 0.48
- base plate & angkur ( 120.12) kg ( 0.05) 100.00% 0.05 0.00% 0.00 100.00% 0.05
- meni zinchromate + cat SEIV ( 1,084.12) kg ( 0.11) 100.00% 0.11 0.00% 0.00 100.00% 0.11
21 Kolom type CS300 H-300.300.10.5 (8 buah) :
- H-BEAM 300.300.10.5 ( 3,008.00) kg ( 1.49) 100.00% 1.49 0.00% 0.00 100.00% 1.49
- base plate & angkur ( 342.62) kg ( 0.14) 100.00% 0.14 0.00% 0.00 100.00% 0.14
- meni zinchromate + cat SEIV ( 3,350.62) kg ( 0.34) 100.00% 0.34 0.00% 0.00 100.00% 0.34

Sub Total Pekerjaan Struktur Lantai Dasar ( 13.13) 69.86% 9.17 6.40% 0.84 76.26% 10.01

IV PEKERJAAN STRUKTUR LANTAI ATAP 1


1 Balok type A4 200 x 600 :
- bekisting multipleks 9 mm ( 12.67) m² ( 0.03) 100.00% 0.03 0.00% 0.00 100.00% 0.03
- besi beton ( 206.57) kg ( 0.05) 100.00% 0.05 0.00% 0.00 100.00% 0.05
- beton readymix K-225 + concrete pump ( 1.27) m³ ( 0.02) 50.00% 0.01 30.00% 0.01 80.00% 0.02
2 Balok type A5A 200 x 500 :
- bekisting multipleks 9 mm ( 17.63) m² ( 0.05) 100.00% 0.05 0.00% 0.00 100.00% 0.05
- besi beton ( 370.84) kg ( 0.09) 100.00% 0.09 0.00% 0.00 100.00% 0.09
- beton readymix K-225 + concrete pump ( 1.76) m³ ( 0.03) 100.00% 0.03 0.00% 0.00 100.00% 0.03
3 Balok type A5B 200 x 500 :
- bekisting multipleks 9 mm ( 103.09) m² ( 0.28) 100.00% 0.28 0.00% 0.00 100.00% 0.28
- besi beton ( 1,895.82) kg ( 0.46) 100.00% 0.46 0.00% 0.00 100.00% 0.46
- beton readymix K-225 + concrete pump ( 10.31) m³ ( 0.20) 90.00% 0.18 0.00% 0.00 90.00% 0.18
4 Balok type A5C 200 x 500 :
- bekisting multipleks 9 mm ( 34.58) m² ( 0.09) 100.00% 0.09 0.00% 0.00 100.00% 0.09
- besi beton ( 585.83) kg ( 0.14) 100.00% 0.14 0.00% 0.00 100.00% 0.14
- beton readymix K-225 + concrete pump ( 3.46) m³ ( 0.07) 90.00% 0.06 0.00% 0.00 90.00% 0.06
5 Balok type A5E 200 x 500 :
- bekisting multipleks 9 mm ( 15.64) m² ( 0.04) 100.00% 0.04 0.00% 0.00 100.00% 0.04
- besi beton ( 240.78) kg ( 0.06) 100.00% 0.06 0.00% 0.00 100.00% 0.06
- beton readymix K-225 + concrete pump ( 1.56) m³ ( 0.03) 100.00% 0.03 0.00% 0.00 100.00% 0.03
6 Balok type CA5 200 x 500 :
- bekisting multipleks 9 mm ( 5.89) m² ( 0.02) 100.00% 0.02 0.00% 0.00 100.00% 0.02
- besi beton ( 116.51) kg ( 0.03) 100.00% 0.03 0.00% 0.00 100.00% 0.03
- beton readymix K-225 + concrete pump ( 0.59) m³ ( 0.01) 100.00% 0.01 0.00% 0.00 100.00% 0.01
7 Balok type A6A 200 x 400 :
- bekisting multipleks 9 mm ( 26.32) m² ( 0.07) 100.00% 0.07 0.00% 0.00 100.00% 0.07
- besi beton ( 305.27) kg ( 0.07) 100.00% 0.07 0.00% 0.00 100.00% 0.07
- beton readymix K-225 + concrete pump ( 2.63) m³ ( 0.05) 100.00% 0.05 0.00% 0.00 100.00% 0.05
8 Balok type A6B 200 x 400 :
- bekisting multipleks 9 mm ( 77.14) m² ( 0.21) 100.00% 0.21 0.00% 0.00 100.00% 0.21
- besi beton ( 744.89) kg ( 0.18) 100.00% 0.18 0.00% 0.00 100.00% 0.18
- beton readymix K-225 + concrete pump ( 7.71) m³ ( 0.15) 100.00% 0.15 0.00% 0.00 100.00% 0.15
9 Balok type A6C 200 x 400 :
- bekisting multipleks 9 mm ( 6.96) m² ( 0.02) 100.00% 0.02 0.00% 0.00 100.00% 0.02
- besi beton ( 66.78) kg ( 0.02) 100.00% 0.02 0.00% 0.00 100.00% 0.02
- beton readymix K-225 + concrete pump ( 0.70) m³ ( 0.01) 100.00% 0.01 0.00% 0.00 100.00% 0.01
10 Balok type A6D 200 x 400 :
- bekisting multipleks 9 mm ( 62.36) m² ( 0.17) 100.00% 0.17 0.00% 0.00 100.00% 0.17
- besi beton ( 479.35) kg ( 0.12) 100.00% 0.12 0.00% 0.00 100.00% 0.12
- beton readymix K-225 + concrete pump ( 6.24) m³ ( 0.12) 95.00% 0.12 0.00% 0.00 95.00% 0.12
11 Balok type CA6 200 x 400 :
- bekisting multipleks 9 mm ( 19.96) m² ( 0.05) 100.00% 0.05 0.00% 0.00 100.00% 0.05
- besi beton ( 229.42) kg ( 0.06) 100.00% 0.06 0.00% 0.00 100.00% 0.06
- beton readymix K-225 + concrete pump ( 2.00) m³ ( 0.04) 100.00% 0.04 0.00% 0.00 100.00% 0.04
12 Balok type B1A 150 x 400 :
- bekisting multipleks 9 mm ( 2.04) m² ( 0.01) 100.00% 0.01 0.00% 0.00 100.00% 0.01
- besi beton ( 15.76) kg ( 0.00) 100.00% 0.00 0.00% 0.00 100.00% 0.00
- beton readymix K-225 + concrete pump ( 0.15) m³ ( 0.00) 100.00% 0.00 0.00% 0.00 100.00% 0.00
13 Balok type B1B 150 x 400 :
- bekisting multipleks 9 mm ( 47.87) m² ( 0.13) 100.00% 0.13 0.00% 0.00 100.00% 0.13
- besi beton ( 370.41) kg ( 0.09) 100.00% 0.09 0.00% 0.00 100.00% 0.09
- beton readymix K-225 + concrete pump ( 3.59) m³ ( 0.07) 100.00% 0.07 0.00% 0.00 100.00% 0.07
14 Balok type B2A 150 x 300 :
- bekisting multipleks 9 mm ( 2.92) m² ( 0.01) 100.00% 0.01 0.00% 0.00 100.00% 0.01
- besi beton ( 34.31) kg ( 0.01) 100.00% 0.01 0.00% 0.00 100.00% 0.01
- beton readymix K-225 + concrete pump ( 0.22) m³ ( 0.00) 100.00% 0.00 0.00% 0.00 100.00% 0.00
15 Balok type B2B 150 x 300 :
- bekisting multipleks 9 mm ( 4.88) m² ( 0.01) 100.00% 0.01 0.00% 0.00 100.00% 0.01
- besi beton ( 57.57) kg ( 0.01) 100.00% 0.01 0.00% 0.00 100.00% 0.01
- beton readymix K-225 + concrete pump ( 0.37) m³ ( 0.01) 100.00% 0.01 0.00% 0.00 100.00% 0.01
16 Balok type D1 200 x 1600 :
- bekisting multipleks 9 mm ( 91.98) m² ( 0.25) 100.00% 0.25 0.00% 0.00 100.00% 0.25
- besi beton ( 1,505.48) kg ( 0.37) 100.00% 0.37 0.00% 0.00 100.00% 0.37
- beton readymix K-225 + concrete pump ( 9.20) m³ ( 0.18) 100.00% 0.18 0.00% 0.00 100.00% 0.18
17 Balok type CD1 200 x 1600 :
- bekisting multipleks 9 mm ( 8.73) m² ( 0.02) 100.00% 0.02 0.00% 0.00 100.00% 0.02
- besi beton ( 162.34) kg ( 0.04) 100.00% 0.04 0.00% 0.00 100.00% 0.04
- beton readymix K-225 + concrete pump ( 0.87) m³ ( 0.02) 70.00% 0.01 20.00% 0.00 90.00% 0.02
18 Balok type D2 200 x 1350 :
- bekisting multipleks 9 mm ( 51.91) m² ( 0.14) 100.00% 0.14 0.00% 0.00 100.00% 0.14
- besi beton ( 864.88) kg ( 0.21) 100.00% 0.21 0.00% 0.00 100.00% 0.21
- beton readymix K-225 + concrete pump ( 5.19) m³ ( 0.10) 70.00% 0.07 20.00% 0.02 90.00% 0.09
19 Balok type D3 200 x 1100 :
- bekisting multipleks 9 mm ( 5.88) m² ( 0.02) 100.00% 0.02 0.00% 0.00 100.00% 0.02
- besi beton ( 104.55) kg ( 0.03) 100.00% 0.03 0.00% 0.00 100.00% 0.03
- beton readymix K-225 + concrete pump ( 0.59) m³ ( 0.01) 100.00% 0.01 0.00% 0.00 100.00% 0.01
20 Balok type CD3 200 x 1100 :
- bekisting multipleks 9 mm ( 4.26) m² ( 0.01) 100.00% 0.01 0.00% 0.00 100.00% 0.01
- besi beton ( 81.66) kg ( 0.02) 100.00% 0.02 0.00% 0.00 100.00% 0.02
- beton readymix K-225 + concrete pump ( 0.43) m³ ( 0.01) 100.00% 0.01 0.00% 0.00 100.00% 0.01
21 Balok type D4 200 x 900 :
- bekisting multipleks 9 mm ( 18.72) m² ( 0.05) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- besi beton ( 350.54) kg ( 0.09) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- beton readymix K-225 + concrete pump ( 1.87) m³ ( 0.04) 0.00% 0.00 0.00% 0.00 0.00% 0.00
22 Balok type D5 200 x 700 : VE
- bekisting multipleks 9 mm ( - ) m² ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- besi beton ( - ) kg ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- beton readymix K-225 + concrete pump ( - ) m³ ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
23 Balok type CD5 200 x 700 : VE
- bekisting multipleks 9 mm ( - ) m² ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- besi beton ( - ) kg ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- beton readymix K-225 + concrete pump ( - ) m³ ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
24 Balok type BS1 WF 700.300.13.24 : VE
- WF 700.300.13.24 ( - ) kg ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- joint plate, stiffener plate & baut ( - ) kg ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- meni zinchromate + cat SEIV ( - ) kg ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
25 Balok type BS2 WF 350.175.7.11 :
- WF 350.175.7.11 ( 1,961.68) kg ( 0.97) 100.00% 0.97 0.00% 0.00 100.00% 0.97
- voute WF 350.175.7.11 ( 119.04) kg ( 0.06) 70.00% 0.04 0.00% 0.00 70.00% 0.04
- joint plate, stiffener plate & baut ( 108.52) kg ( 0.04) 70.00% 0.03 0.00% 0.00 70.00% 0.03
- meni zinchromate + cat SEIV ( 2,189.24) kg ( 0.22) 100.00% 0.22 0.00% 0.00 100.00% 0.22
26 Balok type BS3 WF 300.150.6,5.9 :
- WF 300.150.6,5.9 ( 3,188.68) kg ( 1.58) 70.00% 1.11 0.00% 0.00 70.00% 1.11
- voute WF 300.150.6,5.9 ( 367.00) kg ( 0.18) 70.00% 0.13 0.00% 0.00 70.00% 0.13
- joint plate, stiffener plate & baut ( 229.45) kg ( 0.09) 60.00% 0.06 0.00% 0.00 60.00% 0.06
- meni zinchromate + cat SEIV ( 3,785.13) kg ( 0.38) 70.00% 0.27 0.00% 0.00 70.00% 0.27
27 Balok type BS4 WF 200.100.5,5.8 :
- WF 200.100.5,5.8 ( 990.77) kg ( 0.49) 60.00% 0.29 0.00% 0.00 60.00% 0.29
- voute WF 200.100.5,5.8 ( 51.20) kg ( 0.03) 60.00% 0.02 0.00% 0.00 60.00% 0.02
- joint plate, stiffener plate & baut ( 86.70) kg ( 0.04) 60.00% 0.02 0.00% 0.00 60.00% 0.02
- meni zinchromate + cat SEIV ( 1,128.67) kg ( 0.11) 60.00% 0.07 0.00% 0.00 60.00% 0.07
28 Pelat lantai type S1 t = 120 mm :
- bekisting multipleks 9 mm ( 846.35) m² ( 2.71) 85.00% 2.30 10.00% 0.00 95.00% 2.57
- besi beton ( 9,820.27) kg ( 2.39) 95.00% 2.27 0.00% 0.00 95.00% 2.27
- beton readymix K-225 + concrete pump ( 96.97) m³ ( 1.89) 95.00% 1.80 0.00% 0.00 95.00% 1.80
29 Pelat lantai type S2 t = 120 mm :
- floor deck type UNION DECK II t = 0,75 mm ( 118.90) m² ( 0.54) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- wiremesh M-8 : U-55 ( 118.90) m² ( 0.19) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- beton readymix K-225 + concrete pump ( 14.27) m³ ( 0.28) 0.00% 0.00 0.00% 0.00 0.00% 0.00
30 Kolom type KS1 H-400.400.13.21 (4 buah) : VE
- H-BEAM 400.400.13.21 ( - ) kg ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- base plate & angkur ( - ) kg ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- meni zinchromate + cat SEIV ( - ) kg ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
31 Kolom type KS3 H-150.150.7.10 (18 buah) : VE
- H-BEAM 150.150.7.10 ( - ) kg ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- base plate & angkur ( - ) kg ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- meni zinchromate + cat SEIV ( - ) kg ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
32 Kolom type CS300 H-300.300.10.5 (8 buah) :
- H-BEAM 300.300.10.5 ( 1,504.00) kg ( 0.75) 100.00% 0.75 0.00% 0.00 100.00% 0.75
- base plate & angkur ( 293.67) kg ( 0.12) 100.00% 0.12 0.00% 0.00 100.00% 0.12
- meni zinchromate + cat SEIV ( 1,797.67) kg ( 0.18) 100.00% 0.18 0.00% 0.00 100.00% 0.18
33 Penutup Atap Ex. Alderon Putih
Atap baja ringan ( 57.48) m2 ( 0.18) 40.00% 0.07 60.00% 0.11 100.00% 0.18
Alumunium foil ( 57.48) m2 ( 0.03) 30.00% 0.01 70.00% 0.02 100.00% 0.03
Penutup alderon putih ( 57.48) m2 ( 0.38) 30.00% 0.11 60.00% 0.23 90.00% 0.34

Sub Total Pekerjaan Struktur Lantai Atap 1 ( 18.84) 82.72% 15.59 2.06% 0.39 86.22% 16.25

V PEKERJAAN STRUKTUR LANTAI ATAP 2


1 Balok type BS1 WF 700.300.13.24 : VE
- WF 700.300.13.24 ( - ) kg ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- joint plate, stiffener plate & baut ( - ) kg ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- meni zinchromate + cat SEIV ( - ) kg ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
2 Balok type BS1 WF 400.200.8.13 :
- WF 400.200.8.13 ( 9,170.04) kg ( 4.55) 25.00% 1.14 0.00% 0.00 25.00% 1.14
- joint plate, stiffener plate & baut ( 1,527.36) kg ( 0.62) 15.00% 0.09 0.00% 0.00 15.00% 0.09
- meni zinchromate + cat SEIV ( 10,697.40) kg ( 1.08) 15.00% 0.16 0.00% 0.00 15.00% 0.16
3 Balok type BS3 WF 300.150.6,5.9 :
- WF 300.150.6,5.9 ( 1,600.12) kg ( 0.79) 25.00% 0.20 0.00% 0.00 25.00% 0.20
- voute WF 300.150.6,5.9 ( 330.30) kg ( 0.16) 25.00% 0.04 0.00% 0.00 25.00% 0.04
- joint plate, stiffener plate & baut ( 268.20) kg ( 0.11) 25.00% 0.03 0.00% 0.00 25.00% 0.03
- meni zinchromate + cat SEIV ( 2,198.62) kg ( 0.22) 25.00% 0.06 0.00% 0.00 25.00% 0.06
4 Balok type BS4 WF 200.100.5,5.8 :
- WF 200.100.5,5.8 ( 1,862.40) kg ( 0.92) 25.00% 0.23 0.00% 0.00 25.00% 0.23
- voute WF 200.100.5,5.8 ( 38.40) kg ( 0.02) 25.00% 0.00 0.00% 0.00 25.00% 0.00
- joint plate, stiffener plate & baut ( 190.72) kg ( 0.08) 25.00% 0.02 0.00% 0.00 25.00% 0.02
- meni zinchromate + cat SEIV ( 2,091.52) kg ( 0.21) 25.00% 0.05 0.00% 0.00 25.00% 0.05
5 Pelat lantai type S2 t = 120 mm :
- floor deck type UNION DECK II t = 0,75 mm ( 252.13) m² ( 1.14) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- wiremesh M-8 : U-55 ( 252.13) m² ( 0.41) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- beton readymix K-225 + concrete pump ( 30.26) m³ ( 0.59) 0.00% 0.00 0.00% 0.00 0.00% 0.00

Sub Total Pekerjaan Struktur Lantai Atap 2 ( 10.90) 18.54% 2.02 0.00% 0.00 18.54% 2.02

VI PEKERJAAN STRUKTUR KOLAM RENANG


1 Pondasi batu belah 1pc : 5ps :
- galian tanah ( 240.42) m³ ( 0.50) 100.00% 0.50 0.00% 0.00 100.00% 0.50
- pondasi batu belah 1pc : 5ps ( 66.82) m³ ( 0.94) 0.00% 0.00 30.00% 0.28 30.00% 0.28
2 Pelat lantai beton bertulang t = 200 mm :
- pemadatan ( 115.46) m² ( 0.04) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- plastik cor ( 115.46) m² ( 0.02) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- besi beton ( 3,705.12) kg ( 0.90) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- beton readymix K-225 + concrete pump ( 23.09) m³ ( 0.45) 0.00% 0.00 0.00% 0.00 0.00% 0.00
3 Pelat lantai beton bertulang t = 150 mm :
- pemadatan ( 16.94) m² ( 0.01) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- plastik cor ( 16.94) m² ( 0.00) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- besi beton ( 321.70) kg ( 0.08) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- beton readymix K-225 + concrete pump ( 2.54) m³ ( 0.05) 0.00% 0.00 0.00% 0.00 0.00% 0.00
4 Dinding beton bertulang t = 200 mm :
- bekisting multipleks 9 mm ( 162.71) m² ( 0.43) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- besi beton ( 1,819.18) kg ( 0.44) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- beton readymix K-225 + concrete pump ( 16.27) m³ ( 0.32) 0.00% 0.00 0.00% 0.00 0.00% 0.00
5 Dinding beton bertulang t = 150 mm :
- bekisting multipleks 9 mm ( 17.71) m² ( 0.05) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- besi beton ( 190.74) kg ( 0.05) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- beton readymix K-225 + concrete pump ( 1.33) m³ ( 0.03) 0.00% 0.00 0.00% 0.00 0.00% 0.00

Sub Total Pekerjaan Struktur Kolam Renang ( 4.31) 11.64% 0.50 6.53% 0.28 18.16% 0.78

VII PEKERJAAN STRUKTUR PUMP ROOM


1 Pondasi batu belah 1pc : 5ps :
- galian tanah ( 5.60) m³ ( 0.01) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- pondasi batu belah 1pc : 5ps ( 3.50) m³ ( 0.05) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- urugan tanah kembali ( 2.10) m³ ( 0.00) 0.00% 0.00 0.00% 0.00 0.00% 0.00
2 Pelat lantai beton bertulang t = 150 mm :
- galian tanah ( 11.66) m³ ( 0.02) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- pemadatan ( 5.83) m² ( 0.00) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- plastik cor ( 5.83) m² ( 0.00) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- besi beton ( 187.00) kg ( 0.05) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- beton readymix K-225 + concrete pump ( 0.87) m³ ( 0.02) 0.00% 0.00 0.00% 0.00 0.00% 0.00
3 Dinding beton bertulang t = 200 mm :
- bekisting multipleks 9 mm ( 20.00) m² ( 0.05) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- bekisting batako ( 20.00) m² ( 0.03) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- besi beton ( 434.48) kg ( 0.11) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- beton readymix K-225 + concrete pump ( 4.00) m³ ( 0.08) 0.00% 0.00 0.00% 0.00 0.00% 0.00
Sub Total Pekerjaan Struktur Pump Room ( 0.42) 0.00% 0.00 0.00% 0.00 0.00% 0.00

I PEKERJAAN DINDING
Lantai Dasar
1 Pasangan bata 1/2 batu 1pc : 5ps ( 1,204.40) m² ( 3.60) 100.00% 3.60 0.00% 0.00 100.00% 3.60
2 Plesteran 1pc : 5ps & acian ( 3,609.63) m² ( 4.77) 30.00% 1.43 10.00% 0.48 40.00% 1.91
3 Kolom praktis 12 x 12 ( 471.25) m¹ ( 1.06) 100.00% 1.06 0.00% 0.00 100.00% 1.06
4 Ring balk praktis 12 x 15 ( 185.70) m¹ ( 0.42) 100.00% 0.42 0.00% 0.00 100.00% 0.42
5 Finishing master bathroom :
- homogenous tile 300 x 600 ex. Granito (Install Only) ( 52.46) m² ( 0.11) 0.00% 0.00 0.00% 0.00 0.00% 0.00
6 Finishing guest bathroom :
- homogenous tile 300 x 600 ex. Granito (Install Only) ( 86.24) m² ( 0.19) 0.00% 0.00 0.00% 0.00 0.00% 0.00
7 Finishing kids villa bathroom 1 :
- homogenous tile 300 x 600 ex. Granito (Install Only) ( 37.36) m² ( 0.08) 0.00% 0.00 0.00% 0.00 0.00% 0.00
8 Finishing kids villa bathroom 2 :
- homogenous tile 300 x 600 ex. Granito (Install Only) ( 37.36) m² ( 0.08) 0.00% 0.00 0.00% 0.00 0.00% 0.00
9 Finishing kids villa bathroom 3 :
- homogenous tile 300 x 600 ex. Granito (Install Only) ( 41.41) m² ( 0.09) 0.00% 0.00 0.00% 0.00 0.00% 0.00
10 Finishing service building bathroom :
- ceramic tile 200 x 200 ex. Asia Tile (Install Only) ( 14.65) m² ( 0.02) 0.00% 0.00 0.00% 0.00 0.00% 0.00
11 Pekerjaan waterproofing ex Sika 107
- swimming pool ( 90.21) m² ( 0.09) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- pump room ( 23.40) m² ( 0.02) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- master bathroom ( 52.46) m² ( 0.05) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- guest bathroom ( 86.24) m² ( 0.08) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- kids villa bathroom 1 ( 37.36) m² ( 0.04) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- kids villa bathroom 2 ( 37.36) m² ( 0.04) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- kids villa bathroom 3 ( 41.41) m² ( 0.04) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- service building bathroom ( 14.65) m² ( 0.01) 0.00% 0.00 0.00% 0.00 0.00% 0.00

Sub Total Pekerjaan Dinding ( 10.78) 60.38% 6.51 4.42% 0.48 64.80% 6.99

II PEKERJAAN KUSEN, PINTU & JENDELA


Lantai Dasar
1 D1 (13400 x 3000 + 13400 x 1030) Sliding Door Alumunium Xing Fa ( 2.00) unit
Aluprime L98; 3 Rail 6 Leaf + Fixed Glass 8 mm (8 Daun) ( 3.60) 0.00% 0.00 0.00% 0.00 0.00% 0.00
2 D2 (3050 x 3000 +2 x 3920 x 3000) Sliding Door Alumunium Xing ( 1.00) unit
Fa Aluprime L98; Sliding 2 Rail 2 Leaf, Jendela Fixed Glass 10 mm ( 1.10) 0.00% 0.00 0.00% 0.00 0.00% 0.00
3 D3 (3457 x 3000 + 4250 x 3000) Sliding Door Alumunium Xing Fa ( 1.00) unit
Aluprime L98; 2 Rail 2 Leaf + Fixed Glass 10 mm ( 0.82) 0.00% 0.00 0.00% 0.00 0.00% 0.00
4 D4 (2950 x 3000) Sliding Door Alumunium Xing Fa Aluprime L98; 2 ( 1.00) unit
Rail 2 Leaf ( 0.48) 0.00% 0.00 0.00% 0.00 0.00% 0.00
5 D4' (2950 x 3000) Sliding Door Alumunium Xing Fa Aluprime L98; 2 ( 1.00) unit
Rail 2 Leaf ( 0.49) 0.00% 0.00 0.00% 0.00 0.00% 0.00
6 D5A (1100 x 3000) Pivot Door Engineering Wood; Aksesoris Ex ( 3.00) unit ( 0.44) 0.00% 0.00 0.00% 0.00 0.00% 0.00
7 Dekkson
D5B (1100 x 3000) Pivot Door Engineering Wood; Aksesoris Ex ( 3.00) unit ( 0.44) 0.00% 0.00 0.00% 0.00 0.00% 0.00
8 Dekkson
D5A' (1100 x 3000) Pivot Door Engineering Wood; Aksesoris Ex ( 3.00) unit ( 0.41) 0.00% 0.00 0.00% 0.00 0.00% 0.00
9 Dekkson
D5B' (1100 x 2600) Pivot Door Engineering Wood; Aksesoris Ex ( 2.00) unit ( 0.27) 0.00% 0.00 0.00% 0.00 0.00% 0.00
10 Dekkson
D6A (900 x 2100) Swing Door Engineering Wood; Aksesoris Ex ( 3.00) unit ( 0.26) 0.00% 0.00 0.00% 0.00 0.00% 0.00
11 Dekkson
D6B (900 x 2100) Swing Door Engineering Wood; Aksesoris Ex ( 2.00) unit ( 0.17) 0.00% 0.00 0.00% 0.00 0.00% 0.00
12 Dekkson
D7 (2910 x 3000) Sliding Door Alumunium Xing Fa Aluprime L98; 2 ( 1.00) unit
Rail 2 Leaf ( 0.48) 0.00% 0.00 0.00% 0.00 0.00% 0.00
13 D8 (2850 x 2400) Shower Partition Tempered 10 mm + Glass Panel ( 2.00) unit
Tempered 10 mm; Aksesoris Ex Dekkson ( 0.25) 0.00% 0.00 0.00% 0.00 0.00% 0.00
14 D9A (900 x 2400) Swing Door Engineering Wood; Aksesoris Ex ( 2.00) unit ( 0.19) 0.00% 0.00 0.00% 0.00 0.00% 0.00
15 Dekkson
D9B (900 x 2400) Swing Door Engineering Wood; Aksesoris Ex ( 2.00) unit ( 0.19) 0.00% 0.00 0.00% 0.00 0.00% 0.00
16 Dekkson
D10 (3325 x 2400 + 1240 x 2400) Shower Partition Tempered 10 mm ( 2.00) unit
+ Glass Panel tempered 10 mm; Aksesoris Ex Dekkson ( 0.41) 0.00% 0.00 0.00% 0.00 0.00% 0.00
17 D11 (950 x 3000) Sliding Door Engineering Wood; Aksesoris Ex ( 4.00) unit ( 0.41) 0.00% 0.00 0.00% 0.00 0.00% 0.00
18 Dekkson
D12 (4800 x 3000) Sliding Door Alumunium Xing Fa EcoPrime; 2 ( 2.00) unit ( 1.07) 0.00% 0.00 0.00% 0.00 0.00% 0.00
19 Rail 4(3800
D13 Leaf x 3000) Sliding Door Alumunium Xing Fa Ecoprime; 2 ( 2.00) unit ( 0.95) 0.00% 0.00 0.00% 0.00 0.00% 0.00
20 Rail 4(3850
D14 Leaf x 2400 + 1340 x 2400) Shower Partition Tempered 10 mm ( 1.00) unit
+ Glass Panel Tempered 10 mm; Aksesoris Ex Dekkson ( 0.22) 0.00% 0.00 0.00% 0.00 0.00% 0.00
21 D15 (5850 x 3000) Sliding Door Gate; Bangkirai Wood Lath 30x30 ( 1.00) unit
mm; Frame Bangkirai Wood 50x150 mm; Fin. Natural; Aksesoris Ex ( 0.84) 0.00% 0.00 0.00% 0.00 0.00% 0.00
Dekkson
22 D16A (950 x 2400) Swing Door Engineering Wood; Aksesoris Ex ( 3.00) unit ( 0.29) 0.00% 0.00 0.00% 0.00 0.00% 0.00
23 Dekkson
D16B (950 x 2400) Swing Door Engineering Wood; Aksesoris Ex ( 3.00) unit ( 0.29) 0.00% 0.00 0.00% 0.00 0.00% 0.00
24 Dekkson
D17 (2100 x 3000) Double Sliding Door Engineering Wood; ( 1.00) unit
Aksesoris Ex Dekkson ( 0.20) 0.00% 0.00 0.00% 0.00 0.00% 0.00
25 D17' (1150 x 3000) Sliding Door Engineering Wood; Aksesoris Ex ( 2.00) unit
Dekkson ( 0.25) 0.00% 0.00 0.00% 0.00 0.00% 0.00
26 D17 (1820 x 2400) Pump Room Double Swing Door Engoneering ( 1.00) unit
Wood; Aksesoris Ex Dekkson ( 0.16) 0.00% 0.00 0.00% 0.00 0.00% 0.00
27 DW1 (950 x 2400 + 700 x 1400) Swing Door Engineering Wood + ( 1.00) unit
Swing Window; Clear Glass 6 mm ( 0.13) 0.00% 0.00 0.00% 0.00 0.00% 0.00
28 W1 (4975 x 1400) Sliding Window Alumunium Xing Fa Ecoprime ( 1.00) unit
4D2R; Glass 8 mm ( 0.31) 0.00% 0.00 0.00% 0.00 0.00% 0.00
29 W2 (1000 x 3200) Fixed Window Alumunium Xing Fa Ecoprime; ( 2.00) unit
Glass 8 mm ( 0.17) 0.00% 0.00 0.00% 0.00 0.00% 0.00
30 W3A (1000 x 3000) Swing Window Alumunium Xing Fa Aluprime ( 1.00) unit ( 0.23) 0.00% 0.00 0.00% 0.00 0.00% 0.00
30 L98
W3A'(1D)
(1000 x 3000) Swing Window Alumunium Xing Fa Aluprime ( 1.00) unit
L98 (1D) ( 0.14) 0.00% 0.00 0.00% 0.00 0.00% 0.00
31 W3B (1000 x 3000) Swing Window Alumunium Xing Fa Aluprime ( 1.00) unit ( 0.23) 0.00% 0.00 0.00% 0.00 0.00% 0.00
32 L98 (5825
W4 (1D) x 3000) Fixed Glass Window 8 mm ( 1.00) unit ( 0.12) 0.00% 0.00 0.00% 0.00 0.00% 0.00
33 W5 (3400 x 500) Fixed Window Alumunium Xing Fa Ecoprime; ( 1.00) unit ( 0.06) 0.00% 0.00 0.00% 0.00 0.00% 0.00
34 Glass 6 mm
W6 (6450 x 550 + 2 x 1750 x 550) Fixed Glass Window 8 mm ( 2.00) unit ( 0.21) 0.00% 0.00 0.00% 0.00 0.00% 0.00
35 W7 (3000 x 3000 + 1325 x 3000) Fixed Window Alumunium Xing Fa ( 1.00) unit
Ecoprime (1D); Glass 8 mm ( 0.30) 0.00% 0.00 0.00% 0.00 0.00% 0.00
36 W8 (1650 x 500) Fixed Window Alumunium Xing Fa Ecoprime (1D); ( 1.00) unit
Glass 6 mm ( 0.02) 0.00% 0.00 0.00% 0.00 0.00% 0.00
37 W9 (5800 x 500) Fixed Window Alumunium Xing Fa Ecoprime (1D); ( 1.00) unit
Glass 6 mm ( 0.09) 0.00% 0.00 0.00% 0.00 0.00% 0.00
38 W10 (3325 x 500) Fixed Window Alumunium Xing Fa Ecoprime ( 2.00) unit
(1D); Glass 6 mm ( 0.23) 0.00% 0.00 0.00% 0.00 0.00% 0.00
39 W11 (3850 x 500) Fixed Window Alumunium Xing Fa Ecoprime ( 1.00) unit
(1D); Glass 6 mm ( 0.06) 0.00% 0.00 0.00% 0.00 0.00% 0.00
40 W12 (950 x 1400) Swing Window Bangkirai Wood; Clear Glass 6 mm ( 1.00) unit ( 0.05) 0.00% 0.00 0.00% 0.00 0.00% 0.00
41 W13 (750 x 1400) Swing Window Bangkirai Wood; Clear Glass 6 mm ( 2.00) unit ( 0.09) 0.00% 0.00 0.00% 0.00 0.00% 0.00
42 W14 (950 x 400) Fixed Glass Window Bangkirai; Clear Glass 6 mm ( 1.00) unit ( 0.01) 0.00% 0.00 0.00% 0.00 0.00% 0.00
43 W15 (3750 x 700) Sliding Window Bangkirai Wood; Clear Glass 6 ( 1.00) unit
mm; Aksesoris Ex Dekkson ( 0.13) 0.00% 0.00 0.00% 0.00 0.00% 0.00
44 W16 (1900 x 1425) Double Sliding Window Bangkirai Wood; Clear ( 1.00) unit
Glass 6 mm; Aksesoris Ex Dekkson ( 0.11) 0.00% 0.00 0.00% 0.00 0.00% 0.00
45 W17 (5850 x 500) Fixed Glass Window Bangkirai; Clear Glass 6 mm ( 1.00) unit ( 0.07) 0.00% 0.00 0.00% 0.00 0.00% 0.00
46 Folding Door (3850x2400) Generator Building (exlude, no detail ( 1.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
47 drawing)Door (5740x2700) Entrance Road
Sliding ( 1.00) unit ( 0.55) 0.00% 0.00 0.00% 0.00 0.00% 0.00

Sub Total Pekerjaan Kusen, Pintu & Jendela ( 18.02) 0.00% 0.00 0.00% 0.00 0.00% 0.00

III PEKERJAAN PLAFOND


Lantai Dasar
1 Plafond Gypsum Board 9 mm rangka hollow galvanis 40 x 40 mm ( 614.02) m² ( 1.12) 0.00% 0.00 0.00% 0.00 0.00% 0.00
2 tebal 0,35Gypsum
Plafond mm u/ Board
area dalam
WR 9 mm rangka hollow galvanis 40 x 40 ( 445.43) m² ( 1.01) 0.00% 0.00 0.00% 0.00 0.00% 0.00
3 mm tebal
Shadow line0,35 mm u/ area luar ( 950.27) m¹ ( 0.28) 0.00% 0.00 0.00% 0.00 0.00% 0.00
4 Indirect light ( 64.60) m¹ ( 0.05) 0.00% 0.00 0.00% 0.00 0.00% 0.00
5 Cove for curtain ( 23.02) m¹ ( 0.02) 0.00% 0.00 0.00% 0.00 0.00% 0.00
6 Metal plate 1 mm (white finish) ( 56.87) m¹ ( 0.10) 0.00% 0.00 0.00% 0.00 0.00% 0.00
7 Cove for LED strip light ( 70.86) m¹ ( 0.07) 0.00% 0.00 0.00% 0.00 0.00% 0.00

Sub Total Pekerjaan Plafond ( 2.66) 0.00% 0.00 0.00% 0.00 0.00% 0.00

IV PEKERJAAN LANTAI
Lantai Dasar
1 Homogenous tile 600 x 600 ex. Travertino (01) (Install Only) ( 724.62) m² ( 1.51) 0.00% 0.00 0.00% 0.00 0.00% 0.00
2 Homogenous tile 600 x 600 ex. Granito (02) (Install Only) ( 69.87) m² ( 0.15) 0.00% 0.00 0.00% 0.00 0.00% 0.00
3 Iron wood decking wide 200 mm (03) ( 249.23) m² ( 3.89) 0.00% 0.00 0.00% 0.00 0.00% 0.00
4 Grass Block 200x200x80 mm (04) ( 332.24) m² ( 1.14) 0.00% 0.00 0.00% 0.00 0.00% 0.00
5 Ceramic tile 200 x 200 ex. Asia Tile (05) (Install Only) ( 83.90) m² ( 0.11) 0.00% 0.00 0.00% 0.00 0.00% 0.00
6 Andesit stone 300 x 300 natural finish (06) ( - ) m² ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
7 Plint canal U aluminium high 15 mm ( 446.15) m¹ ( 0.18) 0.00% 0.00 0.00% 0.00 0.00% 0.00
8 Pekerjaan waterproofing ex Sika 107
- swimming pool ( 132.40) m² ( 0.13) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- pump room ( 8.38) m² ( 0.01) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- master bathroom ( 16.71) m² ( 0.02) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- guest bathroom ( 19.88) m² ( 0.02) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- kids villa bathroom 1 ( 9.48) m² ( 0.01) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- kids villa bathroom 2 ( 9.48) m² ( 0.01) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- kids villa bathroom 3 ( 14.32) m² ( 0.01) 0.00% 0.00 0.00% 0.00 0.00% 0.00
- service building bathroom ( 4.21) m² ( 0.00) 0.00% 0.00 0.00% 0.00 0.00% 0.00

Lantai Atap
1 Waterproofing Sikatop + Secreed ( 1,179.12) m² ( 2.17) 0.00% 0.00 0.00% 0.00 0.00% 0.00

Sub Total Pekerjaan Lantai ( 9.35) 0.00% 0.00 0.00% 0.00 0.00% 0.00

V PEKERJAAN PENGECATAN
Lantai Dasar
1 Cat dinding luar ICI Dulux Weathershields ( 2,324.82) m² ( 2.28) 0.00% 0.00 0.00% 0.00 0.00% 0.00
2 Cat dinding dalam ICI Dulux Pentalite ( 1,206.58) m² ( 1.06) 0.00% 0.00 0.00% 0.00 0.00% 0.00
3 Cat plafond ICI Dulux Pentalite ( 614.02) m² ( 0.54) 0.00% 0.00 0.00% 0.00 0.00% 0.00
4 Cat plafond ICI Dulux Weathershields ( 345.09) m² ( 0.34) 0.00% 0.00 0.00% 0.00 0.00% 0.00

Sub Total Pekerjaan Pengecatan ( 4.22) 0.00% 0.00 0.00% 0.00 0.00% 0.00

VI PEKERJAAN SANITARY (BY OWNER)


Lantai Dasar
Guest Bathroom :
1 Closet TOTO CW631J/SW631JP ( 2.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
2 Jet washer TOTO TX403SMCRB ( 2.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
3 Tissue holder TOTO TX703AES ( 2.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
4 Towel holder TOTO TX704AES ( 2.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
5 Lavatory TOTO LW592J ( 2.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
6 Lavatory faucet TOTO TX115LU ( 2.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
7 Hand towel holder TOTO TX702AES ( 2.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
8 Head shower TOTO TX465SEN ( 2.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
9 Hand shower TOTO TX721AEV1N ( 2.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
10 Meja lavatory + top table ( 1.85) m¹ ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
11 Floor drain TOTO smart drain Eco ( 4.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00

Master Bathroom :
1 Closet TOTO CW840J ( 1.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
2 Jet washer TOTO TX403SMCRB ( 1.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
3 Tissue holder TOTO TX703AES ( 1.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
4 Towel holder TOTO TX704AES ( 2.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
5 Lavatory TOTO L548 ( 2.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
6 Lavatory faucet TOTO TX119LEBR ( 2.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
7 Hand towel holder TOTO TX702AE ( 2.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
8 Head shower TOTO TX465SEN ( 1.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
9 Hand shower TOTO TX721AEV1N ( 1.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
10 Mixing shower TOTO TX442SU ( 2.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
11 Towel hanger TOTO TX724AES ( 1.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
12 Meja lavatory + top table ( 2.20) m¹ ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
13 Floor drain TOTO smart drain Eco ( 2.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00

Kids Villa Bathroom 1 :


1 Closet TOTO CW896J/SW896JP ( 1.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
2 Jet washer TOTO TX403SMCRB ( 1.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
3 Tissue holder TOTO TX703AES ( 1.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
4 Towel holder TOTO TX704AES ( 1.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
5 Lavatory TOTO L548 ( 1.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
6 Lavatory faucet TOTO TX115LU ( 1.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
7 Hand towel holder TOTO TX702AE ( 1.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
8 Head shower TOTO TX465SEN ( 1.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
9 Hand shower TOTO TX721AEV1N ( 1.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
10 Towel hanger TOTO TX724AES ( 1.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
11 Meja lavatory + top table ( 3.35) m¹ ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
12 Floor drain TOTO smart drain Eco ( 2.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00

Kids Villa Bathroom 2 :


1 Closet TOTO CW896J/SW896JP ( 1.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
2 Jet washer TOTO TX403SMCRB ( 1.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
3 Tissue holder TOTO TX703AES ( 1.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
4 Towel holder TOTO TX704AES ( 1.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
5 Lavatory TOTO L548 ( 1.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
6 Lavatory faucet TOTO TX115LU ( 1.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
7 Hand towel holder TOTO TX702AE ( 1.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
8 Head shower TOTO TX465SEN ( 1.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
9 Hand shower TOTO TX721AEV1N ( 1.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
10 Towel hanger TOTO TX724AES ( 1.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
11 Meja lavatory + top table ( 3.35) m¹ ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
12 Floor drain TOTO smart drain Eco ( 2.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00

Kids Villa Bathroom 3 :


1 Closet TOTO CW896J/SW896JP ( 1.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
2 Jet washer TOTO TX403SMCRB ( 1.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
3 Tissue holder TOTO TX703AES ( 1.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
4 Towel holder TOTO TX704AES ( 2.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
5 Lavatory TOTO L548 ( 2.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
6 Lavatory faucet TOTO TX115LU ( 2.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
7 Hand towel holder TOTO TX702AE ( 2.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
8 Head shower TOTO TX465SEN ( 1.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
9 Hand shower TOTO TX721AEV1N ( 1.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
10 Towel hanger TOTO TX724AES ( 1.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
11 Meja lavatory + top table ( 3.85) m¹ ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
12 Floor drain TOTO smart drain Eco ( 2.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00

Service Building Bathroom :


1 Closet TOTO CW637J/SW637JP ( 1.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
2 Jet washer TOTO TX403SMCRB ( 1.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
3 Tissue holder TOTO TX703AE ( 1.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
4 Hand & faucet shower TOTO TX432SDN ( 1.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00
5 Floor drain TOTO smart drain Eco ( 1.00) unit ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00

Sub Total Pekerjaan Sanitary ( - ) 0.00% 0.00 0.00% 0.00 0.00% 0.00

VII PEKERJAAN LAIN - LAIN


1 Pembersihan akhir proyek ( 1.00) ls ( 0.27) 0.00% 0.00 0.00% 0.00 0.00% 0.00

Sub Total Pekerjaan Lain - Lain ( 0.27) 0.00% 0.00 0.00% 0.00 0.00% 0.00

100.00 40.88% 40.88 1.99% 1.99 43.14% 43.14