WQT Parameter Recording Sheet

The document contains welder qualification test records for three welders. It details the welding process, materials, pipe dimensions, joint design, and electrical characteristics for multi-pass pipe welds. Visual inspections of the root and subsequent passes showed them to be okay.

Uploaded by

sonuanupam14
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
201 views

WQT Parameter Recording Sheet

The document contains welder qualification test records for three welders. It details the welding process, materials, pipe dimensions, joint design, and electrical characteristics for multi-pass pipe welds. Visual inspections of the root and subsequent passes showed them to be okay.

Uploaded by

sonuanupam14
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 13

CREATION OF NEW SURFACE FACILITIES IN ANKLAV FIELD OF

CAMBAY

WELDER QUALIFICATION TEST RECORD


Client : M/s OIL AND NATURAL GAS CORPORATION DOC.NO.: SOPAN/ONGC/5102/WI-02/1

Contractor: M/s SOPAN O&M CO. PVT.LTD. Report No. :


Date : 09.04.2021
Tested Date Tested Location : EPS ANKLAV Weather Conditions
09.04.2021
PQT/WQT No.
SOP/ONGC/WQT/07
Welder Name:
ABDUL KADIR
Welder No.
PW-04
Qualified for WPS No.
SOPAN/ONGC/PIPE/WPS-03
Qualified For
ALL PASSES
Welding M/c Type
RECTIFIER (400 Amps)
Welding Process GTAW+SMAW
Pipe Material A106 Gr. B
Pipe Diameter 150NB
Pipe Wall thickness 10.97 MM
Joint Design:
Single V-Groove
Range Qualified for Dia meter
73NB to Unlimited
Range Qualified for Thickness
5MM to 21.48MM
Type of Line up Clamp
CLITS
Removal of Clamp
DURING WELDING PROGRESSION
Cleaning Method
GRINDING & BRUSHING
Welding Position
6G
Root Pass
VISUAL OK
Subsequent Pass (Hot,Fill & Cap) VISUAL OK
Maximum time between commencement and
completion of weld N/A

ELECTRICAL CHARACTERISTICS

Welding Welding Trade Size Travel Speed


Pass Spec No. AWS No. Mfg Polarity Voltage Amp Remarks
process Direction Name (mm) (mm/min)

120-
Root Pass GTAW UPHILL ER70S-2 5.18 ADOR ----- 2.5 DCEN 16-18 130 50-60

110-
Hot Pass GTAW UPHILL ER70S-2 5.18 ADOR ----- 2.5 DCEN 17-32 130 60-70

110-
Fill Up SMAW UPHILL E7018 5.1 ADOR ----- 4 DCEP 28-30 130 70-80

100-
Capping 1 SMAW UPHILL E7018 5.1 ADOR ----- 3.15 DCEP 26-28 110 50-60

100-
Capping 2 SMAW UPHILL E7018 5.1 ADOR ----- 3.15 DCEP 26-28 110 50-60

FOR SOPAN FOR ONGC / TPI


Signature : Signature :

Name : Name :

Date:
CREATION OF NEW SURFACE FACILITIES IN ANKLAV FIELD OF
CAMBAY

WELDER QUALIFICATION TEST RECORD


Client : M/s OIL AND NATURAL GAS CORPORATION DOC.NO.: SOPAN/ONGC/5102/WI-02/1

Contractor: M/s SOPAN O&M CO. PVT.LTD. Report No. :


Date : 18.03.2021
Tested Date Tested Location : EPS ANKLAV Weather Conditions
18.03.2021
PQT/WQT No.
SOP/ONGC/WQT/04
Welder Name:
NAZMULLAH ALAM
Welder No.
PW-03
Qualified for WPS No.
SOPAN/ONGC/PIPE/WPS-03
Qualified For
ALL PASSES
Welding M/c Type
RECTIFIER (400 Amps)
Welding Process GTAW+SMAW
Pipe Material A106 Gr. B
Pipe Diameter 150NB
Pipe Wall thickness 10.97 MM
Joint Design:
Single V-Groove
Range Qualified for Dia meter
73NB to Unlimited
Range Qualified for Thickness
5MM to 21.48MM
Type of Line up Clamp
CLITS
Removal of Clamp
DURING WELDING PROGRESSION
Cleaning Method
GRINDING & BRUSHING
Welding Position
6G
Root Pass
VISUAL OK
Subsequent Pass (Hot,Fill & Cap) VISUAL OK
Maximum time between commencement and
completion of weld N/A

ELECTRICAL CHARACTERISTICS

Welding Welding Trade Size Travel Speed


Pass Spec No. AWS No. Mfg Polarity Voltage Amp Remarks
process Direction Name (mm) (mm/min)

120-
Root Pass GTAW UPHILL ER70S-2 5.18 ADOR ----- 2.5 DCEN 16-18 130 50-60

110-
Hot Pass GTAW UPHILL ER70S-2 5.18 ADOR ----- 2.5 DCEN 17-32 130 70-80

110-
Fill Up SMAW UPHILL E7018 5.1 ADOR ----- 4 DCEP 28-30 130 70-80

100-
Capping 1 SMAW UPHILL E7018 5.1 ADOR ----- 3.15 DCEP 26-28 110 60-70

100-
Capping 2 SMAW UPHILL E7018 5.1 ADOR ----- 3.15 DCEP 26-28 110 60-70

FOR SOPAN FOR ONGC / TPI


Signature : Signature :

Name : Name :

Date:
CREATION OF NEW SURFACE FACILITIES IN ANKLAV FIELD OF
CAMBAY

WELDER QUALIFICATION TEST RECORD


Client : M/s OIL AND NATURAL GAS CORPORATION DOC.NO.: SOPAN/ONGC/5102/WI-02/1

Contractor: M/s SOPAN O&M CO. PVT.LTD. Report No. :


Date : 24.04.2021
Tested Date Tested Location : EPS ANKLAV Weather Conditions
24.04.2021
PQT/WQT No.
SOP/ONGC/WQT/07
Welder Name:
SUJEET KUMAR SINGH
Welder No.
PW-05
Qualified for WPS No.
SOPAN/ONGC/PIPE/WPS-03
Qualified For
ALL PASSES
Welding M/c Type
RECTIFIER (400 Amps)
Welding Process SMAW
Pipe Material A106 Gr. B
Pipe Diameter 150NB
Pipe Wall thickness 10.97 MM
Joint Design:
Single V-Groove
Range Qualified for Dia meter
73NB to Unlimited
Range Qualified for Thickness
5MM to 21.48MM
Type of Line up Clamp
CLITS
Removal of Clamp
DURING WELDING PROGRESSION
Cleaning Method
GRINDING & BRUSHING
Welding Position
6G
Root Pass
VISUAL OK
Subsequent Pass (Hot,Fill & Cap) VISUAL OK
Maximum time between commencement and
completion of weld N/A

ELECTRICAL CHARACTERISTICS

Welding Welding Trade Size Travel Speed


Pass Spec No. AWS No. Mfg Polarity Voltage Amp Remarks
process Direction Name (mm) (mm/min)

120-
Root Pass GTAW UPHILL ER70S-2 5.18 ADOR ----- 2.5 DCEN 16-18 130 60-70

110-
Hot Pass GTAW UPHILL ER70S-2 5.18 ADOR ----- 2.5 DCEN 17-32 130 60-70

110-
Fill Up SMAW UPHILL E7018 5.1 ADOR ----- 4 DCEP 28-30 130 70-80

100-
Capping 1 SMAW UPHILL E7018 5.1 ADOR ----- 3.15 DCEP 26-28 110 60-70

100-
Capping 2 SMAW UPHILL E7018 5.1 ADOR ----- 3.15 DCEP 26-28 110 60-70

FOR SOPAN FOR ONGC / TPI


Signature : Signature :

Name : Name :

Date:
CREATION OF NEW SURFACE FACILITIES IN ANKLAV FIELD OF
CAMBAY

WELDER QUALIFICATION TEST RECORD


Client : M/s OIL AND NATURAL GAS CORPORATION DOC.NO.: SOPAN/ONGC/5102/WI-02/1

Contractor: M/s SOPAN O&M CO. PVT.LTD. Report No. :


Date : 24.04.2021
Tested Date Tested Location : EPS ANKLAV Weather Conditions
24.04.2021
PQT/WQT No.
SOP/ONGC/WQT/08
Welder Name:
DEEPAK KUMAR SINGH
Welder No.
PW-06
Qualified for WPS No.
SOPAN/ONGC/PIPE/WPS-03
Qualified For
ALL PASSES
Welding M/c Type
RECTIFIER (400 Amps)
Welding Process SMAW
Pipe Material A106 Gr. B
Pipe Diameter 150NB
Pipe Wall thickness 10.97 MM
Joint Design:
Single V-Groove
Range Qualified for Dia meter
73NB to Unlimited
Range Qualified for Thickness
5MM to 21.48MM
Type of Line up Clamp
CLITS
Removal of Clamp
DURING WELDING PROGRESSION
Cleaning Method
GRINDING & BRUSHING
Welding Position
6G
Root Pass
VISUAL OK
Subsequent Pass (Hot,Fill & Cap) VISUAL OK
Maximum time between commencement and
completion of weld N/A

ELECTRICAL CHARACTERISTICS

Welding Welding Trade Size Travel Speed


Pass Spec No. AWS No. Mfg Polarity Voltage Amp Remarks
process Direction Name (mm) (mm/min)

120-
Root Pass GTAW UPHILL E7018 5.18 ADOR ----- 2.5 DCEN 16-18 130 70-80

110-
Hot Pass GTAW UPHILL E7018 5.18 ADOR ----- 2.5 DCEN 17-32 130 70-80

110-
Fill Up SMAW UPHILL E7018 5.1 ADOR ----- 4 DCEP 28-30 130 60-70

100-
Capping 1 SMAW UPHILL E7018 5.1 ADOR ----- 3.15 DCEP 26-28 110 70-85

100-
Capping 2 SMAW UPHILL E7018 5.1 ADOR ----- 3.15 DCEP 26-28 110 70-85

FOR SOPAN FOR ONGC / TPI


Signature : Signature :

Name : Name :

Date:
CREATION OF NEW SURFACE FACILITIES IN ANKLAV FIELD OF
CAMBAY

WELDER QUALIFICATION TEST RECORD


Client : M/s OIL AND NATURAL GAS CORPORATION DOC.NO.: SOPAN/ONGC/5102/WI-02/1

Contractor: M/s SOPAN O&M CO. PVT.LTD. Report No. :


Date : 24.04.2021
Tested Date Tested Location : EPS ANKLAV Weather Conditions
24.04.2021
PQT/WQT No.
SOP/ONGC/WQT/09
Welder Name:
SATRUDHAN KUMAR
Welder No.
PW-07
Qualified for WPS No.
SOPAN/ONGC/PIPE/WPS-03
Qualified For
FILLUP & CAPPING ONLY
Welding M/c Type
RECTIFIER (400 Amps)
Welding Process SMAW
Pipe Material A106 Gr. B
Pipe Diameter 150NB
Pipe Wall thickness 10.97 MM
Joint Design:
Single V-Groove
Range Qualified for Dia meter
73NB to Unlimited
Range Qualified for Thickness
5MM to 21.48MM
Type of Line up Clamp
CLITS
Removal of Clamp
DURING WELDING PROGRESSION
Cleaning Method
GRINDING & BRUSHING
Welding Position
6G
Root Pass
VISUAL OK
Subsequent Pass (Hot,Fill & Cap) VISUAL OK
Maximum time between commencement and
completion of weld N/A

ELECTRICAL CHARACTERISTICS

Welding Welding Trade Size Travel Speed


Pass Spec No. AWS No. Mfg Polarity Voltage Amp Remarks
process Direction Name (mm) (mm/min)

Root Pass SMAW UPHILL E7018 5.1 ADOR ----- 2.5 DCEP 22-24 80-90 60-70

Hot Pass SMAW UPHILL E7018 5.1 ADOR ----- 2.5 DCEP 22-24 80-90 60-70

110-
Fill Up SMAW UPHILL E7018 5.1 ADOR ----- 4 DCEP 28-30 130 60-70

100-
Capping 1 SMAW UPHILL E7018 5.1 ADOR ----- 3.15 DCEP 26-28 110 70-85

100-
Capping 2 SMAW UPHILL E7018 5.1 ADOR ----- 3.15 DCEP 26-28 110 70-85

FOR SOPAN FOR ONGC / TPI


Signature : Signature :

Name : Name :

Date:
CREATION OF NEW SURFACE FACILITIES IN ANKLAV FIELD OF
CAMBAY

WELDER QUALIFICATION TEST RECORD


Client : M/s OIL AND NATURAL GAS CORPORATION DOC.NO.: SOPAN/ONGC/5102/WI-02/1

Contractor: M/s SOPAN O&M CO. PVT.LTD. Report No. :


Date : 14.08.2021
Tested Date Tested Location : EPS ANKLAV Weather Conditions
14.08.2021
PQT/WQT No.
PQR-03
Welder Name:
SANJIB GUCHHAIT
Welder No.
PW-13
Qualified for WPS No.
SOPAN/ONGC/PIPE/WPS-01
Qualified For
ALL PASSES
Welding M/c Type
RECTIFIER (400 Amps)
Welding Process SMAW
Pipe Material A106 Gr. B
Pipe Diameter
150 NB
Pipe Wall thickness 10.97 MM
Joint Design:
Single V-Groove
Range Qualified for Dia meter
73 NB to Unlimited
Range Qualified for Thickness
1.56MM to 21.48MM
Type of Line up Clamp
CLITS
Removal of Clamp
DURING WELDING PROGRESSION
Cleaning Method
GRINDING & BRUSHING
Welding Position
6G
Root Pass
VISUAL OK
Subsequent Pass (Hot,Fill & Cap) VISUAL OK
Maximum time between commencement and
completion of weld N/A

ELECTRICAL CHARACTERISTICS

Welding Welding Trade Size Travel Speed


Pass Spec No. AWS No. Mfg Polarity Voltage Amp Remarks
process Direction Name (mm) (mm/min)

Root Pass SMAW UPHILL E6010 5.1 ADOR ----- 2.5 DCEP 15-26 50-55 60-80

Hot Pass SMAW UPHILL E7018 5.1 D&H ----- 2.5 DCEP 22-32 75-85 100-120

110-
Fill Up SMAW UPHILL E7018 5.1 D&H ----- 4 DCEP 28-32 120 80-110

100-
Capping 1 SMAW UPHILL E7018 5.1 D&H ----- 3.15 DCEP 27-34 110 80-100

100-
Capping 2 SMAW UPHILL E7018 5.1 D&H ----- 3.15 DCEP 27-34 110 80-100

FOR SOPAN FOR ONGC / TPI


Signature : Signature :

Name : Name :

Date:
CREATION OF NEW SURFACE FACILITIES IN ANKLAV FIELD OF
CAMBAY

WELDER QUALIFICATION TEST RECORD


Client : M/s OIL AND NATURAL GAS CORPORATION DOC.NO.: SOPAN/ONGC/5102/WI-02/1

Contractor: M/s SOPAN O&M CO. PVT.LTD. Report No. :


Date : 14.08.2021
Tested Date Tested Location : EPS ANKLAV Weather Conditions
14.08.2021
PQT/WQT No.
WQT-15
Welder Name:
SANJIB GUCHHAIT
Welder No.
PW-13
Qualified for WPS No.
SOPAN/ONGC/PIPE/WPS-01
Qualified For
ALL PASSES
Welding M/c Type
RECTIFIER (400 Amps)
Welding Process SMAW
Pipe Material A106 Gr. B
Pipe Diameter
50 NB
Pipe Wall thickness 8.74 MM
Joint Design:
Single V-Groove
Range Qualified for Dia meter
25 NB to Unlimited
Range Qualified for Thickness
1.56MM to 17.48MM
Type of Line up Clamp
CLITS
Removal of Clamp
DURING WELDING PROGRESSION
Cleaning Method
GRINDING & BRUSHING
Welding Position
6G
Root Pass
VISUAL OK
Subsequent Pass (Hot,Fill & Cap) VISUAL OK
Maximum time between commencement and
completion of weld N/A

ELECTRICAL CHARACTERISTICS

Welding Welding Trade Size Travel Speed


Pass Spec No. AWS No. Mfg Polarity Voltage Amp Remarks
process Direction Name (mm) (mm/min)

Root Pass SMAW UPHILL E6010 5.1 ADOR ----- 2.5 DCEP 15-16 45-50 35-40

Hot Pass SMAW UPHILL E7018 5.1 D&H ----- 2.5 DCEP 22-24 75-85 50-60

100-
Fill Up SMAW UPHILL E7018 5.1 D&H ----- 4 DCEP 28-30 110 35-45

90-
Capping 1 SMAW UPHILL E7018 5.1 D&H ----- 3.15 DCEP 27-29 100 40-50

90-
Capping 2 SMAW UPHILL E7018 5.1 D&H ----- 3.15 DCEP 27-29 100 40-50

FOR SOPAN FOR ONGC / TPI


Signature : Signature :

Name : Name :

Date:
CREATION OF NEW SURFACE FACILITIES IN ANKLAV FIELD OF
CAMBAY

WELDER QUALIFICATION TEST RECORD


Client : M/s OIL AND NATURAL GAS CORPORATION DOC.NO.: SOPAN/ONGC/5102/WI-02/1

Contractor: M/s SOPAN O&M CO. PVT.LTD. Report No. :


Date : 14.08.2021
Tested Date Tested Location : EPS ANKLAV Weather Conditions
14.08.2021
PQT/WQT No.
WQT-16
Welder Name:
ANUB MONDAL
Welder No.
PW-14
Qualified for WPS No.
SOPAN/ONGC/PIPE/WPS-01
Qualified For
ALL PASSES
Welding M/c Type
RECTIFIER (400 Amps)
Welding Process SMAW
Pipe Material A106 Gr. B
Pipe Diameter
50 NB
Pipe Wall thickness 8.74 MM
Joint Design:
Single V-Groove
Range Qualified for Dia meter
25 NB to Unlimited
Range Qualified for Thickness
1.56MM to 17.48MM
Type of Line up Clamp
CLITS
Removal of Clamp
DURING WELDING PROGRESSION
Cleaning Method
GRINDING & BRUSHING
Welding Position
6G
Root Pass
VISUAL OK
Subsequent Pass (Hot,Fill & Cap) VISUAL OK
Maximum time between commencement and
completion of weld N/A

ELECTRICAL CHARACTERISTICS

Welding Welding Trade Size Travel Speed


Pass Spec No. AWS No. Mfg Polarity Voltage Amp Remarks
process Direction Name (mm) (mm/min)

Root Pass SMAW UPHILL E6010 5.1 ADOR ----- 2.5 DCEP 15-16 45-50 35-40

Hot Pass SMAW UPHILL E7018 5.1 D&H ----- 2.5 DCEP 22-24 75-85 50-60

100-
Fill Up SMAW UPHILL E7018 5.1 D&H ----- 4 DCEP 28-30 110 35-45

90-
Capping 1 SMAW UPHILL E7018 5.1 D&H ----- 3.15 DCEP 27-29 100 40-50

90-
Capping 2 SMAW UPHILL E7018 5.1 D&H ----- 3.15 DCEP 27-29 100 40-50

FOR SOPAN FOR ONGC / TPI


Signature : Signature :

Name : Name :

Date:
CREATION OF NEW SURFACE FACILITIES IN ANKLAV FIELD OF
CAMBAY

WELDER QUALIFICATION TEST RECORD


Client : M/s OIL AND NATURAL GAS CORPORATION DOC.NO.: SOPAN/ONGC/5102/WI-02/1

Contractor: M/s SOPAN O&M CO. PVT.LTD. Report No. :


Date : 17.08.2021
Tested Date Tested Location : EPS ANKLAV Weather Conditions
17.08.2021
PQT/WQT No.
WQT-17
Welder Name:
ABHAY KUMAR DUBEY
Welder No.
PW-15
Qualified for WPS No.
SOPAN/ONGC/PIPE/WPS-03
Qualified For
Fill Up & Capping
Welding M/c Type
RECTIFIER (400 Amps)
Welding Process SMAW
Pipe Material A106 Gr. B
Pipe Diameter
150N
Pipe Wall thickness 10.97 MM
Joint Design:
Single V-Groove
Range Qualified for Dia meter
50 NB to Unlimited
Range Qualified for Thickness
1.56MM to 21.48MM
Type of Line up Clamp
CLITS
Removal of Clamp
DURING WELDING PROGRESSION
Cleaning Method
GRINDING & BRUSHING
Welding Position
6G
Root Pass
VISUAL OK
Subsequent Pass (Hot,Fill & Cap) VISUAL OK
Maximum time between commencement and
completion of weld N/A

ELECTRICAL CHARACTERISTICS

Welding Welding Trade Size Travel Speed


Pass Spec No. AWS No. Mfg Polarity Voltage Amp Remarks
process Direction Name (mm) (mm/min)

Root Pass SMAW UPHILL E7018 5.1 ADOR ----- 2.5 DCEP 22-24 75-85 50-60

Hot Pass SMAW UPHILL E7018 5.1 ADOR ----- 2.5 DCEP 22-24 75-85 60-70

100-
Fill Up SMAW UPHILL E7018 5.1 ADOR ----- 4 DCEP 28-30 110 50-60

90-
Capping 1 SMAW UPHILL E7018 5.1 ADOR ----- 3.15 DCEP 27-29 100 70-80

90-
Capping 2 SMAW UPHILL E7018 5.1 ADOR ----- 3.15 DCEP 27-29 100 70-80

FOR SOPAN FOR ONGC / TPI


Signature : Signature :

Name : Name :

Date:
CREATION OF NEW SURFACE FACILITIES IN ANKLAV FIELD OF
CAMBAY

WELDER QUALIFICATION TEST RECORD


Client : M/s OIL AND NATURAL GAS CORPORATION DOC.NO.: SOPAN/ONGC/5102/WI-02/1

Contractor: M/s SOPAN O&M CO. PVT.LTD. Report No. :


Date : 29.08.2021
Tested Date Tested Location : EPS ANKLAV Weather Conditions
29.08.2021
PQT/WQT No.
WQT-18
Welder Name:
RABINDRA NATH DAS
Welder No.
PW-16
Qualified for WPS No.
SOPAN/ONGC/PIPE/WPS-02
Qualified For
ALL PASS
Welding M/c Type
RECTIFIER (400 Amps)
Welding Process GTAW
Pipe Material A106 Gr. B
Pipe Diameter
50NB
Pipe Wall thickness 8.74 MM
Joint Design:
Single V-Groove
Range Qualified for Dia meter
25 NB to Unlimited
Range Qualified for Thickness
1.5MM to 17.48MM
Type of Line up Clamp
CLITS
Removal of Clamp
DURING WELDING PROGRESSION
Cleaning Method
GRINDING & BRUSHING
Welding Position
5G
Root Pass
VISUAL OK
Subsequent Pass (Hot,Fill & Cap) VISUAL OK
Maximum time between commencement and
completion of weld N/A

ELECTRICAL CHARACTERISTICS

Welding Welding Trade Size Travel Speed


Pass Spec No. AWS No. Mfg Polarity Voltage Amp Remarks
process Direction Name (mm) (mm/min)

90-
1st Root GTAW UPHILL ER70S-2 5.18 ADOR Filler Wire 2.5 DCEN 13-15 100 45-50

90-
2nd Hot GTAW UPHILL ER70S-2 5.18 ADOR Filler Wire 2.5 DCEN 14-17 110 45-50

90-
3rd Fillup GTAW UPHILL ER70S-2 5.18 ADOR Filler Wire 2.5 DCEN 15-18 100 40-55

90-
4th Capping GTAW UPHILL ER70S-2 5.18 ADOR Filler Wire 2.5 DCEN 15-18 120 50-55

FOR SOPAN FOR ONGC / TPI


Signature : Signature :

Name : Name :

Date:
CREATION OF NEW SURFACE FACILITIES IN ANKLAV FIELD OF
CAMBAY

WELDER QUALIFICATION TEST RECORD


Client : M/s OIL AND NATURAL GAS CORPORATION DOC.NO.: SOPAN/ONGC/5102/WI-02/1

Contractor: M/s SOPAN O&M CO. PVT.LTD. Report No. :


Date : 31.08.2021
Tested Date Tested Location : EPS ANKLAV Weather Conditions
31.08.2021
PQT/WQT No.
SOP/ONGC/WQT/19
Welder Name:
Md. Zahid Alam
Welder No.
PW-20
Qualified for WPS No.
SOPAN/ONGC/PIPE/WPS-03
Qualified For
ALL PASSES
Welding M/c Type
RECTIFIER (400 Amps)
Welding Process GTAW+SMAW
Pipe Material A106 Gr. B
Pipe Diameter
150NB
Pipe Wall thickness 10.97 MM
Joint Design:
Single V-Groove
Range Qualified for Dia meter
73NB to Unlimited
Range Qualified for Thickness
5MM to 21.48MM
Type of Line up Clamp
CLITS
Removal of Clamp
DURING WELDING PROGRESSION
Cleaning Method
GRINDING & BRUSHING
Welding Position
6G
Root Pass
VISUAL OK
Subsequent Pass (Hot,Fill & Cap) VISUAL OK
Maximum time between commencement and
completion of weld N/A

ELECTRICAL CHARACTERISTICS

Welding Welding Trade Size Travel Speed


Pass Spec No. AWS No. Mfg Polarity Voltage Amp Remarks
process Direction Name (mm) (mm/min)

120-
Root Pass GTAW UPHILL E7018 5.1 ADOR ----- 2.5 DCEN 16-18 130 70-75

110-
Hot Pass GTAW UPHILL E7018 5.1 ADOR ----- 2.5 DCEN 17-32 130 75-80

110-
Fill Up SMAW UPHILL E7018 5.1 ADOR ----- 4 DCEP 22-24 130 60-75

100-
Capping 1 SMAW UPHILL E7018 5.1 ADOR ----- 3.15 DCEP 26-28 110 70-80

100-
Capping 2 SMAW UPHILL E7018 5.1 ADOR ----- 3.15 DCEP 26-28 110 70-80

FOR SOPAN FOR ONGC / TPI


Signature : Signature :

Name : Name :

Date:
CREATION OF NEW SURFACE FACILITIES IN ANKLAV FIELD OF
CAMBAY

WELDER QUALIFICATION TEST RECORD


Client : M/s OIL AND NATURAL GAS CORPORATION DOC.NO.: SOPAN/ONGC/5102/WI-02/1

Contractor: M/s SOPAN O&M CO. PVT.LTD. Report No. :


Date : 31.08.2021
Tested Date Tested Location : EPS ANKLAV Weather Conditions
31.08.2021
PQT/WQT No.
SOP/ONGC/WQT/20
Welder Name:
Zahid
Welder No.
PW-21
Qualified for WPS No.
SOPAN/ONGC/PIPE/WPS-03
Qualified For
ALL PASSES
Welding M/c Type
RECTIFIER (400 Amps)
Welding Process GTAW+SMAW
Pipe Material A106 Gr. B
Pipe Diameter
150NB
Pipe Wall thickness 10.97 MM
Joint Design:
Single V-Groove
Range Qualified for Dia meter
73NB to Unlimited
Range Qualified for Thickness
5MM to 21.48MM
Type of Line up Clamp
CLITS
Removal of Clamp
DURING WELDING PROGRESSION
Cleaning Method
GRINDING & BRUSHING
Welding Position
6G
Root Pass
VISUAL OK
Subsequent Pass (Hot,Fill & Cap) VISUAL OK
Maximum time between commencement and
completion of weld N/A

ELECTRICAL CHARACTERISTICS

Welding Welding Trade Size Travel Speed


Pass Spec No. AWS No. Mfg Polarity Voltage Amp Remarks
process Direction Name (mm) (mm/min)

120-
Root Pass GTAW UPHILL E7018 5.18 ADOR ----- 2.5 DCEN 16-18 130 70-80

110-
Hot Pass GTAW UPHILL E7018 5.18 ADOR ----- 2.5 DCEN 17-32 130 70-80

110-
Fill Up SMAW UPHILL E7018 5.1 ADOR ----- 4 DCEP 22-24 130 60-70

100-
Capping 1 SMAW UPHILL E7018 5.1 ADOR ----- 3.15 DCEP 26-28 110 70-85

100-
Capping 2 SMAW UPHILL E7018 5.1 ADOR ----- 3.15 DCEP 26-28 110 70-85

FOR SOPAN FOR ONGC / TPI


Signature : Signature :

Name : Name :

Date:
CREATION OF NEW SURFACE FACILITIES IN ANKLAV FIELD OF
CAMBAY

WELDER QUALIFICATION TEST RECORD


Client : M/s OIL AND NATURAL GAS CORPORATION DOC.NO.: SOPAN/ONGC/5102/WI-02/1

Contractor: M/s SOPAN O&M CO. PVT.LTD. Report No. :


Date :
Tested Date : Tested Location : Weather Conditions
PQT/WQT No.
Welder Name:
Welder No.
Qualified for WPS No.
Qualified For
Welding M/c Type
Welding Process
Pipe Material
Pipe Diameter
Pipe Wall thickness
Joint Design:
Range Qualified for Dia meter
Range Qualified for Thickness
Type of Line up Clamp
Removal of Clamp
Cleaning Method
Welding Position
Root Pass
Subsequent Pass (Hot,Fill & Cap)
Maximum time between commencement and
completion of weld

ELECTRICAL CHARACTERISTICS

Welding Welding Trade Size Travel Speed


Pass Spec No. AWS No. Mfg Polarity Voltage Amp Remarks
process Direction Name (mm) (mm/min)

FOR SOPAN FOR ONGC / TPI


Signature : Signature :

Name : Name :

Date: