DailyReport - KPB-GUSTI-HCC 003 A & 008 A-1500923

The document reports on construction activities at a Pertamina refinery project in Balikpapan on September 15, 2023. It details 6 work areas, the activities being performed in each, and safety aspects like permits and job safety analyses. A total of 189 workers were involved across dismantling, installation, erection and modification tasks.

Uploaded by

chandra manik
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views4 pages

DailyReport - KPB-GUSTI-HCC 003 A & 008 A-1500923

The document reports on construction activities at a Pertamina refinery project in Balikpapan on September 15, 2023. It details 6 work areas, the activities being performed in each, and safety aspects like permits and job safety analyses. A total of 189 workers were involved across dismantling, installation, erection and modification tasks.

Uploaded by

chandra manik
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Proyek Pembangunan

Kilang Pertamina Balikpapan


↓POB ↓
Hari : JUMAT Tanggal : 15 SEPTEMBER 2023 ISBL [Revamp] [orang]

Reported by : I Gusti Eka Darmawan HSSE daily report of shift 1 HCC 003 A 155
Catatan untuk Highlight / High Risk : HCC 008 A 34

LAPORAN CUACA HARI INI


Prakiraan Cuaca Balikpapan Range Time 07:00 08:00 09:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00

Cuaca % CERAH 73 % Cerah


o
Suhu (max) 30 C Mendung
Wind speed 11 Km/h Gerimis
Wind Barat Daya Hujan
Direction Petir
A. Report of Pre Activities
Larangan dan Edukasi bahaya dari tapping Terminal Fit To Work (pekerja) 189 Orang
Topic TBM / PJSM :
cabang ke terminal cabang legran PIC of Sub/Contractor JO Irwan Sega, Prio, Kukuh, James

PIC of Construction KPB Devanka, Juli Eko, Zulkifly


Catatan PERMIT/ JSA/MS :

B. Report of Construction Activities


HSE JO /
No. Area Kerja Activities Alat Kerja SPV JO
SUBCON

HSE SC :
HCC [003 A] Harry SPV SC :
> Crane
PT DAEAH SMP 01 > Erection Steel Struture MEDIC SC : Mudiono
1 > Man Lift
POB : 15 > Bolting Sundari SPV JO :
> Kunci Bolting HSE JO : Sabath
DCU : 15 James
Pandiangan

HCC [003 A] > Rachet HSE SC : Andika SPV SC :


> Dismantle & Install Scaffolding MEDIC SC :
PT CHANGWON > Mesin Bor Kusyana
2 > Install Tray Badrianti
POB : 10 > Tang & HSE JO : Sabath
SPV JO :
> Grouting
DCU : 10 Obeng Pandiangan Lery

SPV SC :
> Hot Work [Fit Up, Grinding, Cutting] HSE SC : Jamonang,
HCC [003 A] > Mesin Las
Faris, Udha Pangihutan,
> Manual Stringing > Gerinda
PT JEL SMP 03 MEDIC SC : Firman
3 > Install & Dismantle Scaffolding > Rachet
SPV JO :
POB : 130 Rasmilla
> Erection Pipe Spool & Steel Structure > Crane Prio, Nadif Irwan
DCU : 130 HSE JO : Sabath
> Underground Pipe > Chain Block Sega
pandiangan
Proyek Pembangunan
Kilang Pertamina Balikpapan
↓POB ↓
Hari : JUMAT Tanggal : 15 SEPTEMBER 2023 ISBL [Revamp] [orang]

Reported by : I Gusti Eka Darmawan HSSE daily report of shift 1 HCC 003 A 155
HCC 008 A 34
HSE SC :
HCC [003 A] ZUlkifly SPV SC :
PT TTP MEDIC SC : Sunandi
4 > Modifikasi & Install Scaffolding > Rachet
POB : 12 Rizki SPV JO :
DCU : 12 HSE JO : Sabath Eko
Pandiangan

HCC [003 A] HSE SC :


> Tang gegep Awaluddin SPV SC :
PT ENCONA INTI > Demolish Concrete
> Jack Hammer MEDIC SC : Supriadi
5 INDUSTRI > Install Rebaar
> Hammer Jihan SPV JO :
POB : 15 > Install Formwork HSE JO : Sabath
> Cangkul Peter
DCU : 15 Pandiangan

HSE SC :
HCC [008 A] > Hot Work [Fit Up, Grinding, Cutting] > Mesin Las Agung SPV SC :
> Gerinda MEDIC SC : Nanang
PT JEL PIF 05 > Manual Stringing
6 > Rachet Putri SPV JO :
POB : 34 > Install & Dismantle Scaffolding
> Crane HSE JO : Decky
DCU : 34 > Erection Pipe Spool > Chain Block Sabath
Pandiangan
Proyek Pembangunan
Kilang Pertamina Balikpapan
↓POB ↓
Hari : JUMAT Tanggal : 15 SEPTEMBER 2023 ISBL [Revamp] [orang]

Reported by : I Gusti Eka Darmawan HSSE daily report of shift 1 HCC 003 A 155
HCC 008 A 34

C. Report of Aspect HSSE


Finding item
No Corporate Life Saving Rules (CLSR) Ya Tidak N/A Action taken Status
(positive & negative)

Good Finding :
1 Tool & Equipment √ Tambahan Material fire blanket untuk Clear
welding habitat

Negative Finding :
Penyimpanan material pipa
sementara yang berada di
2 Safe zone position √ Open
dalam koridor utama HCU 003
A tidak di lengkapi dengan
Baricade [PT JEL SMP 03]

3 Permit to work √
4 Isolation √
5 Confined Space √
6 Lifting operation √
7 Fit to work √
8 Working at height (WAH) √
9 Personal Floatation Device (PFD) √
10 System override √
11 Asset Integrity √
12 Safety Driving √
13 Observasi APD √

Good Finding :
Material pipa yang menjorok
keluar dari welding habitat ,
14 Hot Work Permit √ telah ditutup menggunakan fire Clear
blanket, guna mencegah
adanya gas yang masuk dari
lubang pipa [PT JEL SMP 03]

15 Item lain yang terkait HSSE

D. Special HSSE Concern - if any (High Critical Info/Permasalahan HSSE - jika ada)
No High Critical Info/Permasalahan HSSE Mitigasi yang sudah dilakukan

Gas mudah terbakar / beracun berpotensi masuk kedalam welding


1 habitat melewati lubang pipa yang menjorok keluar Menutup lubang pipa menggunakan fire blanket

Kegiatan demolish concrete keperluan underground pipe


2 Gas Test berkala dan APAR stand by
didekat lubang sewer
Proyek Pembangunan
Kilang Pertamina Balikpapan
↓POB ↓
Hari : JUMAT Tanggal : 15 SEPTEMBER 2023 ISBL [Revamp] [orang]

Reported by : I Gusti Eka Darmawan HSSE daily report of shift 1 HCC 003 A 155
2 Gas Test berkala dan APAR stand by
didekat lubang sewer HCC 008 A 34

Catatan :

Checked by, Reported by,

Joko Santoso I Gusti Eka Darmawan


HSSE KOORDINATOR ISBL HSSE Sr. Inspector
CRITICAL WORKS