DailyReport - KPB-GUSTI-HCC 003 A & 008 A-1500923
DailyReport - KPB-GUSTI-HCC 003 A & 008 A-1500923
Reported by : I Gusti Eka Darmawan HSSE daily report of shift 1 HCC 003 A 155
Catatan untuk Highlight / High Risk : HCC 008 A 34
HSE SC :
HCC [003 A] Harry SPV SC :
> Crane
PT DAEAH SMP 01 > Erection Steel Struture MEDIC SC : Mudiono
1 > Man Lift
POB : 15 > Bolting Sundari SPV JO :
> Kunci Bolting HSE JO : Sabath
DCU : 15 James
Pandiangan
SPV SC :
> Hot Work [Fit Up, Grinding, Cutting] HSE SC : Jamonang,
HCC [003 A] > Mesin Las
Faris, Udha Pangihutan,
> Manual Stringing > Gerinda
PT JEL SMP 03 MEDIC SC : Firman
3 > Install & Dismantle Scaffolding > Rachet
SPV JO :
POB : 130 Rasmilla
> Erection Pipe Spool & Steel Structure > Crane Prio, Nadif Irwan
DCU : 130 HSE JO : Sabath
> Underground Pipe > Chain Block Sega
pandiangan
Proyek Pembangunan
Kilang Pertamina Balikpapan
↓POB ↓
Hari : JUMAT Tanggal : 15 SEPTEMBER 2023 ISBL [Revamp] [orang]
Reported by : I Gusti Eka Darmawan HSSE daily report of shift 1 HCC 003 A 155
HCC 008 A 34
HSE SC :
HCC [003 A] ZUlkifly SPV SC :
PT TTP MEDIC SC : Sunandi
4 > Modifikasi & Install Scaffolding > Rachet
POB : 12 Rizki SPV JO :
DCU : 12 HSE JO : Sabath Eko
Pandiangan
HSE SC :
HCC [008 A] > Hot Work [Fit Up, Grinding, Cutting] > Mesin Las Agung SPV SC :
> Gerinda MEDIC SC : Nanang
PT JEL PIF 05 > Manual Stringing
6 > Rachet Putri SPV JO :
POB : 34 > Install & Dismantle Scaffolding
> Crane HSE JO : Decky
DCU : 34 > Erection Pipe Spool > Chain Block Sabath
Pandiangan
Proyek Pembangunan
Kilang Pertamina Balikpapan
↓POB ↓
Hari : JUMAT Tanggal : 15 SEPTEMBER 2023 ISBL [Revamp] [orang]
Reported by : I Gusti Eka Darmawan HSSE daily report of shift 1 HCC 003 A 155
HCC 008 A 34
Good Finding :
1 Tool & Equipment √ Tambahan Material fire blanket untuk Clear
welding habitat
Negative Finding :
Penyimpanan material pipa
sementara yang berada di
2 Safe zone position √ Open
dalam koridor utama HCU 003
A tidak di lengkapi dengan
Baricade [PT JEL SMP 03]
3 Permit to work √
4 Isolation √
5 Confined Space √
6 Lifting operation √
7 Fit to work √
8 Working at height (WAH) √
9 Personal Floatation Device (PFD) √
10 System override √
11 Asset Integrity √
12 Safety Driving √
13 Observasi APD √
Good Finding :
Material pipa yang menjorok
keluar dari welding habitat ,
14 Hot Work Permit √ telah ditutup menggunakan fire Clear
blanket, guna mencegah
adanya gas yang masuk dari
lubang pipa [PT JEL SMP 03]
D. Special HSSE Concern - if any (High Critical Info/Permasalahan HSSE - jika ada)
No High Critical Info/Permasalahan HSSE Mitigasi yang sudah dilakukan
Reported by : I Gusti Eka Darmawan HSSE daily report of shift 1 HCC 003 A 155
2 Gas Test berkala dan APAR stand by
didekat lubang sewer HCC 008 A 34
Catatan :