The document establishes a procedure for repair confirmation to ensure compliance with original specifications. It outlines responsibilities for identifying defects, risk analysis, repair, and re-inspection. The procedure details activities like defect marking, approved repair methods, re-inspection, and maintaining traceability of repaired parts.

Uploaded by

sharif1974
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
36 views

P-04 Procedure For Repaire

The document establishes a procedure for repair confirmation to ensure compliance with original specifications. It outlines responsibilities for identifying defects, risk analysis, repair, and re-inspection. The procedure details activities like defect marking, approved repair methods, re-inspection, and maintaining traceability of repaired parts.

Uploaded by

sharif1974
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Ref.

No: VEW-PRD-P-04
Rev. No: 00
VEW Procedure for Repair Date of Rev. 01.08.2017
Page No. 1 of 1

1.0 Purpose

To Establish a documented procedure to ensure that the repair confirmation in accordance with the control
plan or relevant documented information to verify compliance to original specifications..

2.0 Scope

This is applicable to:


 Identification of defects for repair,
 Re-Inspection of repaired parts as per Control Plan
 Repair risk analysis (FMEA)
 Retain the documented information

3.0 References
Nil
4.0 Definitions
Compliances with original Specification
5.0 Responsibilities
Quality I/c is responsible for the identification defects for repair, Re-Inspection after repair & Retain the documented
information
Production I/c is responsible for to get original specification -Repair

6.0 Process Inputs

Input Description Source Reference (if any)

PFMEA for Repair Quality I/c


Control Plan Quality I/c
SOP/ WI Production I/c

7.0 Process Description:

S No. Activity Responsibility Reference (if


any)

7.1 Identify the defects through the Stage wise inspection and mark “X” Quality I/c Q Chart
for Repair by Quality Inspector, same handover to production
supervisor of each section with documented information through Q
Chart
7.2 Repair will be done for following defects: Production I/c & N C Register
- Wrong piece welded Zone Leader
- Welding crack in assembly
- Wiper damage in assembly
- Glass chip out / Glass scratches
- Frame damage in finished assembly
7.2 Repaired defects will be shown to the operator during repair and Quality N C Register
retained as limit defined
7.4 Risk Analysis will study the nature of repair to be carried out. Production I/c PFMEA for
Production & Quality personal will study repair defects and take repair
necessary action for repair based on nature of repair.
7.5 Take approval from Quality I/c or Customer if required Production I/c
7.6 Based on requirement production zone leader /operator will carry out Quality I/c &
repair on “X “Marked defects and offer it to quality personnel for re- Production I/c
inspection.
7.7 Quality I/c recheck the “X” mark defects as per check list and re- Quality I/c Re-inspection
inspection status will maintained in Rework &
Repaired
register
7.8 Take Approval from MP after repair done, If not approved, repeat the Quality I/c Re-inspection
above points in Rework &
Repaired
register
7.9 Identify the repaired parts & maintained the traceability of repaired Quality I/c Re-inspection
parts, Take customer approval before commencing the repair of the in Rework &
product Repaired
register

8.0 Process Outputs

Output Description To Reference (if any)


Re-inspection in Repair & Repaired register Quality I/c
PFMEA for Repair – Risk analysis Production & Quality

9.0 Key Performance Indicators

Indicator details Review frequency Reference (if any)

Reduce the repair Every month Production KPI

10.0 Revision History:

Revision no Effective Author Change Description


Date

00 01.04.2018 New release

Prepared By Approved By
& Date & Date