P-04 Procedure For Repaire
P-04 Procedure For Repaire
No: VEW-PRD-P-04
Rev. No: 00
VEW Procedure for Repair Date of Rev. 01.08.2017
Page No. 1 of 1
1.0 Purpose
To Establish a documented procedure to ensure that the repair confirmation in accordance with the control
plan or relevant documented information to verify compliance to original specifications..
2.0 Scope
3.0 References
Nil
4.0 Definitions
Compliances with original Specification
5.0 Responsibilities
Quality I/c is responsible for the identification defects for repair, Re-Inspection after repair & Retain the documented
information
Production I/c is responsible for to get original specification -Repair
7.1 Identify the defects through the Stage wise inspection and mark “X” Quality I/c Q Chart
for Repair by Quality Inspector, same handover to production
supervisor of each section with documented information through Q
Chart
7.2 Repair will be done for following defects: Production I/c & N C Register
- Wrong piece welded Zone Leader
- Welding crack in assembly
- Wiper damage in assembly
- Glass chip out / Glass scratches
- Frame damage in finished assembly
7.2 Repaired defects will be shown to the operator during repair and Quality N C Register
retained as limit defined
7.4 Risk Analysis will study the nature of repair to be carried out. Production I/c PFMEA for
Production & Quality personal will study repair defects and take repair
necessary action for repair based on nature of repair.
7.5 Take approval from Quality I/c or Customer if required Production I/c
7.6 Based on requirement production zone leader /operator will carry out Quality I/c &
repair on “X “Marked defects and offer it to quality personnel for re- Production I/c
inspection.
7.7 Quality I/c recheck the “X” mark defects as per check list and re- Quality I/c Re-inspection
inspection status will maintained in Rework &
Repaired
register
7.8 Take Approval from MP after repair done, If not approved, repeat the Quality I/c Re-inspection
above points in Rework &
Repaired
register
7.9 Identify the repaired parts & maintained the traceability of repaired Quality I/c Re-inspection
parts, Take customer approval before commencing the repair of the in Rework &
product Repaired
register
Prepared By Approved By
& Date & Date