0 m)
1.4 Back filling under a hard core with good and approved
selected material aroundthe site well rammed and
compacted in layers not exeeding 20cm m3 5
1.5
cart away suplus material to a distance of 100m m3 35
2.2
Construction of 40 cm thick basaltic or equivalent
masonry foundation wall toa height of 35 cm above
ground levelblended & joined in cement mortor1:3 m3 4
Page 1 of 44
Bill Of Quantity of Generator & guard house (4.5 x 6.0 m)
3.4
Supply, cut & fixing in positions sawn wooden
formworks or equavalentproperly erected and struted
with posts & Slings having tight joint not to bleed m2 2.5
4 Wall work
6.3 supply & fix mesh wire for insect netting and
ventilation as design 75 cm high ml 8
Total cost For One Generator House
Page 2 of 44
Bill of Quantity for 4-faucet Water point
S.N Description Unit Qty Unit Rate
1 Earth work
Site clearing and striping of top soil to a minimum
1.1 depth of 200) m2 24.2
Bulk excavation for up to a depth of 50cm below site
1.2 clearing for foundation (working space 25cm) m3 6.85
Excavation for foundation, soak away pit and valve
1.3 chamber m3 5.4
Provide, fill and compact selected material in layers of
1.4 150mm,for foundation. m3 6.85
Provide and fill hard core with hard basaltic or
equivalent stone, well compacted and blinded with
1.5 crushed stone m3 3.5
Cart away and dispose all excavated material to
1.6 approapriate distance not exceeding 1Km m3 11.69
2 Concrete Work
2.1 C-15 lean concrete m3 0.3
2.2 C-20 concrete mass concrete m3 2.16
2.3 Concrete cylinder (Dia,1m and Hight,1m) No 1
2.4 Concrete cylinder (Dia, 30cm and Height, 1m) No 1
3 Masonry Work
Provide and construct 400mm thick trychytic masonry
wall grouted and filled with (1:3) mortar for
3.1 foundation and super structure m3 2.37
Plastering to smooth finish for water point wall and
3.2 surface m2 15
Provide and fix in place pre-cast R. concrete water
3.3 seller seats as per the drawing No 1
Masonry pavement around the water point as per the
3.4 drawing (200 mm thick with 1:3 mortar) m2 7.6
4 Pipe work
4.1 Supplying and installing GS pipes
4.2 DN 40 GS pipe (variable) m 6
4.3 DN20 GS m 6
4.4 Supplying and fixing fittings
4.5 Cross tee DN 40 No 1
4.6 Reducer 40x20 No 4
4.7 Tee DN 40 No 1
4.8 DN 40 Bend (elbow) 90 degree No 5
4.9 Faucet DN 20 No 4
4.1 Socket DN 20 No 4
4.1 Gate valve DN 40 No 2
4.1 Union DN 40(variable) No 1
4.1 Nipple DN 40 No 6
Supply and install DN 40 water meter (approved
4.1 quality) No 1
Construct two valve chambers for water meter and gate
valve, covered with 600*550*6mm sheet metal with
4.2 latch and lock as per the drawing No 2
Supply and place boulders, crashed aggregate and sand
4.2 to form the soak away as per the drawing m3 0.32
Total for one water point
1.2
Excavation for foundation, soak away pit and valve m3
10.34
1.3 chamber
Provide and compact selected material in layers of m3
13.00
1.4 150mm
Provide and fill hard core with hard basaltic or m3
equivalent stone, well compacted and blinded with
crushed stone 3.00
1.5
Cart away and dispose all excavated material to m3
appropriate distance not exceeding 1 Km. 30.34
1.6
2 Concrete Work
2.1 C-15 lean concrete m3 0.78
2.2 C-25 concrete mass concrete m3 3.78
C-25 R. concrete for tie beam m 3
0.85
2.3 Provide and fix formwork m2 5.00
Provide cut, and fix in position reinforced steel bar all
according to structural drawing, Price shall include
tying wires
2.4
2.5 Diametr 6 mm Kg 21.20
2.6 Diametr 10 mm Kg 42.50
3 Masonery Work
Provide and construct 400mm thick trychytic masonry m3
wall grouted and filled with (1:3) mortar for
foundation and super structure 6.74
3.1
Plastering to smooth finish for waterpoint wall and m2
18.97
3.2 surface
Provide and fix in place precast R.concrete water seller No
seats as per the drawing 1.00
3.3
Masonery pavement around the water point as per the m2
drawing (200 mm thick with 1:3 mortar) 8.90
4 Pipework
Sub-total - Carried forward
Sub-total - Brought forward
4.1 Supplying and installing GS pipes
4.2 DN 40 GS m 12.00
4.3 DN20 GS m 3.00
4.4 Supplying and fixing fittings
4.5 Cross tee DN 40 No 2
4.6 Reducer 40x20 No 6
4.7 Tee DN 40 No 1
4.8 DN 40 Bend (elbow) 90 degree No 5
4.9 Faucet DN 20 No 6
4.10 Socket DN 20 No 6
4.11 Gate valve DN 40 No 1
4.12 Union DN 40 No 1
4.13 Nipples DN 40 No 8
Water meter DN 40 (install only, supplird by
No 1
4.14 employer)
Construct two valve chambers for water meter and gate
valve , covered with 700*700*6mm sheet metal with
latch and lock as per the drawing No 2
4.15
5 Drainage
Reinforced Concrete drainage ditchfrom water point to
soak away pitas per the drawing, Price including
excavation and any other incedental works
m 2.00
5.1
Supply and place boulders, crashed agregate and sand
to form the soak away as per the drawing m3 0.32
5.2
6 Fence
Barbed wires fencing consists of 2.5 mm barbed wire
horizontal and diagonal member fixed to 2500 mm
long concrete posts spaced every 2000mm, including
all necessary material as per the drawing m 30.00
6.1
Supply and fix iron gate 2.1*1.2 m with lock and latch
No 2.00
6.2
6.3 Sub total of - One Public fountain
Amount (birr)
TOTAL
BIRR
Cattle Trough
Item Description Unit Qty Rate
Earth Work
2 Masonry work
Back Fill excavated area above the concrete cover over filter
2.3 m3 10.0
media with clay
3 Concrete work
Page 11 of 44
Amount
Page 12 of 44
Bill of Quantity for Spring Development-Standard
Item Description of Works unit Qty. Rate
No
1 Earth work
1.1 Site clearing to an average depth of 20 cm to remove top m2 25
soil
1.2 Excavation for spring box floor area, wing walls' strip m3 10
foundation& retaining walls
1.3 Back fill work around the external faces of the m3 10
foundation wall with approved excavated meterial from
the site
1.5 Filling the spring eye area with clean and graded river m3 2.5
Gravel for filter of approved required size arranged
1.6 Placing 20cm thick hard core for flooring above the m3 2
graded gravel toprotect the spring and for hygene
2 Concrete work
2.1 Construction of reinforced concrete collection box LS 1
adjacent to Spring Eye to collect filtered water and
guide to theOut let, Drainage & Over flow system
including all supply of Pipes, fittings & Control Valves
2.2 Casting 10cm thick mass concrete above the hard core m2 12
to cover andprotect the spring eye
2.7 Provide cut & fix in positions sawn wooden from work M2 10
or equavalentproperly erected and struted with tight
joint not to bleed
Page 13 of 44
Bill of Quantity for Spring Development-Standard
Item Description of Works unit Qty. Rate
No
Sub total - Brought Forward
3.1 Construction of 50 cm thick stone masonry wall for
4 Pipe work
4.1 Supply & install all necessary class "B" pipes and LS 1
fittings ( for out let ,drainage and over flow system)
with all necessarygate valves &control
Page 14 of 44
Amount
Page 15 of 44
Amount
Page 16 of 44
10M3 ROTO TANKER & STAND
Item Description Unit Qty Rate
1 Excavation & Earth Work
1" Gib for Shelter of roto tank post hight 3.50 & truss
3.4 M2 57
lengh 2.90
3.5 2.5mm thick sheet metal roof cover M2 16
3.6 Welding truss & post at G2 pipes sheet metal Ls 1
3.7 Painting to Sheet metal roof cover M2 16
Total for one Roto Tank and Stand
Page 17 of 44
Amount
Page 18 of 44
Standard Service Reservoir 50 m3
2.8 Supply and fix 3/4 Hexagonal Mesh Wire for hoop stress m2 55
Sub total - Carried Forward
Page 19 of 44
Standard Service Reservoir 50 m3
Install & Fix all necessary pipes & fittings with all necessary
accessories, gate valves, Float Valves asper the Design
Drawings for In-let, Out-let, Vent pipe Drain,& Over-flow
4.1 system of the reservoir LS 1
Page 20 of 44
Standard Service Reservoir 25 m 3
2.8 Supply and fix 3/4 Hexagonal Mesh Wire for hoop stress m2 35.5
Sub total - Carried Forward
Page 21 of 44
Standard Service Reservoir 25 m 3
Floor finish 30 mm thick trawl and smooth finish with 1:3 cement
3.2 Sand mortar screed m2 11
Install & Fix all necessary pipes & fittings with all necessary
accessories, gate valves, Float Valves asper the Design Drawings for
4.1 In-let, Out-let, Vent pipe Drain,& Over-flow system of the reservoir LS 1
Supply & Install lockabl Steel Man-Hole cover with all fixing hings
4.2 & Accessories with lock gate (Design) No 1
Supply and install both External & Internal Ladder made of Class B,
G S Pipe of DN 25 mm Length 3.0 m having extra 1.0 m high handle
4.3 at the top for External Ladder No 2
Plastering the whole inner wall face and exposed faces of concrete
4.6 works with three coates of cement sand mortar of mix 1 : 2 m2 68
Pointing the whole External face of the masonry wall with cement
4.7 mortar mix 1 : 2 m2 38.5
Total for one reservoir
Page 22 of 44
Under Ground Collection Chamber Capacity 25 m3
I No Description of Works unit Qty. Rate Amount
1 Earth Works
Page 23 of 44
Under Ground Collection Chamber Capacity 25 m3
I No Description of Works unit Qty. Rate Amount
Sub total - Brought Forward
a. Diameter 6mm Kg 26
b. Diameter 10mm Kg 256
c Diameter 12mm Kg 674
Supply and fixing an approperiate type Formwork for all
2.8 types of concrete work with proper struting and m2 32
anchoring
3 Finishing and Miscllaneous Works
Finishing with 30 mm thick cement screed mix 1:3 for
3.1 floor base slab Base Slab with 2 % sloping towards the m2 15
drainage
Total
Page 24 of 44
Under Ground Collection Chamber Capacity 50m3
No Description of Works unit Qty. Rate Amount
1 Earth Works
1.1 Site clearing to an average depth of 20cm m2 70
1.2 Excavation for Foundation to a depth of not exceeding 100 cm m3 45
1.3 Excavation for foundation to a depth greater than 100cm & not exceeding 250 cm m3 78
Back fill work with selected material below hard core and around the masonry
1.4 m3 50.7
foundation wall
1.5 Placing 25 cm thick Basaltic (Equavalent) Stone for Hard-core m2 38.4
1.6 Cart away surplus material from the site to a distance of 100 m m3 110
2 Concrete & Masonry Work
Casting 5 cm thick Lean Concrete above the Hard-Core with Grade C - 15 mix 1: 3 :
2.1 m2 38.4
6 min Cement 150 Kg / m3
Casting 25 cm thick Base Slab with Grade C - 25 Concrete of minimum cement
2.2 content of 360 Kg / m3 filled into approperiate form work and properly Vibrated m3 9.6
around the re-bars.
Construction of Masonry wall embeded with cement mortar of mix 1:3 friction key
2.4 m3 34
in the middle for 25 cm at the base
Construction of 30 cm thick concrete friction key at the base Concrete Inner Core all
2.6 m3 1.5
around the side wall center
Supply, Cut, Bend into Shape and fixing in position mild steel Reinforcement Bars
2.7
as Per Design Drawings
Sub total - Carried Forward
Sub total - Brought Forward
a. Diameter 6mm Kg 35
b. Diameter 10mm Kg 308
c Diameter 12mm Kg 835
Supply and fixing an approperiate type Formwork for all types of concrete work with
2.8 m2 41
proper struting and anchoring
3 Finishing and Miscllaneous Works
Finishing with 30 mm thick cement screed mix 1:3 for floor base slab Base Slab
3.1 m2 25
with 2 % sloping towards the drainage
Apply 3 coats of plastering with mortar of 1 : 3 mix to inner wall and external faces
3.2 m2 91
of the ring beam , roof and base slab side
Pointing with cement sand mortar of 1 : 3 mix the external wall surfaces of the
3.3 m2 67
chamber
Install all necessary pipes and fittings with all accessories, gate valves, float valves,
3.4 Ls 1
as per the drawing for inlet, out let, vent pipes, drainage and overflow system
3.5 Supply and fixing lockable steel Man-hole cover with hinges and accessories for lock No 1
Supply and install both external and internal ladder made of 25mm GI pipe, length
3.6 No 2
3m having extra 1m high handle at top for the external ladder
Fixing quality water meter at the out let of the chamber with appropriate fitting as
3.7 No 1
per the drawing
Supply and fix 25mm thick quality expansion joint made of buitmen asphalt applied
3.8 m2 3
when necessary
Total
Page 25 of 44
Standard Masonry Reservoir 75 m3
Description
1 Earth Work Unit Quantity Unit Rate Total Amount
Site clearing & grubbing up to a
average depth of 20 cm to remove top
1.1 vegetated soil m2 120
Foundation excavetion to a depth of 75
1.2 cm below ground level m3 49.6
Construction of 2 x 20 cm thick
Masonry Wall on both side of the
Concrete - Core embeded with cement
3.1 Sand mortar of mix 1 : 3 m3 23
Floor finish 30 mm thick trawl and
smooth finish with 1:3 cement Sand
3.2 mortar screed m2 26
Construction of Semi-Circular 30 cm
3.4 diameter Drainage Ditch as per drawing m 42
Construction of Semi-Circular 30 cm
3.4 diameter Drainage Ditch as per drawing m 32
Construction of 20 x 20 x 40 cm hollow
concrete block Valve- Chamber with supply
and fixing of all necessary pipes, valves and
3.5 fittings (as per Design Drawing) LS 1
4 Miscellaneous & Finishing
1.3 Back fill under hardcore with non expansive selected material M3 1.2
and well rammed in layers not exceeding 100mm
1.4 Cart away surplus excavated material at a distance not less than M3 9.4
50m from the site
1.5 Basaltic or equivalent stone hard core well rammed consolidated M3 4.6
and blinded with crushed stone to finished thickness of 400
2 Concrete Work
2.1 50mm thick lean concrete in class C-5 with minimum cement M2 11.6
content of 150kg/m3 above hardcore
2.2 Class C-25 concrete with minimum cement content of 360kg/m3 M3 2.3
filled into formwork and vibrated around steel reinforcement in
200m thick cover slab
2.3 Class C-25 concrete with minimum cement content of 360kg/m3 M3 1.7
filled into formwork and vibrated around steel reinforcement in
150mm thick cover slab
2.4 Provide, cut and fix in position sawn zigba wood form work to M2 2.7
foundation base slab
2.5 Provide, cut and fix in position sawn zigba wood form work to M2 8.8
cover slab
2.6 Steel reinforcement according to structural drawing, price
includes cutting, bending, placing in position & tying wires
Page 32 of 44
10 m3 water reservoir(Break Pressure Tank)
5.2 2”elbow No 3
5.3 2”Union No 1
5.4 2”Nipples No 2
5.5 2”Tap No 1
5.6 2”Gate valve No 1
5.7 1 1/2”union No 1
5.8 1 1/2”elbow No 2
5.9 Construct reinforced concrete C-20 valve chamber of 75x75cm No 1
as per the drawing
5.10 2m long 40cm width at interval of 40cm mobile welded ladder No 1
with 11/2” GI pipes
Page 33 of 44
Amount
Page 34 of 44
Amount
Page 35 of 44
Bill Of Quantity of Shower Room (3x4m)
Item Description of Works unit Qty Rate Amount
1 Earth Works
Site clearing to anaverageg depth of 20 cm to remove top soil &
1.1 m2 20
Grubbing
Back filling under a hard core with good and approved selected
1.4
material
2 Masonry work
3 concrete work
Page 36 of 44
Bill Of Quantity of Shower Room (3x4m)
Item Description of Works unit Qty Rate Amount
supply and fix corrugated galvanised iron sheets of G-32 for
4.1
wall, fixed to 5x4 cm
Supply, assemble and fix roof truss @1.25m interval as per the
4.4 No. 4
drawing
Supply & fixs G-32 G.I.Sheets with roof nail having washer
4.5 m2 22
fixed to 5x4 zigba Purlins
5 Doors
6 Pipe Works
Page 37 of 44
Bill of Quantities Public Washing Basin Construction
S.N Description of Work Unit Qty Rate Amount
1 Earth work
1.1 Site clearing & grubbing up to a average depth of 20cm to M2 9.6
remove top vegetated soil
1.2 Foundation excavation to a depth of 50cm below ground level M3 4.8
1.3 Filling and compacting foundation base with selected materials M3 0.9
for20cm
1.4 Cart away surplus excavated materials from the site to a M3 1.65
distance not less 100m
2 Masonry Work
2.1 Placing 25cm thick basaltic or equivalent hardcore well rolled,
consolidated and blinded with crushed stone M2 4.4
3.3 Casting mass concrete for the edges of the washing escarpments M3 0.68
4.2 Apply 25mm thick cement screed mix 1:3 for floor base of
washing basin with 1% sloping towards the drainage. M2 2.2
4.3 Plastering the exposed faces of concrete works with three coats
of cement sand mortar of mix 1:3 M2 2.2
4.4 Pointing the whole external face of the masonry wall with
cement mortar mix 1:4
Page 38 of 44
Bill of Quantities Public Washing Basin Construction
S.N Description of Work Unit Qty Rate Amount
4.4 Pointing the whole external face of the masonry wall with
cement mortar mix 1:4 M2 4
4.5 Construction of gravel packed soak away pit to downstream of
the washing basin having 700mm dia. and 600mm depth with
proper drainage canal connection work
No 1
5 Construction of 1.75m high fence of barbed wire fixed to
eucalyptus posts diameter 120mm placed 125cm c/c buried in
concrete C-15 to a depth of 30cm in 50cm dug holes with
corrugated galvanized iron sheet single leaf gate
m 20
Total for one Washing Basin Birr
Page 39 of 44
Bill of Quantities for Public Latrine
I.N Unit
Description of work Unit Qty Rate
1 Earth Work
1.1 Site clearing & grubbing up to a average depth of 20cm to M2
remove top vegetated soil 15
1.2 Excavation for well of latrine to a depth of 2m below ground M3 13.4
level
1.3 Cart away surplus material to a distance not less than 100m M3 13.4
2 Masonry Work
2.1 Construction of basaltic or equivalent cement pointed
masonry to exposed face of excavated latrine well blended &
joined in cement mortar 1:4
M3 7.7
2.3 Pointing the exposed wall surface with cement mortar1:4 M2 1.1
3 Concrete work
3.1 Pouring 50mm thick lean concrete (1:2:6 mix) over the M2 7.8
hardcore
3.2 Casting 15cm thick Grade C-20 singly reinforced cover slab M3 1.2
4 Wall Work
4.1 Construction of corrugated galvanized iron sheets wall made
of G-32 CGI Sheet fixed to horizontal eucalyptus purlins of
DN 80mm spaced 90 cm with roof nail
M2 26
Page 40 of 44
Bill of Quantities for Public Latrine
I.N Unit
Description of work Unit Qty Rate
5 Roofing
5.1 Supply, assemble & fix roof truss spaced @ 1.25m as shown no 4
on the drawing
5.3 Supply & fix G-32 G.I. Sheets with roof nail having washer
fixed to 5x4 cm zigba purlins spaced at 90 cm.
M2 15
6 Doors
6.1 “Tid or Equivalent wooden frame lockable doors made of G-
32 CGI sheets of single Leaf type 2.10m x 0.80m Pcs 2
Total Birr
Page 41 of 44
Amount
(Birr)
Page 42 of 44
Amount
(Birr)
Page 43 of 44
Bill of Quantity for 4-faucet Water point
S.N Description Unit Qty Unit Rate Amount (birr)
1 Earth work
1.1 Site clearing and striping of top soil to a minimum depth of 200) m2 24.2
Bulk excavation for up to a depth of 50cm below site clearing for
1.2 foundation (working space 25cm) m3 6.85
1.3 Excavation for foundation, soak away pit and valve chamber m3 5.4
Provide, fill and compact selected material in layers of 150mm,for
1.4 foundation. m3 6.85
Provide and fill hard core with hard basaltic or equivalent stone,
1.5 well compacted and blinded with crushed stone m3 3.5
Cart away and dispose all excavated material to approapriate
1.6 distance not exceeding 1Km m3 11.69
2 Concrete Work
2.1 C-15 lean concrete m3 0.3
2.2 C-20 concrete mass concrete m3 2.16
2.3 Concrete cylinder (Dia,1m and Hight,1m) No 1
2.4 Concrete cylinder (Dia, 30cm and Height, 1m) No 1
3 Masonry Work