Superstructure Design 1
Superstructure Design 1
Design Data
Allowable stresses :
a ) Concrete M 45 (Normal condition As per IRC - 21-2000 table -9) Fck = 45 N/mm2
At transfer : ( 80 % of Actual girder strength ) STAGE - I 36 N/mm2
STAGE - II 45 N/mm2
Flexure compression in girder (As per IRC 18 -2000 , 0.5 fcj or 20 Mpa) = 18 N/mm2
Flexure Tension in girder 1/10 th of above = 1.8 N/mm2
During service :
Flexure Compression in slab = 14.85 N/mm2
Flexure Tension in slab for considering uncracked section = 0.67 N/mm2
Density of materials :
ONLY THE DESIGN OF OUTER GIRDER IS PERFORMED AS IS COMES OUT TO BE MOST CRITICAL
Section Details:
2500
225
1000
200 Depth of slab = 225 mm
75 Width of slab = 2500 mm
Width of Web @ mid = 350 mm
Width of Web @ end = 750 mm
350 1225
1950
200
250
750
For Properties of section @ different section pl. refer concern sheets.
Cable Details :
Calculation of properties
1000
1 200
. 2 75
3
350 1225
1950
4 200
5 250
750
Sr.No b d remark A =b*d x from top A*x Ic.g h Ah2 Ixx
1 1.00 0.20 Rec. 0.200 0.10 0.0200 0.00067 0.8538 0.1458 0.146
2 0.65 0.08 Tri. 0.024 0.23 0.0055 0.00001 0.7288 0.0129 0.013
3 0.35 1.50 Rec. 0.525 0.95 0.4988 0.09844 0.0038 0.0000 0.098
4 0.40 0.20 Tri. 0.040 1.633 0.0653 0.00009 -0.6795 0.0185 0.019
5 0.75 0.25 Rec. 0.188 1.83 0.3422 0.00098 -0.8712 0.1423 0.143
0.98 0.9318 0.10018 0.3195 0.420
Depth of Girder = 1.950 m
Area = 0.9769 m2
y top = 0.954 m
y bottom = 0.996 m
I xx = 0.420 m4
Z top = 0.440 m3
Z bottom = 0.421 m3
Composite Section
2500
225
1000
1 200
2 75
3
350 1225
1950
4 200
5 250
750
1000
1 200
2 28.85
3
750 1271
1950
4 200
5 250
750
Sr.No b d remark A =b*d x from top A*x Ic.g h Ah2 Ixx
1 1.00 0.20 Rec. 0.200 0.10 0.0200 0.00067 0.8443 0.1426 0.143
2 0.25 0.03 Tri. 0.004 0.21 0.0008 0.00000 0.7347 0.0019 0.002
3 0.75 1.50 Rec. 1.125 0.95 1.0688 0.21094 -0.0057 0.0000 0.211
4 0.00 0.20 Tri. 0.000 1.633 0.0000 0.00000 -0.6890 0.0000 0.000
5 0.75 0.25 Rec. 0.188 1.83 0.3422 0.00098 -0.8807 0.1454 0.146
1.52 1.4317 0.21258 0.2900 0.503
3
750 1271.15
1950
4 200
5 250
750
Sr.No b d remark A =b*d x from top A*x Ic.g h Ah2 Ixx
1 2.50 0.23 Rec. 0.563 0.11 0.0633 0.00237 0.7708 0.3342 0.337
1 1.00 0.20 Rec. 0.200 0.33 0.0650 0.00067 0.5583 0.0623 0.063
2 0.25 0.03 Tri. 0.004 0.43 0.0016 0.00000 0.4487 0.0007 0.001
3 0.75 1.50 Rec. 1.125 1.18 1.3219 0.21094 -0.2917 0.0957 0.307
4 0.00 0.20 Tri. 0.000 1.858 0.0000 0.00000 -0.9750 0.0000 0.000
5 0.75 0.25 Rec. 0.188 2.05 0.3844 0.00098 -1.1667 0.2552 0.256
2.08 1.8361 0.21495 0.7482 0.963
Depth of Girder = 2.175 m
Area = 2.079 m2
y top slab = 0.883 m
y top girder 0.658
y bottom = 1.292 m
I xx = 0.963 m4
Z top slab = 1.090 m3
Z top girder = 1.463
Z bottom = 0.746 m3
PROPERTIES OF SECTION
Area y top slab y top Girder y bottom Ixx Z top slab Z top Girder Z bottom
Running Section 0.98 - 0.95 1.00 0.42 - 0.44 0.42
Running Composite Sec. 1.539 0.789 0.564 1.386 0.828 1.049 1.468 0.597
End Section 1.52 0.94 1.01 0.50 - 0.53 0.50
End Composite Sec. 2.079 0.883 0.658 1.292 0.963 1.090 1.463 0.746
36.412 m
0.98 m 2m 0.98 m
38.052 m
40.012 m
Reaction @ support : 547.38 kN
Bending & Shear force at various section ;
Location From end From Suppo.end Bending moment & Shear force Moment Shear
547.38*19.03-25.4*(19.03+0.98-1.8)^2/2 -1.8*39.42*(19.03+0.98-1.8/2)-
L/2 20.01 m 19.03 m 0.5*14.02*2(18.21-2/3) = 4592.16
547.38-25.4*(19.03+0.98-1.8)-1.8*39.42-0.5*14.02*2 0.00
547.38*15.02-25.4*(15.02+0.98-1.8)^2/2 -1.8*39.42*(15.02+0.98-1.8/2)-
0.4L 16.00 m 15.02 m 0.5*14.02*2(14.2-2/3) = 4388.85
547.38-25.4*(15.02+0.98-1.8)-1.8*39.42-0.5*14.02*2 101.63
547.38*11.02-25.4*(11.02+0.98-1.8)^2/2 -1.8*39.42*(11.02+0.98-1.8/2)-
0.3L 12.00 m 11.02 m 0.5*14.02*2(10.2-2/3) = 3778.91
547.38-25.4*(11.02+0.98-1.8)-1.8*39.42-0.5*14.02*2 203.25
547.38*7.02-25.4*(7.02+0.98-1.8)^2/2 -1.8*39.42*(7.02+0.98-1.8/2)-
0.2L 8.00 m 7.02 m 0.5*14.02*2(6.2-2/3) = 2762.35
547.38-25.4*(7.02+0.98-1.8)-1.8*39.42-0.5*14.02*2 304.88
547.38*3.02-25.4*(3.02+0.98-1.8)^2/2 -1.8*39.42*(3.02+0.98-1.8/2)-
0.1L 4.00 m 3.02 m 0.5*14.02*2(2.2-2/3) = 1339.17
547.38-25.4*(3.02+0.98-1.8)-1.8*39.42-0.5*14.02*2 406.50
547.38*2.82-25.4*(2.82+0.98-1.8)^2/2 -1.8*39.42*(2.82+0.98-1.8/2)-0.5*14.02*2(2-
Cha. End 3.80 m 2.82 m 2/3) = 1256.87
547.38-25.4*(2.82+0.98-1.8)-1.8*39.42-0.5*14.02*2 411.61
547.38*0.82-1.8*39.42*1.8/2 =
X 1.80 m 0.82 m 385.00
547.38-1.8*39.42= 476.43
547.38*0-0.98*39.42*(0+0.98/2) =
0 0.98 m 0.00 m 0.00
547.38-0.98*39.42= 508.75
0.98 m 2m 0.98 m
38.052 m
40.012 m
Reaction @ support : 281.33 kN
Bending & Shear force at various section ;
Location From end From Suppo.end Bending moment & Shear force Moment Shear
281.33*19.03-14.06*20.01^2/2 = 2538.48
L/2 20.01 m 19.03 m
281.33-14.06*20.01 = 0.00
281.33*15.02-14.06*16^2/2 = 2425.91
0.4L 16.00 m 15.02 m
281.33-14.06*16 = 56.27
281.33*11.02-14.06*12^2/2 = 2088.21
0.3L 12.00 m 11.02 m
281.33-14.06*12 = 112.53
281.33*7.02-14.06*8^2/2 = 1525.37
0.2L 8.00 m 7.02 m
281.33-14.06*8 = 168.80
281.33*3.02-14.06*4^2/2 = 737.40
0.1L 4.00 m 3.02 m
281.33-14.06*4 = 225.07
281.33*2.82-14.06*3.8^2/2 = 691.83
Cha. End 3.80 m 2.82 m
281.33-14.06*3.8 = 227.90
281.33*0.82-14.06*1.8^2/2 = 207.91
X 1.80 m 0.82 m
281.33-14.06*1.8 = 256.02
281.33*0-14.06*0.98^2/2 = 0.00
0 0.98 m 0.00 m
281.33-14.06*0.98 = 267.55
STAAD MODEL has been prepared by very closer beam element to get accrurate distribution of load by avoiding
torsion in the imaginary slab member . Properties have been calculated as per DECK BEHAVIOUR
BY - HAMBLY
I - Girder member :
Calculation of Compression flange for Cross Girder (Cl- 305.15.2 - IRC - 21 - 2000)
No of Girders 6
Foot path Loading 426 306
Width 2m
Depth 0.37 m Av. Thickness Equivalent to PCC.
Weight of footpath t/m 16.1kN/m or 8.05 kN/m / m
No of footpath : 2
Median verge
Width 0.6 m
Depth 0.331 m
Weight of kN/m 4.4 kN/m As per IRC 6 - 2000 FOR SPAN MORE THAN 30
Pedestrian loading 3.539 kN/m^2 =(500-260-4800/L) * (16-W)15
Weight /m 7.08 kN/m I.E TOTAL LOADING DL OF FOOTPATH+ FPLL
8.052 + 3.539 11.591 kN/SQM
Anticrash barrier : 2
0.25
0.35
0.32
1.05 0.55
0.5
0.15
Weight /m = 10.0 kN
Wearing Coat weight /m of thick. = 75 mm
Density of wearing coat = 22kN/m^3
@ mid girder = 4.13 kN/m
@ end girder = 3.63 kN/m Near to footpath G2 / G7
These Loading values are applied on the grillage model to get distribution among beams
To make combination with live load for worst condition end girder value is taken from grillage analysis.
please refer output file of model , Where to avoid reading of large result of STAAD only required result
have been attached
Bending & Shear force at various section ;
Location From end From Suppo.end Bending moment & Shear force Moment Shear
- 1470.00
L/2 20.01 m 19.03 m - 17.30
- 1490.00
0.4L 16.00 m 15.02 m - 25.10
- 1300.00
0.3L 12.00 m 11.02 m - 81.40
- 1060.00
0.2L 8.00 m 7.02 m - 93.00
- 633.00
0.1L 4.00 m 3.02 m - 148.00
- 761.00
Cha. End 3.80 m 2.82 m - 133.00
- 162.00
X 1.80 m 0.82 m - 179.00
- 0.00
0 0.98 m 0.00 m (higher value considered) 179.00
9.51 9.51
43.82 X 25.95 25.95 25.95 43.82
1.8 m
0.98 m 0.98 m
38.052 m
40.012 m
Reaction = 82.75 kN
Live load analysis carried out with aid of STAAD based on grillage analysis
These values taken for nearer girder to crash barrier , which is produce maximum effect with
the combination of SIDL.
Location From end From BM Corrosponding Max Shear Corrosponding
Shear BM
Suppo.end
L/2 20.01 m 19.03 m 6516.05 6.83 255.8 5486.9
0.4L 16.00 m 15.02 m 6279.44 198.36 403.7 5697.3
0.3L 12.00 m 11.02 m 5394.07 382.06 519.6 5124.3
0.2L 8.00 m 7.02 m 3975.24 488.96 606.3 3852.6
0.1L 4.00 m 3.02 m 2485.12 679.82 685.4 2412.9
Cha. End 3.80 m 2.82 m 1762.43 679.82 685.4 2412.9
X 1.80 m 0.82 m 564.22 553.34 759.5 759.5
0 0.98 m 0.00 m 0.00 168.00 759.5 70.2
THIS CASE IS CRITICAL PLEASE REFER FOR EXPLANATION OUR SUMMARY IN NEXT SHEETS
SIDL LOADING
LOADS
Anticrash Barrier - 10.01 kN/m
Median Verge - 4.37 kN/m
Wearing Coat - 4.13 kN/m Intermediate Girder
2.06 kN/m End Girder
Post Weight - 3 kN/m (Post Weight + 200Kg/m Service Load)
Above Load applied on modellled Grillage Analysis , Please refer Input and Output File of STAAD
Instead of attaching large output report for different girder , the result of critical outer girder is summarized as under.
Girder - G1 Girder - G1
Section BM S.F
Distance
form
Support
(m)
19.03 m 1470.00 17.3
15.02 m 1490.00 25.10
11.02 m 1300.00 81.40
7.02 m 1060.00 93.00
3.02 m 633.00 148.00
2.82 m 761.00 133.00
0.82 m 162.00 179.00
Girder - G1 *** This Value for the design have been considered
Section BM S.F
Distance
form
Support
(m)
19.03 m 6516.05 255.77 as per clause 304.7.2.4.2 and 304.7.2.3 of IRC:21-2000 shall be design to resist equivalent bending moment
15.02 m 6279.44 403.74 and equivalent shear due to torsion.
11.02 m 5394.07 519.59
7.02 m 3975.24 606.32 MeL = M+Ml Mt = T (1+D/b) /1.7
3.02 m 2485.12 685.44 Ve = V + 1.6 T / b
2.82 m 1762.43 685.44
0.82 m 564.22 759.50
DESCRIPTION BM
SIDL LL MAX TOTAL LIVE LOAD
C-1A C-2A C-3A C-70R 1L-70R 1LCL A MOMENT FOR
G1 1470.00 0.00 0.00 0.00 0.00 6516.05 6516.05 3993.02 OUTER GIRDER
From above detail analysis of Live Load and SIDL with combination it conclude that
the outer girder for the without foot path condition is critical
*** Instead of Providing large output result - Result of (Live Load + SIDL without out Foot path for Outer Girder is Produced at
the End of Design for reference)
SIDL moment +/ - Ve BM 0.0 162.0 761.0 633.0 1060.0 1300.0 1490.0 1470.0
Diaphragm 0.0 31.9 109.8 117.6 273.4 390.0 441.9 493.8
Total 0.0 193.9 870.8 750.6 1333.4 1690.0 1931.9 1963.8
Live Load for
+ Ve Max BM 0.0 564.2 1762.4 2485.1 3975.2 5394.1 6279.4 6516.0
Profile of Cable :
Cable No. Strands No. End 0 X Cha. End 0.1L 0.2L 0.3L 0.4L L/2
Section from End 0 830 1650 3650 3851.2 7852.4 11853.6 15854.8 19856
1 17 500.00 469.30 440.27 374.80 368.64 262.05 185.91 140.23 125.00
2 17 1000.00 928.38 860.62 707.88 693.49 444.78 267.12 160.53 125.00
3 0 1350.00 1265.69 1185.93 1006.13 989.20 696.42 487.30 361.82 320.00
4 0 1700.00 1603.00 1511.24 1304.38 1284.90 948.07 707.48 563.12 515.00
5 0 2050.00 1940.31 1836.55 1602.63 1580.61 1199.72 927.65 764.41 710.00
C.G of group 34.00 750.00 698.84 650.44 541.34 531.07 353.41 226.52 150.38 125.00
Combined C.G 1304.07 1225.93 1152.01 985.37 969.68 698.34 504.53 388.24 349.48
CABLE - 1
Max Braking Force F = 18.733 t
CABLE - 5
Max Braking Force F = 18.733 t
Dis. From End 0.83 1.65 3.65 3.85 7.85 11.85 15.85 19.86
Area of gir. 1516106 1516106 976875 976875 976875 976875 976875 976875
M.I 5.03E+11 5.03E+11 4.20E+11 4.20E+11 4.20E+11 4.20E+11 4.20E+11 4.20E+11
Ytop 944.32 944.32 953.81 953.81 953.81 953.81 953.81 953.81
Ybottom 1005.68 1005.68 996.19 996.19 996.19 996.19 996.19 996.19
Ztop 532194355 532194355 440031750 440031750 440031750 440031750 440031750 440031750
Zbottom 499726272 499726272 421313709 421313709 421313709 421313709 421313709 421313709
Composite section
Area of gir. 2078606 2078606 1539375 1539375 1539375 1539375 1539375 1539375
M.I 9.63E+11 9.63E+11 8.28E+11 8.28E+11 8.28E+11 8.28E+11 8.28E+11 8.28E+11
Y deck 883.33 883.33 789.17 789.17 789.17 789.17 789.17 789.17
Ytop 658.33 658.33 564.17 564.17 564.17 564.17 564.17 564.17
Ybottom 1291.67 1291.67 1385.83 1385.83 1385.83 1385.83 1385.83 1385.83
Zdeck 1.09E+09 1.09E+09 1.05E+09 1.05E+09 1.05E+09 1.05E+09 1.05E+09 1.05E+09
Ztop 1.46E+09 1.46E+09 1.47E+09 1.47E+09 1.47E+09 1.47E+09 1.47E+09 1.47E+09
Zbottom 745676854 745676854 597440822 597440822 597440822 597440822 597440822 597440822
First stage Area of cab. 3355.80 3355.8 3355.8 3355.8 3355.8 3355.8 3355.8 3355.8
c.g 698.841 650.443 541.340 531.066 353.412 226.517 150.379 125.000
Sec stage Area of cab. 5132.400 5132.400 5132.400 5132.400 5132.400 5132.400 5132.400 5132.400
c.g 1570.568 1479.960 1275.703 1256.469 923.873 686.305 543.764 496.250
Combined C.G 1225.932 1152.011 985.373 969.682 698.342 504.528 388.240 349.477
FS Eg 306.836 355.234 454.848 465.122 642.776 769.671 845.809 871.188
SS Eg -564.891 -474.283 -279.515 -260.281 72.315 309.883 452.424 499.938
Ec.g 65.736 139.657 400.454 416.145 687.485 881.299 997.587 1036.350
Str.due pre.
str.@ top. 0.36 -0.03 -0.04 -0.15 -1.94 -3.27 -4.06 -4.36
str.@ bottom. 5.50 5.93 9.11 9.26 11.29 12.83 13.70 14.09
Str. @ c.g Average
of Cable 3.66 3.94 6.57 6.70 8.90 10.96 12.33 12.91 8.25
Mpa
D.l of girder t_m0.00 385.00 1256.87 1339.17 2762.35 3778.91 4388.85 4592.16
str.@ top. 0.000 0.723 2.856 3.043 6.278 8.588 9.974 10.436
str.@ bottom. 0.000 -0.770 -2.983 -3.179 -6.557 -8.969 -10.417 -10.900
Str. @ c.g 0.000 -0.272 -1.362 -1.484 -4.231 -6.930 -8.845 -9.532
of Cable
Cumulative stress
str.@ top. 0.36 0.69 2.81 2.90 4.34 5.32 5.91 6.08
str.@ bottom. 5.50 5.16 6.13 6.08 4.74 3.86 3.29 3.19 Avg stress
str.@ cable. 3.66 3.67 5.21 5.22 4.66 4.03 3.49 3.37 4.16
Loss in force -45.41 -45.41 -45.41 -45.41 -45.41 -45.41 -45.41 -45.41
str.@ top. 0.00 0.00 0.00 0.00 0.02 0.03 0.04 0.04
str.@ bottom. -0.06 -0.06 -0.10 -0.10 -0.12 -0.13 -0.14 -0.14
str.@ cable. -0.04 -0.04 -0.07 -0.07 -0.09 -0.11 -0.12 -0.13
str.@ top. 0.35 0.69 2.81 2.90 4.36 5.35 5.95 6.12
str.@ bottom. 5.44 5.10 6.03 5.99 4.62 3.74 3.15 3.05 Avg stress
str.@ cable. 3.62 3.63 5.14 5.15 4.57 3.92 3.36 3.24 4.08
Check =
Loss in force -104.70 -104.70 -104.70 -104.70 -104.70 -104.70 -104.70 -104.70
str.@ top. -0.01 0.00 0.00 0.00 0.05 0.08 0.09 0.10
str.@ bottom. -0.1 -0.1 -0.2 -0.2 -0.3 -0.3 -0.3 -0.3
str.@ cable. -0.09 -0.10 -0.16 -0.16 -0.21 -0.25 -0.29 -0.30
Loss in force -10.68 -10.68 -10.68 -10.68 -10.68 -10.68 -10.68 -10.68
str.@ top. 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.01
str.@ bottom. 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
str.@ cable. -0.01 -0.01 -0.02 -0.02 -0.02 -0.03 -0.03 -0.03
str.@ top. 0.34 0.69 2.82 2.91 4.44 5.49 6.12 6.30
str.@ bottom. 5.20 4.84 5.64 5.59 4.14 3.20 2.58 2.47
str.@ cable. 3.46 3.46 4.86 4.86 4.20 3.47 2.85 2.71
Str.due pre.
str.@ top.G 11.47 10.37 11.14 10.88 5.88 2.22 -0.03 -0.79
str.@ bottom. -3.14 -1.94 2.42 2.74 8.18 12.21 14.75 15.46
Str. @ c.g Average
of Cable 8.63 7.40 8.13 7.99 7.09 8.69 10.62 11.33 8.7
Mpa
Cumulative stress
str.@ top.G 11.81 11.06 13.96 13.79 10.32 7.71 6.09 5.51
str.@ bottom. 2.06 2.90 8.06 8.32 12.32 15.41 17.33 17.93 Avg stress
Str. @ c.g 12.09 10.86 12.98 12.84 11.29 12.16 13.48 14.04 12.5
of Cable
Clause - 11.1 IRC 18-2000
Modular Ratio = 5.81 Grade of Conc. @ transfer 45
El.Sh Loss = 36.24 Mpa Ec = 33541.02 Mpa
=1/2 * m * avg stress at cable Force = 18.60 kN Es = 195000 Mpa
El.Sh Loss on first stage force = 72.48 Mpa
= m * avg stress at cable Force = 24.32 t
Loss in force -42.92 -42.92 -42.92 -42.92 -42.92 -42.92 -42.92 -42.92
str.@ top.G -0.07 -0.07 -0.07 -0.07 -0.04 -0.01 0.00 0.00
str.@ bottom. 0.02 0.01 -0.02 -0.02 -0.05 -0.08 -0.09 -0.09
Str. @ c.g -0.06 -0.05 -0.05 -0.05 -0.04 -0.05 -0.06 -0.07
of Cable
str.@ top.G 11.74 10.99 13.89 13.72 10.29 7.69 6.09 5.52
str.@ bottom. 2.08 2.92 8.04 8.31 12.27 15.33 17.24 17.84 Avg stress
Str. @ c.g 12.03 10.81 12.93 12.79 11.24 12.10 13.41 13.97 12.4
of Cable
Losses due to total prestressing : ( Assuming Girder in storage for two month)
Loss in force -66.21 -66.21 -66.21 -66.21 -66.21 -66.21 -66.21 -66.21
str.@ top.G -0.11 -0.10 -0.11 -0.11 -0.06 -0.02 0.00 0.01
str.@ bottom. 0.0 0.0 0.0 0.0 -0.1 -0.1 -0.1 -0.1
Str. @ c.g -0.09 -0.07 -0.08 -0.08 -0.07 -0.08 -0.10 -0.11
Loss in force -8.22 -8.22 -8.22 -8.22 -8.22 -8.22 -8.22 -8.22
str.@ top.G -0.01 -0.01 -0.01 -0.01 -0.01 0.00 0.00 0.00
str.@ bottom. 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Str. @ c.g -0.01 -0.01 -0.01 -0.01 -0.01 -0.01 -0.01 -0.01
Loss in force -253.91 -253.91 -253.91 -253.91 -253.91 -253.91 -253.91 -253.91
str.@ top.G -0.44 -0.39 -0.42 -0.41 -0.22 -0.08 0.00 0.03
str.@ bottom. 0.1 0.1 -0.1 -0.1 -0.3 -0.4 -0.5 -0.6
Str. @ c.g -0.33 -0.28 -0.31 -0.30 -0.26 -0.32 -0.38 -0.41
str.@ top. 11.17 10.49 13.34 13.19 10.00 7.59 6.09 5.56
str.@ bottom. 2.24 3.01 7.92 8.17 11.88 14.75 16.55 17.11
str.@ cable. 11.61 10.45 12.53 12.40 10.90 11.69 12.92 13.44
D.l of slab 0.0 207.9 691.8 737.4 1525.4 2088.2 2425.9 2538.5
str.@ top. 0.0 0.4 1.6 1.7 3.5 4.7 5.5 5.8
str.@ bottom. 0.0 -0.4 -1.6 -1.8 -3.6 -5.0 -5.8 -6.0
Str. @ c.g 0.0 -0.1 -0.7 -0.8 -2.3 -3.8 -4.9 -5.3
of Cable
str.@ top. 11.2 10.9 14.9 14.9 13.5 12.3 11.6 11.3
str.@ bottom. 2.2 2.6 6.3 6.4 8.3 9.8 10.8 11.1
Str. @ c.g 11.6 10.3 11.8 11.6 8.6 7.9 8.0 8.2
of Cable
Stress due to Dead Load of Diaphragm
Loss in force -98.16 -98.16 -98.16 -98.16 -98.16 -98.16 -98.16 -98.16
str.@ top. -0.04 -0.04 -0.04 -0.04 -0.02 0.00 0.00 0.01
str.@ bottom. -0.1 -0.1 -0.1 -0.1 -0.2 -0.2 -0.2 -0.2
str.@ cable. -0.05 -0.05 -0.08 -0.08 -0.12 -0.16 -0.18 -0.19
Loss in force -21.96 -21.96 -21.96 -21.96 -21.96 -21.96 -21.96 -21.96
str.@ top. -0.01 -0.01 -0.01 -0.01 0.00 0.00 0.00 0.00
str.@ bottom. 0.0 0.0 0.0 0.0 0.0 0.0 -0.1 -0.1
str.@ cable. -0.01 -0.01 -0.02 -0.02 -0.03 -0.03 -0.04 -0.04
str.@ top. -0.80 -0.71 -0.75 -0.73 -0.38 -0.13 0.02 0.07
str.@ bottom. -0.15 -0.26 -0.82 -0.85 -1.35 -1.71 -1.93 -2.00
str.@ cable. -0.68 -0.63 -0.85 -0.85 -0.99 -1.26 -1.48 -1.57
str.@ top. 10.37 10.22 14.42 14.41 13.71 13.09 12.63 12.51
str.@ bottom. 2.09 2.27 5.20 5.29 6.26 7.16 7.82 7.92
str.@ cable. 10.92 9.65 10.82 10.61 7.16 5.89 5.65 5.58
Differential Shrinkage
Force due to differential shrinkage is calculated as per cl. 608.1 of IRC : 22- 1966
F = 0.4 Ec A ( rs xs - rg xg)
acting at the centre of gravity of deck slab
Thickness of deck slab = 225
Effective width of slab = 2500
Composite Section
2500
225
1000
1 200
2 75
333.5
3
350 1225
1950
320.2 4 200
5 250
750
As per cl 10.2 of IRC : 18 -2000
2
Area of deck slab : = (2500*225) = 562500 mm
Top Width of girder = 1000 mm
Exposed perimeter of Deck Slab =
(2500+2*225+(2500-1000)) = 4450 mm
50 % of exposed perimeter = 2225 mm
Fictitious thickness of slab = dm 252.81 mm
From Table 3 IRC : 22 - 1966
dm as
200 0.675 as = 0.60
252.81 x
300 0.525
% of longitudinal steel in deck slab = fs
Main steel in deck slab will be about 1.25 to 1.4 % and genrally distribution steel will be about
30 % of main steel
Therefore : f s = 0.3 * 1.4 0.42 %
xs = y as b (1 -0.1 fs)
Where y= 0.0005 For relative humidity between 30 % to 50 %
as = 0.60
b= 1
fs = 0.42
xs = 0.0002854
Calculation of xg
2
Beam area = 976875 mm
Exposed perimeter =
(200+333.54+1225+320.16+250+750) * 2 = 4657.40 mm
50 % of exposed perimeter = 2328.70 mm
Fictitious thickness of slab = dm 419.49 mm
From Table 3 IRC : 22 - 1966
dm as
200 0.675 as = 0.35
419.49 x
300 0.525
% of longitudinal steel in deck slab = fg = 0.2 %
xg = y ag b (1 -0.1 fg)
Where y= 0.0005 For relative humidity between 30 % to 50 %
ag = 0.35
b= 1
fg = 0.20
xg = 0.0001694
F = 0.4 Ec A ( rs xs - rg xg)
rs = 1 As per cl 608.1 of IRC : 22 -1966
rg = 0.4 As per Table 1 of IRC : 22 -1966
rs xs - rg xg = (1*0.00029-0.4*0.00017) =
= 0.0002176
F= ( 0.4 *38236.76*562500*0.00022) = 1872183.8 N
= 1872.1838 kN
Force due to shrinkage = F 187218.38 kg
As deck slab is cast on precast Post tensioned girder at later date effect due to differential shrinkage will
increse tension at bottom of girder and compression in girder top. The effect due to same is calculated
as per BS 5400 cl No 7.4.3.4
Modulus of elasticity of slab concrete for M M 45
Ecj = 38236.762 Mpa
Residual Shrinkage after 10 days of Slab 0.0003 Net Shrinkage strain 0.00011
Beam Residual Shrinkage at 28 days 0.00019 With Reduction factore 0.000047
Reduction factor = 0.43 Area of Deck Slab 562500 mm2
Grade of Concrete = 40 Force as BS 5400 1017336.86 N
Force = 1017336.86 N
F / Ac 0.49 0.49 0.66 0.66 0.66 0.66 0.66 0.66
y slab from top 113 113 113 113 113 113 113 113
Eccentricity 770.83 770.83 676.67 676.67 676.67 676.67 676.67 676.67
Moment 7.84E+08 7.84E+08 6.88E+08 6.88E+08 6.88E+08 6.88E+08 6.88E+08 6.88E+08
str.@ deck top. 1.21 1.21 1.32 1.32 1.32 1.32 1.32 1.32
str.@ Gir.top. 1.03 1.03 1.13 1.13 1.13 1.13 1.13 1.13
Str. @ bottom -0.56 -0.56 -0.49 -0.49 -0.49 -0.49 -0.49 -0.49
Str. @ c.g 0.4 0.4 0.3 0.3 0.1 -0.1 -0.2 -0.2
of Cable
str.@ deck top. 1.21 1.21 1.32 1.32 1.32 1.32 1.32 1.32
str.@ Gir.top. 11.40 11.25 15.55 15.54 14.84 14.22 13.76 13.64
Str. @ bottom 1.53 1.71 4.71 4.80 5.76 6.67 7.32 7.42
Str. @ c.g 11.36 10.02 11.14 10.92 7.25 5.82 5.49 5.38
of Cable
Cumulative Stresses
Cumulative Stresses
str.@ top. -0.2 -0.1 -0.1 -0.1 -0.1 0.0 0.0 0.0
str.@ bottom. -0.1 -0.1 -0.2 -0.2 -0.4 -0.4 -0.5 -0.5
str.@ cable. -0.2 -0.2 -0.2 -0.2 -0.3 -0.3 -0.4 -0.4
Grade of Concrete 45
Permissible Stress: Mpa
@ transfer of prestress 18 compressive The beam shall be stressed after achieving strength of 32Mpa
1.8 tensile
Composite Section
2500
225
1000
1 200
2 75
333.5
3
350 1225
1950
320.2 4 200
5 250
750
67.0 1.5
350
2175
1509.0
0
303.33
2.1
750
Zone A m2 ym Ay Ay2 t At Aty
a 0.739 0.148 0.109 0.0162 12 8.870 1.311
b 0.023 0.329 0.008 0.0025 1.5 0.035 0.012
c 0.528 1.117 0.590 0.6592 0 0.000 0.000
d 0.228 2.023 0.460 0.9314 0 0.000 0.000
1.518 1.167 1.6092 8.905 1.323
eo sA - q s Ay = a s A t ……… 1
eo sA y - q s Ay2 = a s A y t……. 2
y yq t at fci N/mm2
0 0.00E+00 17.8 2.08E-04 -1.17 comp
0.30 2.68E-05 4 4.68E-05 1.09 Ten
0.36 3.29E-05 0 0.00E+00 1.77 Ten
1.87 1.70E-04 0 0.00E+00 -0.53 comp
2.18 1.98E-04 2.1 2.46E-05 -1.40 comp
-1.09
-1.77 =
+
0.53
Composite Section
2500
225
1000
1 200
2 75
333.5
3
350 1225
1950
320.2 4 200
5 250
750
Total Depth of Girder : = 1950 mm
Average thickness of Deck slab = 295.65 mm
Average thickness of bottom blub = 303.33 mm
2500 10.6
295.65 6
1.2
67.0 0.7
350
2175
1509.0
0
0.8
303.33
6.6
750
eo sA - q s Ay = a s A t ……… 1
eo sA y - q s Ay2 = a s A y t……. 2
y yq t at fci N/mm2
0 0.00E+00 10.6 1.24E-04 -0.24 comp
0.30 2.68E-05 1.2 1.40E-05 -1.64 comp
0.36 3.29E-05 0 0.00E+00 -1.77 comp
1.87 1.70E-04 0 0.00E+00 0.53 Ten
2.18 1.98E-04 6.6 7.72E-05 2.29 Ten
1.64
1.77 =
+
-0.53
Composite section
Area of gir. 2078606 2078606 1539375 1539375 1539375 1539375 1539375 1539375
M.I 9.63E+11 9.63E+11 8.28E+11 8.28E+11 8.28E+11 8.28E+11 8.28E+11 8.28E+11
Y deck 883 883 789 789 789 789 789 789
Ytop 658 658 564 564 564 564 564 564
Ybottom 1292 1292 1386 1386 1386 1386 1386 1386
Zdeck 1.09E+09 1.09E+09 1.05E+09 1.05E+09 1.05E+09 1.05E+09 1.05E+09 1.05E+09
Ztop 1.46E+09 1.46E+09 1.47E+09 1.47E+09 1.47E+09 1.47E+09 1.47E+09 1.47E+09
Zbottom 7.46E+08 7.46E+08 5.97E+08 5.97E+08 5.97E+08 5.97E+08 5.97E+08 5.97E+08
Check for Ultimate Shear
As per IRC 18 - 2000 clause no : 12 Torsion factor : 1
A prestressed concrete structure & its constitunet members shall be checked for failure condition
at an ultimate load of 1.5 G + 2 SG + 2.5 Q under severe exposure condition where
G , SG and Q denots permanent load , superimposed dead load and live load
V - Vc
Asv/sv =
0.87* fy * dt
As per IRC- 18 - 2000 cl-No : 14.1.2.2 For bridge decks with precast prestressed beams and
Cast - in - situ deck slab , Vco can be evaluated as given below
Vc2 = additional ultimate shear force which can be carried by the composite
section before the principal tensile stress at composite centroid reaches
Ft = 0.24 Fck 1.61 N/mm2
(Ic b )
= [( ft2 + fcp ft ) 1/2 - fs ]
(Ay)c
2500
1225 350
1385.83
1291.67
200
250
750
Shear capacity Vc 4682.90 4715.93 2818.70 2787.56 2862.41 2835.77 2770.91 2689.51
check V<Vc/2 min min min min min min min min
min shear reinforcement 768.13 768.13 324.98 324.98 324.98 324.98 324.98 324.98 mm2/m
V - Vc -1183.83 -1282.65 216.12 229.18 -372.23 -874.35 -1448.57 -1989.52
Asv 768.13 768.13 344.02 364.81 324.98 324.98 324.98 324.98
Required Asv 768.13 768.13 344.02 364.81 324.98 324.98 324.98 324.98
Dia of bar 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00
leg 4.00 4.00 4.00 4.00 2.00 2.00 2.00 2.00
Spacing 200.00 200.00 150.00 200.00 200.00 200.00 200.00 200.00
Provided Asv 2260.80 2260.80 3014.40 2260.80 1130.40 1130.40 1130.40 1130.40
check safe safe safe safe safe safe safe safe
750
Sections 0.00 X 0.1L Cha. End 0.2L 0.3L 0.4L L/2
Total S.F. , V ( t ) 3499.07 3433.29 3034.83 3016.74 2490.18 1961.41 1322.33 699.99
Area of Deck slab
A ( cm2 ) 5625 5625 5625 5625 5625 5625 5625 5625
INA ( cm4 ) 9.63E+11 9.63E+11 8.28E+11 8.28E+11 8.28E+11 8.28E+11 8.28E+11 8.28E+11
Vts ( cm ) 883.33 883.33 789.17 789.17 789.17 789.17 789.17 789.17
c.g of Deck slab 11.3 11.3 11.3 11.3 11.3 11.3 11.3 11.3
( cm )
Ms = A ( Vts - c.g ) 4905459.6 4905459.58 4375817.4 4375817.41 4375817.41 4375817.41 4375817.4 4375817.41
( cm3 )
Sh = V Ms / INA 1.78 1.75 1.60 1.59 1.32 1.04 0.70 0.37
(t/m)
Ast reqd ( cm2/m )
= Sh x 1000 0.49 0.48 0.44 0.44 0.36 0.29 0.19 0.10
0.87*4150
Ast provided as
22.61 22.61 30.14 22.61 11.30 11.30 11.30 11.30
stp. legs ( cm2/m)
Additional Ast reqd. -22.11 -22.12 -29.70 -22.17 -10.94 -11.02 -11.11 -11.20
( cm2/m) No shear No shear No shear No shear Rein No shear No shear No shear No shear
Rein Req. Rein Req. Rein Req. Req. Rein Req. Rein Req. Rein Req. Rein Req.
Provide f ( mm ) 12 12 12 12 12 12 12 12
No. of legs 4 4 2 2 2 2 2 2
at spacing ( mm ) 100 100 150 200 200 200 200 200
Provided 45.2 45.2 15.1 11.3 11.3 11.3 11.3 11.3
ok ok ok ok ok ok ok ok
Deflection Calculations
The maximum Deflection will be at mid section of the prestress beam so the calculation of deflection at
Mid is as below :
Total Upward deflection due to Prestressing force immediately after transfer of force
Total force after slip Loss which cause maximum hoggaing will occur
Force = 11244.13 t
e= 1036.35 cm
2
deflection = PeL / 8 EI
deflection = 1.45 mm
267.5 OK
As per IRC -18 : 1985 clause 7.3
Now,
2 Yo = 300 mm 215
2 Ypo= 215 mm Ypo
Cable Type : 19 T 13