Checklist VIP Work
Checklist VIP Work
Route : Plant gate to Kapurdi Temple( Jalipa Acess road-NH) to Jalipa View Point /Workshop/Camp/Pit
SN
1
#
a
b
c
d
e
#
a
b
c
d
e
#
a
b
c
d
e
#
a
b
c
d
#
a
b
c
d
e
f
g
h
i
j
k
#
a
b
c
d
e
f
#
#
#
#
#
Work Related to Upkeep of Mine
Route : Plant gate to Kapurdi Temple( Jalipa Acess road-NH) to Jalipa View Point /Workshop/Camp/Pit
Particulars
Acess road from Plant gate to Jalipa gate
No Bushes/dead tree /Green Net /House Keeping
Plant gate to 300 m towards Kapurdi ( No bushes/House keeping)
Plant gate to Jalipa Office ( No buses , No dead tree, House keeping)
Jalipa Office to Jalipa Main Gate
Watering of all plants along access road in next 20 days
Kapurdi Bet Hood cleaning & fixing
Color Painting of Boards
Old Board writing & Painting
New Board Installation ( Board size 6 x 4)
Bricks paint Black & Yellow ( Sewa Ram)
Paint of Gate & Poles ( Sewa Ram)
Plantation Board Orientation( Sewa Ram)
Acces Road preparation
New baord materials
No losse material dumping/Grading/Water sprinkling
White stone -Both side
Radium plate poles
Multi color flags at 500 m
LHP
No visibility of scarp material / Electrcic wire/Pipe line
White wash Fire hydrant tank
LHP Jalipa - Ladder work
LHP Control Room/Dewatering digitalisation/ Plants/Painting
Jalipa View Point
AC/Water fountain/Toilet /Pantry/Electric cable covering,MCC board/Glass Sealing
Sofa Set with Centre table /Painting frame/Jhoomer/Digital smart board
Jalip & Kapurdi Mine layout Board on Tripod
Plantation along Viiew Point/Safety bund of aceess road
Scarap removal/House keeping
Lighting tower
Access road preparation grading sprinkling safety bund
Parking Area boad
Pantry arrangement and Cook
Toilet materials ( Soap,Airfrshner,Tissue paper, 4 dust bin)
Safety shoes, Helmet, Goggles, Ear buds, Gloves, Mask,First Aid Kits for Management
Workshop & Camp
Layout of Workshop & Camp (Tripod)
Work shop SOP/Rooms Board Painting work order
Workshop tools and machinery with First Aid Box/Fire extingusiher
Construction work/Painting/Door/Window/
Total Area leveling compaction Water sprinkling
Green net /Controled fire of Bushes
Mine Benches, Machinery deployment, Lignite Road /Lignite face
Safety shoes, Helmet, Goggles, Ear buds, Gloves, Mask,First Aid Kits for Management
Ambulance /Guard of honors moves along the ways with team
Jalipa Office /Jalipa Café House Keeping
Transformer /Electric work related with Jalipa office/View Point/Dewatering
Workshop/Camp/Pit
PIC
Ram Nivas
Ladu Ram/Chowhan
Sandeep
Mishra ji
Rajnessh Mishra
DKS/Nitin Jain
DKS
Chandrajeet
Chandrajeet
Chandrajeet
Rajeev Kumar
Arup Ghosh
Arup Ghosh
Rajeev/Arup Ghosh
Dhirender Singh
Nitin Jain/Naveen Sethia
Nitin Jain/Naveen Sethia
Naveen sethia
Ram Sagar Gupta
Chandrajeet
Prashant Tiwari
Kuldeep ji
Dilpi Singh
Sandeep
Rajeev
Temple Construction Work
SN Particulars
1. Vastusasatra related work (Mr Sompura)
a Pedstal Hight of all temples
b Gadhi for murti (Darshti matching)
c Dhwaja length of each temple
d Flag pole hight of each temple
e Kalash hight of each shikhar
f Murti pooja place near hawan kund
g Modification of Murti stand as per Sompura
2.Stone Work
a Chajja work (Stone available)
b Front and side parikrama work (Filling and PCC)
c Jali work (18No ready 12 Pending- Jodhpur- Mr Bhagwan & Mr Amit)
d Front side stone fixing (stone received at factory Carving pending Mr Amit)
e Sand blasting of all temples(Stone cleaning Mr Surinder)
f Parikrama pedestal fixing (Pedastal available) Stone Available
g Carving of shikhar - Mr Suinder
h Hawan kund prepration
i Water reservoir
j Water drain work for Jalabhisek of Murti
3.Marbel Work
a Marbel fixing at parikrama
b Marbel fixing at stairs
c Marbel fixing at pedstals in garbh (With carving) Carving stone available
d Ghisai of all marbels
e Galicha fixing in front of each garbh
f Granite fixing for wheel chair - Granite available
3.Electrical Work
a All light fixing at temple ground floor
b All light fixing at temple first floor
c LDB fixing near temple parikrama
d DG shifting at temple
e Trial of complete system
4.Wooden, Steel Work & Others
a Gates of all the temple
b Steel Ladder for Flag hosting( Dwaja and Kalash sthapna)
c Steel stair railing on stairs and parikrma- Mr Surinder
d 1 Container for Murti, Srangar and cloth
e 2 mobile container for toilet
f Donation box
5.Pooja material
a Material to be purchased as per list attached
6. Top Soil & Plantation
PIC
Dilip Singh
Dilip Singh
Dilip Singh
Mishra ji
Pooja Program (11t
SN Particulars
1 Yagya Sala Pandal ( 60 ft x 60 ft) with natural kachi green roof 10th April to 15th April- Sanjay Jain
2 Pandit ji & team ( 8 rooms ( 15 feet x 120 feet)- 10th April to 15th April-Sanjay Jain
3 Kitchen for Pandit ji cook and food material for 10th to 15th April- Sanjay Jain Size
4 Mobile container for Toilet,Bathroom on rent with water arrangement - 10th April to 15th April-
5 Kitchen & Store tent ( 30 feet x 45 feet)- 14th April to 15th April-Sanjay Jain
6 Drinking water & Tea Arrangement ( 15 feet x 30 feet)-11 Sapril to 15th April- Sanjay Jain
7 Stage for Bhajan sandyha & Devotee ( 60 feet x 90 feet)- 11 April to 15th April- Sanjay Jain
8 Chief Guset Pandal with Sofaset and Asan- 14th April & 15th April - 8 person- Sanjay Jain Size
9 Wooden takth /hard matress/blanket/cushion bedsheet for Chief guest rest area ( Bab ji & Nirmal das jit)- Sanja
10 Mutri grah with hard mattress bed/blanket/cushion/bedsheet ( Yellow/Red Color)- Sanjay Jain- Size 1 Room size
11 Coolar/AC /Fan Arrangement in All pandal- Sanjay Jain
12 Parking area of LMV along Access road
13 Welcome board ON Main acees road to Temple- Sanjay Jain
14 Bhajan sandya background flex with god statue and daily flower arrangement- Sanjay Jain'
15 Decoration of temple and Pandal from 11th Apr to 15th April-Sanjay Jain
16 Redcarpet area for Chiefguest for acess to temple and Yagyasala -Sanjay Jain
17 Seating arrangement for 25 people around Yagyasala- Sanjay Jain
18 Shoes rack , Hand washing ( Hand washing 5 set) at side corner of access road to temple,Dist bin near pandal, -S
19 Lighting arraement with Genset- Sanjay Jain
20 Security arrangement from 7th April to 15th April
21 Shift roaster for 2 person in each shift with 2 LMV from 10th to 15th April
22 Sweet water tanker, Ambulance & Fire tank standby at Pandal
23 Hawan Samagri, Murti pooja Samagri list as per attachement
24
Jain
y flower arrangement- Sanjay Jain'
April-Sanjay Jain
agyasala -Sanjay Jain
anjay Jain
corner of access road to temple,Dist bin near pandal, -Sanjay Jain
Mr Kuldeep
Singh & Mr Dilip
Singh
Dilip Singh
Lokender Singh
Yogesh calla