0% found this document useful (0 votes)
32 views

04 Overhauling Plan

Uploaded by

happybhangu50082
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
32 views

04 Overhauling Plan

Uploaded by

happybhangu50082
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

SUVI INDUSTRIES

Over Hauling Maintenance Plan


Sr. No. Machine Name Machine No. Year of Purchase Plan In Month

Prepared by:-
TRIES Document No.
Issue.Revision No.
SUVI/MN/QP/04
1.0
Date 25.12.2023
enance Plan No. of Pages 1 OF 1

Action Done In Exception From Maintenance Unit


Remarks
Year/ Month Planned (Outsource / In House)

Maintenance Incharge:-
SUVI INDUSTRIES
Over Hauling Maintenance Plan
Plan In Month /
Sr. No. Machine Name Machine No. Year of Purchase
Year

1 SCREW PRESS 2000T SV/FR/SP/01 Mar-23 Mar-26

2 IBH 750 KW SV/FR/IBH/01 Mar-23 Mar-26

3 TRIMMING PRESS 250T SV/FR/TP/01 Mar-23 Mar-26

4 CIRCULAR SAW SV/FR/CS/01 Mar-23 Apr-26

5 BAND SAW SV/FR/BS/01 Mar-23 Apr-26

CONTROL COOLING
6 SV/FR/CCC/01 Mar-23 Mar-26
CONVEYOR

7 SHOT BLAST M/C SV/FR/SB/01 Mar-23 May-26

8 OVER HEAD CRANE SV/FR/EOT/01 Mar-23 May-26

9 SCREW PRESS 1000T SV/FR/SP/02 Feb-24 Feb-27

10 IBH 350 KW SV/FR/IBH/02 Feb-24 Feb-27

11 TRIMMING PRESS 150T SV/FR/TP/02 Feb-24 Feb-27

12

13

Prepared by:-
RIES Document No.
Issue.Revision No.
SUVI/MN/QP/04
1.0
Date 25.12.2023
ance Plan No. of Pages 1 OF 1

Action Done In Exception From Maintenance Unit


Remarks
Year/ Month Planned (Outsource / In House)

N/A N/A N/A

N/A N/A N/A

N/A N/A N/A

N/A N/A N/A

N/A N/A N/A

N/A N/A N/A

N/A N/A N/A

N/A N/A N/A

N/A N/A N/A

N/A N/A N/A

N/A N/A N/A

Maintenance Incharge:-

You might also like