0% found this document useful (0 votes)
16 views

ADIDAS CONSTRUCTION - SM CITY GRAND CENTRAL - Layout

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
16 views

ADIDAS CONSTRUCTION - SM CITY GRAND CENTRAL - Layout

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

TOTAL NO.

OF
SPEAKERS / AMPLIFIERS / VOL. CONTROL LEGENDS

CEILING MOUNTED SPEAKERS


SPK AMP
AMPLIFIER
THIRD FLR 6 1 CH CHANNEL OF AMPLIFIER

AM
G
IO
ENTERTA
N
IMENTECHNOLOG
E
N
IS
C
,
DESIGNED PFF OWNER PROJECT TITLE SHEET CONTENT PSL NO. NOTES
DRAWN PFF LOUDSPEAKERS
ARE
DRAWNOUTOF
SCALA
EN
,D
1 OF 1
26th Flr, High Street Corporate Plaza Tower 2 PROPOSED PLAN AREPRESENTED
FOR
LOCAT
O
INPURPOSESONLY.
26th St. cor. 11th Ave., Bonifacio Global City, Taguig City DATE MAY 25,2024 SM PRIME HOLDINGS INC.
Tel. Nos: (02) 808-8771 to 73
CHECKED RPS
SPEAKER LAYOUT SPEAKER LAYOUT SCALE ADJUSTMENTSMAY
BE
DONE
ON THE
SPEAKERS'
Fax No: (02) 7808-8774 ADIDAS SM CITY GRAND CENTRAL LOCATOINS
DEPEND
N
IG
ONOBSTRUCTN
IG
NTS
E-m@il [email protected] APPROVED F
XITURES

You might also like