0% found this document useful (0 votes)
21 views

PFD CastingBypass Valve

Uploaded by

vijay.abeegroup
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views

PFD CastingBypass Valve

Uploaded by

vijay.abeegroup
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Supplier Name / Location : Abee cast private limited /

Coimbatore Process Flow Chart Page No : 1 of 1

Part Number : M09508 Key Contact Person / Phone No : D.Prabhu


PFD No : PFD Date (original) : --
Drawing No : M09508 Rev Number / Date :

Core Team :
Part Name : CAP BYPASS VALVE D.Prabhu,V.haribhaskaran,K.Venkadesh,L.Maniraj, PFD Rev No : PFD Rev Date :
R.Vijayarajan

Customer Name : GILBARCO VEEDER ROOT Vendor Code : Customer SQE Approval Date :

Operation No Operation Description Manufacturing Location Process Flow Diagram Product Characteristics Process Characteristics

Recipt of Ingots 1. As per Material grade


10 Inspection Area ---
2. Defects

1. As per Control Plan


20 Inward Inspection Inspection Area ---
2. Defects

1. Closed environment storage


30 Storage Store 2. Free from Raw Material handling ---
damages & rust

1.Proper material
40 Melting Melting Furnace 2.Melting temperature ---

1.Groove Diameter
2.Distance 1. Speed
50 Metal treatment Melting Furnace 3.Chamfer 4.Total 2. Depth of Cut
Length 3. Clamping Pressure
5.Defects

60 Die Casting Die Casting area 1.Free from burrs. ---

70 Running Cutting Cutting machine area 1. Excess ribs to be removed ---

1. Proper arrangement
80 Fettling Fettling area 2. Sharp edges and parting flash to be -----
removed

90 Inspection Inspection Area 1.As per the control plan

100 Move to Machine shop Despatch Section -----

110 Operation Storage Delay Transport Inspection

Notes:
1) *Indicates Shop Floor Issues, 2) ** Repeated Quality Issues, 3) # Indicates Customer Complaints,

Supplier GVR Supplier Quality

Prepared By & Date : Reviewed By & Date : Approved By & Date

Revision History

Rev No Rev Date Revision Details Reviewed By / Date Approved By / Date

Process Flow Diagram - Revision History


Rev No. Rev. Date. Revision Details Reviewed By / Date Approved By / Date