Iserv Information For Service Iserv
Iserv Information For Service Iserv
The 1.5T and 1.0T Signa Horizon LX (Release 8.2) systems provide a new computer (Silicon Graphics Octane
computer) and a new operator workspace cabinet for forward production beginning FW22. Upgrades from
Release 3.x, 4.x and 5.x to LX will also be available.
The Octane computer will sit on the operator workspace table (the narrow table is no longer available). The
operator workspace cabinet contains the PC workstation, SCSI box (all system drives including the Legacy
Option), Bit3, and the LAN Hub. The operator workspace table includes the host computer monitor, PC monitor,
DASM, Workspace Interface Module (WIM), and the Serial Expansion Module.
There is one additional cable that runs from the Serial Expansion module (on the table) to the Systems Cabinet.
This cable is used to connect the debug ports of the Systems Cabinet.
All existing hardware in the system will remain the same. The following is a list of purchased hardware options
that will be available when the new computer is introduced:
The following purchased hardware options will be available at M4
• VCR Interface - M1090TZ
• Bar Code Reader (this is used in conjunction with the HIS/RIS option) - M1090PM
• LCD Color Monitor - M1000NZ
• PC Keyboard - M1000NL (English)
M1000NM (German)
M1000NN (Spanish)
M1000NP (Italian)
M1000NR (French)
M1000NS (Scandinavian)
2 INSTALLATION
3 MAINTENANCE READINESS
PART # DESCRIPTION
2204245 IRIX Operating System 6.2 CD-ROM
2204244-4 Host LFC Applications CD-ROM
2216271-2 Signa Horizon LX PC Software CD-ROM
2202250 Windows 95 Upgrade
2202251 IPSWITCH WS_FTP PRO Version (License)
2204247 PC Boot Floppy
PART # DESCRIPTION
2212597 IRIX Operating System 6.4 CD-ROM
2204244-4 Host LFC Applications CD-ROM
2216271-2 PC MR Apps CD-ROM (includes drivers)
2202251 IPSWITCH WS_FTP PRO Version
2204247 PC Boot Floppy
3-6 TRAINING
3-7 TRACEABILITY
The following table lists the new items in the system that will be tracked and are shipped with ICD (product
locator) cards.
4 Planned Maintenance
The PM manual is being updated to include the new operator workspace and the Octane computer. The update
to the manual is scheduled for fourth quarter of 1998.
Kiyoshi Inao
Service Integrator
MR SERVICE ENGINEERING
GEMS-A