No. Activity
1 Site Clearing
2 Setting out
3 Foundation excavation
4 Blinding
5 Block work to DPC
6 Construction of isolated column base
7 Filling and compaction of DPC
8 Mass concrete slab
9 Block work (Internal and External Walls to Final Level)
10 Roofing
11 Conduit piping
12 Ceiling finishing
13 Plastering/Rendering
14 Floor screeding
15 Installation of Doors and Windows frame
16 Installation of blackboards
17 Painting internal/external walls
18 Installation of Doors and Windows
19 Electrical fittings
20 Commissioning
Normal days
Z-value
Sum of variance of critical activities
Adjusted days
ooms School Building with Common Toilet
Titay, Zamboanga Sibugay)
No. Activity
1 Site Clearing
2 Setting out
3 Foundation excavation
4 Blinding
5 Block work to DPC
6 Construction of isolated column base
7 Filling and compaction of DPC
8 Mass concrete slab
9 Block work (Internal and External Walls to Final Level)
10 Roofing
11 Conduit piping
12 Ceiling finishing
13 Plastering/Rendering
14 Floor screeding
15 Installation of Doors and Windows frame
16 Installation of blackboards
17 Painting internal/external walls
18 Installation of Doors and Windows
19 Electrical fittings
20 Commissioning
ooms School Building with Common Toilet
Titay, Zamboanga Sibugay)
Normal days X
Z-value Z
Sum of variance of critical activities
Adjusted days
Te Variance Standard
Deviation
7 0 0
6 0.028 0.167
7 0.694 0.833
3 0 0
9 0.444 0.666
6 0..027 0.164
21 0.111 0.333
11 0.111 0.333
69 0.694 0.833
21 0.111 0.333
7 0.027 0.164
14 0.111 0.333
27 0.027 0.164
20 0.111 0.333
4 0.027 0.164
4 0.027 0.164
7 0.111 0.333
7 0.027 0.164
11 0.111 0.333
1 0 0
267 Sundays 30
3.72 Weather 14
2.691 Holidays 10
262
0 7
Site Clearing
START
7
0 7
ms School Building with Common Toilet
y, Zamboanga Sibugay)
7 11 11 18 18 22 22 33
Setting out Foundation excavation Binding Blockwork to DPC
4 7 4 11
7 11 11 18 18 22 22 33
22 26
Construction of isolated column
base
29 33
33 54 54 65 65 135
Filling and compaction of DPC Mass concrete slab Block work
21 11 70
33 54 54 65 65 135
135 142 135 139
Installation of Doors and
Conduit piping
Windows Frames
7 4
21 14 21
28 4
7 7 11 1
No. Activity
1 Site Clearing
2 Setting out
3 Foundation excavation
4 Blinding
5 Block work to DPC
6 Construction of isolated column base
7 Filling and compaction of DPC
8 Mass concrete slab
9 Block work
10 Roofing
11 Conduit piping
12 Ceiling finishing
13 Plastering/Rendering
14 Floor screeding
15 Installation of Doors and Windows frame
16 Installation of blackboards
17 Painting internal/external walls
18 Installation of Doors and Windows
19 Electrical fittings
20 Commissioning
ssrooms School Building with Common Toilet
n, Titay, Zamboanga Sibugay)
WEEK 1
Duration
1 2 3 4
7
4
7
4
11
7
21
11
70
21
7
14
28
21
4
4
7
7
11
1
EEK 1
5 6 7 8 9
WEEK 2
10 11 12 13 14
WEEK 3
15 16 17 18 19
WEEK 4
20 21 22 23 24
WEEK 4
25 26 27 28 29
WEEK 5
30 31 32 33 34
WEEK 6
35 36 37 38 39
EEK 6
40 41 42 43 44
WEEK 7
45 46 47 48 49
WEEK 8
50 51 52 53 54
WEEK 9
55 56 57 58 59
WEEK 9
60 61 62 63 64
WEEK 10
65 66 67 68 69
WEEK 11
70 71 72 73 74
EEK 11 W
75 76 77 78 79
WEEK 12
80 81 82 83 84
WEEK 13
85 86 87 88 89
WEEK 14
90 91 92 93 94
WEEK 14
95 96 97 98 99
WEEK 15
100 101 102 103 104
WEEK 16
105 106 107 108 109
EEK 16 W
110 111 112 113 114
WEEK 17
115 116 117 118 119
WEEK 18
120 121 122 123 124
WEEK 19
125 126 127 128 129
WEEK 19
130 131 132 133 134
WEEK 20
135 136 137 138 139
WEEK 21
140 141 142 143 144
EEK 21
145 146 147 148 149
WEEK 22
150 151 152 153 154
WEEK 23
155 156 157 158 159
EEK 23 W
160 161 162 163 164
WEEK 24
165 166 167 168 169
WEEK 25
170 171 172 173 174
WEEK 26
175 176 177 178 179
WEEK 26
180 181 182 183 184
WEEK 27
185 186 187 188 189
WEEK 28
199 191 192 193 194
EEK 28 W
195 196 197 198 199
WEEK 29
200 201 202 203 204
WEEK 30
205 206 207 208 209
WEEK 31
210 211 212 213 214
WEEK 31
215 216 218 217 218
WEEK 32
219 220 221 222 223
WEEK 33
224 225 226 227 228
EEK 33 W
229 230 231 232 233
WEEK 34
234 235 236 237 238
WEEK 35
239 240 241 242 243
WEEK 36
244 245 246 247 248
WEEK 36
249 250 251 252 253
WEEK 37
254 255 256 257 258
WEEK 38
259 260 261 262 263
EEK 38 WEEK 39
264 265 266 267