Earthing Transformer Calculation
Earthing Transformer Calculation
Example 1:
1. Objective: The three-phase fault duty at a Wind Farm facility is 5kA (299 MVA) on the ungrounded 34.5
kV system. It is required to ground this system using a zigzag grounding transformer and limit the ground-
fault current to 400 A. the objective of this study is specifying the grounding transformer.
2. Input Data
3. Calculation:
a. Transformer Impedance
Use 100 MVA Base (100000 kVA)
Rated Voltage = 34.5 kV
Base Ohms = (1000) (kV)2/KVA=1000 (34.5)2/100000= 11.9 Ω
Base Amps = KVA/(KV × √3)= 100000/(34.5 x √3)= 1673 A
Z1 = Z2 = 100/299 = 0.334 per unit (p.u.)
Positive
0.334 p.u.
sequence
Negative
0.334 p.u..
sequence
Zero
Z0
sequence
Accessories
Normal Special
1 Conservator with liquid drain valve 1 Buchholtz relay
and filling valve
2 Breather 2 Winding temperature indicator
3 Liquid level indicator 3 Conservator magnetic liquid level
indicator
4 Liquid draining and sampling valve 4 Anti-condensate heater
5 Top oil thermometer 5 Pressure relief device
6 Lifting, moving detanking & jacketing
6 4 CTs, 600/5A, C50, B0.5
facilities
7 Name plate 7 Control box
8 Grounding pad
Or in another way, the current in the zero sequence impedance IG during a line-to-earth fault
must be equal to or greater than three times the line-to-earth system charging current, 3IC0
IG ≥ 3IC0
Where,
VL-L = system line-to-line voltage in kilovolts,
C0 = zero sequence capacitance of the system,
f = system frequency
The zero sequence capacitance of any type of cable can be calculated using the following
formula:
Where,
SIC = dielectric constant,
D = the diameter of cables over the insulation shield,
d = the diameter of the conductor,
The zero sequence capacitance of transformer is negligible. However, for overhead lines, zero
sequence capacitance can be high if considerable lengths are involved.
As a general rule, the following approximate capacitance values could be used:
Note: the given admittance of collector system, i.e. YC =170.5 micro-mho does not seem reliable;
however it meets the above mentioned requirement.
It is recommended to verify the line-to-ground capacitive reactance of the collector system
based on the formulas given above.