0% found this document useful (0 votes)
23 views4 pages

001 Mech. - Manual Excavation JSA

Uploaded by

Kiên Đinh Văn
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
23 views4 pages

001 Mech. - Manual Excavation JSA

Uploaded by

Kiên Đinh Văn
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 4

JOB TITLE / AIM: Excavation for construction of Foundations/Building

JSA DATE: 19-06-2014 JSA NO./ REVISION:


SUPERVISOR/ JSA LEADER: Jabir Khan/Zakir Ali SCRIBE: Hafeez Ullah Khan
PARTICIPANTS : M.Kashif, Muhammad Aamir Muhammad Latif,
LIST ASSOCIATED PROCEDURES/WORK INSTRUCTIONS OR TEMPORARY WIs:
Attach copies of any relevant documentation/ drawings.
Part 2: Job Safety Analysis
Job Steps:
1. Mechanical Excavation
2. Working in live areas
3. Manual Excavation

Part 3: Equipments / Tools to be used: Excavator, Loader, Dumper, Tractor, & Hand Tools, Jack Hammer .
Part 4: Contingency Plans. Standard PPE’s: First aid kit must be present at work site and the HSE personnel will be the first response in case of
emergency, ERPs & Emergency contact numbers to be in placed at job location

Part 5:JSA Review Process. After the job has been completed, JSA leader should note: any hazards, which were identified in the original JSA? In
case of any new hazard indentified by any of the working team member during the job, JSA review process should be carried on.
JSA No: JOB TITLE: Excavation Works for the construction of Foundations/Buildings
Step# Describe Job Step Potential Hazards Hazard Controls
1 Mechanical Excavation  Personnel hit by Movement of heavy  Deliver tool box talk to all of vehicles
vehicles/equipments drivers & operators
 Damaging to underground utilities  Banks men should be available at site
(live electric cable etc)  Keep away all unauthorized people during
 Excavation collapse movement of heavy vehicle/equipments
 Excavator bucket hit to nearby live line  Ensure Close HSE monitoring
 Personnel/Equipments fall in /supervision
excavated place  Flame arrestor to be installed in vehicles
 Working in live areas
 Personnel hit by Movement of heavy  Deliver tool box talk to all drivers/optrs
vehicles/equipments  Banks man should be available at site
 Excavation collapse  Restrict People during movement of
 Personnel/Equipments fall in heavy vehicle/equipments
excavated place  Ensure proper barrication of excavated
 Falling objects area also display safety signs
 Close HSE monitoring /supervision
 Ensure proper shoring/ramping/benching
of deep excavations (as required)
 Dust  Ensure use of Dust Mask
 Water sprinkling to be carried out on
regular biases to avoid dust
 Slip, Trip & fall  Excavated area should be properly hard
barricaded
 Keep access/walk ways always clear from
any obstruction
 Inclement weather condition  Stop work in case of any inclement
weather conditions (Rain, storm, fog etc.)
 Restrict movement of heavy
vehicles/equipments in rain/fog
 Fire & explosion  Ensure availability of fire extinguisher at
JSA No: JOB TITLE: Excavation Works for the construction of Foundations/Buildings
Step# Describe Job Step Potential Hazards Hazard Controls
site & perform explosive test (if needed)
2 Working in Live areas  Vehicles/equipments striking/hit with  Obtain relevant permit before
Structure/live lines commencing of any work
 Work in live area  Ensure vehicles/equipment movement
 Unaware about hazards of live areas only on designated/defined routes
 Traffic movement on authorized routes  Be highly careful while crossing over the
at plan site culverts/drains
 Damaged to underground utilities  Avoid sharp turnings of vehicles
(Drains, Culverts, electrical cable ,pipe  Banks man should be at site while
lines etc) movement of vehicles/equipments
 Ensure use of appropriate PPE’s
 Ensure close safety supervision of all
work
 Deliver TBT & awareness to all of
workforce about area/activity hazards
 Mishandling with live  Do not mishandle or operate any of live
instruments/valves equipment/valve in the area
 Movement of people in unauthorized  Unauthorized movement of workers to be
areas restricted in live areas
 Fumes of Hydrocarbons in live areas  Gas test to be performed in live areas
 Flammable ,toxic gases  Remove any of combustible material from
 Fire/explosion site
 Slip , trip & fall  Don’t switch off engine once started to
avoid sparking from battery terminals
 Maintain good housekeeping at site
 Don not left any vehicle/equipment/tool
un attendant in running condition

3 Manual Excavation for Civil works  Unskilled personnel involvement  Deliver tool box talk to all of workforce
Ensure Hand tools are inspected & colour
JSA No: JOB TITLE: Excavation Works for the construction of Foundations/Buildings
Step# Describe Job Step Potential Hazards Hazard Controls
 Personnel hit by hand tools due to coded
SIMOPS  Ensure use of appropriate PPE’s
 Concrete paved area/hard surface  Dump concrete material away from trench
 Excavation collapse  Workers should keep a reasonable
 Use of damage tools distance during manual excavation
 Flying particles  Ensure Close HSE monitoring
 Falling objects  Ensure proper shoring/ramping/benching
of deep excavations (as required)
 Working areas should be clearly marked
& hard barricaded
 Proper coordination with ARL Team
regarding all works
 Stop work in case exposing of any
underground utilities & contact ARL
 Dust  Ensure use of appropriate PPE’s (dust
mask)
 Ensure dust suppression on site
 Slip, Trip & fall  Excavated area should be properly hard
barricaded
 Keep access/walk ways always clear from
any obstruction
 Ensure proper housekeeping of workplace
all the time

Prepared By: Hafeez Ullah Khan Approved By: _____________________