CS31 - Method Statement For External Painting
CS31 - Method Statement For External Painting
Document No:
GLSS-JP-MS-CS34
Rev : 00
Date: 14/07/2019
Method Statement for
External Painting
Page 1 of 9
EXTERNAL PAINTING
Issue No.: 0
Revision No.: 0
CADANGAN TAMBAHAN DAN UBAHSUAI
BAGI SEBUAH PUSAT JAGAAN
AMBULATORI SWASTA SETINGGI 4
TINGKAT DI ATAS LOT 3140, BANDAR
TAIPING DAERAH LARUT DAN MATANG,
PERAK DARUL RIDZUAN.
Document No:
GLSS-JP-MS-CS34
Rev : 00
Date: 14/07/2019
Method Statement for
External Painting
Page 2 of 9
Revision Record
1. This cover page is a record of all revisions of the document identified above by number and title. All
previous cover pages are hereby superseded and are to be destroyed.
2. The contractor has the full right to modify, amend or change Method Statement and supporting
documents as required or as deemed necessary. All such documents will be submitted to the
“CONSULTANT” for approval.
CONTENTS
Issue No.: 0
Revision No.: 0
CADANGAN TAMBAHAN DAN UBAHSUAI
BAGI SEBUAH PUSAT JAGAAN
AMBULATORI SWASTA SETINGGI 4
TINGKAT DI ATAS LOT 3140, BANDAR
TAIPING DAERAH LARUT DAN MATANG,
PERAK DARUL RIDZUAN.
Document No:
GLSS-JP-MS-CS34
Rev : 00
Date: 14/07/2019
Method Statement for
External Painting
Page 3 of 9
1.0 SCOPE
2.0 PURPOSE
3.0 REFERENCES
5.0 RESPONSIBILITIES
6.0 MATERIALS
9.0 PROCEDURE
10.0 ATTACHMENTS
Issue No.: 0
Revision No.: 0
CADANGAN TAMBAHAN DAN UBAHSUAI
BAGI SEBUAH PUSAT JAGAAN
AMBULATORI SWASTA SETINGGI 4
TINGKAT DI ATAS LOT 3140, BANDAR
TAIPING DAERAH LARUT DAN MATANG,
PERAK DARUL RIDZUAN.
Document No:
GLSS-JP-MS-CS34
Rev : 00
Date: 14/07/2019
Method Statement for
External Painting
Page 4 of 9
1.0 SCOPE
This method statement covers application of external stone painting as indicated in approved schedule of finishes as specified in specification for civil &
architectural works.
2.0 PURPOSE
The purpose of generating this method statement is to describe the procedure for application of stone painting as specified in Specification
3.0 REFERENCES
Project Specifications
Schedule of Finishes
5.0 RESPONSIBILITIES
Project Manager is responsible for overall project execution, quality and safety. Adopt a leading role with respect to Contractor’s quality and safety
procedures. The PM is responsible for the overall implementation of this method statement. The Project Manager shall ensure that the key personnel
are well aware of the specifications and method statement.
CM / Project Engineer shall arrange all materials, equipment, safety related items & manpower & direct the Site Engineers & Foremen to resort
appropriate action for the smooth execution of the works.
Safety Engineer shall be responsible for safe working environment & conditions. Coordinate with Site Engineer to identify potential hazards before
works and advise methods of safe working from new developments.
Surveyor shall be responsible for setting out for levels, layout, and lines & establish top levels. Ensuring setting out books are properly maintained and
filed when completed. To coordinate with the CONSULTANT surveyor in determining coordinates, levels, and limits.
QA/QC Engineer shall be responsible for ensuring that execution of works are complying with approved method statement; specifications, approved
shop drawings and ensure ITR are submitted based on ITP requirements.
Issue No.: 0
Revision No.: 0
CADANGAN TAMBAHAN DAN UBAHSUAI
BAGI SEBUAH PUSAT JAGAAN
AMBULATORI SWASTA SETINGGI 4
TINGKAT DI ATAS LOT 3140, BANDAR
TAIPING DAERAH LARUT DAN MATANG,
PERAK DARUL RIDZUAN.
Document No:
GLSS-JP-MS-CS34
Rev : 00
Date: 14/07/2019
Method Statement for
External Painting
Page 5 of 9
Site Engineer shall ensure that all works are carried out according to approved shop drawings. He shall direct the surveyor for the setting out lines &
levels in concurrence from the Construction Manager/Senior Civil Engineer.
MEP Coordinator / Engineer shall be responsible for proper execution of MEP works involved before, during and after the works.
6.0 MATERIALS
Spray Gun
Masks
Painting Rollers
Painting Brush
Putty knifes
Scrappers
Abrasive Paper
Bucket
Ladders
Mobile scaffolds
The capacity / size of the above tools and equipment shall be judged in accordance with site
conditions, requirements, and availability at the time of execution
All employees shall be provided with complete personal Protection equipment PPE.
All employees shall attend Safety Induction and training Course to identify all Hazards associated with this work.
All workers shall be provided with proper tools and equipment to execute the work safely.
MSDS (material safety data sheet) shall be displayed at work location as appropriate
9.0 PROCEDURE
GENERAL:
Check materials, paint system and subcontractors are approved by the Engineer.
Issue No.: 0
Revision No.: 0
CADANGAN TAMBAHAN DAN UBAHSUAI
BAGI SEBUAH PUSAT JAGAAN
AMBULATORI SWASTA SETINGGI 4
TINGKAT DI ATAS LOT 3140, BANDAR
TAIPING DAERAH LARUT DAN MATANG,
PERAK DARUL RIDZUAN.
Document No:
GLSS-JP-MS-CS34
Rev : 00
Date: 14/07/2019
Method Statement for
External Painting
Page 6 of 9
Material shall be stored in a cool, well ventilated and dry place, away from direct sunlight.
The parts not to be painted are protected prior to commence of painting works.
Before commencement of work, remove electrical switch and outlet plates, surface hardware, frames of lighting fixtures and all the other obstructions
and replace properly at completion of the work.
Mock Samples will be prepared in the designated area for the CONSULTANT approval using the correct material, number of coats, colour, texture and
degree of gloss required.
The Surfaces to receive painting shall be free from all loose particles and prepared as per manufacturer's recommendation.
All materials must be collected and returned to the designated storage area after working hours and properly secured and locked.
Preparation:
Prior commencing, clean floors and adjacent surfaces, as well as surfaces to be painted.
Surface shall be sound, clean, dry and free from all defective or poorly adhering materials, dirt, grease etc.
Defects in the plastered surfaces will be repaired using approved patching compound or plaster and flush with adjoining surface, when dry, smooth and
seal the patch before application of priming coat.
Cement plastered surfaces shall be rubbed down with rubbing stone or approved method and cleaned of dust and all foreign matter before application
of primer
Fill any nail holes and similar defect after primer coat has been applied.
In case of high alkali conditions, wash the surface to neutralize the alkali.
In case area to be painted is having any existing coating, it should be cleaned, sanded and primed with the approved primer. All loose existing coating
should be removed prior to application of primer.
Test all the surfaces for moisture before painting. Do not apply paint when moisture content exceeds 8%, as determined by an approved moisture
testing device.
Application:
Do not undertake exterior painting at temperatures outsides of paint manufacturer’s recommended application and curing temperature and humidity
range, or immediately following rain and dew.
Specific paint system shall be applied at locations as per approved finishes schedule.
Issue No.: 0
Revision No.: 0
CADANGAN TAMBAHAN DAN UBAHSUAI
BAGI SEBUAH PUSAT JAGAAN
AMBULATORI SWASTA SETINGGI 4
TINGKAT DI ATAS LOT 3140, BANDAR
TAIPING DAERAH LARUT DAN MATANG,
PERAK DARUL RIDZUAN.
Document No:
GLSS-JP-MS-CS34
Rev : 00
Date: 14/07/2019
Method Statement for
External Painting
Page 7 of 9
Paint system samples Mock ups of all types of finishes shall be made in presence of CONSULTANT’s representative as specified in the specification
Samples shall be made using correct approved materials, number of coats, colour, texture and degree of gloss required as specified in the specification
Approved paint materials delivered to site shall be stored at designated area as specified in the specification
Substrate surface to receive shall be dry, clean sound, free from all defects and extraneous matter as specified in the specification
Cement plastered surfaces rubbed down with rubbing stone shall be cleaned of dust and all foreign matters before application of primer as specified in
specification.
Concrete and masonry surfaces shall be wire brushed as specified in the specification.
Prior commencing painting PE will check surfaces for moisture content with approved moisture testing device. Do not apply the paint unless the
moisture content is less than 8% as specified in specification.
After surface is ready to receive primer coat, surface preparation ITR will be raised for the CONSULTANT’s inspection and approval.
Application of Stone Finish Paint on Exterior finishes will be done as per specification using approved material.
After the application of stone finish paint is completed and all the minor defects ratified, ITR for final inspection will be raised to the
CONSULTANT’s for inspection and approval of finished works.
All activities on these stages will be carried out under full supervision of concerned Project Engineer, Foremen and HSE Officers.
10.0 ATTACHMENTS
EuroStone – Premium quality, natural stone like finishes for exterior and interiors. Highly decorative.
Nanoclear – Protective clear coat for Stone-Paint Systems with Nano-Quartz Technology
ITP
Checklist
Risk Assessment
Issue No.: 0
Revision No.: 0