0% found this document useful (0 votes)
51 views

Location Map Balud Masbate

Uploaded by

Jenica Dela Cruz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
51 views

Location Map Balud Masbate

Uploaded by

Jenica Dela Cruz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

123°15' 123°30' 123°45'

PALANI 124°

N
123°12'00" 123°12'30" 123°13'00" 123°13'30" 123°14'00" 123°14'30" 123°15'00"

Monreal
12°8' 12°8'
W E BEG. OF THE PROJECT
STA. 12+092

San Jacinto

S
12°30' Aroroy 12°30'
San Fernando
Baleno 12°7'30" 12°7'30"

Batuan

THIS SITE
Masbate City

Mobo
Looc
12°7' Malibos 12°7'
END OF THE PROJECT
STA. 13+400

12°15' 12°15'
Mandaon Uson
Milagros

Dimasalang

Palanas 12°6'30" 12°6'30"

Balud

Cataingan
12° 12°
12°6' 12°6'

Cawayan

Pio V. Corpuz
Placer

12°5'30" 12°5'30"

11°45' Esperanza
Map data © OpenStreetMap contributors 123°12'00" 123°12'30" 123°13'00" 123°13'30" 123°14'00" 123°14'30" 123°15'00"

1 2

A 1/1
LOCATION MAP A 1/1
VICINITY MAP
NOT TO SCALE NOT TO SCALE
G-2b G-2b

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONVERGENCE AND SPECIAL SUPPORT PROGRAM - JENICA V. DELA CRUZ
REGIONAL OFFICE NO. V CONCTRUCTION/ IMPROVEMENT OF ACCESS ROADS TO ENGINEER I
DECLARED TOURISM DESTINATIONS -BALUD - PALANI - PANUBIGAN -
LOCATION MAP
MASBATE 2ND PAJO - TALISAY ROAD LEADING TO PALANI BEACHES, PANUBIGAN, PAJO
PREPARED: ALDO O. MAGLENTE JOSEPHINE F. GIME GERRYLIN M. CANTILLEP RAINERO A. ZERDA G 7
AND TALISAY MANGROVE AREA, BRGY. TALISAY, BALUD, MASBATE VICINITY MAP
DISTRICT ENGINEERING OFFICE BALUD, MASBATE
CAPITOL ROAD, MASBATE CITY STA. 12 + 092 - STA. 13 + 400 MC GREGOR D. ARCUENO ENGINEER II CHIEF, PLANNING & DESIGN SECTION OIC - ASST. DISTRICT ENGINEER DISTRICT ENGINEER 2b 28 94
1.308 km (2.616 lane km) DATE: DATE: DATE: DATE:
ENGINEER II

You might also like