01-ACMV Calculation
01-ACMV Calculation
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name (MBH) Load (CFM) (MBH) (sqft) CFM/sqft
ARENA 1
ARENA 1 148.8 June 18:00 7490 1.0 1168.4 6.41
ARENA 2 190.4 April 18:00 9585 1.2 1231.2 7.78
ARENA 3 84.6 May 17:00 4259 0.7 1172.7 3.63
ARENA 4 312.3 January 17:00 15725 4.5 1800.6 8.73
ARENA 5 310.6 January 17:00 15637 4.5 1785.6 8.76
ARENA 6 106.6 April 15:00 5365 0.8 790.8 6.78
ARENA 7 110.4 April 14:00 5559 0.8 781.4 7.11
ARENA 8 159.1 June 17:00 8010 1.1 1214.1 6.60
AV 7.9 May 17:00 399 0.1 215.9 1.85
BILIK KAWALAN (1) 3.1 May 17:00 157 0.0 12.6 12.46
BILIK VVIP 16.5 May 17:00 831 0.2 543.5 1.53
BINCANG 20.3 June 19:00 1024 0.2 171.3 5.98
DOPPING 26.3 June 17:00 1326 0.3 546.9 2.42
DUDUK VIP 24.1 April 17:00 1214 0.3 644.3 1.88
FOYER VIP 168.3 June 18:00 8472 1.7 872.9 9.71
GELANGGANG SUKAN SERBAGUNA 1547.7 May 17:00 77928 9.0 36670.7 2.13
KAWALAN 10.6 April 17:00 535 0.2 265.9 2.01
LOBBY 71.1 April 15:00 3581 0.9 1008.2 3.55
MEDIA 8.5 May 17:00 427 0.1 228.4 1.87
MENUNGGU 13.2 May 17:00 667 0.2 448.0 1.49
PEJABAT 83.1 June 19:00 4182 0.8 527.5 7.93
PENGADIL 19.1 May 17:00 960 0.2 527.9 1.82
PENGAWAL 9.1 May 17:00 459 0.1 194.0 2.36
PENGAWAL 1 5.5 May 17:00 277 0.1 98.6 2.81
SURAU (LELAKI) 16.7 May 17:00 841 0.3 329.9 2.55
SURAU (PEREMPUAN) 44.6 April 19:00 2244 0.6 307.9 7.29
TIKET 1 33.7 January 15:00 1695 0.2 91.0 18.64
TIKET 2 36.2 June 15:00 1823 0.2 95.8 19.02
UTILITI 7.6 May 17:00 383 0.1 114.3 3.35
Make up water (%) = Evaporation Loss (%) + Drift Loss (%) + Blowdown Loss (%)
Where ;
Evaporation Loss = 0.85%
Drift Loss = 0.02%
Blowdown Loss = 0.22%
Therefore,
Make up water (%) = 0.85% + 0.02% + 0.22%
= 1.09% of total circulating water flow rate x hr
Hence, considering safety margin, a make up of 1.1% of the circulating water flow rate is
sufficient.
Take Operation hr = 12 hrs
Make up Water = (1.1% of circulating water x 12 hrs) x 60
= {(1.1% x 950 igpm) x12hr x60
= 7,524 igals
Pump Head :
Pump Head, H = static head + pressure required at outlet + pressure drop due
to friction in the piping
Where
Static Head = vertical distance between the furthest point and pump
discharge level
= 12 m
= 39.36 ft
Pressure required
at outlet = 7.5 m
= 24.6 ft
HR/1
PERUNDING AZFAR
Pressure drop due
to friction = calculated as follows
Water Pipe Description No. of Equal Eff. 10% Head
Flow Size Item Length Length Safety Consume
(Igpm) (in) (ft) (ft) Factor (ft)
20 2 Static pipe - 180 256.7 282.4 5.67
Tee 1 3.3
Elbow 10 5
Strainer 2 10
Gate Valve 2 1.7
HR/2
PERUNDING AZFAR
SUKMA KELANTAN 2026 - PEMBINAAN ARENA TERTUTUP, KOMPLEKS SUKAN
BUKIT MERBAU, PASIR PUTEH, KELANTAN ( REKA DAN BINA )
Introduction:
Capacity of the smoke ventilation system is calculated based on the incidence of a likely
maximum fire size for a sprinkler controlled fire as recommended in the following table;
The reservoir is the collection point for the smoke and the design will ensure that the
smoke reservoir is maintained above head height, thereby ensuring maximum conditions
for breathing and visibility (and minimising conditions for panic). Minimum smoke layer
base (head height clearance) shall be :
Upper storey
= 3.0 m (natural exhaust ventilation)
2.0 m (powered exhaust ventilation)
_______________________________________________________________________________________________________________________
SMOKE SPILL PERUNDING AZFAR
SP/1
Calculation:
a) Gelanggang Sukan
Floor area = 4,482m²
Slab to raise floor height = 17.8 m
For mechanical smoke ventilation system, the maximum size is 2600 m². Hence,
this area will be divided to 3 zones of 1,494 m² each.
= 12.44 kg/s
This calculated smoke layer temperature exceeds 250 ºC, which is deemed as the
highest temperature suitable for safe escape below the smoke layer. However, for
fully sprinklered building, the maximum smoke layer temperature assumed as 250
ºC due to cooling provided by the activated sprinklers. Hence, this calculated
smoke layer temperature is meant for unsprinklered building consideration.
Ambient temperature
To = 273 + 28 = 301 K
Smoke temperature
Tc = 301 + 250 = 551 K
M TC
=
0 T0
12.44 551
=
1.22 301
= 18.67 m3/s
= 39,490 cfm
≈ 40,000 cfm
_______________________________________________________________________________________________________________________
SMOKE SPILL PERUNDING AZFAR
SP/2
Fresh Air Fan
Powered replacement air should not exceed 75% or be less than 50% of the
extracted air volume.
Hence, fresh air fan capacity = 40,000 cfm x 0.6 = 24,000 cfm
_______________________________________________________________________________________________________________________
SMOKE SPILL PERUNDING AZFAR
SP/3