We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1
Performance Improvement Plan (PIP) Process
1. Supervisors maintain performance logs for their direct report employees
a. Includes: corrective action logs, performance reviews b. To be stored only on secure SharePoint location for these items – Access is to be supervisor and higher management only 2. Where repeated underperformance warrants, a PIP is initiated and signed by the direct supervisor 3. The Sr. Manager signs off on the PIP and notifies HR of the impending action 4. The PIP is presented to the employee and signed by the employee and direct supervisor a. HR is to be given the fully executed PIP along with any accompanying documentation b. HR will send fully executed PIP to ADP Total Source (APD TS) for their records 5. For a successful PIP, a memo of completion is signed by employee and direct supervisor a. Direct supervisor sends fully executed successful memo of completion to HR b. HR will send fully execute successful memo of completion sent to ADP TS for their records 6. For an unsuccessful PIP, HR is notified of impending escalated action a. “Last chance,” continued PIP based on performance history b. HR will contact ADP TS for next steps in the termination process c. Termination 7. Upon a termination decision, HR is notified of the termination date. All performance logs and PIPs will be sent to HR by the supervising manager. a. HR will work with ADP TS on the termination documentation b. HR will also inform Accounting Department (Accounting) of impending termination and get accurate status of remaining Vacation days that need to be included in final paycheck. 8. Meeting will be set up with HR, ADP TS and the employee. a. HR, ADP TS and Accounting will collaborate to get documentation and accurate information to properly fill out termination letter. b. HR and ADP TS will conduct the termination meeting with the employee, direct supervisor, and Sr. manager c. HR and ADP TS will request employee to sign termination letter and to return all RGBSI A&D equipment that has been issued to employee. d. All documentation will be stored electronically in HR’s folders. 9. If a verification of employment (e.g., mortgage or auto loan) comes in during an employee PIP process, HR will request a status update on employee’s progress toward either successful complete or possible termination before responding to requester of verification.