two job’s part, office and site place execution. I already serving on different parts of DHA
(office and site), it developed and promoted my practical skills, I spend more time on the site.
I have been working in the office as a Site Supervisor/Engineer working on projects at
various locations, again my role is not limited to visiting sites and practical understanding of
the work, but my responsibilities also included producing some quantities, bar schedules
(steel reinforcement) of projects
4.1. What I've been doing at work: -
As I perform tasks in the company, I note the progress of each activity its serving program,
preparation of progress reports, I will try to describe some of these activities as have
implemented in mine hosting company, from beginning to end of this practice, I
Participated and performed in the office and on-site Work.
4.2. Office work: -
office Work yes work That yes portable exist this office mainly divided into exist arrive
this technical and management part. in progress Place Work resort and question be
opposed to implement of work and record and report in the office. Main work contents of
the office include:
4.3.How to prepare a work plan/statement: -
The declaration method is prepared before construction begins. And by Project managers and
field engineers. Construction work method instructions for safety work of building work That
Meet this Customer's Performance Require. this Technical Notes describe and provide
guidance on the writing process and presentation methods in appropriate structure and
content. this method of statement will yes worried and Event safety, quality and logistics
(human resources, equipment and materials) Work.
4.4.Preparation of working methods: -
this Serving method yes one of this pat of method of statement and Specified go through The
following are this contract document. as technical Specification yes this guidelines for this
implement of Construction activities, work will be carried out in accordance with the bill of
quantities (Bill of Quantities).
a sample working method for placing rebar that I saw in office and in Place.
Get ready schedule.
Prepare appropriate steel bars according to the steel bars schedule.
Place the rebar at template
If steel bars are present, grind them before pouring concrete rust.
Preparing for takeoff sheet
twenty four
This is the process of measuring or scaling dimensions based on drawings and records all
sizes exist one easily understandable Format. These special Format yes is called "Take
off table" or "dimensions Paper.
4.5.Preparation of bill of quantities: -
it yes this Format Which yes used exist A bill of quantity arrive Checklist (include) A
short describe of Specification along and it is Measurement unit, quantity and unit price
arrive Decide this all cost per transaction thing.
25
I'll perform that mission. Then I'll finish the job and try to get it done in a short amount of
time time them gave I. this office engineer need and See all this work I have complete. he
checksum Correction I if There yes one mistake and mine Work. back this, he Tell I this
correct Way to handle the task. For example, in quantity surveying or when I prepare takeoff
sheets, I try Explain or describe all the necessary steps that must be followed for each piece
of work According to specs and listing quantity.
I try to follow the simplest and shortest way to qualify different tasks In an
understandable way when the other person sees it.
I need arrive Work each and Every Task go through I unless I No understand it
Excellent. Additionally, I want to perform any type of work independently,
accurately, and accurately with required speed.
back I have Completed mine office work, I think arrive look Activity That yes under go
exist Place. Because as a trainer, I have to observe and participate in the office and on-site in
sequence Develop my theory and practice Skill.
Whenever I do field work I follow the following principles program:
First, I follow safety procedures; I wear a helmet and safety shoe.
I go into the website and write down all the activities I completed on a piece of paper
Paper.
I observe or ask questions about how I do my work and participate in the work
Excellent.
when I get arrive this Place exist this morning, I take this ground plan and Check
this Work complete. For example, if the job scheduled the night before is pouring
concrete, I Check that concrete pouring stops 1/3 from the main line structure.
Then I Check this Completed Work go through refer to this plan. For example, if
this Completed Task It is strengthening Work of this Pillar, I Check this quantity and
Check this appropriate direction bar and it is diameter. if this Completed Work yes
template of this Pillar, I Use a bubble (plumb bob) to check the horizontal and
vertical alignment of the columns, and soon.
4.10. Qualities that I possess when performing my job tasks: -
arrive Tell you this the truth, I try arrive fully any Task That yes expected from I within
specified time. especially I used to be focus exist this accuracy of work and exist
finishing them Quickly. I do my job independently and don't need much assist.
In addition to work, I also assist employees by sharing their ideas with them and I give them
help Provide good service in different offices and communicate well with my staff member.
Treating everyone on site and in the office courteously is essential to order arrive
26
have A OK association of Work and all interested parties of this company. because of
this, I make Smooth relation and all of mine staff member arrive avoid interrupt of
work process. also, I developed A OK Work ethics period this period. like on time,
Reliability, professionalism, accuracy, etc. exist.
4.11. Challenges I face while performing work tasks:-
it yes known That Every Work need strong motivation arrive join and implement it. when I
Enter this company, I assumed That everything running smoothly. back I Enter, this company
There yes There is no direct and smooth way to operate any direction.
Generally speaking, this challenge That yes face I exist 4 months practice program yes look
like this:
this challenge I have face although I yes Serving yes Lack of distribute (distribute)
Number of works arrive this practise student like I often. as A coach, them have
arrive arranged continuously work arrive this practise student exist Order arrive
train us exist all aspect of the construction industry. Additionally, they must control
our performance and On time throughout train.
The weather conditions prevented me from performing the mission easily.
Communicate with field staff Knowledge.
Transportation services are not very convenient morning.
Lack of theoretical concept of office Work.
Lack of quantitative knowledge Opinion polls.
The design of the project is very complex and difficult to understand easily During
internship or student period stage.
Lack of safety tools, materials, and safety tips in the project Place.
4.12. Steps I took to overcome challenges:-
from beginning to end this train, I try arrive make fixed mine obstacle within mine my
own talent and Skill because of these challenge make I stronger and Increase mine
technical Skill. I try arrive adoption The culture, beliefs and overall lifestyle of the
place Community.
Here are some of the things I did to solve these problems question:
I try to collaborate with colleagues when there are no tasks for me to complete
quantity surveyor and data collector. within These measure, I try arrive use mine
train Valid time according to expected.
I asked the field engineer to prepare the work space for us Place.
Ask Forman and engineers to understand complex drawings and get More
information.
27
Strong wear resistance, good quality and safe construction shoe.
Overall, the progress of this internship program has been so exciting and fulfilling.
Challenging. Those ones challenging also production Some Body arrive Know this
Work follow method. since any type of put up used to be full of question and Those
ones question should has been solved.
so, I able explain That These follow method production I arrive develop mine
Knowledge and experience Skill.
28
Check the pancake level of the plaster.
Layout based on painting.
dig Work.
Make an "array". (specific semester).
Sewage pipe Install.
manhole put up.
water boring.
Material Buy.
Place Work.
floor
sand examine
brick examine
gain knowledge from elderly
lintel Prepare
basement layout
basement Digging.
29
Figure 17 Photo practice
30
6. Description of equipment/tools and technology/implementation
Theoretical knowledge: -
At the construction site, the following materials are being prepared used,
6.1. cement: -
this Function of cement yes arrive combine and water and arrive form cement stick. this paste
first set
i.e. It becomes hard and then stiffens due to a chemical reaction called hydration, Between
cement and water. As it sets and hardens, cement binds the aggregate together to form a rock
like hard Lots of & therefore supply strength, Durability & water tight arrive this
specific. The quality of cement depends on the grade of cement. The mark of cement is as-
33 score
43 score
53 score
➢ No. 43 Portland cement was used on site. (maple leaf).
➢ Initial setting time of cement = 30 minutes (1/2 Hour)
➢ Final setting time of cement=10 Hour.
6.2. Total: -
Aggregates are small pieces of gravel of irregular size and shape. Pure cement is very rare
used exist put up work since it yes easy arrive shrink also a lot of and become crack exist
environment. and, it will yes expensive arrive use Neat cement exist put up Work.
Therefore, cement is mixed with some hard materials that are inert and durable. Material.
They also reduce the cost of concrete as they are relatively much cheaper cement.
31
6.3. Aggregate type: -
I. beautiful total
II. thick total
6.3.1. Fine aggregate (sand): -
Aggregate, through 4.75mm, 1.S. Sieve and keep completely at 75 Micron (.075mm) 1.S.
sieve is called fine Total.
There are three types of sand on it Place,
Ravi Shah
chinab sand
Lawrence grunts sand
32
6.3.2. The function of fine aggregate: -
this Function of use beautiful total exist A specific mix yes arrive full up this void existing
exist Thick total and arrive get A dense and strong specific and less quantity of cement and
improve the workability of concrete mix.
6.4. Coarse aggregate: -
this in total, Which through through 75 mm L.S. screen and completely reserve exist 4.75
mm L.S. coarse sieve aggregate.
The aggregate materials used at the construction site are as follows: Next,
thick total of 20mm size. thick total of 10 mm size (as Every specific mix design). Fine
aggregate in the form of coarse aggregate sand.
6.5. strengthen: -
Materials that form a good bond with concrete to increase its strength are It's called
reinforcement. Steel bars have high tensile, shear, bending moment and torsion capabilities
and compression.
6.6. Reinforcement effect: -
strengthen Serving as A nervous member because specific yes strong exist compression and
33
Week exist nervous so strengthen resistance this stretch pressure exist this specific member.
exist website contractor use this High strength steel bar of diameter 8 mm, 10 mm, 12 mm,
16 mm, 20mm and 25mm on request design.
exist this put up Place , 8 mm, 10 mm, 12 mm, 16 mm, 20 mm & 25 mm strengthen The bar
is used.
Bars are hierarchical Fe500.
These bars are Mughal branded steel.
this main reason for use steel bar exist roller compacted concrete yes That this coefficient
of hot expansion Approximately equal amounts of steel and concrete are used value.
6.7. Fly ash: -
exist this Place, A small quantity of fly Ash used to be also exist used Which yes produced go
through combustion of Coal in thermal power generation plant.
The main advantages of using fly ash in building construction are Next,
its consumption reduces the environment pollute.
It has good bonding qualities characteristic.
6.8. Admixtures:
-
Admixtures are often used to affect the workability of concrete mixes and reduce Moisture
content. Admixtures can also increase target average intensity specific.
exist this Place, Complast SP Chapter 440 (production go through Ittihad Chemicals) mixture
used to be exist Used to improve workability and reduce the amount of water in concrete mix.
6.8.1. Types of admixtures: -
accelerator
Retarder
Water reducing agent/plasticizer /High-efficiency water reducing agent
refill agent
34
adhesive
7. Equipment used: -
7.1. brick hammer
brick hammer yes used arrive cut this Bricks and also used arrive push this Bricks if them
Come go out of course Wire.
35
Figure 24 Concave and convex Knives
7.3. chisel
Chisels are commonly used in carpentry and this will definitely be useful for removing
concrete Bumps or excess concrete in hardening surface.
Figure 25 chisel
7.4. Dig it
dig bar yes hard Metal rod and pin shape exist this bottom. it yes also used arrive dig this
hard surface ground.
36
End of Figure 27 frame
7.6. float
float yes production of wood Which yes used arrive Smoothing this plastered specific
surface. it It has a handle on top and its smooth wooden surface bottom.
Figure 28 float
7.7. Glove
s
Gloves yes required arrive prevent this hand from direct touch and cement, paint ETC. and
Avoid injuries when using machines and tools ETC.
37
Figure 29 Gloves
7.8. Starter
The top plate is made of iron and is used to lift the excavated soil or cement or concrete to
Work sites, etc., more commonly used in construction website.
38
7.10. Measuring box
Measurement Box yes used arrive measure this quantity of sand and total used for make
specific. it yes of stable aspect so, total need no arrive yes Weighted for Every time. this
The general size of the measuring box is 300mm X 300mm X 400mm (length x width depth).
this volume of Measurement Box yes Generally speaking 1 cube foot, Which make it
simple arrive Measure concrete proportions or mortar ratio.
7.12. vertical
Bob
vertical Bob yes used arrive Check this Verticality of structure. it Include A hard Metal Bob
Connect to the end of the thread. Can also be used as a level in surveying Location.
vertical rule yes used arrive Check this vertical Wire of wall regardless it yes perfect
vertical or no. it contains A straight wood board and uniform edge. exist it is center A groove
yes if exist Where is the plumb bob located? When the ruler is placed perpendicular to the
wall, the plumb bob should be on the groove line, otherwise the wall won't vertical.
39
Figure 34 Plumb Bob
40
Figure 36 Sand screen machine
7.15. scraper
machine
Plastering of A surface yes portable go out layer Sensible. at the lowest limit 2 coat yes
necessary for Plastering. arrive supply this OK link between this coat, bottom layer yes
scratched and A tool called scratches.
Figure 37 scraper
41
7.17. shovel
shovel yes used arrive dig this soil for Base trench ETC. it Include Metal plate exist this
end long wooden deal with.
Figure 39 shovel
7.18. Spirit
grade
The level is made of wood or hard plastic with a bubble tube in the middle. bubble tube
Partially filled with alcohol. So, the bubble is in it.
Spirit grade yes used exist brick masonry arrive Check this grade of this surface. this Spirit
grade yes put on surface and bubble yes Checked. this surface yes flat when this bubble exist
this tube solve in the middle tube.
7.19. trowel
The trowel is used to lift and apply small amounts of cement mortar. it is made of steel It also
has a wooden handle for holding. The end of the trowel can be pointed or bull-pointed nose.
Figure 41 trowel
42
7.20. wheel Barrow
Trolleys are used to transport bulk materials such as cement, sand, concrete Mix etc. it
Include one or two wheel exist it is front and two handle exist it is Back Which yes used
arrive push the wheel trolley.
43
Figure 44 Bar cutting machine
44
Figure 46 Rebar thread processing machine
Dimensions: -
Diameter 16mm
bar
Spacing=2.5
mm
length Thread=22.5mm
Diameter 20mm bar
pitch = 2.5 mm
length Thread=25mm
7.29. Excavator:
-
Figure 51 Excavator
47
7.30. Tape measure: -
A measuring tape or measuring tape is a flexible ruler used for measuring distances. it
Consists of cloth, plastic, fiberglass or metal tape with linear measurement marks. it It is a
commonly used measuring tool. Surveyors use tape measures longer than 100 rice.
7.31.1.Conversion factor: -
1 cm = 10 mm
1 foot (1) 12 inches (12”) =30.48 cm-0.3048 m 1 inch (1”) =2.54 cm =
25.4 mmIm-3.28 ft 39.37 inches
1 square meter = 10.76 square feet
1 square meter-35.28 square feet
7.31.2. Density of different materials: -
Density of water = 1000 Density
of steel in kg/m3 = 7850
kg/cubic meter
Density of concrete in PCC = 2400 Density of
concrete in RCC = 2500 kg/m3 Wood density
Kg/m = 1200 kg/cubic meter
Cement density = 1440 Aggregate
density Kg/m=1200-1750 Sand density
kg/m3 1840 kg/m
7.31.3. Cement bag volume: -
Cement density = 1440 Kg/m3
density=mass/ Volume
1440=50kg (1 bag)/ volume
Volume 50 kg/1440
48
Volume 0.0347≈0.035 cubic meters
49
8. Skills and techniques learned during Industrial training/internship: -
8.1. Overall skills learned during training: -
Automatic land surveying grade.
Research painting.
Different methods put up.
Different mixing methods of raw materials Material.
test sand.
Check the workability of concrete.
Check strength specific.
Steel fixed.
Solve the problem.
calculate Material
Labor costs
cost transportation
cost template
bar bending journey
teamwork Skill
Learn how to use pipes grade
communicate effectively labor.
time manage.
cost manage.
How to communicate with different people in different situations situation.
8.2.Painting skills: -
Ability to read and understand complex content painting.
Ability to understand and apply complex technical specifications and standards And
procedures.
8.3.Computer skill: -
Automatic CAD
MD solid
Microsoft office
9. Intern Roles/Responsibilities: -
I am a good student at a certain university Lahore.
50
My mistake was disrespectful to me, especially to University
Schedule a meeting with your site supervisor before your first day practice.
forward you start practice, touch your union university tutor arrive go
Exceed What to expect during your internship experience.
Assist Highway Engineer/Construction engineer.
Provide regular reports on building status to the resident engineer Very important.
Report arrive this resident engineer any dangerous event Accident fire or
possible property damage Place
Report any vehicle incident involving the following vehicles to the resident engineer
personal consultant
51
weather conditions on Place
Work on progress
arrive Record all Delay arrive this Work and Their reason include A
Record of then any other work is progress on possible and other positions
side
Measure the amount of work completed and be able to reach
agreement Disagree with submitted measurements contractor
connection this resident engineer arrive Check and agree this Measurement submit
this contractor
53
and Every Task contribute of Every personal Add to A value for this the best output.
although We were doing these different tasks and there were ideas that came up and there
were debates us.
10.5. leadership: -
lead yes A Skill arrive guide, control and monitor people. exist our practice time exist DHA
Lahore shape community club project different work help us arrive promote And developed
my leadership skills. Leadership comes with responsibility. There are also works Responsible
for working with others to perform different site work and bills of quantities people. These
are of great help in improving my leadership skills Skill.
10.6. Professional ethics issues: -
10.6.1. Punctuality: -
arrive exist time exist Work used to be necessary since it used to be part of mine Work.
exist any part of Work punctuality is directly related to the accuracy and correctness of the
test, and ultimately to the test results. Not being on time means reporting incorrect results,
this is because most office jobs are be related to time, and arrive exist time exist all part of
project yes must arrive have precise and correct result. All this helps me understand the
importance of punctuality at work place.
10.6.2. responsibility: -
I am responsible for the work and equipment I perform. Responsibility lies Work ethics are
important in our workplace as I am responsible for all tasks I perform. this helped me
understand responsibility.
Office Discipline: - I shall not disrupt the working atmosphere in the workplace. For
example, avoid turning on loud sounds, loud music, songs, and distractions. other workers
are working mood.
10.6.3. cooperate: -
Every worker should cooperate and cooperate with each other when working. That's because
system problems can be easily solved through such a system, thus facilitating the workflow
company.
10.7. Entrepreneurial skills: -
go through Now exist our nation, put up yes this lead Business relatively arrive other new
Business. since our nation yes develop nation, this nation need different more civil facility
become developed nation, Which need High participate of put up science and technology
and management party start from, design up arrive finishing put up. put up need high
investment, Which deliver High profit for Both contractor and client. us saw and hear
Different construction related issues. Understanding this makes me think more become an
entrepreneur and us saw different put up company, Which Work Together and DHA
Lahore.
54
Last but not least, entrepreneurship is a big issue in the world today because Increased digit
of Literate manpower. I Observed That There yes many Work Chance In the construction
industry, if someone accepts a contract or subcontract. this shows someone Can successful
exist produce income for him/herself and have Work Chance for people For example
Some of this son department Such as carpentry, electrician, strengthen work During
construction (reinforcement pipe bending machine), sanitation work, etc. Work.
56
12. suggestion: -
from mine practice time, I suggestion this The following about arrive hosting company,
Links to university industry respectively.
12.1. For hosting companies: -
During my final internship, I could observe different diligent activities website.
However, There yes Some point arrive yes respected, because Those ones Activity
Have a negative impact on construction industry.
Avoid or reduce delays in drawing preparation and late deliveries painting.
Prepare or full full Safety toll and Material exist this Place or exist office for engineer
and Daily labor.
mark or painting accidental place exist this Place Such as deep Hole, edge of building
structure…
Care should be taken when handling, casting and placing specific
Interns from different regions attend work continuously organize
12.2. University of Lahore: -
Establish a strong linkage with the hosting company to control attitude and efficiency
The student is in Place.
Assign consultants on time and control consultant-client contact intern.
Pay more attention to practical knowledge before internship semester.
Provide students with necessary and required information about their internship
before starting practice.
control this student and department and create chain and hosting company and
collect information about students.
57
13. in conclusion: -
from this past practice time I get conclusion this The following based on exist actual and
The theoretical knowledge I gained during my internship time:
During my internship I got the opportunity to improve my theory and knowledge Practical
knowledge When I stayed at the construction site, I learned how to communicate with the
workers on the construction site. I believe the skills I gained from my internship will actually
help me in my future Career because I am familiar with the skills necessary in a work
environment. More support I arrive study this different hierarchy of this project. period These
past practice time, I have been capable arrive look this different theoretical and actual aspect,
Methodology. I have Always enriching our curiosity exist study almost building put up
Excellent exist this Internship Program.
Generally speaking, the internship program plays a vital role in our four-year theoretical
courses. practice program connect I arrive this real put up work and production I arrive
catch A Crucial confidence.