4.3 B (PROPOSAL) - FOR SUBMISSION

estimate

Uploaded by

johnsalas516
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
77 views

4.3 B (PROPOSAL) - FOR SUBMISSION

estimate

Uploaded by

johnsalas516
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 530

BILL OF QUANTITIES

CONSTRUCTION OF VARIOUS STRUCTURES AND FACILITIES WITHIN THE 100 HECTARE AREA AT
Project Name :
BATAAN TECHNOLOGY PARK, MORONG BATAAN ( PHASE 1 PACKAGE 2 )
Location : MORONG, BATAAN
BUILDING 4.3B

UNIT COST BUILDING 4.3B


ITEM NO. DESCRIPTION UNIT
(Pesos)
QUANTITY AMOUNT

STRUCTURAL EARTHWORK
803 (1) a Structure Excavation (Common Soil), includes Hauling and Disposal Cost cu.m. 420.00 7,190.10 3,019,842.00
515 (3) Structural Backfilling (using Excavated Materials) cu.m. 367.50 374.18 137,511.15
SUB-TOTAL 3,157,353.15
CONCRETE WORKS
Cast-In Place Concrete, 21 Mpa
900 (1) c1-h Structural Concrete, Bottom Slab, Class A (fc=21 MPa) @ 28 days cu.m. 5,197.50 403.81 2,098,802.48
Cast-In Place Concrete, 28 Mpa
900 (8)-h Structural Concrete, RC Wall, 28 MPa @ 28 days cu.m. 5,932.50 226.83 1,345,668.98
Cast-In Place Concrete, 10 Mpa
901 (1) Structural Concrete, Lean Concrete, 10 Mpa cu.m. 3,638.25 135.39 492,582.67
Reinforcing Steel, Grade 60
902 (1) b-25 Reinforcing Steel, Bottom Slab, Grade 60 kgs. 77.18 80,762.00 6,232,807.35
902 (1) b-35 Reinforcing Steel, RC Wall, Grade 60 kgs. 77.18 119,244.00 9,202,655.70
Formworks and Falsework
903 (2)-a Formworks and Falseworks, Lean Concrete sq.m. 682.50 15.68 10,701.60
903 (2)-u Formworks and Falseworks, RC Wall sq.m. 682.50 1,441.21 983,625.83
903 (2)-ad Formworks and Falseworks, Bottom Slab sq.m. 682.50 46.91 32,016.07

SUB-TOTAL 20,398,860.67

METAL WORKS

Metal Structures and Accessories, Watch Tower for 3-units (includes HSS 5x5x0.375 Steel Column,
1047 (12) C4x4.5 Steel beam, C3x3 Steel Beam and Steel Rafter, LC100x50x15x2.0 Purlins, 150x12 Hollow lot 0.02 n/a
Steel Pipe for Kingpost, connection bolts, connection Plates and other items to complete the works)

Metal Structures and Accessories, Catwalk, L=183.65m, W=1.30m ( includes A505MPU Webforge
1047 (13) Steel Grating, W8x12 Steel Beam, 2L100x100x8 Steel Support, Baseplates, Anchor Bolts and other lot 0.02 n/a
items to complete the works)
Metal Structures and Accessories, Steel Stairs ( includes A323MPU 32x3 Webforge Steel Grating,
1047 (14) HT152x151x8x11 Steel Column, C10x20 Stringer, Angle Bar Connections, Baseplates, Anchor Bolts lot 0.02 n/a
and other items to complete the works)
SUB-TOTAL 0.00

OTHERS FOR SWIMMING POOL - NO DRAWINGS


Underwater Egress Pool (Provisional Cost) lot 1.00 -
Jumping Platform, including Stairs (Provisional Cost) lot 1.00 -
Zip Line (Provisional Cost) lot 1.00 -
Steel Beam including RC Post (Provisional Cost) lot 1.00 -
In Ground Viewing Area (Provisional Cost) lot 1.00 -
Overhear Catwalk (Provisional Cost) lot 1.00 -
SUB-TOTAL 0.00

SUBTOTAL COST - STRUCTURAL WORKS 23,556,213.82

ARCHITECTURAL WORKS (ALL BUILDINGS)

1016 WATERPROOFING -
1016 (1) b.6 Waterproofing: Cementitous Capillary (Location: Concrete Canopies, Watertank, Elevaror Shaft) sq.m. 1,051,891.58
892.50 1,178.59
1016 (1) b.8 Fiber Mesh Tile Underlay (Alkali Resistant) sqm. 1,338.75 1,178.59 1,577,837.36
1018 CERAMIC/ GRANITE TILES -
Glazed Tiles (Wall Finish: Ceramic Tiles, 6mm Thk x 300 x 300mm) (Mariwasa White and Blue for
1018 (1) e sq.m. 807,674.18
Swimming Pool) 1,732.50 466.19
Unglazed Tiles (Floor Finish: Ceramic Tiles, 6mm Thk x 300 x 300mm) (Mariwasa White and Blue for
1018 (2) e sq.m. 1,234,233.00
Swimming Pool) 1,732.50 712.40

SUBTOTAL COST - ARCHITECTURAL WORKS 4,671,636.11


PLUMBING AND SANITARY WORKS ( ALL BUILDINGS)
WATER SYSTEM
Testing and Disinfecting lot 5,250.00 1.00 5,250.00

SUB-TOTAL 5,250.00

SEWER SYSTEM
Testing lot 5,250.00 1.00 5,250.00

SUB-TOTAL 5,250.00

STORM AND DRAINAGE SYSTEM


Testing lot 5,250.00 1.00 5,250.00

SUB-TOTAL 5,250.00

PLUMBING FIXTURES
SUBTOTAL COST (PLUMBING AND SANITARY WORKS) 15,750.00
MECHANICAL WORKS (ALL BUILDINGS)
MECHANICAL WORKS
1200 (42) Testing and Commissioning for AC units lot 157,500.00 1.00 157,500.00
SUB - TOTAL 157,500.00
1200 VENTILATION SYSTEM
1200 (43) Testing and Commissioning for Ventilation units lot 26,250.00 1.00 26,250.00
SUB - TOTAL 26,250.00
1202 FIRE PROTECTION SYSTEM
1202 (39) Testing and Commissioning Fire Protection System lot 15,750.00 1.00 15,750.00
SUB - TOTAL 15,750.00
1202 FIRE SUPPRESSION SYSTEM NOVEC-1230
TOTAL COST - MECHANICAL WORKS 199,500.00
ELECTRICAL WORKS ( ALL BUILDINGS)
1103 (3) Testing and Commissioning lot 31,500.00 1.00 31,500.00
SUB - TOTAL 31,500.00
1102 POWER SYSTEM
1102 (36) Testing and Commissioning lot 31,500.00 1.00 31,500.00
SUB-TOTAL 31,500.00
1208 FIRE ALARM SYSTEM
1208 (19)9 Testing and Commissioning lot 31,500.00 1.00 31,500.00
SUB-TOTAL 31,500.00
1105 NETWORK CABLING SYSTEM
1105 (24)8 Testing and Commissioning lot 31,500.00 1.00 31,500.00
SUB-TOTAL 31,500.00
1106 CCTV SYSTEM
1106 (16)8 Testing and Commissioning lot 31,500.00 1.00 31,500.00
SUB-TOTAL 31,500.00
1107 PUBLIC ADDRESS SYSTEM
1107(7) Testing and Commissioning lot 31,500.00 1.00 31,500.00
SUB-TOTAL 31,500.00
1108 ACCESS CONTROL SYSTEM
1108(13).1 Interfacing, Testing and Commissioning lot 31,500.00 1.00 31,500.00
SUB-TOTAL 31,500.00
1109 GROUNDING SYSTEM
1109 (9).1 Testing and Commissioning lot 31,500.00 1.00 31,500.00

SUB-TOTAL 31,500.00

TOTAL COST - ELECTRICAL WORKS 252,000.00

GRAND TOTAL 28,695,099.93


General Requirements 12% 3,443,411.99
Contingency 5% 1,434,755.00
Contractor's Profit & Overhead 10% 2,869,509.99
PROPOSAL OF 10TH DC 36,442,776.91
VAT 12% 4,373,133.23
40,815,910.14

PHILMARKER (MARK UP) 15% 6,122,386.52


with VAT
TOTAL PROJECT COST 46,938,296.66