The Cirata Floating Solar Photovoltaic Power Plant Project: Comments or Notes

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
30 views

The Cirata Floating Solar Photovoltaic Power Plant Project: Comments or Notes

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Rev01

Comments or Notes:

Name Add the material


LI Wang Su
1 Date 08/12/2022 08/12/2022 08/12/2022
description to the IFR
table and NO.3
Name LI Wang Su
0 21/11/2022 21/11/2022 21/11/2022
IFR
Date

REV. PREPARED CHECKED APPROVED MODIFICATIONS STATUS

THE CIRATA FLOATING SOLAR PHOTOVOLTAIC


POWER PLANT PROJECT
OWNER
PT Pembangkitan Jawa Bali Masdar Solar Energi
Menara Bidakara 2, Jl. Gatot Subroto, Kav. 71-73, Kota Jakarta
Selatan, Daerah Khusus Ibukota Jakarta 12870
PMC

Tractebel Engineering
CONTRACTOR

ONSHORE CONTRACTOR
BUT Sinohydro Corporation Limited
Menara Prima Lt.17 Jl. Kuningan Timur, Kec, Setiabudi, Kota
Adm. Jakarta Selatan, DKI Jakarta, Indonesia
OFFSHORE CONTRACTOR
HDEC Middle East Co DMCC
No.2701, 2702, 2705,2706, 2707, JBC 3, JLT Dubai
Powerchina Huadong Engineering Corporation Limited
No. 22 Chao Wang Road, Hangzhou, China
SUBCONTRACTOR
PT SUNGROW FLOATING INDONESIA
Wisma GKBI, Lantai 39 Suite 3901, Jalan Jenderal
Sudirman No. 28,Kota Adm. Jakarta Pusat, Provinsi DKI
Jakarta, INDONESIA

TITLE Drawings of Cable bracket - 2

PROJECT DATE REF


DOCUMENT NO:
0088-PV-M-VDC-006 NO:
1
2022.12
1 2 3 4 5 6 7 8 9 10 11 12

Cable Placement Position Single cell of calculation

A A

B B
Top view

C C

D D

E E

F Technical Description: F
1、The bracket legs are pre-installed on the floating body, and the installation spacing is subject to the figure;
2、The installation direction of the connection screw between the bracket leg and the floating body and the connection
bolt between the bracket leg and the cross bar shall be subject to the drawing;
3、The center spacing of the floating body of the three cables is 1000mm, the wire rope is used to connect the loose bolt,
the length of which is not less than 1000mm, and the wire rope is anchored by the wire rope clamp, the distance between
G the wire rope clamp is about 30mm-35mm, according to GB60671-2010, to ensure that the wire rope does not slip. G

OWNER OWNER'S CONSULTANT CONTRACTOR SUBCONTRACTOR PROJECT


DATE REV
01/06/2022 DATE MODIFICATION PREPARED CHECKED
NO. CIRATA FLOATING SOLAR PHOTOVOLTAIC POWER PLANT PROJECT

0 21/11/2022 - Wang Pan/Teng


DRAWN Wang Add the material description to the table TITLE
0 21/11/2022 Wang Pan/Teng
and NO.3
H H
CHECKED Pan/Teng
DRAWINGS OF CABLE BRACKET-2
PT PEMBANGKITAN JAWA-BALI INVESTASI - TRACTEBEL ENGINEERING BUT SINOHYDRO CORP. LTD PT SUNGROW FLOATING INDONESIA
MASDAR SOLAR ENERGY POWERCHINA HUADONG ENGINEERING CORP. LTD
JOINT VENTURE APPROVED Zhao/Chen

1 2 3 4 5 6 7 8 9 10 11 12