Transpo Problem Illustrations

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
35 views38 pages

Transpo Problem Illustrations

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 38

Transportation

Problem

Ariel Melad
Northwest Corner Method
1 2 3 Supply
A 8 4 7 20

B 3 6 9 45

C 10 5 2 20

Demand 10 25 50 85/85
Northwest Corner Method
1 2 3 Supply
A 8 4 7 20
10
B 3 6 9 45

C 10 5 2 20

Demand 10 25 50 85/85
Northwest Corner Method
1 2 3 Supply
A 8 4 7 20
10 10
B 3 6 9 45

C 10 5 2 20

Demand 10 25 50 85/85
Northwest Corner Method
1 2 3 Supply
A 8 4 7 20
10 10
B 3 6 9 45
15
C 10 5 2 20

Demand 10 25 50 85/85
Northwest Corner Method
1 2 3 Supply
A 8 4 7 20
10 10
B 3 6 9 45
15 30
C 10 5 2 20

Demand 10 25 50 85/85
Northwest Corner Method
1 2 3 Supply
A 8 4 7 20
10 10
B 3 6 9 45
15 30
C 10 5 2 20
20
Demand 10 25 50 85/85
Northwest Corner Method
 Total Cost: A1: 10 x 8 =80
A2: 10 x4 = 40
B2: 15 x 6 = 90
B3: 30 x 9 = 270
C3: 20 x2 = 40
P 520.00
Lowest Cost Method
1 2 3 Supply
A 8 4 7 20

B 3 6 9 45

C 10 5 2 20
20
Demand 10 25 50 85/85
Lowest Cost Method
1 2 3 Supply
A 8 4 7 20

B 3 6 9 45

C 10 5 2 20
20
Demand 10 25 50 85/85
Lowest Cost Method
1 2 3 Supply
A 8 4 7 20

B 3 6 9 45
10
C 10 5 2 20
20
Demand 10 25 50 85/85
Lowest Cost Method
1 2 3 Supply
A 8 4 7 20
20
B 3 6 9 45
10
C 10 5 2 20
20
Demand 10 25 50 85/85
Lowest Cost Method
1 2 3 Supply
A 8 4 7 20
20
B 3 6 9 45
10 5
C 10 5 2 20
20 0
Demand 10 25 50 85/85
Lowest Cost Method
1 2 3 Supply
A 8 4 7 20
20
B 3 6 9 45
10 5
C 10 5 2 20
20 0
Demand 10 25 50 85/85
Lowest Cost Method
1 2 3 Supply
A 8 4 7 20
20
B 3 6 9 45
10 5 30
C 10 5 2 20
20
Demand 10 25 50 85/85
Lowest Cost Method
1 2 3 Supply
A 8 4 7 20
20
B 3 6 9 45
10 5 30
C 10 5 2 20
20
Demand 10 25 50 85/85

TOTAL COST: P 450.00


Vogel’s Approximation Method (VAM)

1 2 3 Supply
A 8 4 7 20
3
B 3 6 9 45
3
C 10 5 2 20
3
Demand 10 25 50 85/85

5 1 5
Vogel’s Approximation Method (VAM)

1 2 3 Supply
A 8 4 7 20
3
B 3 6 9 45
3
C 10 5 2 20
3
Demand 10 25 50 85/85

5 1 5
Vogel’s Approximation Method (VAM)

1 2 3 Supply
A 8 4 7 20
3
B 3 6 9 45
3
C 10 5 2 20
20 3
Demand 10 25 50 85/85

5 1 5
Vogel’s Approximation Method (VAM)

1 2 3 Supply
A 8 4 7 20
3
B 3 6 9 45
3
C 10 5 2 20
20 3
Demand 10 25 50 85/85

5 1 5
Vogel’s Approximation Method (VAM)

1 2 3 Supply
A 8 4 7 20
3 3
B 3 6 9 45
3 3
C 10 5 2 20
20 3 3
Demand 10 25 50 85/85

5 1 5
5 2 4
Vogel’s Approximation Method (VAM)

1 2 3 Supply
A 8 4 7 20
3 3
B 3 6 9 45
10 3 3
C 10 5 2 20
20 3 3
Demand 10 25 50 85/85

5 1 5
5 2 4
Vogel’s Approximation Method (VAM)

1 2 3 Supply
A 8 4 7 20
3 3
B 3 6 9 45
10 3 3
C 10 5 2 20
20 3 3
Demand 10 25 50 85/85

5 1 5
5 2 4
Vogel’s Approximation Method (VAM)

1 2 3 Supply
A 8 4 7 20
20 3 33
B 3 6 9 45
10 3 33
C 10 5 2 20
20 3 3
Demand 10 25 50 85/85

5 1 5
5 2 4
2 2
Vogel’s Approximation Method (VAM)

1 2 3 Supply
A 8 4 7 20
20 3 33
B 3 6 9 45
10 3 33
C 10 5 2 20
20 3 3
Demand 10 25 50 85/85

5 1 5
5 2 4
2 2
Vogel’s Approximation Method (VAM)

1 2 3 Supply
A 8 4 7 20
20 3 33
B 3 6 9 45
10 3 33
C 10 5 2 20
20 3 3
Demand 10 25 50 85/85

5 1 5
5 2 4
2 2
Vogel’s Approximation Method (VAM)

1 2 3 Supply
A 8 4 7 20
20 3 33
B 3 6 9 45
10 5 30 3 33
C 10 5 2 20
20 3 3
Demand 10 25 50 85/85

5 1 5
5 2 4
2 2
Vogel’s Approximation Method (VAM)

1 2 3 Supply
A 8 4 7 20
20
B 3 6 9 45
10 5 30
C 10 5 2 20
20
Demand 10 25 50 85/85

TOTAL COST: P 450.00


Example: Transportation Table of
JAVILL Electronics Company
1 2 3 Plant
Supply
A 8 4 7 150

B 3 6 9 300

C 10 5 2 100

Demand 180 300 70

Compute the cost using the Three methods.


Stepping stone Method
Warehouse 1 2 3 Supply
A 50 20 40 120

B 30 50 40 180

C 40 30 20 150

Demand 100 170 180 450/450


Stepping stone Method
Warehouse 1 2 3 Supply
A 50 20 40 120
100 20
B 30 50 40 180
150 30
C 40 30 20 150
150
Demand 100 170 180 450/450
Stepping stone Method
Warehouse 1 2 3 Supply
A 50 20 40 120
100 20
B 30 50 40 180
150 30
C 40 30 20 150
150
Demand 100 170 180 450/450

TOTAL COST: P 12, 600.00


Stepping stone Method
Warehouse 1 2 3 Supply
A 50 20 40 120
120
B 30 50 40 180
100 50 30
C 40 30 20 150
150
Demand 100 170 180 450/450

TOTAL COST: P 12, 100.00


MOdified DIstribution Method
Warehouse 1 2 3 Supply
A 50 20 40 120

B 30 50 40 180

C 40 30 20 150

Demand 100 170 180 450/450


MOdified DIstribution Method
w1 w2 w3
Warehouse 1 2 3 Supply
A 100 50 20 40 120
v1 20
B 30 50 40 180
v2 150 30
C 40 30 20 150
v3 150
Demand 100 170 180 450/450
MOdified DIstribution Method
W1=50 W2=20 W3=10
Warehouse 1 2 3 Supply
V1=0 A 50 20 20 40 120
100
V2=30 B 30
150 50 30 40 180

V3=10 C 40 30 150 20 150

Demand 100 170 180 450/450


MOdified DIstribution Method
W1=50 W2=20 W3=10
Warehouse 1 2 3 Supply
V1=0 A 50 20 20 40 120
100
V2=30 B 30
150 50 30 40 180

V3=10 C 40 30 150 20 150

Demand 100 170 180 450/450

TOTAL COST: P 12, 100.00


Thank you!!!