0% found this document useful (0 votes)
65 views

Danav Buildcon (Main Sheet)

Uploaded by

Rizwana Patel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
65 views

Danav Buildcon (Main Sheet)

Uploaded by

Rizwana Patel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 91

BD BUIOLDCON LLP

GUJARAT FLUORO CHEMICALS LTD, DAHEJ-B


SUB:- READY MIX CONCRETE RECEIVED DETAILS
S.NO DESCRIPTION UNIT M-10 M-15 M-20 M-25 M-30 M-30

1 READY MIX CONCRETE RECEIVED CUM 1223.50 6.00 99.75 179.00 55.00 6722.00

2 READY MIX CONCRETE RECEIVED FOR NEW PLOT CUM 170.50 52.00 67.50

READY MIX CONCRETE RECEIVED 15.00

3 CUM
TOTAL QTY CUM 1394.00 6.00 99.75 246.00 55.00 6789.50
CEMENT CONSUMPTION/CUM MT 0.16 0.24 0.32 0.36 0.38 0.385
TOTAL= MT 223.04 1.44 31.92 88.56 20.9 2614
TOTAL CEMENT CONSUMPTION= MT 2979.8175
TOTAL CEMENT UNLOADING= MT 3099.787
WASTAGE 1% MT 30.998
BALANCE(10+12-13)= MT 88.972
CEMENT UNLOADING AT DANAV BUILDCON
UNLOADI
DATE CHALLAN NO UNIT
NG QTY
08.04.2021 7060171502 MT 24.097
08.04.2021 7060171500 MT 23.928
08.04.2021 7060171517 MT 24.314
09.04.2021 7060171568 MT 24.126
09.04.2021 7060171545 MT 24.008
10.04.2021 7060171677 MT 24.097
10.04.2021 7060171664 MT 23.998
13.04.2021 7060171908 MT 23.909
14.04.2021 7060172000 MT 24.186
15.04.2021 8937184379 MT 28.364
15.04.2021 8937184387 MT 31.284
22.06.2021 7060178828 MT 23.76
22.06.2021 7060178848 MT 24.314
23.06.2021 7060178945 MT 23.81
27.06.2021 7060179359 MT 24.918
26.06.2021 7060179175 MT 24.334
03.10.2021 1010197927 MT 24.32
28.10.2021 7060191339 MT 24.33
28.10.2021 7060191366 MT 24.04
30.10.2021 7060191616 MT 24.41
30.11.2021 7060191611 MT 24.41
19.11.2021 7320473315 MT 29.98
20.11.2021 7320473486 MT 29.84
20.11.2021 7060193159 MT 24.11
23.11.2021 7320473846 MT 34.47
23.11.2021 7320473848 MT 29.33
13.01.2022 7060199531 MT 29.62
20.01.2022 7060200166 MT 28.37
21.01.2022 7060200404 MT 24.13
21.01.2022 7060200395 MT 24.22
23.01.2022 7060200745 MT 24.22
26.01.2022 1010202629 MT 33.71
26.01.2022 1010202627 MT 33.74
04.02.2022 7060202620 MT 29.21
11.02.2022 7008823791 MT 38.80
17.02.2022 7008842006 MT 40.31
31.03.2022 7320511760 MT 40.74
31.03.2022 7060209876 MT 29.27
01.04.2022 7320512185 MT 34.21
16.06.2022 1010210749 MT 23.18
18.06.2022 1001022945 MT 34.46
19.06.2022 1010210957 MT 22.52
19.06.2022 7320535149 MT 39.4
24.06.2022 7320536775 MT 34.38
24.06.2022 1010211142 MT 22.52
24.06.2022 7320536658 MT 34.51
24.06.2022 1001024659 MT 40.89
29.06.2022 1010211593 MT 24.74
29.06.2022 1010211589 MT 34.2
07.06.2022 7302531598 MT 34.07
01.04.2022 7320480479 MT 30.05
01.04.2022 7320480475 MT 29.58
01.04.2022 7060199031 MT 24.42
01.04.2022 7320487979 MT 29.44
30.07.2022 100212768 MT 25.13
03.08.2022 1010212947 MT 29.61
03.08.2022 1010212927 MT 30.03
13.08.2022 B10017059 MT 34.33
16.08.2022 B10017058 MT 34.2
16.08.2022 B10017056 MT 34.15
04.09.2022 1010214213 MT 25.03
04.09.2022 1010214215 MT 24.05
05.09.2022 7320559246 MT 34.15
17.09.2022 1010214648 MT 24.81
18.09.2022 1010214627 MT 24.67
11.12.2022 7320588196 MT 36.33
12.12.2022 101018355 MT 24.31
04.01.2023 7320597904 MT 36.54
19.01.2023 7060244366 MT 28.96
19.01.2023 7060244294 MT 28.97
28.01.2023 1010221386 MT 24.9
27.01.2023 7320604847 MT 34.51
30.01.2023 1010221482 MT 33.56
30.01.2023 1010221481 MT 33.29
12.04.2023 7320629038 MT 34.36
12.04.2023 7320629045 MT 34.55
13.04.2023 7320629051 MT 34.24
18.04.2023 1010225408 MT 24.13
19.04.2023 1010225428 MT 24.22
25.05.2023 1010227311 MT 28.8
21.07.2023 1010230458 MT 29.3
21.07.2023 1010230483 MT 29.7
23.07.2023 1010230440 MT 24.62
16.08.2023 9181119194 MT 34.3
24.09.2023 7060275223 MT 34.06
29.09.2023 7060275995 MT 29.18
15.01.2024 1001215984 MT 37.800
15.01.2024 1001215883 MT 35.370
16.01.2024 1001216338 MT 40.420
17.03.2024 8965381925 MT 41.370
18.03.2024 8937320077 MT 30.380
19.03.2024 8965382918 MT 41.990
18.04.2024 8965396990 MT 41.030
18.04.2024 8965396961 MT 41.210
19.04.2024 8937324515 MT 33.250
20.04.2024 8937324678 MT 29.890
20.04.2024 8937374665 MT 32.560
20.04.2024 8965397736 MT 40.980
20.04.2024 8937324858 MT 30.860
24.04.2024 8965398295 MT 41.340
28.04.2024 8965401337 MT 41.490
29.04.2024 8965401666 MT 41.26
TOTAL CEMENT UNLOADING= MT 3099.787
REMARK

RECEIVED AT GFL-1(THIS QTY


SHOW OUR SHEET INSTRUCTION
OF BHAVIKA MADAM)
8584.25

VEHICLE NO

GJ19X-7597
GJ03AX-5171
GJ05BX-7862
GJ18AV-6250
GJ21W-1964
GJ06YY-9415
GJ03AX-5171
GJ08Y4693

GJ19X 2202
GJ01CT 4011
GJ18AX 3596
GJ05BX 7862

GJ27U-0832
GJ16W-1964
GJ19X-2228
GJ21T-7920
GJ12AW-0896
GJ02ZZ-7692
GJ02XX-8510
GJ19X-2228
GJ08AU-6722
GJ08AU-5274
GJ05BX-0202
GJ18BT-4406
GJ01CZ-4910
GJ21W-0748
GJ19X-1422
GJ08AU-6886
GJ08AU-6510
GJ05BV-2645
GJ08AU-4267
RJ22GB-0797
RJ22GB-0797
GJ01DY-0274
GJ08AU-8198
GJ08AU-1998
GJ08AU-8705
GJ08Y-0790
GJ08AU-4267
GJ08AU-7094
GJ08AU-1998
GJ08AU-8790
GJ38GA-2543
GJ18AX-5518
GJ08AU-6243
GJ08AU-8943
GJ08AU-5070
GJ08AU-5047
GJ07YY-2295
GJ08AU-4695
GJ27U-0832
GJ08AU-5145
GJ08AU-1826
GJ08AU-7637
GJ08AU-8140
GJ08AU-9336
GJ08BY-7178
GJ08Y-5312
GJ08AU-8705
GJ08AU-1998
GJ08AU-1304
RJ38GA-2609
GJ08Y-2575
GJ18BT3394
GJ16AV-7506
GJ25U-7362
GJ27U-0832
GJ08AU-8763
GJ08AU-8837
GJ08AU-8790
GJ 08 AU 8198
GJ 08 AU 8140
GJ 08 AU 7981
GJ 08 Y 7278
GJ 27 U 0375
GJ12BX-8141
GJ08AU-2465
GJ12BX-8141
GJ27U-0375
GJ14Z-6002
GJ08AU5453
GJ18AZ5694
RJ22GB-6498
GJ08AU-9202
GJ08AU-9202
GJ12CT-0837
GJ14X-1761
TN37DW-6320
GJ12CT-0877
GJ39T-1491
CG04LL-8261
GJ05BX-6005
GJ16AV-1804
TN37DY-4030
GJ16AU-5431
GJ39T-1271
TN37AW-6320
MH18BZ-0324
BD BUILDCON LLP
GUJARAT FLUORO CHEMICALS LTD, DAHEJ-B
DY MIX CONCRETE M10 RECEIVED DETAILS
GATE ENTRY
SR NO DATE SUPPLIER CHALLAN NO VEHICLE NO.
NO
1 07.11.2020 DANEV BUILDCON 4361 1338 GJ16W-8529
2 12.11.2020 DANEV BUILDCON 4604 1395 GJ16W-8529
3 12.11.2020 DANEV BUILDCON 4596 1394 GJ16W-8529
4 13.11.2020 DANEV BUILDCON 4629 1403 GJ16W-8529
5 28.11.2020 DANEV BUILDCON 4940 1540 GJ16W-8529
6 09.03.2021 DANEV BUILDCON 9253 2390 GJ16AF-9640
7 18.03.2021 DANAV BUILDCON 9674 2599 GJ16AF-9640
8 19.03.2021 DANAV BUILDCON 9760 2636 GJ16AF-9640
9 20.03.2021 DANAV BUILDCON 9791 2651 GJ16AF-9640
10 22.03.2021 DANAV BUILDCON 9875 2682 GJ16W-8529
11 15.04.2021 DANAV BUILDCON 526 327 GJ16AF-9640
12 12.06.2021 DANAV BUILDCON 2240 1947 GJ16AF-9640
13 01.07.2021 DANAV BUILDCON 3053 2922 GJ16BS-2645
14 03.07.2021 DANAV BUILDCON 3146 2989 GJ16BS-2645
15 21.07.2021 DANAV BUILDCON 3905 GJ16BS-1858
16 30.07.2021 DANAV BUILDCON 4181 4424 GJ16BS-2645
17 30.07.2021 DANAV BUILDCON 4188 4435 GJ16BS-2645
18 31.07.2021 DANAV BUILDCON 4207 4457 GJ03CL-9102
19 22.11.2021 DANAV BUILDCON 8336 9161 GJ16BS-2645
20 22.11.2021 DANAV BUILDCON 8344 9175 GJ03CL-9102
21 22.11.2021 DANAV BUILDCON 8332 9158 GJ03CL-9102
22 25.12.2021 DANAV BUILDCON 9604 11543 GJ16BS-2498
23 25.12.2021 DANAV BUILDCON 9606 11548 GJ16BS-2074
24 25.12.2021 DANAV BUILDCON 9634 11596 GJ16BS-2645
25 27.12.2021 DANAV BUILDCON 9717 11730 GJ16BS-2696
26 28.12.2021 DANAV BUILDCON 9739 11751 GJ16BS-2645
27 29.12.2021 DANAV BUILDCON 9831 11891 GJ03CL-9102
28 30.12.2021 DANAV BUILDCON 9847 11923 GJ16BS-2645
29 30.12.2021 DANAV BUILDCON 9860 GJ16BS-2645
30 03.01.2022 DANAV BUILDCON 10032 12179 GJ16BS-2645
31 05.01.2022 DANAV BUILDCON 10140 12294 GJ16BS-1851
32 07.01.2022 DANAV BUILDCON 10295 12520 GJ16BS-2645
33 08.01.2022 DANAV BUILDCON 10338 12615 GJ16BS-1851
34 08.01.2022 DANAV BUILDCON 10341 12620 GJ16BS-1851
35 08.01.2022 DANAV BUILDCON 10317 12562 GJ16BS-2105
36 08.01.2022 DANAV BUILDCON 10331 12595 GJ16BS-2623
37 09.01.2022 DANAV BUILDCON 10351 12657 GJ16BS-1813
38 10.01.2022 DANAV BUILDCON 10359 12689 GJ16BS-2943
39 13.01.2022 DANAV BUILDCON 10646 12862 GJ03CL-9102
40 19.01.2022 DANAV BUILDCON 10957 13166 GJ16BS-2645
41 19.01.2022 DANAV BUILDCON 10945 13160 GJ16BS-2645
42 26.05.2022 DANAV BUILDCON 2372 2482 GJ16BS-2498
43 26.05.2022 DANAV BUILDCON 2400 2526 GJ16BS-2074
44 26.05.2022 DANAV BUILDCON 2410 2538 GJ16BS-2074
45 27.05.2022 DANAV BUILDCON 2441 2576 GJ06DH-0156
46 04.06.2022 DANAV BUILDCON 2845 2995 GJ16BS-2645
47 04.06.2022 DANAV BUILDCON 2846 2997 GJ6AF-9640
48 23.06.2022 DANAV BUILDCON 3639 4275 GJ6BS-1858
49 23.06.2022 DANAV BUILDCON 3658 4303 GJ06DH-0156
50 23.06.2022 DANAV BUILDCON 3667 3667 GJ16AF-9640
51 25.06.2022 DANAV BUILDCON 3781 4448 GJ16AF-9640
52 27.06.2022 DANAV BUILDCON 3898 4572 GJ06DH-0156
53 15.07.2022 DANAV BUILDCON 4416 5276 GJ06DH-0156
54 16.07.2022 DANAV BUILDCON 4432 5288 GJ06DH-0156
55 16.07.2022 DANAV BUILDCON 4440 5293 GJ06DH-0156
56 16.07.2022 DANAV BUILDCON 4444 5297 GJ16BS-2645
57 16.07.2022 DANAV BUILDCON 4449 5301 GJ16AF-9640
58 18.07.2022 DANAV BUILDCON 4472 5343 GJ16AF-9640
59 19.07.2022 DANAV BUILDCON 4527 5402 GJ16AF-9236
60 20.07.2022 DANAV BUILDCON 4549 5429 GJ16AF-9640
61 21.07.2022 DANAV BUILDCON 4595 5473 GJ16AF-9236
62 27.07.2022 DANAV BUILDCON 4813 5726 GJ16BS-2645
63 30.07.2022 DANAV BUILDCON 4981 5916 GJ16BS-2498
64 30.07.2022 DANAV BUILDCON 4982 5918 GJ16BS-2074
65 30.07.2022 DANAV BUILDCON 4986 5922 GJ16AF-9236
66 30.07.2022 DANAV BUILDCON 4987 5923 GJ16BS-3646
67 30.07.2022 DANAV BUILDCON 4989 5925 GJ16BS-2498
68 01.08.2022 DANAV BUILDCON 5039 6042 GJ16BS-2943
69 01.08.2022 DANAV BUILDCON 5037 GJ16BS-3646
70 01.08.2022 DANAV BUILDCON 5038 6040 GJ16BS-3827
71 07.08.2022 DANAV BUILDCON 5273 GJ16BS-3646
72 27.08.2022 DANAV BUILDCON 5875 GJ16AF-9640
73 06.09.2022 DANAV BUILDCON 6290 GJ03CL-9102
74 11.11.2022 DANAV BUILDCON 8726 GJ01JT-4763
75 11.11.2022 DANAV BUILDCON 8727 4036 GJ16BS-2457
76 15.11.2022 DANAV BUILDCON 8847 11207 GJ16BS-2105
77 15.11.2022 DANAV BUILDCON 8849 GJ16BS-1789
78 15.11.2022 DANAV BUILDCON 8830 GJ16BS-2645
79 15.11.2022 DANAV BUILDCON 8848 11206 GJ16BS-2930
80 15.12.2022 DANAV BUILDCON 9831 GJ16BS-3827
81 15.12.2022 DANAV BUILDCON 9834 GJ16BS-1789
82 15.12.2022 DANAV BUILDCON 9842 GJ16AF-9640
83 15.12.2022 DANAV BUILDCON 9844 12871 GJ16BS-2645
84 15.12.2022 DANAV BUILDCON 9855 12883 GJ16BS-2645
85 19.12.2022 DANAV BUILDCON 9954 13065 GJ16BS-1891
86 20.12.2022 DANAV BUILDCON 9981 13097 GJ16BS-2498
87 10.4.2023 DANEV BUILDCON 319 398 GJ 16 AF 9640
88 10.4.2023 DANEV BUILDCON 328 405 GJ 16 AF 9640
89 10.4.2023 DANEV BUILDCON 343 410 GJ 16 AF 9640
90 13.4.2023 DANEV BUILDCON 441 556 GJ 16 BS 2645
91 13.4.2023 DANEV BUILDCON 449 570 GJ 16 AF 9640
92 13.4.2023 DANEV BUILDCON 436 549 GJ 16 AF 9640
93 13.4.2023 DANEV BUILDCON 435 546 GJ 01 JT 4763
94 13.4.2023 DANEV BUILDCON 452 575 GJ 01 JT 4763
95 13.4.2023 DANEV BUILDCON 463 585 GJ 16 AF 9640
96 14.4.2023 DANEV BUILDCON 484 623 GJ 16 AF 9640
97 14.4.2023 DANEV BUILDCON 514 649 GJ 16 AF 9640
98 15.4.2023 DANEV BUILDCON 555 698 GJ 01 JT 4763
99 18.4.2023 DANEV BUILDCON 624 776 GJ 01 JT 4763
100 18.4.2023 DANEV BUILDCON 632 806 GJ 01 JT 4763
101 19.4.2023 DANEV BUILDCON 673 869 GJ 16 BS 2645
102 19.4.2023 DANEV BUILDCON 645 835 GJ 16 AF 9640
103 19.4.2023 DANEV BUILDCON 669 865 GJ 01 JT 4763
104 20.4.2023 DANEV BUILDCON 704 916 GJ 16 BS 2645
105 20.4.2023 DANEV BUILDCON 711 930 GJ 16 BS 2645
106 21.4.2023 DANEV BUILDCON 721 947 GJ 16 AF 9640
107 21.4.2023 DANEV BUILDCON 736 966 GJ 16 BS 2645
108 21.4.2023 DANEV BUILDCON 719 945 GJ 01 JT 4763
109 21.4.2023 DANEV BUILDCON 725 949 GJ 01 JT 4763
110 22.4.2023 DANEV BUILDCON 759 996 GJ 16 BS 2645
112 22.4.2023 DANEV BUILDCON 764 1007 GJ 16 BS 2645
113 24.4.2023 DANEV BUILDCON 815 1068 GJ 01 JT 4763
114 24.4.2023 DANEV BUILDCON 802 1050 GJ 16 BS 2645
115 25.04.2023 DANEV BUILDCON 829 1100 GJ16BS-2645
116 26.4.2023 DANEV BUILDCON 869 1160 GJ 16 AF 9640
117 26.4.2023 DANEV BUILDCON 866 1152 GJ 16 BS 2645
118 11.07.2023 DANEV BUILDCON 3489 4568 GJ16BS-2830
119 14.07.2023 DANEV BUILDCON 3566 4669 GJ05AU-5442
120 15.07.2023 DANEV BUILDCON 3637 4620 GJ16BS-2943
121 15.07.2023 DANEV BUILDCON 3638 4621 GJ6BS-1858
122 15.07.2023 DANEV BUILDCON 3639 4619 GJ16BS-2623
123 15.07.2023 DANEV BUILDCON 3644 4625 GJ16BS-3827
124 15.07.2023 DANEV BUILDCON 3647 4628 GJ16BS-2074
125 16.07.2023 DANEV BUILDCON 3655 4638 GJ16BS-2696
126 17.07.2023 DANEV BUILDCON 3661 4549 GJ16BS-1822
127 17.07.2023 DANEV BUILDCON 3663 4562 GJ16BS-1853
128 17.07.2023 DANEV BUILDCON 3678 4674 GJ16BS-1851
129 17.07.2023 DANEV BUILDCON 3683 4675 GJ16BS-1853
130 17.07.2023 DANEV BUILDCON 3688 4681 GJ16BS-1822
131 10.08.2023 DANEV BUILDCON 4400 5467 GJ05AU-5442
132 10.08.2023 DANEV BUILDCON 4419 5486 GJ16BS-0352
133 10.08.2023 DANEV BUILDCON 4401 5468 GJ01JT-4763
134 10.08.2023 DANEV BUILDCON 4421 5489 GJ01JT-4763
135 11.08.2023 DANEV BUILDCON 4446 5520 GJ16BS-0352
136 11.08.2023 DANEV BUILDCON 4447 5521 GJ01JT-4763
137 11.08.2023 DANEV BUILDCON 4458 5538 GJ05AU-5442
138 11.08.2023 DANEV BUILDCON 4464 5542 GJ01JT-4763
139 11.08.2023 DANEV BUILDCON 4466 5549 GJ16BS-0352
140 11.08.2023 DANEV BUILDCON 4476 5556 GJ05AU-5442
141 18.08.2023 DANEV BUILDCON 4686 5763 GJ05AU-5442
142 28.08.2023 DANEV BUILDCON 5087 6074 GJ01JT-4763
143 28.08.2023 DANEV BUILDCON 5082 6070 GJ05AU-5442
144 29.08.2023 DANEV BUILDCON 5159 7046 GJ16BS-0352
145 15.09.2023 DANEV BUILDCON 5916 7644 GJ01JT-4763
146 23.09.2023 DANEV BUILDCON 6174 7842 GJ01JT-4763
147 23.09.2023 DANEV BUILDCON 6177 7848 GJ16BS-0352
148 03.10.2023 DANEV BUILDCON 6539 8087 GJ16BS-6851
149 18.10.2023 DANEV BUILDCON 7368 8645 GJ16BS-0352
150 20.10.2023 DANEV BUILDCON 7490 8701 GJ16BS-0352
151 28.10.2023 DANEV BUILDCON 7918 8932 GJ16BS-0352
152 30.10.2023 DANEV BUILDCON 7973 8974 GJ16BS-0352
153 30.10.2023 DANEV BUILDCON 7990 8985 GJ16BS-0352
154 31.10.2023 DANEV BUILDCON 8057 9015 GJ16BS-0352
155 31.10.2023 DANEV BUILDCON 8074 9024 GJ16BS-0352
156 31.10.2023 DANEV BUILDCON 8086 9037 GJ16BS-0352
157 02.11.2023 DANEV BUILDCON 8174 9095 GJ16BS-0352
158 02.11.2023 DANEV BUILDCON 8200 9120 GJ16BS-0352
159 03.11.2023 DANEV BUILDCON 8250 9158 GJ16BS-0352
160 03.11.2023 DANEV BUILDCON 8265 9162 GJ16BS-0352
161 04.11.2023 DANEV BUILDCON 8298 9173 GJ16BS-0352
162 DANEV BUILDCON 8316 9193 GJ16BS-0352
163 08.11.2023 DANEV BUILDCON 8550 9300 GJ16BS-0352
164 10.11.2023 DANEV BUILDCON 8674 9369 GJ16BS-0352
165 10.11.2023 DANEV BUILDCON 8678 9371 GJ18BS-2498
166 17.11.2023 DANEV BUILDCON 8797 9431 GJ16BS-0352
167 17.11.2023 DANEV BUILDCON 8810 9443 GJ16BS-0352
168 18.11.2023 DANEV BUILDCON 8826 9456 GJ16BS-0352
169 25.11.2023 DANEV BUILDCON 9094 9612 GJ16BS-0352
170 25.11.2023 DANEV BUILDCON 9115 9630 GJ16BS-0352
171 26.11.2023 DANEV BUILDCON 9140 9643 GJ16BS-0352
172 06.12.2023 DANEV BUILDCON 9602 9733 GJ16BS-0352
173 23.02.2024 DANEV BUILDCON 12768 13163 GJ16BS-1851
174 23.02.2024 DANEV BUILDCON 12782 13192 GJ16BS-2498
175 23.02.2024 DANEV BUILDCON 12792 13208 GJ16BS-2830
176 24.02.2024 DANEV BUILDCON 12819 13239 GJ16BS-0352
177 26.02.2024 DANEV BUILDCON 12892 13295 GJ16BS-2074
178 27.02.2024 DANEV BUILDCON 12910 13301 GJ16BS-0352
179 27.02.2024 DANEV BUILDCON 12922 13318 GJ16BS-0352
180 27.02.2024 DANEV BUILDCON 12931 13320 GJ16BS-3646
181 27.02.2024 DANEV BUILDCON 12937 13323 GJ16BS-0352
182 27.02.2024 DANEV BUILDCON 12940 13324 GJ16BS-3827
183 27.02.2024 DANEV BUILDCON 12947 13330 GJ16BS-0352
184 27.02.2024 DANEV BUILDCON 12948 13332 GJ16BS-2696
185 02.03.2024 DANEV BUILDCON 13129 13450 GJ16BS-2696
186 02.03.2024 DANEV BUILDCON 13144 13466 GJ16BS-1851
187 07.03.2024 DANEV BUILDCON 13279 13511 GJ16BS-0352
188 06.03.2024 DANEV BUILDCON 13254 13472 GJ16BS-0352
189 14.03.2024 DANEV BUILDCON 13504 13564 GJ16BS-1851
190 27.03.2023 DANEV BUILDCON 14027 13966 GJ16BS-0352
191 29.03.2024 DANEV BUILDCON 14071 13940 GJ16BS-0352
192 29.03.2024 DANEV BUILDCON 14086 13951 GJ16BS-0352
193 04.03.2024 DANEV BUILDCON 13179 13490 GJ16BS-2623
194 04.03.2024 DANEV BUILDCON 13185 13507 GJ16BS-3826
195 04.03.2024 DANEV BUILDCON 13193 13515 GJ16BS-1851
196 30.03.2024 DANEV BUILDCON 14125 13981 GJ16BS-0352
197 01.04.2024 DANEV BUILDCON 17 17 GJ16BS-0352
198 03.04.2024 DANEV BUILDCON 70 57 GJ16BS-0352
199 04.04.2024 DANEV BUILDCON 110 84 GJ16BS-1891
200 05.04.2024 DANEV BUILDCON 126 100 GJ16BS-2498
201 05.04.2024 DANEV BUILDCON 130 104 GJ16BS-1851
202 15.04.2024 DANEV BUILDCON 360 228 GJ16BS-3827
204 16.04.2024 DANEV BUILDCON 396 252 GJ16BS-1851
205 16.04.2024 DANEV BUILDCON 381 237 GJ16BS-2623
206 17.04.2024 DANEV BUILDCON 427 267 GJ16BS-2074
207 18.04.2024 DANEV BUILDCON 461 280 DD03CL-9481
208 13.05.2024 DANEV BUILDCON 1116 669 GJ16BS-2943
209 17.05.2024 DANEV BUILDCON 1238 734 GJ16BS-2943
210 18.05.2024 DANEV BUILDCON 1251 745 GJ16BS-1851
211 18.05.2024 DANEV BUILDCON 1257 752 GJ16BS-1822
212 18.05.2024 DANEV BUILDCON 1269 756 GJ16BS-3646
MATERIAL UNIT RECD QTY REMARK
READY MIX CONCRETE M10 CUM 3 Bhumi Developers
READY MIX CONCRETE M10 CUM 6 Bhumi Developers
READY MIX CONCRETE M10 CUM 6 Bhumi Developers
READY MIX CONCRETE M10 CUM 3.5 Bhumi Developers
READY MIX CONCRETE M10 CUM 3 Bhumi Developers
READY MIX CONCRETE M10 CUM 3.5 Bhumi Developers
READY MIX CONCRETE M10 CUM 3 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 3.5 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 3 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 2.5 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 9 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 9 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 3 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 5 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 3 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 5 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 8 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 7 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 8 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 8 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 8 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 5 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 6 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 3.5 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 4 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 9 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 9 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 9 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 8 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 5 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 4 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 2 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 3 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 0.5 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 2.5 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 2.5 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 4 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 5 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 2 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 8 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 9 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 8 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 9 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 8 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 8 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 8 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 5 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 3 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 8 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 7 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 5 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 8 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 8 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 7 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 5 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 8 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 8 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 4 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 4 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 5 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 3 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 6.5 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 6 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 6 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 6 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 6 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 6 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 6 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 7 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 7 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 8 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 7 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 5 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 7 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 2 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 3 BD VEHICLE
READY MIX CONCRETE M10 CUM 8 BD VEHICLE
READY MIX CONCRETE M10 CUM 2.5 BD VEHICLE
READY MIX CONCRETE M10 CUM 3 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 2 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 3 BD VEHICLE
READY MIX CONCRETE M10 CUM 5 BD VEHICLE
READY MIX CONCRETE M10 CUM 7 BD VEHICLE
READY MIX CONCRETE M10 CUM 8 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 7 BD VEHICLE
READY MIX CONCRETE M10 CUM 7 BD VEHICLE
READY MIX CONCRETE M10 CUM 5 BD VEHICLE
READY MIX CONCRETE M10 CUM 7 BD VEHICLE
READY MIX CONCRETE M10 CUM 7 BD VEHICLE
READY MIX CONCRETE M10 CUM 7 BD VEHICLE
READY MIX CONCRETE M10 CUM 7 BD VEHICLE
READY MIX CONCRETE M10 CUM 8 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 8 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 4.5 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 8 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 8 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 4 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 8 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 8 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 4 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 4.5 BD VEHICLE
READY MIX CONCRETE M10 CUM 3 BD VEHICLE
READY MIX CONCRETE M10 CUM 4 BD VEHICLE
READY MIX CONCRETE M10 CUM 8 DANEV VEHICLE
READY MIX CONCRETE M10 CUM 8 DANEV VEHICLE
READY MIX CONCRETE M10 CUM 8 DANEV VEHICLE
READY MIX CONCRETE M10 CUM 2.5 BD VEHICLE
READY MIX CONCRETE M10 CUM 4.5 BD VEHICLE
READY MIX CONCRETE M10 CUM 2.5 BD VEHICLE
READY MIX CONCRETE M10 CUM 5 DANEV VEHICLE
READY MIX CONCRETE M10 CUM 6 DANEV VEHICLE
READY MIX CONCRETE M10 CUM 5 DANEV VEHICLE
READY MIX CONCRETE M10 CUM 8 DANEV VEHICLE
READY MIX CONCRETE M10 CUM 5 DANEV VEHICLE
READY MIX CONCRETE M10 CUM 4 DANEV VEHICLE
READY MIX CONCRETE M10 CUM 5 DANEV VEHICLE
READY MIX CONCRETE M10 CUM 2 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 DANEV VEHICLE
READY MIX CONCRETE M10 CUM 8 DANEV VEHICLE
READY MIX CONCRETE M10 CUM 7 DANEV VEHICLE
READY MIX CONCRETE M10 CUM 7 DANEV VEHICLE
READY MIX CONCRETE M10 CUM 8 DANEV VEHICLE
TOTAL= CUM 1223.50
BD BUILDCON LLP
GUJARAT FLUORO CHEMICALS LTD, DAHEJ-B
DY MIX CONCRETE M10 RECEIVED DETAILS
GATE ENTRY
SR NO DATE SUPPLIER CHALLAN NO VEHICLE NO.
NO
111 22.4.2023 DANEV BUILDCON 779 GJ 16 BS 2645
MATERIAL UNIT RECD QTY REMARK
READY MIX CONCRETE M10 CUM 6
TOTAL= CUM 6.00
BD BUILDCON LLP
GUJARAT FLUORO CHEMICALS LTD, DAHEJ-B
DY MIX CONCRETE M20 RECEIVED DETAILS
GATE ENTRY
SR NO DATE SUPPLIER CHALLAN NO VEHICLE NO.
NO
1 23.11.2021 DANAV BUILDCON 8375 9214 GJ16BS-2645
2 25.12.2021 DANAV BUILDCON 9602 11530 GJ03CL-9102
3 30.12.2021 DANAV BUILDCON 9845 11918 GJ03CL-9102
4 04.01.2022 DANAV BUILDCON 10084 12240 GJ03CL-9102
5 04.01.2022 DANAV BUILDCON 10062 12209 GJ03CL-9102
6 08.01.2022 DANAV BUILDCON 10315 12559 GJ16BS-2645
7 18.02.2022 DANAV BUILDCON 12348 14683 GJ16BS-2645
8 21.06.2022 DANAV BUILDCON 3536 GJ16BS-2074
9 23.06.2022 DANAV BUILDCON 3638 4273 GJ06DH-0156
10 23.06.2022 DANAV BUILDCON 3641 4279 GJ16BS-1851
11 27.06.2022 DANAV BUILDCON 3914 4609 GJ16BS-2498
12 27.06.2022 DANAV BUILDCON 3917 4612 GJ16AF-9640
13 27.06.2022 DANAV BUILDCON 3921 4617 GJ16BS-2074
14 18.07.2022 DANAV BUILDCON 4465 5326 GJ06DH-0156
15 19.09.2022 DANAV BUILDCON 6695 GJ03CL-9102
16 12.09.2023 DANAV BUILDCON 5718 7493 GJ01JT-4763
17 28.02.2024 DANAV BUILDCON 12968 13337 GJ16BS-0352
18 29.02.2024 DANAV BUILDCON 13030 13364 GJ16BS-2943
19 23.03.2024 DANAV BUILDCON 13973 13859 GJ16BS-0352
20 21.03.2024 DANAV BUILDCON 13882 13799 GJ16BS-0352
MATERIAL UNIT RECD QTY REMARK
READY MIX CONCRETE M20 CUM 4.5 BHUMI VEHICLE
READY MIX CONCRETE M20 CUM 3 BHUMI VEHICLE
READY MIX CONCRETE M20 CUM 2 BHUMI VEHICLE
READY MIX CONCRETE M20 CUM 3 BHUMI VEHICLE
READY MIX CONCRETE M20 CUM 3 BHUMI VEHICLE
READY MIX CONCRETE M20 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M20 CUM 1 BHUMI VEHICLE
READY MIX CONCRETE M20 CUM 9
READY MIX CONCRETE M20 CUM 6
READY MIX CONCRETE M20 CUM 8
READY MIX CONCRETE M20 CUM 9
READY MIX CONCRETE M20 CUM 6
READY MIX CONCRETE M20 CUM 9
READY MIX CONCRETE M20 CUM 4
READY MIX CONCRETE M20 CUM 2.5 BD VEHICLE
READY MIX CONCRETE M20 CUM 4 BD VEHICLE
READY MIX CONCRETE M20 CUM 6 BD VEHICLE
READY MIX CONCRETE M20 CUM 6 DANAV VEHICLE
READY MIX CONCRETE M20 CUM 1.75 BD VEHICLE
READY MIX CONCRETE M20 CUM 6 BD VEHICLE
TOTAL= CUM 99.75
BD BUILDCON LLP
GUJARAT FLUORO CHEMICALS LTD, DAHEJ-B
UB:- READY MIX CONCRETE M25 RECEIVED DETAILS
GATE ENTRY
SR NO DATE SUPPLIER CHALLAN NO VEHICLE NO. MATERIAL UNIT RECD QTY REMARK
NO
1 06.11.2020 DANEV BUILDCON 4313 1328 GJ16W-8529 READY MIX CONCRETE M25 CUM 6 BHUMI VEHICLE
2 06.11.2020 DANEV BUILDCON 4323 1329 GJ16BS-2498 READY MIX CONCRETE M25 CUM 9 DANAV VEHICLE
3 06.11.2020 DANEV BUILDCON 4324 1330 GJ16W-8529 READY MIX CONCRETE M25 CUM 6 BHUMI VEHICLE
4 10.11.2020 DANEV BUILDCON 4483 1374 GJ16W-8529 READY MIX CONCRETE M25 CUM 5 BHUMI VEHICLE
5 10.11.2020 DANEV BUILDCON 4482 1373 GJ16AF-9640 READY MIX CONCRETE M25 CUM 6 BHUMI VEHICLE
6 26.11.2020 DANEV BUILDCON 4868 1519 GJ16W-8529 READY MIX CONCRETE M25 CUM 6 BHUMI VEHICLE
7 08.12.2020 DANEV BUILDCON 5262 1618 GJ16W-8529 READY MIX CONCRETE M25 CUM 2.5 BHUMI VEHICLE
8 14.04.2021 DANEV BUILDCON 511 320 GJ16BS-2498 READY MIX CONCRETE M25 CUM 9 DANAV VEHICLE
9 15.04.2021 DANEV BUILDCON 546 336 GJ16BS-1858 READY MIX CONCRETE M25 CUM 8 DANAV VEHICLE
10 27.05.2022 DANEV BUILDCON 2452 2590 GJ16BS-2498 READY MIX CONCRETE M25 CUM 9 DANAV VEHICLE
11 27.05.2022 DANEV BUILDCON 2457 2593 GJ06DH-0156 READY MIX CONCRETE M25 CUM 6 BHUMI VEHICLE
12 13.07.2022 DANEV BUILDCON 4382 5230 GJ16BS-2074 READY MIX CONCRETE M25 CUM 9 DANAV VEHICLE
13 13.07.2022 DANEV BUILDCON 4383 5231 GJ16BS-2498 READY MIX CONCRETE M25 CUM 9 DANAV VEHICLE
14 18.07.2022 DANEV BUILDCON 4466 5329 GJ16AF-9640 READY MIX CONCRETE M25 CUM 6
15 18.07.2022 DANEV BUILDCON 4467 5331 GJ16BS-2645 READY MIX CONCRETE M25 CUM 6
16 18.07.2022 DANEV BUILDCON 4468 5334 GJ16AF-9236 READY MIX CONCRETE M25 CUM 6
17 18.07.2022 DANEV BUILDCON 4469 5335 GJ16BS-2105 READY MIX CONCRETE M25 CUM 8
18 18.07.2022 DANEV BUILDCON 4470 5336 GJ16BS-2498 READY MIX CONCRETE M25 CUM 8
19 18.07.2022 DANEV BUILDCON 4473 5344 GJ16AF-9236 READY MIX CONCRETE M25 CUM 6
20 18.07.2022 DANEV BUILDCON 4474 5345 GJ16BS-2645 READY MIX CONCRETE M25 CUM 6
21 18.07.2022 DANEV BUILDCON 4479 5348 GJ16AF-9236 READY MIX CONCRETE M25 CUM 6
22 18.07.2022 DANEV BUILDCON 4482 5353 GJ16BS-2645 READY MIX CONCRETE M25 CUM 6
23 18.07.2022 DANEV BUILDCON 4487 5361 GJ16AF-9236 READY MIX CONCRETE M25 CUM 6
24 18.07.2022 DANEV BUILDCON 4493 5365 GJ16AF-9640 READY MIX CONCRETE M25 CUM 6
25 18.07.2022 DANEV BUILDCON 4500 5367 GJ16AF-9236 READY MIX CONCRETE M25 CUM 2.5
26 07.08.2022 DANEV BUILDCON 5270 GJ16BS-2930 READY MIX CONCRETE M25 CUM 8
27 07.08.2022 DANEV BUILDCON 5272 GJ16BS-2074 READY MIX CONCRETE M25 CUM 8

TOTAL= CUM 179.00


BD BUILDCON LLP
GUJARAT FLUORO CHEMICALS LTD, DAHEJ-B
DY MIX CONCRETE M30 RECEIVED DETAILS
GATE ENTRY
SR NO DATE SUPPLIER CHALLAN NO
NO
1 14.02.2021 DANAV BUILDCON 8114 1840
2 14.02.2021 DANAV BUILDCON 8120 1842
3 03.03.2021 DANAV BUILDCON 8959 2173
4 03.03.2021 DANAV BUILDCON 8960 2175
5 03.03.2021 DANAV BUILDCON 8963 2178
6 03.03.2021 DANAV BUILDCON 8964 2179
7 03.03.2021 DANAV BUILDCON 8971 2182
8 04.03.2021 DANAV BUILDCON 8973 2185
9 04.03.2021 DANAV BUILDCON 8984 2194
10 04.03.2021 DANAV BUILDCON 8975
11 04.03.2021 DANAV BUILDCON 8977
12 04.03.2021 DANAV BUILDCON 8983
13 04.03.2021 DANAV BUILDCON 8986
14 06.03.2021 DANAV BUILDCON 9116 2293
15 10.03.2021 DANAV BUILDCON 9294 2400
16 10.03.2021 DANAV BUILDCON 9299 2403
17 10.03.2021 DANAV BUILDCON 9303 2409
18 11.03.2021 DANAV BUILDCON 9362 2433
19 11.03.2021 DANAV BUILDCON 9363 2436
20 11.03.2021 DANAV BUILDCON 9373 2443
21 11.03.2021 DANAV BUILDCON 9381 2445
22 11.03.2021 DANAV BUILDCON 9384 2446
23 11.03.2021 DANAV BUILDCON 9386 2447
24 12.03.2021 DANAV BUILDCON 9416 2464
25 12.03.2021 DANAV BUILDCON 9417 312
26 12.03.2021 DANAV BUILDCON 9427 2469
27 12.03.2021 DANAV BUILDCON 9429 2470
28 12.03.2021 DANAV BUILDCON 9433 2474
29 12.03.2021 DANAV BUILDCON 9437 2475
30 12.03.2021 DANAV BUILDCON 9445 2476
31 12.03.2021 DANAV BUILDCON 9449 2477
32 12.03.2021 DANAV BUILDCON 9451 2478
33 13.03.2021 DANAV BUILDCON 9490 2497
34 13.03.2021 DANAV BUILDCON 9491 2498
35 14.03.2021 DANAV BUILDCON 9508 2504
36 14.03.2021 DANAV BUILDCON 9509 2505
37 15.03.2021 DANAV BUILDCON 9550 2526
38 15.03.2021 DANAV BUILDCON 9551 2527
39 16.03.2021 DANAV BUILDCON 9564 2536
40 16.03.2021 DANAV BUILDCON 9593 2553
41 16.03.2021 DANAV BUILDCON 9603 2556
42 16.03.2021 DANAV BUILDCON 9604 2557
43 16.03.2021 DANAV BUILDCON 9608 2558
44 16.03.2021 DANAV BUILDCON 9609 2559
45 16.03.2021 DANAV BUILDCON 9611 2560
46 17.03.2021 DANAV BUILDCON 9620 2571
47 17.03.2021 DANAV BUILDCON 9637 2276
48 17.03.2021 DANAV BUILDCON 9638 2577
49 17.03.2021 DANAV BUILDCON 9639 2519
50 17.03.2021 DANAV BUILDCON 9649 2586
51 17.03.2021 DANAV BUILDCON 9651 2581
52 18.03.2021 DANAV BUILDCON 9689 2606
53 18.03.2021 DANAV BUILDCON 9706 2612
54 19.03.2021 DANAV BUILDCON 9731 2624
55 19.03.2021 DANAV BUILDCON 9754 2633
56 19.03.2021 DANAV BUILDCON 9755 2634
57 19.03.2021 DANAV BUILDCON 9765 2640
58 19.03.2021 DANAV BUILDCON 9771 2641
59 20.03.2021 DANAV BUILDCON 9807 2653
60 20.03.2021 DANAV BUILDCON 9817 2654
61 20.03.2021 DANAV BUILDCON 9819 2655
62 20.03.2021 DANAV BUILDCON 9823 2657
63 20.03.2021 DANAV BUILDCON 9828 2560
64 20.03.2021 DANAV BUILDCON 9834 2561
65 21.03.2021 DANAV BUILDCON 9851 2565
66 21.03.2021 DANAV BUILDCON 9854 2566
67 21.03.2021 DANAV BUILDCON 9867 2672
68 22.03.2021 DANAV BUILDCON 9873 280
69 22.03.2021 DANAV BUILDCON 9898 2689
70 22.03.2021 DANAV BUILDCON 9900 2690
71 22.03.2021 DANAV BUILDCON 9906 2691
72 22.03.2021 DANAV BUILDCON 9910 2692
73 22.03.2021 DANAV BUILDCON 9913 2693
74 22.03.2021 DANAV BUILDCON 9915 2694
75 22.03.2021 DANAV BUILDCON 9916 2695
76 22.03.2021 DANAV BUILDCON 9918 2696
77 23.03.2021 DANAV BUILDCON 9934 2705
78 23.03.2021 DANAV BUILDCON 9936 2706
79 23.03.2021 DANAV BUILDCON 9984 2712
80 23.03.2021 DANAV BUILDCON 9985
81 09.04.2021 DANAV BUILDCON 318 192
82 10.04.2021 DANAV BUILDCON 375 223
83 10.04.2021 DANAV BUILDCON 378 224
84 12.04.2021 DANAV BUILDCON 410 266
85 12.04.2021 DANAV BUILDCON 411 267
86 12.04.2021 DANAV BUILDCON 419 269
87 12.04.2021 DANAV BUILDCON 423 270
88 12.04.2021 DANAV BUILDCON 425 271
89 12.04.2021 DANAV BUILDCON 430 272
90 14.04.2021 DANAV BUILDCON 489 308
91 14.04.2021 DANAV BUILDCON 498 313
92 14.04.2021 DANAV BUILDCON 503 317
93 15.04.2021 DANAV BUILDCON 522 328
94 15.04.2021 DANAV BUILDCON 530 329
95 15.04.2021 DANAV BUILDCON 537
96 11.05.2021 DANAV BUILDCON 1326 1345
97 09.06.2021 DANAV BUILDCON 2075 1774
98 09.06.2021 DANAV BUILDCON 2080 1779
99 09.06.2021 DANAV BUILDCON 2085 1782
100 12.06.2021 DANAV BUILDCON 2234 1944
101 12.06.2021 DANAV BUILDCON 2254 1957
102 12.06.2021 DANAV BUILDCON 2256 1959
103 12.06.2021 DANAV BUILDCON 2262
104 12.06.2021 DANAV BUILDCON 2263 1968
105 12.06.2021 DANAV BUILDCON 2270 1977
106 12.06.2021 DANAV BUILDCON 2277 1989
107 14.06.2021 DANAV BUILDCON 2365 2051
108 14.06.2021 DANAV BUILDCON 2366 2052
109 14.06.2021 DANAV BUILDCON 2373 2062
110 22.06.2021 DANAV BUILDCON 2674 2454
111 22.06.2021 DANAV BUILDCON 2675 2459
112 22.06.2021 DANAV BUILDCON 2676 2458
113 22.06.2021 DANAV BUILDCON 2677 2460
114 22.06.2021 DANAV BUILDCON 2678 2461
115 22.06.2021 DANAV BUILDCON 2685 2463
116 22.06.2021 DANAV BUILDCON 2686 2465
117 29.06.2021 DANAV BUILDCON 2990 2829
118 29.06.2021 DANAV BUILDCON 2991 2830
119 29.06.2021 DANAV BUILDCON 2992 2831
120 29.06.2021 DANAV BUILDCON 2993 2832
121 01.07.2021 DANAV BUILDCON 3066 2930
122 03.07.2021 DANAV BUILDCON 3157 3002
123 03.07.2021 DANAV BUILDCON 3170 3012
124 04.07.2021 DANAV BUILDCON 3199 3029
125 05.07.2021 DANAV BUILDCON 3218 3063
126 05.07.2021 DANAV BUILDCON 3222 3065
127 08.07.2021 DANAV BUILDCON 3436 3256
128 08.07.2021 DANAV BUILDCON 3438 3252
129 08.07.2021 DANAV BUILDCON 3440 3254
130 08.07.2021 DANAV BUILDCON 3442 3255
131 08.07.2021 DANAV BUILDCON 3444 3259
132 09.07.2021 DANAV BUILDCON 3493 3298
133 09.07.2021 DANAV BUILDCON 3504 3316
134 15.07.2021 DANAV BUILDCON 3676 3578
135 15.07.2021 DANAV BUILDCON 3693 3600
136 17.07.2021 DANAV BUILDCON 3750 3724
137 21.07.2021 DANAV BUILDCON 3878 3939
138 21.07.2021 DANAV BUILDCON 3889 3951
139 21.07.2021 DANAV BUILDCON 3916 3982
140 29.07.2021 DANAV BUILDCON 4146 4378
141 29.07.2021 DANAV BUILDCON 4148 4379
142 29.07.2021 DANAV BUILDCON 4149 4382
143 29.07.2021 DANAV BUILDCON 4151 4383
144 29.07.2021 DANAV BUILDCON 4153 4385
145 29.07.2021 DANAV BUILDCON 4154 4386
146 29.07.2021 DANAV BUILDCON 4155 4387
147 30.07.2021 DANAV BUILDCON 4162 4400
148 30.07.2021 DANAV BUILDCON 4184 4431
149 30.07.2021 DANAV BUILDCON 4197 4439
150 31.07.2021 DANAV BUILDCON 4206 4456
151 31.07.2021 DANAV BUILDCON 4229 4485
152 31.07.2021 DANAV BUILDCON 4236 4494
153 31.07.2021 DANAV BUILDCON 4238 4496
154 09.08.2021 DANAV BUILDCON 4624 4935
155 09.08.2021 DANAV BUILDCON 4641 4947
156 10.08.2021 DANAV BUILDCON 4652 4955
157 10.08.2021 DANAV BUILDCON 4653 4955
158 19.09.2021 DANAV BUILDCON 5865 6483
159 26.09.2021 DANAV BUILDCON 6093 6710
160 26.09.2021 DANAV BUILDCON 6097 6713
161 27.09.2021 DANAV BUILDCON 6120 6738
162 27.09.2021 DANAV BUILDCON 6121 6739
163 27.09.2021 DANAV BUILDCON 6122 6742
164 27.09.2021 DANAV BUILDCON 6123 6741
165 27.09.2021 DANAV BUILDCON 6124 6743
166 27.09.2021 DANAV BUILDCON 6125 6748
167 27.09.2021 DANAV BUILDCON 6128 6750
168 27.09.2021 DANAV BUILDCON 6131 6753
169 27.09.2021 DANAV BUILDCON 6133 6757
170 28.09.2021 DANAV BUILDCON 6160 6789
171 28.09.2021 DANAV BUILDCON 6183 6818
172 11.10.2021 DANAV BUILDCON 6640 7379
173 15.10.2021 DANAV BUILDCON 6826 7532
174 15.10.2021 DANAV BUILDCON 6819 7527
175 15.10.2021 DANAV BUILDCON 6822 7531
176 15.10.2021 DANAV BUILDCON 6834 7535
177 15.10.2021 DANAV BUILDCON 6840 7538
178 15.10.2021 DANAV BUILDCON 6831 7533
179 20.10.2021 DANAV BUILDCON 7106 7757
180 20.10.2021 DANAV BUILDCON 7107 7758
181 21.10.2021 DANAV BUILDCON 7136 7775
182 21.10.2021 DANAV BUILDCON 7133 7772
183 24.10.2021 DANAV BUILDCON 7297 7908
184 25.10.2021 DANAV BUILDCON 7350 7981
185 25.10.2021 DANAV BUILDCON 7349 7980
186 26.10.2021 DANAV BUILDCON 7375 7996
187 02.11.2021 DANAV BUILDCON 7713 8331
188 02.11.2021 DANAV BUILDCON 7727 8336
189 02.11.2021 DANAV BUILDCON 7739 8340
190 02.11.2021 DANAV BUILDCON 7740 8342
191 08.11.2021 DANAV BUILDCON 7774 8469
192 08.11.2021 DANAV BUILDCON 7775 8472
193 08.11.2021 DANAV BUILDCON 7779 8480
194 08.11.2021 DANAV BUILDCON 7782 8482
195 08.11.2021 DANAV BUILDCON 7792 8485
196 09.11.2021 DANAV BUILDCON 7806 8494
197 09.11.2021 DANAV BUILDCON 7819 8514
198 10.11.2021 DANAV BUILDCON 7881 2579
199 10.11.2021 DANAV BUILDCON 7863 8558
200 10.11.2021 DANAV BUILDCON 7892 8585
201 10.11.2021 DANAV BUILDCON 7873 8569
202 10.11.2021 DANAV BUILDCON 7896 8588
203 10.11.2021 DANAV BUILDCON 7886 8582
204 10.11.2021 DANAV BUILDCON 7862 8557
205 11.11.2021 DANAV BUILDCON 7905 8599
206 11.11.2021 DANAV BUILDCON 7911 8607
207 15.11.2021 DANAV BUILDCON 8060 8804
208 15.11.2021 DANAV BUILDCON 8056 8801
209 15.11.2021 DANAV BUILDCON 8063 8808
210 16.11.2021 DANAV BUILDCON 8066 8821
211 16.11.2021 DANAV BUILDCON 8069 8822
212 16.11.2021 DANAV BUILDCON 8075 8831
213 16.11.2021 DANAV BUILDCON 8077 8834
214 16.11.2021 DANAV BUILDCON 8079 8837
215 19.11.2021 DANAV BUILDCON 8207 9023
216 19.11.2021 DANAV BUILDCON 8197 9010
217 19.11.2021 DANAV BUILDCON 8196 9011
218 22.11.2021 DANAV BUILDCON 8349 9178
219 22.11.2021 DANAV BUILDCON 8325 9154
220 22.11.2021 DANAV BUILDCON 8337 9167
221 22.11.2021 DANAV BUILDCON 8343 9176
222 23.11.2021 DANAV BUILDCON 8365 9191
223 24.11.2021 DANAV BUILDCON 8405 9257
224 24.11.2021 DANAV BUILDCON 8403 9256
225 24.11.2021 DANAV BUILDCON 8407 9262
226 24.11.2021 DANAV BUILDCON 8439 9303
227 24.11.2021 DANAV BUILDCON 8408 9260
228 24.11.2021 DANAV BUILDCON 8419 9281
229 24.11.2021 DANAV BUILDCON 8423 9287
230 24.11.2021 DANAV BUILDCON 8424 9288
231 24.11.2021 DANAV BUILDCON 8425 9295
232 24.11.2021 DANAV BUILDCON 8430 9299
233 24.11.2021 DANAV BUILDCON 8440 9305
234 28.11.2021 DANAV BUILDCON 8660
235 28.11.2021 DANAV BUILDCON 8661 9522
236 16.12.2021 DANAV BUILDCON 9215 10989
237 16.12.2021 DANAV BUILDCON 9212 10984
238 16.12.2021 DANAV BUILDCON 9213 10986
239 17.12.2021 DANAV BUILDCON 9224 11007
240 17.12.2021 DANAV BUILDCON 9236 11023
241 17.12.2021 DANAV BUILDCON 9226 11009
242 17.12.2021 DANAV BUILDCON 9235 11022
243 17.12.2021 DANAV BUILDCON 9249 11050
244 17.12.2021 DANAV BUILDCON 9251 11051
245 17.12.2021 DANAV BUILDCON 9254 11057
246 17.12.2021 DANAV BUILDCON 9259 11069
247 24.12.2021 DANAV BUILDCON 9576 11483
248 24.12.2021 DANAV BUILDCON 9575 11489
249 24.12.2021 DANAV BUILDCON 9580 11487
250 24.12.2021 DANAV BUILDCON 9582 11491
251 24.12.2021 DANAV BUILDCON 9583 11492
252 24.12.2021 DANAV BUILDCON 9586 11500
253 24.12.2021 DANAV BUILDCON 9587 11501
254 24.12.2021 DANAV BUILDCON 9588 11503
255 25.12.2021 DANAV BUILDCON 9600 11523
256 25.12.2021 DANAV BUILDCON 9621 11567
257 25.12.2021 DANAV BUILDCON 9622 11568
258 25.12.2021 DANAV BUILDCON 9632 11594
259 25.12.2021 DANAV BUILDCON 9641 11606
260 26.12.2021 DANAV BUILDCON 9675 11643
261 26.12.2021 DANAV BUILDCON 9670 11633
262 27.12.2021 DANAV BUILDCON 9685 11660
263 27.12.2021 DANAV BUILDCON 9686 11670
264 27.12.2021 DANAV BUILDCON 9688 11682
265 27.12.2021 DANAV BUILDCON 9702 11701
266 27.12.2021 DANAV BUILDCON 9704 11704
267 27.12.2021 DANAV BUILDCON 9706 11711
268 27.12.2021 DANAV BUILDCON 9708 11712
269 27.12.2021 DANAV BUILDCON 9709 11721
270 27.12.2021 DANAV BUILDCON 9712 11725
271 27.12.2021 DANAV BUILDCON 9713 11728
272 28.12.2021 DANAV BUILDCON 9749 11775
273 28.12.2021 DANAV BUILDCON 9735 11746
274 28.12.2021 DANAV BUILDCON 9755 11785
275 28.12.2021 DANAV BUILDCON 9763 11804
276 28.12.2021 DANAV BUILDCON 9736 11749
277 28.12.2021 DANAV BUILDCON 9765 11807
278 28.12.2021 DANAV BUILDCON 9772 11810
279 28.12.2021 DANAV BUILDCON 9759 11791
280 28.12.2021 DANAV BUILDCON 9747 11768
281 28.12.2021 DANAV BUILDCON 9754 11784
282 28.12.2021 DANAV BUILDCON 9757 11788
283 28.12.2021 DANAV BUILDCON 9762 11863
284 29.12.2021 DANAV BUILDCON 9796 11830
285 29.12.2021 DANAV BUILDCON 9815 11866
286 29.12.2021 DANAV BUILDCON 9805 11850
287 29.12.2021 DANAV BUILDCON 9824 11884
288 29.12.2021 DANAV BUILDCON 9827 11887
289 29.12.2021 DANAV BUILDCON 9819 11871
290 29.12.2021 DANAV BUILDCON 9833 11893
291 29.12.2021 DANAV BUILDCON 9820 11874
292 29.12.2021 DANAV BUILDCON 9801 11854
293 29.12.2021 DANAV BUILDCON 9802 11841
294 29.12.2021 DANAV BUILDCON 9836 11897
295 30.12.2021 DANAV BUILDCON 9879 11967
296 30.12.2021 DANAV BUILDCON 9886 11973
297 30.12.2021 DANAV BUILDCON 9867 11951
298 30.12.2021 DANAV BUILDCON 9877 11960
299 30.12.2021 DANAV BUILDCON 9853 11935
300 30.12.2021 DANAV BUILDCON 9841 11912
301 30.12.2021 DANAV BUILDCON 9842 11916
302 30.12.2021 DANAV BUILDCON 9858 11942
303 30.12.2021 DANAV BUILDCON 9869 11953
304 30.12.2021 DANAV BUILDCON 9873 11956
305 30.12.2021 DANAV BUILDCON 9891 11983
306 31.12.2021 DANAV BUILDCON 9949 12052
307 31.12.2021 DANAV BUILDCON 9906 12000
308 31.12.2021 DANAV BUILDCON 9948 12051
309 31.12.2021 DANAV BUILDCON 9910 12004
310 31.12.2021 DANAV BUILDCON 9917 12018
311 31.12.2021 DANAV BUILDCON 9944 12048
312 31.12.2021 DANAV BUILDCON 9908 12001
313 03.01.2022 DANAV BUILDCON 10028 12167
314 03.01.2022 DANAV BUILDCON 10036 12184
315 03.01.2022 DANAV BUILDCON 10045 12187
316 03.01.2022 DANAV BUILDCON 10047 12188
317 04.01.2022 DANAV BUILDCON 10114 12277
318 04.01.2022 DANAV BUILDCON 10117 12283
319 04.01.2022 DANAV BUILDCON 10104 12264
320 04.01.2022 DANAV BUILDCON 10097 12258
321 04.01.2022 DANAV BUILDCON 10071 12220
322 04.01.2022 DANAV BUILDCON 10108 12271
323 04.01.2022 DANAV BUILDCON 10069 12218
324 04.01.2022 DANAV BUILDCON 10065
325 04.01.2022 DANAV BUILDCON 10076 12229
326 04.01.2022 DANAV BUILDCON 10106 12267
327 04.01.2022 DANAV BUILDCON 10088 12247
328 05.01.2022 DANAV BUILDCON 10192 12361
329 05.01.2022 DANAV BUILDCON 10202 12369
330 05.01.2022 DANAV BUILDCON 10180 12349
331 05.01.2022 DANAV BUILDCON 10170 12336
332 05.01.2022 DANAV BUILDCON 10190 12359
333 05.01.2022 DANAV BUILDCON 10208 12371
334 05.01.2022 DANAV BUILDCON 10173 12339
335 05.01.2022 DANAV BUILDCON 10183 12352
336 05.01.2022 DANAV BUILDCON 10195 12365
337 05.01.2022 DANAV BUILDCON 10155 12321
338 05.01.2022 DANAV BUILDCON 10147 12308
339 05.01.2022 DANAV BUILDCON 10145 12301
340 05.01.2022 DANAV BUILDCON 10201 12368
341 05.01.2022 DANAV BUILDCON 10203 12370
342 05.01.2022 DANAV BUILDCON 10194 12364
343 06.01.2022 DANAV BUILDCON 10230 12417
344 06.01.2022 DANAV BUILDCON 10229 12416
345 07.01.2022 DANAV BUILDCON 10289 12507
346 07.01.2022 DANAV BUILDCON 10309 12535
347 07.01.2022 DANAV BUILDCON 10300 12524
348 07.01.2022 DANAV BUILDCON 10308 12534
349 07.01.2022 DANAV BUILDCON 10304 12528
350 07.01.2022 DANAV BUILDCON 10301 12523
351 07.01.2022 DANAV BUILDCON 10307 12531
352 08.01.2022 DANAV BUILDCON 10328 12587
353 08.01.2022 DANAV BUILDCON 10313 12557
354 08.01.2022 DANAV BUILDCON 10334 12600
355 08.01.2022 DANAV BUILDCON 10322 12576
356 08.01.2022 DANAV BUILDCON 10335 12606
357 08.01.2022 DANAV BUILDCON 10337 12611
358 09.01.2022 DANAV BUILDCON 10345 12649
359 09.01.2022 DANAV BUILDCON 10348 12652
360 10.01.2022 DANAV BUILDCON 10389 12725
361 10.01.2022 DANAV BUILDCON 10370 12703
362 10.01.2022 DANAV BUILDCON 10372 12711
363 10.01.2022 DANAV BUILDCON 10381 12721
364 10.01.2022 DANAV BUILDCON 10391 12729
365 10.01.2022 DANAV BUILDCON 10373 12715
366 10.01.2022 DANAV BUILDCON 10365 12697
367 10.01.2022 DANAV BUILDCON 10355 12683
368 12.01.2022 DANAV BUILDCON 10604 12822
369 12.01.2022 DANAV BUILDCON 10603 12818
370 12.01.2022 DANAV BUILDCON 10596 12798
371 12.01.2022 DANAV BUILDCON 10599 12805
372 12.01.2022 DANAV BUILDCON 10621 12839
373 12.01.2022 DANAV BUILDCON 10623 12842
374 13.01.2022 DANAV BUILDCON 10660 12879
375 13.01.2022 DANAV BUILDCON 10652 12868
376 17.01.2022 DANAV BUILDCON 10801
377 19.01.2022 DANAV BUILDCON 10946 13161
378 19.01.2022 DANAV BUILDCON 10921 13127
379 19.01.2022 DANAV BUILDCON 10940 13150
380 19.01.2022 DANAV BUILDCON 10931 13141
381 19.01.2022 DANAV BUILDCON 10920 13124
382 19.01.2022 DANAV BUILDCON 10938 13149
383 19.01.2022 DANAV BUILDCON 10930 13138
384 20.01.2022 DANAV BUILDCON 10989 13188
385 20.01.2022 DANAV BUILDCON 10977 13172
386 22.01.2022 DANAV BUILDCON 11129 13348
387 23.01.2022 DANAV BUILDCON 11151 13360
388 25.01.2022 DANAV BUILDCON 11252 13506
389 25.01.2022 DANAV BUILDCON 11250 13503
390 31.01.2022 DANAV BUILDCON 11473 13760
391 01.02.2022 DANAV BUILDCON 11526 13826
392 01.02.2022 DANAV BUILDCON 11527 13828
393 01.02.2022 DANAV BUILDCON 11531 13835
394 01.02.2022 DANAV BUILDCON 11535 13837
395 05.02.2022 DANAV BUILDCON 11773 14090
396 08.02.2022 DANAV BUILDCON 11853 14175
397 08.02.2022 DANAV BUILDCON 11855 14178
398 08.02.2022 DANAV BUILDCON 11856 14180
399 08.02.2022 DANAV BUILDCON 11857 14184
400 08.02.2022 DANAV BUILDCON 11859 14187
401 08.02.2022 DANAV BUILDCON 11861 14190
402 08.02.2022 DANAV BUILDCON 11862 14192
403 08.02.2022 DANAV BUILDCON 11863 14194
404 08.02.2022 DANAV BUILDCON 11866 14200
405 08.02.2022 DANAV BUILDCON 11880 14222
406 08.02.2022 DANAV BUILDCON 11883 14229
407 08.02.2022 DANAV BUILDCON 11885 14230
408 09.02.2022 DANAV BUILDCON 11926 14273
409 09.02.2022 DANAV BUILDCON 11927 14274
410 09.02.2022 DANAV BUILDCON 11928 14275
411 09.02.2022 DANAV BUILDCON 11929 14276
412 09.02.2022 DANAV BUILDCON 11931 14277
413 18.02.2022 DANAV BUILDCON 12347 14681
414 18.02.2022 DANAV BUILDCON 12349 14684
415 05.03.2022 DANAV BUILDCON 13058 15446
416 19.04.2022 DANAV BUILDCON 652 650
417 19.04.2022 DANAV BUILDCON 654 652
418 19.04.2022 DANAV BUILDCON 657 653
419 19.04.2022 DANAV BUILDCON 658 654
420 19.04.2022 DANAV BUILDCON 661 655
421 20.04.2022 DANAV BUILDCON 688 692
422 20.04.2022 DANAV BUILDCON 697 703
423 20.04.2022 DANAV BUILDCON 707 708
424 20.04.2022 DANAV BUILDCON 687 697
425 20.04.2022 DANAV BUILDCON 702 707
426 20.04.2022 DANAV BUILDCON 677 683
427 20.04.2022 DANAV BUILDCON 690 696
428 20.04.2022 DANAV BUILDCON 678 684
429 20.04.2022 DANAV BUILDCON 674 667
430 20.04.2022 DANAV BUILDCON 689 693
431 20.04.2022 DANAV BUILDCON 701 706
432 20.04.2022 DANAV BUILDCON 710 712
433 20.04.2022 DANAV BUILDCON 709 711
434 20.04.2022 DANAV BUILDCON 708 710
435 20.04.2022 DANAV BUILDCON 706 709
436 27.04.2022 DANAV BUILDCON 946 973
437 27.04.2022 DANAV BUILDCON 956 1001
438 27.04.2022 DANAV BUILDCON 965 1014
439 27.04.2022 DANAV BUILDCON 971 1034
440 28.04.2022 DANAV BUILDCON 1021 1098
441 28.04.2022 DANAV BUILDCON 1020 1097
442 04.05.2022 DANAV BUILDCON 1474 1374
443 04.05.2022 DANAV BUILDCON 1475 1375
444 04.05.2022 DANAV BUILDCON 1476 1376
445 05.05.2022 DANAV BUILDCON 1484 1391
446 05.05.2022 DANAV BUILDCON 1485 1404
447 05.05.2022 DANAV BUILDCON 1489 1411
448 05.05.2022 DANAV BUILDCON 1494 1425
449 06.05.2022 DANAV BUILDCON 1515 1450
450 06.05.2022 DANAV BUILDCON 1523 1458
451 06.05.2022 DANAV BUILDCON 1531 1461
452 06.05.2022 DANAV BUILDCON 1536 1462
453 07.05.2022 DANAV BUILDCON 1569 1498
454 07.05.2022 DANAV BUILDCON 1579 1518
455 07.05.2022 DANAV BUILDCON 1581 1521
456 07.05.2022 DANAV BUILDCON 1582 1522
457 07.05.2022 DANAV BUILDCON 1585 1524
458 08.05.2022 DANAV BUILDCON 1591 1534
459 09.05.2022 DANAV BUILDCON 1593 1576
460 09.05.2022 DANAV BUILDCON 1606 1619
461 09.05.2022 DANAV BUILDCON 1613 1627
462 17.05.2022 DANAV BUILDCON 1897 2070
463 21.05.2022 DANAV BUILDCON 2180 2310
464 21.05.2022 DANAV BUILDCON 2181 2311
465 21.05.2022 DANAV BUILDCON 2183 2312
466 25.05.2022 DANAV BUILDCON 2349 2673
467 26.05.2022 DANAV BUILDCON 2373 2484
468 26.05.2022 DANAV BUILDCON 2374 2486
469 26.05.2022 DANAV BUILDCON 2379 2488
470 26.05.2022 DANAV BUILDCON 2380 2489
471 26.05.2022 DANAV BUILDCON 2381 2492
472 26.05.2022 DANAV BUILDCON 2382 2502
473 26.05.2022 DANAV BUILDCON 2385 2503
474 26.05.2022 DANAV BUILDCON 2386 2508
475 26.05.2022 DANAV BUILDCON 2388 2509
476 26.05.2022 DANAV BUILDCON 2390 2510
477 26.05.2022 DANAV BUILDCON 2392 2512
478 26.05.2022 DANAV BUILDCON 2393 2514
479 26.05.2022 DANAV BUILDCON 2399 2525
480 26.05.2022 DANAV BUILDCON 2403 2528
481 26.05.2022 DANAV BUILDCON 2405 2530
482 26.05.2022 DANAV BUILDCON 2407 2534
483 26.05.2022 DANAV BUILDCON 2408
484 26.05.2022 DANAV BUILDCON 2409 2537
485 26.05.2022 DANAV BUILDCON 2413 2539
486 26.05.2022 DANAV BUILDCON 2414 2541
487 26.05.2022 DANAV BUILDCON 2416 2543
488 26.05.2022 DANAV BUILDCON 2417 2544
489 27.05.2022 DANAV BUILDCON 2426 2554
490 27.05.2022 DANAV BUILDCON 2427 2558
491 27.05.2022 DANAV BUILDCON 2438 2574
492 27.05.2022 DANAV BUILDCON 2440
493 27.05.2022 DANAV BUILDCON 2449 2585
494 27.05.2022 DANAV BUILDCON 2459 2595
501 29.05.2022 DANAV BUILDCON 2516 2663
502 29.05.2022 DANAV BUILDCON 2517 2666
503 04.06.2022 DANAV BUILDCON 2847 2999
504 04.06.2022 DANAV BUILDCON 2855 3008
505 05.06.2022 DANAV BUILDCON 2878 3043
506 07.06.2022 DANAV BUILDCON 2943 3180
507 07.06.2022 DANAV BUILDCON 2944 3183
508 07.06.2022 DANAV BUILDCON 2945 3186
509 21.06.2022 DANAV BUILDCON 3531 4154
510 21.06.2022 DANAV BUILDCON 3532 4156
511 21.06.2022 DANAV BUILDCON 3538 4162
512 21.06.2022 DANAV BUILDCON 3542 4165
513 21.06.2022 DANAV BUILDCON 3545 4168
514 21.06.2022 DANAV BUILDCON 3548 4172
515 21.06.2022 DANAV BUILDCON 3549 4173
516 21.06.2022 DANAV BUILDCON 3554 2943
517 21.06.2022 DANAV BUILDCON 3555 4175
518 22.06.2022 DANAV BUILDCON 3569 4186
519 22.06.2022 DANAV BUILDCON 3574 4192
520 22.06.2022 DANAV BUILDCON 3580 4220
521 22.06.2022 DANAV BUILDCON 3581 4223
522 22.06.2022 DANAV BUILDCON 3593 4228
523 22.06.2022 DANAV BUILDCON 3594 4230
524 22.06.2022 DANAV BUILDCON 3597 4234
525 22.06.2022 DANAV BUILDCON 3600 30175
526 22.06.2022 DANAV BUILDCON 3602 4239
527 22.06.2022 DANAV BUILDCON 3608 4245
528 22.06.2022 DANAV BUILDCON 3613 4247
529 22.06.2022 DANAV BUILDCON 3615 4250
530 22.06.2022 DANAV BUILDCON 3618 4251
531 22.06.2022 DANAV BUILDCON 3610 4246
535 24.06.2022 DANAV BUILDCON 3698 4339
536 24.06.2022 DANAV BUILDCON 3701 4345
537 24.06.2022 DANAV BUILDCON 3707 4356
538 24.06.2022 DANAV BUILDCON 3708 4358
539 24.06.2022 DANAV BUILDCON 3709 4363
540 24.06.2022 DANAV BUILDCON 3719 4373
541 24.06.2022 DANAV BUILDCON 3720 4375
542 24.06.2022 DANAV BUILDCON 3721 4376
543 24.06.2022 DANAV BUILDCON 3722 4377
544 24.06.2022 DANAV BUILDCON 3727 4387
545 24.06.2022 DANAV BUILDCON 3729 4388
546 24.06.2022 DANAV BUILDCON 3732 4395
547 24.06.2022 DANAV BUILDCON 3756 4419
548 24.06.2022 DANAV BUILDCON 3755 4418
549 24.06.2022 DANAV BUILDCON 3749 4413
550 24.06.2022 DANAV BUILDCON 3740 4406
551 24.06.2022 DANAV BUILDCON 3759 4420
552 24.06.2022 DANAV BUILDCON 3730 4393
553 24.06.2022 DANAV BUILDCON 3738 4401
554 24.06.2022 DANAV BUILDCON 3739 4404
555 24.06.2022 DANAV BUILDCON 3747 4411
556 24.06.2022 DANAV BUILDCON 3746 4410
557 24.06.2022 DANAV BUILDCON 3744 4409
558 24.06.2022 DANAV BUILDCON 3737 4400
559 24.06.2022 DANAV BUILDCON 3702 4347
560 25.06.2022 DANAV BUILDCON 3772 4435
561 25.06.2022 DANAV BUILDCON 3774 4439
562 25.06.2022 DANAV BUILDCON 3798 4482
563 25.06.2022 DANAV BUILDCON 3799 4484
564 25.06.2022 DANAV BUILDCON 3802 4488
565 25.06.2022 DANAV BUILDCON 3811 4493
566 25.06.2022 DANAV BUILDCON 3813 4496
567 27.06.2022 DANAV BUILDCON 3896 4567
568 29.06.2022 DANAV BUILDCON 3973 4738
569 29.06.2022 DANAV BUILDCON 3967 4729
570 29.06.2022 DANAV BUILDCON 3985 4760
571 29.06.2022 DANAV BUILDCON 3974 4739
572 29.06.2022 DANAV BUILDCON 3970 4733
573 29.06.2022 DANAV BUILDCON 3975 4741
574 29.06.2022 DANAV BUILDCON 3968 4731
575 01.07.2022 DANAV BUILDCON 4072 4858
576 01.07.2022 DANAV BUILDCON 4084 4873
577 01.07.2022 DANAV BUILDCON 4091 4877
578 02.07.2022 DANAV BUILDCON 4103
579 05.07.2022 DANAV BUILDCON 4246
580 05.07.2022 DANAV BUILDCON 4247
581 05.07.2022 DANAV BUILDCON 4256
582 05.07.2022 DANAV BUILDCON 4257
583 05.07.2022 DANAV BUILDCON 4259
584 15.07.2022 DANAV BUILDCON 4404 5268
585 15.07.2022 DANAV BUILDCON 4405 5269
586 15.07.2022 DANAV BUILDCON 4409 5273
587 15.07.2022 DANAV BUILDCON 4410 5272
588 15.07.2022 DANAV BUILDCON 4420 5278
589 15.07.2022 DANAV BUILDCON 4421 5279
590 16.07.2022 DANAV BUILDCON 4450 5302
591 16.07.2022 DANAV BUILDCON 4452 5303
592 16.07.2022 DANAV BUILDCON 4453 5305
593 18.07.2022 DANAV BUILDCON 4492 5364
594 19.07.2022 DANAV BUILDCON 4509 5377
595 19.07.2022 DANAV BUILDCON 4510 5378
596 19.07.2022 DANAV BUILDCON 4513 5385
597 19.07.2022 DANAV BUILDCON 4515 5386
598 19.07.2022 DANAV BUILDCON 4518 5390
599 19.07.2022 DANAV BUILDCON 4528 5403
600 19.07.2022 DANAV BUILDCON 4530 5405
601 19.07.2022 DANAV BUILDCON 4532 4532
602 19.07.2022 DANAV BUILDCON 4533 5412
603 19.07.2022 DANAV BUILDCON 4534 5413
604 19.07.2022 DANAV BUILDCON 4521 5391
605 19.07.2022 DANAV BUILDCON 4529
606 19.07.2022 DANAV BUILDCON 4531 5408
607 20.07.2022 DANAV BUILDCON 4548 5426
608 20.07.2022 DANAV BUILDCON 4554 5432
609 20.07.2022 DANAV BUILDCON 4558 5442
610 20.07.2022 DANAV BUILDCON 4559 5444
611 20.07.2022 DANAV BUILDCON 4563 5447
612 21.07.2022 DANAV BUILDCON 4596 5475
613 21.07.2022 DANAV BUILDCON 4592
614 23.07.2022 DANAV BUILDCON 4673 5563
615 23.07.2022 DANAV BUILDCON 4675 5565
616 26.07.2022 DANAV BUILDCON 4768
617 26.07.2022 DANAV BUILDCON 4771
618 27.07.2022 DANAV BUILDCON 4809 5721
619 27.07.2022 DANAV BUILDCON 4810 5722
620 27.07.2022 DANAV BUILDCON 4816 5729
621 30.07.2022 DANAV BUILDCON 4958 5885
622 30.07.2022 DANAV BUILDCON 4978 5910
623 30.07.2022 DANAV BUILDCON 4979 5911
624 30.07.2022 DANAV BUILDCON 4980 5913
625 30.07.2022 DANAV BUILDCON 4983 5919
626 30.07.2022 DANAV BUILDCON 4984 5920
627 30.07.2022 DANAV BUILDCON 4991 5926
628 30.07.2022 DANAV BUILDCON 4960 5888
629 30.07.2022 DANAV BUILDCON 4957 5884
630 30.07.2022 DANAV BUILDCON 4977 5909
631 30.07.2022 DANAV BUILDCON 4985 5921
632 30.07.2022 DANAV BUILDCON 4992 5927
633 30.07.2022 DANAV BUILDCON 4993 5928
634 30.07.2022 DANAV BUILDCON 4994 5929
635 30.07.2022 DANAV BUILDCON 4974
636 30.07.2022 DANAV BUILDCON 4968 5899
637 30.07.2022 DANAV BUILDCON 4969 5900
638 30.07.2022 DANAV BUILDCON 4972 5903
639 30.07.2022 DANAV BUILDCON 4967 5896
640 31.07.2022 DANAV BUILDCON 4996 5930
641 02.08.2022 DANAV BUILDCON 5076 6114
642 02.08.2022 DANAV BUILDCON 5077 6113
643 02.08.2022 DANAV BUILDCON 5078 6115
644 02.08.2022 DANAV BUILDCON 5079 6116
645 02.08.2022 DANAV BUILDCON 5080 6117
646 24.08.2022 DANAV BUILDCON 5717
647 24.08.2022 DANAV BUILDCON 5718
648 27.08.2022 DANAV BUILDCON 5850
649 27.08.2022 DANAV BUILDCON 5861
650 27.08.2022 DANAV BUILDCON 5862
651 27.08.2022 DANAV BUILDCON 5866
652 27.08.2022 DANAV BUILDCON 5869
653 27.08.2022 DANAV BUILDCON 5878
654 28.08.2022 DANAV BUILDCON 5889
655 31.08.2022 DANAV BUILDCON 5990 7474
656 31.08.2022 DANAV BUILDCON 5993 7479
657 31.08.2022 DANAV BUILDCON
658 31.08.2022 DANAV BUILDCON 6011 7510
659 31.08.2022 DANAV BUILDCON 6013 7518
660 31.08.2022 DANAV BUILDCON 6016 7515
661 06.09.2022 DANAV BUILDCON 6291
662 06.09.2022 DANAV BUILDCON 6292
663 06.09.2022 DANAV BUILDCON 6293
664 07.09.2022 DANAV BUILDCON 6309
665 07.09.2022 DANAV BUILDCON 6312
666 19.09.2022 DANAV BUILDCON 6696
667 19.09.2022 DANAV BUILDCON 6697
668 23.09.2022 DANAV BUILDCON 6882
669 17.10.2022 DANAV BUILDCON 7978 10009
670 17.10.2022 DANAV BUILDCON 7979 10010
671 17.10.2022 DANAV BUILDCON 7980 10011
672 17.10.2022 DANAV BUILDCON 7981 10012
673 18.10.2022 DANAV BUILDCON 7985 10036
674 18.10.2022 DANAV BUILDCON 7988 10048
675 22.10.2022 DANAV BUILDCON 8175 10371
676 22.10.2022 DANAV BUILDCON 8177 10372
677 22.10.2022 DANAV BUILDCON 8186 10383
678 22.10.2022 DANAV BUILDCON 8187 10384
679 22.10.2022 DANAV BUILDCON 8188 10386
680 22.10.2022 DANAV BUILDCON 8189 10388
681 22.10.2022 DANAV BUILDCON 8190 10389
682 23.10.2022 DANAV BUILDCON 8207 10399
683 23.10.2022 DANAV BUILDCON 8208 10400
684 23.10.2022 DANAV BUILDCON 8204 10392
685 23.10.2022 DANAV BUILDCON 8025 10397
686 29.10.2022 DANAV BUILDCON 8285 10513
687 29.10.2022 DANAV BUILDCON 8288
688 29.10.2022 DANAV BUILDCON 8296 10524
689 29.10.2022 DANAV BUILDCON 8301 10529
690 29.10.2022 DANAV BUILDCON 8302 10530
691 29.10.2022 DANAV BUILDCON 8305 10531
692 10.11.2022 DANAV BUILDCON 8685 10158
693 10.11.2022 DANAV BUILDCON 8686 10161
694 10.11.2022 DANAV BUILDCON 8687
695 11.11.2022 DANAV BUILDCON 8720 11023
696 11.11.2022 DANAV BUILDCON 8722 11024
698 15.11.2022 DANAV BUILDCON 8825 11176
699 15.11.2022 DANAV BUILDCON 8826 11184
700 15.11.2022 DANAV BUILDCON 8828 11185
701 15.11.2022 DANAV BUILDCON 8837 11193
702 15.11.2022 DANAV BUILDCON 8851 11209
703 15.11.2022 DANAV BUILDCON 8841 11198
704 15.11.2022 DANAV BUILDCON 8845 11199
705 15.11.2022 DANAV BUILDCON 8854
706 26.11.2022 DANAV BUILDCON 9187
707 11.12.2022 DANAV BUILDCON 9709 12561
708 14.12.2022 DANAV BUILDCON 9769 12754
709 14.12.2022 DANAV BUILDCON 9770 12753
710 14.12.2022 DANAV BUILDCON 9772 12761
711 14.12.2022 DANAV BUILDCON 9774 12765
712 14.12.2022 DANAV BUILDCON 9778 12767
713 14.12.2022 DANAV BUILDCON 9792 12788
714 14.12.2022 DANAV BUILDCON 9794 12793
715 14.12.2022 DANAV BUILDCON 9796 12794
716 14.12.2022 DANAV BUILDCON 9797 12796
717 14.12.2022 DANAV BUILDCON 9799 12798
718 14.12.2022 DANAV BUILDCON 9809 12812
719 14.12.2022 DANAV BUILDCON 9768 12752
720 14.12.2022 DANAV BUILDCON 9775 12766
721 14.12.2022 DANAV BUILDCON 9780 12772
722 14.12.2022 DANAV BUILDCON 9784 12778
723 14.12.2022 DANAV BUILDCON 9793 12789
724 14.12.2022 DANAV BUILDCON 9795 12792
725 14.12.2022 DANAV BUILDCON 9798 12797
726 14.12.2022 DANAV BUILDCON 9801 12803
727 14.12.2022 DANAV BUILDCON 9803 12805
728 14.12.2022 DANAV BUILDCON 9806 12808
729 14.12.2022 DANAV BUILDCON 9800 12801
730 14.12.2022 DANAV BUILDCON 9802 12804
731 14.12.2022 DANAV BUILDCON 9804 12806
732 14.12.2022 DANAV BUILDCON 9805 12807
733 14.12.2022 DANAV BUILDCON 9807 12809
734 15.12.2022 DANAV BUILDCON 9819 12838
735 15.12.2022 DANAV BUILDCON 9820 12840
736 15.12.2022 DANAV BUILDCON 9821 12842
737 15.12.2022 DANAV BUILDCON 9839 12866
738 15.12.2022 DANAV BUILDCON 9849
739 15.12.2022 DANAV BUILDCON 9851 12877
740 15.12.2022 DANAV BUILDCON 9856 12884
741 15.12.2022 DANAV BUILDCON
742 19.12.2022 DANAV BUILDCON 9947
743 19.12.2022 DANAV BUILDCON 9950 13059
744 19.12.2022 DANAV BUILDCON 9951
745 19.12.2022 DANAV BUILDCON 9964 13070
746 19.12.2022 DANAV BUILDCON 9965 13072
747 21.12.2022 DANAV BUILDCON 10038 13155
748 21.12.2022 DANAV BUILDCON 10028 13145
749 21.12.2022 DANAV BUILDCON 10030 13149
750 21.12.2022 DANAV BUILDCON 10040 13159
751 21.12.2022 DANAV BUILDCON 10027 13143
752 21.12.2022 DANAV BUILDCON 10065 13191
753 18.01.2023 DANAV BUILDCON 10916 14436
754 6.4.2023 DANEV BUILDCON DC/00179 225
755 6.4.2023 DANEV BUILDCON DC/00180 224
756 6.4.2023 DANEV BUILDCON DC/00182 227
757 6.4.2023 DANEV BUILDCON DC/00183 228
758 6.4.2023 DANEV BUILDCON DC/00189 242
759 7.4.2023 DANEV BUILDCON DC/00244 306
760 8.4.2023 DANEV BUILDCON DC/00276 345
761 8.4.2023 DANEV BUILDCON DC/00275 344
762 8.4.2023 DANEV BUILDCON DC/00290 355
763 8.4.2023 DANEV BUILDCON DC/00291 356
764 8.4.2023 DANEV BUILDCON DC/00287 351
765 10.4.2023 DANEV BUILDCON DC/00303 377
766 10.4.2023 DANEV BUILDCON DC/00330 406
767 11.4.2023 DANEV BUILDCON DC/00352 429
768 11.4.2023 DANEV BUILDCON DC/00361 445
769 11.4.2023 DANEV BUILDCON DC/00364 449
770 11.4.2023 DANEV BUILDCON DC/00365 450
771 11.4.2023 DANEV BUILDCON DC/00368 454
772 11.4.2023 DANEV BUILDCON DC/00369 456
773 11.4.2023 DANEV BUILDCON DC/00376 461
774 11.4.2023 DANEV BUILDCON DC/00350 426
775 11.4.2023 DANEV BUILDCON DC/00373 459
776 12.4.2023 DANEV BUILDCON DC/00419 522
777 12.4.2023 DANEV BUILDCON DC/00408 515
778 12.4.2023 DANEV BUILDCON DC/00423 525
779 12.4.2023 DANEV BUILDCON DC/00421 530
780 12.4.2023 DANEV BUILDCON DC/00412 517
781 12.4.2023 DANEV BUILDCON DC/00406 514
782 12.4.2023 DANEV BUILDCON DC/00430 531
783 12.4.2023 DANEV BUILDCON DC/00385 490
784 12.4.2023 DANEV BUILDCON DC/00405 513
785 12.4.2023 DANEV BUILDCON DC/00384 489
786 13.4.2023 DANEV BUILDCON DC/00453 574
787 14.4.2023 DANEV BUILDCON DC/00499 639
788 14.4.2023 DANEV BUILDCON DC/00507 645
789 14.4.2023 DANEV BUILDCON DC/00506 644
790 14.4.2023 DANEV BUILDCON DC/00478 611
791 14.4.2023 DANEV BUILDCON DC/00483 621
792 14.4.2023 DANEV BUILDCON DC/00497 637
793 14.4.2023 DANEV BUILDCON DC/00505 642
794 14.4.2023 DANEV BUILDCON DC/00515 651
795 14.4.2023 DANEV BUILDCON DC/00519 653
796 15.4.2023 DANEV BUILDCON DC/00529 668
797 18.4.2023 DANEV BUILDCON DC/00631 799
798 19.4.2023 DANEV BUILDCON D/C00668 864
799 19.4.2023 DANEV BUILDCON DC/00659 853
800 19.4.2023 DANEV BUILDCON DC/660 854
801 19.4.2023 DANEV BUILDCON DC/00644 836
802 19.4.2023 DANEV BUILDCON DC/00672 868
803 19.4.2023 DANEV BUILDCON DC/00661 855
804 20.4.2023 DANEV BUILDCON DC/00685 888
805 20.4.2023 DANEV BUILDCON DC/00693 898
806 20.4.2023 DANEV BUILDCON DC/00707 921
807 20.4.2023 DANEV BUILDCON DC/00695 904
808 20.4.2023 DANEV BUILDCON DC/00688 890
809 21.4.2023 DANEV BUILDCON DC/00747 980
810 21.4.2023 DANEV BUILDCON DC/00718 944
811 21.4.2023 DANEV BUILDCON DC/00746 978
812 21.4.2023 DANEV BUILDCON DC/00737 967
813 21.4.2023 DANEV BUILDCON DC/00742 973
814 22.4.2023 DANEV BUILDCON DC/00788 1028
815 22.4.2023 DANEV BUILDCON DC/00789 1029
816 22.4.2023 DANEV BUILDCON DC/00776 1019
817 22.4.2023 DANEV BUILDCON DC/00758 995
818 22.4.2023 DANEV BUILDCON DC/00787 1027
819 24.4.2023 DANEV BUILDCON DC/00799 1046
820 24.4.2023 DANEV BUILDCON DC/00819 1072
821 25.4.2023 DANEV BUILDCON DC/00848 1133
822 25.4.2023 DANEV BUILDCON DC/00860 1141
823 25.4.2023 DANEV BUILDCON DC/0853 1137
824 25.4.2023 DANEV BUILDCON DC/00854 1139
825 27.4.2023 DANEV BUILDCON DC/00925 1238
826 27.4.2023 DANEV BUILDCON DC/00903 1196
827 27.4.2023 DANEV BUILDCON DC/00928 1241
828 27.4.2023 DANEV BUILDCON DC/00945 1283
829 29.4.2023 DANEV BUILDCON DC/00977 1382
830 29.4.2023 DANEV BUILDCON DC/00975 1314
831 01.05.2023 DANEV BUILDCON DC/01059 1369
832 01.05.2023 DANEV BUILDCON DC/01061 1371
833 03.05.2023 DANEV BUILDCON DC/01140 1433
834 03.05.2023 DANEV BUILDCON DC/01137 1432
835 03.05.2023 DANEV BUILDCON DC/01124 1416
836 28.06.2023 DANEV BUILDCON 3146 4081
837 28.06.2023 DANEV BUILDCON 3147 4082
838 17.07.2023 DANEV BUILDCON 3671 4667
839 17.07.2023 DANEV BUILDCON 3710 4658
840 17.07.2023 DANEV BUILDCON 3708 4687
841 17.07.2023 DANEV BUILDCON 3707 4681
842 17.07.2023 DANEV BUILDCON 3700 4685
843 17.07.2023 DANEV BUILDCON 3691 4683
844 17.07.2023 DANEV BUILDCON 3675 4671
845 17.07.2023 DANEV BUILDCON 3662 4561
846 08.08.2023 DANEV BUILDCON 4327 5393
847 09.08.2023 DANEV BUILDCON 4354 5418
848 10.08.2023 DANEV BUILDCON 4398 5466
849 10.08.2023 DANEV BUILDCON 4399 5464
850 10.08.2023 DANEV BUILDCON 4405 5473
851 10.08.2023 DANEV BUILDCON 4427 5499
852 10.08.2023 DANEV BUILDCON 4429 5501
853 10.08.2023 DANEV BUILDCON 4430 5502
854 10.08.2023 DANEV BUILDCON 4432 5505
855 10.08.2023 DANEV BUILDCON 4433 5506
856 10.08.2023 DANEV BUILDCON 4434 5507
857 10.08.2023 DANEV BUILDCON 4435 5508
858 10.08.2023 DANEV BUILDCON 4436 5511
859 10.08.2023 DANEV BUILDCON 4437 5510
860 10.08.2023 DANEV BUILDCON 4438 5512
861 10.08.2023 DANEV BUILDCON 4439 5513
862 11.08.2023 DANEV BUILDCON 4477 5557
863 28.08.2023 DANEV BUILDCON 5102 6093
864 28.08.2023 DANEV BUILDCON 5104 6095
865 29.08.2023 DANEV BUILDCON 5162 7049
866 29.08.2023 DANEV BUILDCON 5160 7047
867 29.08.2023 DANEV BUILDCON 5168 7058
868 30.08.2023 DANEV BUILDCON 5173 7066
869 30.08.2023 DANEV BUILDCON 5180 7073
870 10.09.2023 DANEV BUILDCON 5641 7412
871 10.09.2023 DANEV BUILDCON 5642 7414
872 10.09.2023 DANEV BUILDCON 5645 7421
873 10.09.2023 DANEV BUILDCON 5648 7431
874 11.09.2023 DANEV BUILDCON 5682 7471
875 11.09.2023 DANEV BUILDCON 5686 7473
876 11.09.2023 DANEV BUILDCON 5687 7474
877 12.09.2023 DANEV BUILDCON 5716 7490
878 12.09.2023 DANEV BUILDCON 5752 7517
879 12.09.2023 DANEV BUILDCON 5717 7492
880 23.09.2023 DANEV BUILDCON 6192 7853
881 23.09.2023 DANEV BUILDCON 6193 7859
882 23.09.2023 DANEV BUILDCON 6200 7862
883 23.09.2023 DANEV BUILDCON 6202 7864
884 23.09.2023 DANEV BUILDCON 6203 7865
885 30.09.2023 DANEV BUILDCON 6434 8026
886 30.09.2023 DANEV BUILDCON 6450 8037
887 30.09.2023 DANEV BUILDCON 6464 8044
888 30.09.2023 DANEV BUILDCON 6467 8045
889 21.10.2023 DANEV BUILDCON 7591 8750
890 30.10.2023 DANEV BUILDCON 8010 9001
891 31.10.2023 DANEV BUILDCON 8098 9042
892 02.11.2023 DANEV BUILDCON 8188 9113
893 10.11.2023 DANEV BUILDCON 8647 9342
894 10.11.2023 DANEV BUILDCON 8652 9349
895 10.11.2023 DANEV BUILDCON 8666 9365
896 10.11.2023 DANEV BUILDCON 8657 9357
897 10.11.2023 DANEV BUILDCON 8662 9359
898 15.11.2023 DANEV BUILDCON 8734 9393
899 15.11.2023 DANEV BUILDCON 8736 9395
900 15.11.2023 DANEV BUILDCON 8738 9396
901 15.11.2023 DANEV BUILDCON 8739 9400
902 16.11.2023 DANEV BUILDCON 8759 9406
903 16.11.2023 DANEV BUILDCON 8760 9408
904 16.11.2023 DANEV BUILDCON 8765 9412
905 16.11.2023 DANEV BUILDCON 8766 9415
906 16.11.2023 DANEV BUILDCON 8767 9417
907 18.11.2023 DANEV BUILDCON 8839 9463
908 24.11.2023 DANEV BUILDCON 9050 9590
909 24.11.2023 DANEV BUILDCON 9052 9592
910 24.11.2023 DANEV BUILDCON 9055 9593
911 27.11.2023 DANEV BUILDCON 9159 9656
912 28.11.2023 DANEV BUILDCON 9178 9666
913 30.12.2023 DANEV BUILDCON 10719 11602
914 20.02.2024 DANEV BUILDCON 12611 13046
915 20.02.2024 DANEV BUILDCON 12613 13048
916 20.02.2024 DANEV BUILDCON 12618 13061
917 20.02.2024 DANEV BUILDCON 12619 13063
918 21.02.2024 DANEV BUILDCON 12661 14212
919 21.02.2024 DANEV BUILDCON 12669 14217
920 21.02.2024 DANEV BUILDCON 12647 14202
921 21.02.2024 DANEV BUILDCON 12648 14203
922 21.02.2024 DANEV BUILDCON 1259 14208
923 22.02.2024 DANEV BUILDCON 12694 13129
924 22.02.2024 DANEV BUILDCON 12698 13132
925 22.02.2024 DANEV BUILDCON 12730 13149
926 23.02.2024 DANEV BUILDCON 12784 13196
927 23.02.2024 DANEV BUILDCON 12795 13213
928 24.02.2024 DANEV BUILDCON 12816 13238
929 24.02.2024 DANEV BUILDCON 12817 13235
930 24.02.2024 DANEV BUILDCON 12830 13241
931 24.02.2024 DANEV BUILDCON 12814 13220
932 24.02.2024 DANEV BUILDCON 12815 13233
933 24.02.2024 DANEV BUILDCON 12818 13236
934 24.02.2024 DANEV BUILDCON 12829 13241
935 24.02.2024 DANEV BUILDCON 12831 13242
936 24.02.2024 DANEV BUILDCON 12838 13249
937 26.02.2024 DANEV BUILDCON 12869 13283
938 26.02.2024 DANEV BUILDCON 12878 13285
939 26.02.2024 DANEV BUILDCON 12879 13286
940 26.02.2024 DANEV BUILDCON 12868 13282
941 28.02.2024 DANEV BUILDCON 13008 13361
942 28.02.2024 DANEV BUILDCON 13003 13360
943 28.02.2024 DANEV BUILDCON 13020 13362
944 28.02.2024 DANEV BUILDCON 13027 13365
945 29.02.2024 DANEV BUILDCON 13032 13371
946 29.02.2024 DANEV BUILDCON 13035 13382
947 29.02.2024 DANEV BUILDCON 13042 13385
948 01.03.2024 DANEV BUILDCON 13095 13426
949 01.03.2024 DANEV BUILDCON 13098 13427
950 01.03.2024 DANEV BUILDCON 13099 13428
951 01.03.2024 DANEV BUILDCON 13101 13430
952 01.03.2024 DANEV BUILDCON 13431
953 01.03.2024 DANEV BUILDCON 13104 13435
954 01.03.2024 DANEV BUILDCON 13087 13407
955 01.03.2024 DANEV BUILDCON 13090 13410
956 01.03.2024 DANEV BUILDCON 13092 13416
957 01.03.2024 DANEV BUILDCON 13094 13419
958 01.03.2024 DANEV BUILDCON 13096 13422
962 05.03.2024 DANEV BUILDCON 13200 13526
963 05.03.2024 DANEV BUILDCON 13205 13527
964 05.03.2024 DANEV BUILDCON 13209 13534
965 05.03.2024 DANEV BUILDCON 13211 13538
966 05.03.2024 DANEV BUILDCON 13220 13541
967 05.03.2024 DANEV BUILDCON 13235 13451
968 05.03.2024 DANEV BUILDCON 13237 13452
969 06.03.2024 DANEV BUILDCON 13265 13483
970 06.03.2024 DANEV BUILDCON 13262 13479
971 09.03.2024 DANEV BUILDCON 13356 13372
972 09.03.2024 DANEV BUILDCON 13359 13374
973 09.03.2024 DANEV BUILDCON 13367 13379
974 11.03.2024 DANEV BUILDCON 13389 13437
975 11.03.2024 DANEV BUILDCON 13391 13441
976 11.03.2024 DANEV BUILDCON 13391 13438
977 12.03.2024 DANEV BUILDCON 13413 13457
978 12.03.2024 DANEV BUILDCON 13434 13467
979 12.03.2024 DANEV BUILDCON 13441 13475
980 12.03.2024 DANEV BUILDCON 13448 13478
981 12.03.2024 DANEV BUILDCON 13454 13480
982 13.03.2024 DANEV BUILDCON 13460 13492
983 15.03.2024 DANEV BUILDCON 13556 13609
984 16.03.2024 DANEV BUILDCON 13670 13659
985 18.03.2024 DANEV BUILDCON 13731 13998
986 18.03.2024 DANEV BUILDCON 13736 13708
987 19.03.2024 DANEV BUILDCON 13747 13710
988 19.03.2024 DANEV BUILDCON 13755 13721
989 19.03.2024 DANEV BUILDCON 13756 13724
990 20.03.2023 DANEV BUILDCON 13796 13744
991 20.03.2023 DANEV BUILDCON 13806 13758
992 20.03.2023 DANEV BUILDCON 13816 13770
993 20.03.2023 DANEV BUILDCON 13832 13774
994 20.03.2023 DANEV BUILDCON 13842 13780
995 20.03.2023 DANEV BUILDCON 13839 13778
997 21.03.2023 DANEV BUILDCON 13895 13810
998 23.03.2024 DANEV BUILDCON 13991 13874
999 28.03.2024 DANEV BUILDCON 14044 13919
1000 28.03.2024 DANEV BUILDCON 14045 13920
1001 28.03.2024 DANEV BUILDCON 14048 13923
1002 28.03.2024 DANEV BUILDCON 14057 13927
1003 30.03.2024 DANEV BUILDCON 41403 13960
1004 30.03.2024 DANEV BUILDCON 41406 13961
1005 30.03.2024 DANEV BUILDCON 14112 13969
1006 30.03.2024 DANEV BUILDCON 14115 13972
1007 03.04.2024 DANEV BUILDCON 58 49
1008 05.04.2024 DANEV BUILDCON 118 88
1009 05.04.2024 DANEV BUILDCON 119 89
1010 05.04.2024 DANEV BUILDCON 122 93
1011 08.04.2024 DANEV BUILDCON 174 125
1012 10.04.2024 DANEV BUILDCON 227 161
1013 10.04.2024 DANEV BUILDCON 234 169
1014 18.04.2024 DANEV BUILDCON 451 275
1015 18.04.2024 DANEV BUILDCON 460 279
1016 20.04.2024 DANEV BUILDCON 523 308
1017 20.04.2024 DANEV BUILDCON 530 314
1018 20.04.2024 DANEV BUILDCON 540 323
1019 15.04.2024 DANEV BUILDCON 367 233
1020 03.05.2024 DANEV BUILDCON 821 534
1021 03.05.2024 DANEV BUILDCON 825 538
1022 03.05.2024 DANEV BUILDCON 827 540
1023 03.05.2024 DANEV BUILDCON 829 542
1024 03.05.2024 DANEV BUILDCON 839 548
1025 03.05.2024 DANEV BUILDCON 840 550
1026 03.05.2024 DANEV BUILDCON 820 533
1027 03.05.2024 DANEV BUILDCON 822 532
1028 03.05.2024 DANEV BUILDCON 828 539
1029 03.05.2024 DANEV BUILDCON 830 541
1030 03.05.2024 DANEV BUILDCON 838 549
1031 03.05.2024 DANEV BUILDCON 841 551
1032 09.05.2024 DANEV BUILDCON 973 611
1033 09.05.2024 DANEV BUILDCON 974 612
1034 09.05.2024 DANEV BUILDCON 975 613
1035 09.05.2024 DANEV BUILDCON 976 616
1036 09.05.2024 DANEV BUILDCON 978 618
1037 09.05.2024 DANEV BUILDCON 980 617
1038 09.05.2024 DANEV BUILDCON 985 622
1039 09.05.2024 DANEV BUILDCON 986 623
1040 09.05.2024 DANEV BUILDCON 989 624
VEHICLE NO. MATERIAL UNIT RECD QTY REMARK
GJ16W-8529 READY MIX CONCRETE M30 CUM 6.5 BHUMI VEHICLE
GJ16W-8529 READY MIX CONCRETE M30 CUM 6.5 BHUMI VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16BS-1858 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
NEW VEHICLE READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16W-8529 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
NEW VEHICLE READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16W-8529 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 6 DANAV VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6.5 BHUMI VEHICLE
GJ16W-8529 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6.5 BHUMI VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16BS-1851 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-1851 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16BS-2830 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-1891 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2696 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-1891 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-1891 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2696 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-1891 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2696 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-1891 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2830 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
NEW VEHICLE READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16BS-2696 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 7 BHUMI VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 7 BHUMI VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 7 BHUMI VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 4 BHUMI VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
NEW VEHICLE READY MIX CONCRETE M30 CUM 7 DANAV VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 4 BHUMI VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 4 BHUMI VEHICLE
NEW VEHICLE READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
NEW VEHICLE READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 7 BHUMI VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 7 BHUMI VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 5 BHUMI VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 3 BHUMI VEHICLE
GJ16W-8529 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16W-8529 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16W-8529 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16W-8529 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16W-8529 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 3 BHUMI VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 5 BHUMI VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16W-8529 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16W-8529 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16W-8529 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16BS-2830 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16W-8529 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2830 READY MIX CONCRETE M30 CUM 5 DANAV VEHICLE
GJ16BS-1813 READY MIX CONCRETE M30 CUM 4 DANAV VEHICLE
GJ16W-8529 READY MIX CONCRETE M30 CUM 3 BHUMI VEHICLE
GJ16W-8529 READY MIX CONCRETE M30 CUM 6.5 BHUMI VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 5 BHUMI VEHICLE
GJ16W-8529 READY MIX CONCRETE M30 CUM 5 BHUMI VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16W-8529 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16W-8529 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 DANAV VEHICLE
GJ16W-8529 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2623 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 5 BHUMI VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-1858 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2930 READY MIX CONCRETE M30 CUM 6 DANAV VEHICLE
GJ16BS-2696 READY MIX CONCRETE M30 CUM 6 DANAV VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2949 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-1822 READY MIX CONCRETE M30 CUM 6 DANAV VEHICLE
GJ16BS-1853 READY MIX CONCRETE M30 CUM 6 DANAV VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 6 DANAV VEHICLE
GJ16BS-1851 READY MIX CONCRETE M30 CUM 6 DANAV VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 4.5 BHUMI VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 2 BHUMI VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2930 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-1851 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2830 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16BS-2930 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 3 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 3 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-1853 READY MIX CONCRETE M30 CUM 6 DANAV VEHICLE
GJ16BS-1822 READY MIX CONCRETE M30 CUM 6 DANAV VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-1858 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-1891 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2943 READY MIX CONCRETE M30 CUM 5 DANAV VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 4 BHUMI VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 4.5 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 4 BHUMI VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16BS-2696 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 5 BHUMI VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 2 BHUMI VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 4 BHUMI VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2623 READY MIX CONCRETE M30 CUM 6 DANAV VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 3 BHUMI VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 6 DANAV VEHICLE
GJ16BS-2184 READY MIX CONCRETE M30 CUM 6 DANAV VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2930 READY MIX CONCRETE M30 CUM 6 DANAV VEHICLE
GJ16BS-2623 READY MIX CONCRETE M30 CUM 7.5 DANAV VEHICLE
GJ16BS-2830 READY MIX CONCRETE M30 CUM 7.5 DANAV VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-1858 READY MIX CONCRETE M30 CUM 7 DANAV VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 DANAV VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 DANAV VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 DANAV VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 6 DANAV VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2184 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2696 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2275 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-1891 READY MIX CONCRETE M30 CUM 6 DANAV VEHICLE
GJ16BS-1851 READY MIX CONCRETE M30 CUM 6 DANAV VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 5.5 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2830 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2830 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2830 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2696 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2830 READY MIX CONCRETE M30 CUM 6 DANAV VEHICLE
GJ16BS-2930 READY MIX CONCRETE M30 CUM 6 DANAV VEHICLE
GJ16BS-1813 READY MIX CONCRETE M30 CUM 6 DANAV VEHICLE
GJ16BS-1789 READY MIX CONCRETE M30 CUM 4.5 DANAV VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2930 READY MIX CONCRETE M30 CUM 6 DANAV VEHICLE
GJ16BS-1813 READY MIX CONCRETE M30 CUM 6 DANAV VEHICLE
GJ16BS-2623 READY MIX CONCRETE M30 CUM 6 DANAV VEHICLE
GJ16S-1789 READY MIX CONCRETE M30 CUM 6 DANAV VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16BS-1851 READY MIX CONCRETE M30 CUM 4.5 DANAV VEHICLE
GJ16BS-1822 READY MIX CONCRETE M30 CUM 4.5 DANAV VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 6 DANAV VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16BS-2623 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-1851 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16BS-1822 READY MIX CONCRETE M30 CUM 7 DANAV VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6.5 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6.5 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2943 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-1891 READY MIX CONCRETE M30 CUM 7 DANAV VEHICLE
GJ16BS-1789 READY MIX CONCRETE M30 CUM 4 DANAV VEHICLE
GJ16BS-1789 READY MIX CONCRETE M30 CUM 5 DANAV VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16BS-2943 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-1851 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2830 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2943 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 4 BHUMI VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-1891 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2105 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 3 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-1891 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2623 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16BS-2930 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-1813 READY MIX CONCRETE M30 CUM 7 DANAV VEHICLE
GJ16BS-2943 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 3.5 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16BS-1813 READY MIX CONCRETE M30 CUM 6 DANAV VEHICLE
GJ16BS-1851 READY MIX CONCRETE M30 CUM 6 DANAV VEHICLE
GJ16BS-1891 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16BS-1789 READY MIX CONCRETE M30 CUM 6 DANAV VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 4 BHUMI VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 1 BHUMI VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 5 BHUMI VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 5 BHUMI VEHICLE
GJ16BS-2623 READY MIX CONCRETE M30 CUM 7 DANAV VEHICLE
GJ16BS-1851 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 4 BHUMI VEHICLE
GJ16BS-1853 READY MIX CONCRETE M30 CUM 3 DANAV VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 3 BHUMI VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2830 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-1891 READY MIX CONCRETE M30 CUM 7 DANAV VEHICLE
GJ16BS-1853 READY MIX CONCRETE M30 CUM 6 DANAV VEHICLE
GJ16BS-1853 READY MIX CONCRETE M30 CUM 7 DANAV VEHICLE
GJ16BS-1853 READY MIX CONCRETE M30 CUM 7 DANAV VEHICLE
GJ16BS-1789 READY MIX CONCRETE M30 CUM 7 DANAV VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 3 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 5 BHUMI VEHICLE
GJ16BS-2105 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-1858 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2105 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-1789 READY MIX CONCRETE M30 CUM 7 DANAV VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 2 BHUMI VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16BS-1891 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-1891 READY MIX CONCRETE M30 CUM 6 DANAV VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16BS-1891 READY MIX CONCRETE M30 CUM 6.5 DANAV VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 7 DANAV VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 5.5 BHUMI VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 5 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 5 BHUMI VEHICLE
GJ16BS-2943 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2696 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 2.5 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-1891 READY MIX CONCRETE M30 CUM 6 DANAV VEHICLE
GJ16BS-1813 READY MIX CONCRETE M30 CUM 6 DANAV VEHICLE
GJ16BS-1822 READY MIX CONCRETE M30 CUM 5 DANAV VEHICLE
GJ16BS-2943 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 4.5 BHUMI VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6.5 BHUMI VEHICLE
GJ16BS-1813 READY MIX CONCRETE M30 CUM 6.5 DANAV VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 3 BHUMI VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6.5 BHUMI VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 5.5 BHUMI VEHICLE
GJ16BS-1822 READY MIX CONCRETE M30 CUM 6 DANAV VEHICLE
GJ16BS-1822 READY MIX CONCRETE M30 CUM 7 DANAV VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 2 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 5 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2943 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-1891 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-1813 READY MIX CONCRETE M30 CUM 7 DANAV VEHICLE
GJ16BS-2943 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16BS-2943 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2105 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-1813 READY MIX CONCRETE M30 CUM 7 DANAV VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16BS-2623 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2696 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ6BS-1813 READY MIX CONCRETE M30 CUM 4 DANAV VEHICLE
GJ16BS-1789 READY MIX CONCRETE M30 CUM 6 DANAV VEHICLE
GJ16BS-2930 READY MIX CONCRETE M30 CUM 6 DANAV VEHICLE
GJ16BS-2623 READY MIX CONCRETE M30 CUM 6.5 DANAV VEHICLE
GJ16BS-1789 READY MIX CONCRETE M30 CUM 7 DANAV VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2696 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-1851 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16BS-2105 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-1891 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 3 BHUMI VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 5 BHUMI VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 4 BHUMI VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 2 BHUMI VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 4.5 BHUMI VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 1 BHUMI VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 2.5 BHUMI VEHICLE
GJ16BS-3646 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-3646 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2943 READY MIX CONCRETE M30 CUM 2 DANAV VEHICLE
GJ16BS-2623 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2696 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16BS-2105 READY MIX CONCRETE M30 CUM 7 DANAV VEHICLE
GJ16BS-1789 READY MIX CONCRETE M30 CUM 7 DANAV VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 7 DANAV VEHICLE
GJ16BS-2830 READY MIX CONCRETE M30 CUM 7 DANAV VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16BS-1851 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2623 READY MIX CONCRETE M30 CUM 7 DANAV VEHICLE
GJ16BS-1891 READY MIX CONCRETE M30 CUM 7 DANAV VEHICLE
GJ16BS-3827 READY MIX CONCRETE M30 CUM 7 DANAV VEHICLE
GJ16BS-2623 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2930 READY MIX CONCRETE M30 CUM 6.5 DANAV VEHICLE
GJ16BS-2943 READY MIX CONCRETE M30 CUM 6.5 DANAV VEHICLE
GJ16BS-2830 READY MIX CONCRETE M30 CUM 6.5 DANAV VEHICLE
GJ16BS-2623 READY MIX CONCRETE M30 CUM 6 DANAV VEHICLE
GJ16BS-3646 READY MIX CONCRETE M30 CUM 6 DANAV VEHICLE
GJ16BS-2623 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-1851 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2830 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2830 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-3646 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-3827 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2830 READY MIX CONCRETE M30 CUM 7 DANAV VEHICLE
GJ06DH-0156 READY MIX CONCRETE M30 CUM 2 BHUMI VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16BS-3646 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-1851 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-3646 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16BS-2623 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2623 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2623 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-3827 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ06DH-0156 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-1813 READY MIX CONCRETE M30 CUM 7 DANAV VEHICLE
GJ16BS-2830 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-3646 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ06DH-0156 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2696 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2623 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ06DH-0156 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-3646 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-3827 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2696 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ06DH-0156 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-1784 READY MIX CONCRETE M30 CUM 7 DANAV VEHICLE
GJ16BS-2943 READY MIX CONCRETE M30 CUM 7 DANAV VEHICLE
GJ16BS-3646 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2943 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 4 BHUMI VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-3646 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2930 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ06DH-0156 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-1891 READY MIX CONCRETE M30 CUM 6 DANAV VEHICLE
GJ16BS-2830 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-3827 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-3646 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2623 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-1855 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16BS-1858 READY MIX CONCRETE M30 CUM 6.5 DANAV VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-02074 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16BS-2943 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2930 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2696 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ06DH-0156 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2696 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ06DH-0156 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-4943 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 5 BHUMI VEHICLE
GJ06DH-0156 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2930 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ06DH-0156 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-3827 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ06DH-0156 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2930 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-3827 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ06DH-0156 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-3827 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ06DH-0156 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-1851 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-3827 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2943 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-1851 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-1858 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16AV-2943 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-1851 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ06DH-0156 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2623 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ06DH-0156 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-1858 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-3827 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-1813 READY MIX CONCRETE M30 CUM 7 DANAV VEHICLE
GJ16BS-2105 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2830 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16BS-2830 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-3646 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2943 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2105 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2105 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2830 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2696 READY MIX CONCRETE M30 CUM 7 DANAV VEHICLE
GJ16BS-2696 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2930 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-3646 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-1851 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2930 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ06DH-0156 READY MIX CONCRETE M30 CUM 4 BHUMI VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 4 BHUMI VEHICLE
GJ16AF-9236 READY MIX CONCRETE M30 CUM 3 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 3 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 3 BHUMI VEHICLE
GJ16AF-9236 READY MIX CONCRETE M30 CUM 3.5 BHUMI VEHICLE
GJ16AF-9236 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ06DH-0156 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ06DH-0156 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16AF-9236 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6
GJ16AF-9236 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-3827 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 5 BHUMI VEHICLE
GJ16BS-1891 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2831 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-1851 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ06DH-0156 READY MIX CONCRETE M30 CUM 1 BHUMI VEHICLE
GJ06DH-0156 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16AF-9236 READY MIX CONCRETE M30 CUM 4 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 5 BHUMI VEHICLE
GJ06DH-0156 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ06DH-0156 READY MIX CONCRETE M30 CUM 5 BHUMI VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16BS 2930 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ06DH-0156 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16AF-9236 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ06DH-0156 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16AF-9236 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16AF-9236 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16B-2074 READY MIX CONCRETE M30 CUM 6 DANAV VEHICLE
GJ06DH-0156 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16AF-9236 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ06DH-0156 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-3827 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16AF-9236 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-1822 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 4.5 BHUMI VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-1813 READY MIX CONCRETE M30 CUM 7 DANAV VEHICLE
GJ16BS-2930 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ6BS-2498 READY MIX CONCRETE M30 CUM 9 DANAV VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-3827 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 5 BHUMI VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 5 BHUMI VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 5 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 5.5 BHUMI VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 5.5 BHUMI VEHICLE
GJ01JT-4763 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 4.5 BHUMI VEHICLE
GJ01JT-4763 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2487 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ06DH-0156 READY MIX CONCRETE M30 CUM 5 BHUMI VEHICLE
READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16AF-9236 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ03CL-9102 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ01JT-4763 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2457 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ01JT-4763 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 5 BHUMI VEHICLE
GJ16BS-2457 READY MIX CONCRETE M30 CUM 5 BHUMI VEHICLE
GJ06DH-0156 READY MIX CONCRETE M30 CUM 5 BHUMI VEHICLE
GJ16BS-3827 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-1891 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-7696 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-1858 READY MIX CONCRETE M30 CUM 6 DANAV VEHICLE
GJ16BS-2457 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2830 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2457 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ06DH-0156 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ06DH-0156 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2457 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-1858 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ06DH-0156 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2457 READY MIX CONCRETE M30 CUM 4 BHUMI VEHICLE
GJ06DH-0156 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2457 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-1789 READY MIX CONCRETE M30 CUM 7 DANAV VEHICLE
GJ16BS-2696 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2457 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ01JT-4763 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2457 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ01JT-4763 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2457 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2457 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ06DH-0156 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ01JT-4763 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ06DH-0156 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 5 BHUMI VEHICLE
GJ06DH-0156 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2457 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ01JT-4763 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2457 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2457 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ01JT-4763 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ06DH-0156 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2645 READY MIX CONCRETE M30 CUM 5 BHUMI VEHICLE
GJ01JT-4763 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ01JT-4763 READY MIX CONCRETE M30 CUM 5 BHUMI VEHICLE
GJ16BS-2623 READY MIX CONCRETE M30 CUM 8 DANAV VEHICLE
GJ16BS-2105 READY MIX CONCRETE M30 CUM 8
GJ16BS-1759 READY MIX CONCRETE M30 CUM 7
GJ16BS-2498 READY MIX CONCRETE M30 CUM 8
GJ16BS-2943 READY MIX CONCRETE M30 CUM 8
GJ16BS-1822 READY MIX CONCRETE M30 CUM 7
GJ16BS-1891 READY MIX CONCRETE M30 CUM 8
GJ16BS-3827 READY MIX CONCRETE M30 CUM 8
GJ16BS-1789 READY MIX CONCRETE M30 CUM 7
GJ16BS-2623 READY MIX CONCRETE M30 CUM 8
GJ16BS-1813 READY MIX CONCRETE M30 CUM 7
GJ16BS-2930 READY MIX CONCRETE M30 CUM 8
GJ16BS-1813 READY MIX CONCRETE M30 CUM 7
GJ16BS-3821 READY MIX CONCRETE M30 CUM 8
GJ16BS-1789 READY MIX CONCRETE M30 CUM 7
GJ16BS-2074 READY MIX CONCRETE M30 CUM 8
GJ16BS-1813 READY MIX CONCRETE M30 CUM 7
GJ16BS-2696 READY MIX CONCRETE M30 CUM 8
GJ16BS-2105 READY MIX CONCRETE M30 CUM 7
GJ16BS-3646 READY MIX CONCRETE M30 CUM 8
GJ16BS-2498 READY MIX CONCRETE M30 CUM 9
GJ16BS-2830 READY MIX CONCRETE M30 CUM 8
GJ16BS-2943 READY MIX CONCRETE M30 CUM 8
GJ16BS-2930 READY MIX CONCRETE M30 CUM 8
GJ16BS-2074 READY MIX CONCRETE M30 CUM 9
GJ16BS-1891 READY MIX CONCRETE M30 CUM 8
GJ16BS-1891 READY MIX CONCRETE M30 CUM 8
GJ16BS-3646 READY MIX CONCRETE M30 CUM 8
GJ16BS-2930 READY MIX CONCRETE M30 CUM 8
GJ16BS-2930 READY MIX CONCRETE M30 CUM 8
GJ16BS-3827 READY MIX CONCRETE M30 CUM 8
GJ16BS-2105 READY MIX CONCRETE M30 CUM 8
GJ16BS-1858 READY MIX CONCRETE M30 CUM 8
READY MIX CONCRETE M30 CUM 8
GJ16BS-3827 READY MIX CONCRETE M30 CUM 8
GJ16BS-1822 READY MIX CONCRETE M30 CUM 7
GJ16BS-1858 READY MIX CONCRETE M30 CUM 8
GJ16BS-3827 READY MIX CONCRETE M30 CUM 8
GJ16BS-3646 READY MIX CONCRETE M30 CUM 8
GJ16BS-2457 READY MIX CONCRETE M30 CUM 6
GJ16BS-2457 READY MIX CONCRETE M30 CUM 6
GJ06DH-0156 READY MIX CONCRETE M30 CUM 6
GJ06DH-0156 READY MIX CONCRETE M30 CUM 6
GJ01JT-4763 READY MIX CONCRETE M30 CUM 6
GJ16BS-2943 READY MIX CONCRETE M30 CUM 8
GJ16CS-2493 READY MIX CONCRETE M30 CUM 6
GJ16 BS 2645 READY MIX CONCRETE M30 CUM 6
GJ 01 JT 4763 READY MIX CONCRETE M30 CUM 6
GJ 16 AF 9640 READY MIX CONCRETE M30 CUM 6
GJ 06 DH 0156 READY MIX CONCRETE M30 CUM 6
GJ 01 JT 4763 READY MIX CONCRETE M30 CUM 6
GJ 16 AF 9640 READY MIX CONCRETE M30 CUM 6
GJ 16 AF 9640 READY MIX CONCRETE M30 CUM 6
GJ 01 JT 4763 READY MIX CONCRETE M30 CUM 6
GJ 16 AF 9640 READY MIX CONCRETE M30 CUM 6
GJ 01 JT 4763 READY MIX CONCRETE M30 CUM 6
GJ 01 JT 4763 READY MIX CONCRETE M30 CUM 6
GJ 01 JT 4763 READY MIX CONCRETE M30 CUM 3
GJ 01 JT 4763 READY MIX CONCRETE M30 CUM 3
GJ 16 AF 9640 READY MIX CONCRETE M30 CUM 3
GJ 16 AF 9640 READY MIX CONCRETE M30 CUM 6
GJ 01 JT 4763 READY MIX CONCRETE M30 CUM 6
GJ 16 BS 2645 READY MIX CONCRETE M30 CUM 6
GJ16 AF 9640 READY MIX CONCRETE M30 CUM 6
GJ16 BS 2645 READY MIX CONCRETE M30 CUM 6
GJ 16 AF 9640 READY MIX CONCRETE M30 CUM 6
GJ 01 JT 4763 READY MIX CONCRETE M30 CUM 6
GJ 01 JT 4763 READY MIX CONCRETE M30 CUM 6
GJ 01 JT 4763 READY MIX CONCRETE M30 CUM 6
GJ 16 BS 2645 READY MIX CONCRETE M30 CUM 6
GJ 16 BS 2645 READY MIX CONCRETE M30 CUM 6
GJ 16 AF 9640 READY MIX CONCRETE M30 CUM 6
GJ 16 AF 9640 READY MIX CONCRETE M30 CUM 6
GJ 16 AF 9640 READY MIX CONCRETE M30 CUM 6
GJ 01 JT 4763 READY MIX CONCRETE M30 CUM 4
GJ 16 BS 2645 READY MIX CONCRETE M30 CUM 4
GJ 01 JT 4763 READY MIX CONCRETE M30 CUM 6
GJ 01 JT 4763 READY MIX CONCRETE M30 CUM 6
GJ 16 BS 2645 READY MIX CONCRETE M30 CUM 6
GJ 16 AF 9640 READY MIX CONCRETE M30 CUM 6
GJ 16 AF 9640 READY MIX CONCRETE M30 CUM 6
GJ 16 BS 2645 READY MIX CONCRETE M30 CUM 6
GJ 16 BS 2645 READY MIX CONCRETE M30 CUM 6
GJ 01 JT 4763 READY MIX CONCRETE M30 CUM 6
GJ 16 BS 2645 READY MIX CONCRETE M30 CUM 6
GJ 01 JT 4763 READY MIX CONCRETE M30 CUM 6
GJ 01 JT 4763 READY MIX CONCRETE M30 CUM 6
GJ 16 BS 2645 READY MIX CONCRETE M30 CUM 2
GJ 01 JT 4763 READY MIX CONCRETE M30 CUM 4
GJ 16 AF 9640 READY MIX CONCRETE M30 CUM 6
GJ 16 BS 2645 READY MIX CONCRETE M30 CUM 6
GJ 16 BS 2645 READY MIX CONCRETE M30 CUM 6
GJ 16 AF 9640 READY MIX CONCRETE M30 CUM 6
GJ 01 JT 4763 READY MIX CONCRETE M30 CUM 6
GJ 16 AF 9640 READY MIX CONCRETE M30 CUM 4.5
GJ 01 JT 4763 READY MIX CONCRETE M30 CUM 6
GJ 01 JT 4763 READY MIX CONCRETE M30 CUM 6
GJ 01 JT 4763 READY MIX CONCRETE M30 CUM 6
GJ 01 JT 4763 READY MIX CONCRETE M30 CUM 4.5
GJ 16 BS 2645 READY MIX CONCRETE M30 CUM 6
GJ 16 BS 2645 READY MIX CONCRETE M30 CUM 6
GJ 16 BS 2645 READY MIX CONCRETE M30 CUM 6
GJ 16 BS 2645 READY MIX CONCRETE M30 CUM 6
GJ 01 JT 4763 READY MIX CONCRETE M30 CUM 6
GJ 01 JT 4763 READY MIX CONCRETE M30 CUM 6
GJ 01 JT 4763 READY MIX CONCRETE M30 CUM 6
GJ16 BS1822 READY MIX CONCRETE M30 CUM 6 DANAV VEHICLE
GJ 16 BS 2623 READY MIX CONCRETE M30 CUM 6 DANAV VEHICLE
GJ 01 JT 4763 READY MIX CONCRETE M30 CUM 6
GJ 01 JT 4763 READY MIX CONCRETE M30 CUM 3.5
GJ 01 JT 4763 READY MIX CONCRETE M30 CUM 6
GJ 01 JT 4763 READY MIX CONCRETE M30 CUM 6
GJ 16 BS 2645 READY MIX CONCRETE M30 CUM 3.5
GJ 01 JT 4763 READY MIX CONCRETE M30 CUM 3
GJ 16 BS 2645 READY MIX CONCRETE M30 CUM 4
GJ 16 BS 2645 READY MIX CONCRETE M30 CUM 6
GJ 16 AF 9640 READY MIX CONCRETE M30 CUM 6
GJ 16 BS 1858 READY MIX CONCRETE M30 CUM 8
GJ 16 BS 2645 READY MIX CONCRETE M30 CUM 4
GJ 16 BS 2645 READY MIX CONCRETE M30 CUM 2
GJ 16 BS 2645 READY MIX CONCRETE M30 CUM 3
GJ 16 BS 2943 READY MIX CONCRETE M30 CUM 8
GJ 16 BS 2074 READY MIX CONCRETE M30 CUM 7
GJ 16 BS 2943 READY MIX CONCRETE M30 CUM 8
GJ 01 JT 4763 READY MIX CONCRETE M30 CUM 6
GJ01 JT 4763 READY MIX CONCRETE M30 CUM 4
GJ 16 AF 9640 READY MIX CONCRETE M30 CUM 6
GJ 01 JT 4763 READY MIX CONCRETE M30 CUM 6
GJ16BS-2074 READY MIX CONCRETE M30 CUM 9 DANEV VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 9 DANEV VEHICLE
GJ16AF-9640 READY MIX CONCRETE M30 CUM 3.5 BD VEHICLE
GJ16BS-3646 READY MIX CONCRETE M30 CUM 7 DANEV VEHICLE
GJ16BS-2105 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-1891 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-2830 READY MIX CONCRETE M30 CUM 7 DANEV VEHICLE
GJ16BS-1822 READY MIX CONCRETE M30 CUM 7 DANEV VEHICLE
GJ16B-3646 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-0352 READY MIX CONCRETE M30 CUM 5.5 BD VEHICLE
GJ05AU-5442 READY MIX CONCRETE M30 CUM 2 BD VEHICLE
GJ16BS-3646 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-0352 READY MIX CONCRETE M30 CUM 6 BD VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 7 DANEV VEHICLE
GJ05AV-5442 READY MIX CONCRETE M30 CUM 4.5 BD VEHICLE
GJ16BS-1891 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-0352 READY MIX CONCRETE M30 CUM 6 BD VEHICLE
GJ16BS-2830 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-2105 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ01JT-4763 READY MIX CONCRETE M30 CUM 6 BD VEHICLE
GJ16BS-2696 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-3827 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 9 DANEV VEHICLE
GJ16BS-2623 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-3646 READY MIX CONCRETE M30 CUM 3.5 DANEV VEHICLE
GJ16BS-2830 READY MIX CONCRETE M30 CUM 7 DANEV VEHICLE
GJ01JT-4763 READY MIX CONCRETE M30 CUM 6 BD VEHICLE
GJ05AU-5442 READY MIX CONCRETE M30 CUM 6 BD VEHICLE
GJ05AU-5442 READY MIX CONCRETE M30 CUM 6 BD VEHICLE
GJ01JT-4763 READY MIX CONCRETE M30 CUM 6 BD VEHICLE
GJ01JT-4763 READY MIX CONCRETE M30 CUM 3 BD VEHICLE
GJ16BS-0352 READY MIX CONCRETE M30 CUM 6 BD VEHICLE
GJ05AU-5442 READY MIX CONCRETE M30 CUM 6 BD VEHICLE
GJ16BS-0352 READY MIX CONCRETE M30 CUM 6 BD VEHICLE
GJ01JT-4763 READY MIX CONCRETE M30 CUM 6 BD VEHICLE
GJ05AU-5442 READY MIX CONCRETE M30 CUM 6 BD VEHICLE
GJ16BS-3827 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-1810 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-0352 READY MIX CONCRETE M30 CUM 6 BD VEHICLE
GJ05AU-5442 READY MIX CONCRETE M30 CUM 3 BD VEHICLE
GJ16BS-0352 READY MIX CONCRETE M30 CUM 6 BD VEHICLE
GJ16BS-0352 READY MIX CONCRETE M30 CUM 6 BD VEHICLE
GJ05AU-5442 READY MIX CONCRETE M30 CUM 6 BD VEHICLE
GJ16BS-0352 READY MIX CONCRETE M30 CUM 6 BD VEHICLE
GJ01T-4763 READY MIX CONCRETE M30 CUM 6 BD VEHICLE
GJ16BS-0352 READY MIX CONCRETE M30 CUM 6 BD VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 9 DANEV VEHICLE
GJ01JT-4763 READY MIX CONCRETE M30 CUM 6 BD VEHICLE
GJ16BS-0352 READY MIX CONCRETE M30 CUM 6 BD VEHICLE
GJ01JT-4763 READY MIX CONCRETE M30 CUM 6 BD VEHICLE
GJ01JT-4763 READY MIX CONCRETE M30 CUM 6 BD VEHICLE
GJ16BS-3646 READY MIX CONCRETE M30 CUM 2.5 DANEV VEHICLE
GJ16BS-0352 READY MIX CONCRETE M30 CUM 3 BD VEHICLE
GJ16BS-0352 READY MIX CONCRETE M30 CUM 1 BD VEHICLE
GJ16BS-0352 READY MIX CONCRETE M30 CUM 1 BD VEHICLE
GJ16BS-0352 READY MIX CONCRETE M30 CUM 1 BD VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-0352 READY MIX CONCRETE M30 CUM 7 BD VEHICLE
GJ16BS-2943 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-1851 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-0352 READY MIX CONCRETE M30 CUM 7 BD VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-2830 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-0352 READY MIX CONCRETE M30 CUM 4 BD VEHICLE
GJ16BS-0352 READY MIX CONCRETE M30 CUM 0.5 BD VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-1891 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-1858 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 7 DANEV VEHICLE
GJ16BS-0352 READY MIX CONCRETE M30 CUM 4.5 BHUMI VEHICLE
GJ16BS-2830 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-0352 READY MIX CONCRETE M30 CUM 7 BHUMI VEHICLE
GJ16BS-1891 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-0352 READY MIX CONCRETE M30 CUM 4 BHUMI VEHICLE
GJ16BS-0352 READY MIX CONCRETE M30 CUM 5 BHUMI VEHICLE
GJ16BS-0352 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 9 DANEV VEHICLE
GJ16BS-2943 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-2830 READY MIX CONCRETE M30 CUM 5 DANEV VEHICLE
GJ16BS-2105 READY MIX CONCRETE M30 CUM 5 DANEV VEHICLE
GJ16BS-3827 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-2623 READY MIX CONCRETE M30 CUM 2.5 DANEV VEHICLE
GJ16BS-2696 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 9 DANEV VEHICLE
GJ16BS-2623 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-0352 READY MIX CONCRETE M30 CUM 2 BHUMI VEHICLE
GJ16BS-2696 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-0352 READY MIX CONCRETE M30 CUM 3 BHUMI VEHICLE
GJ16BS-0352 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16BS-0352 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16AU5773 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 9 DANEV VEHICLE
GJ16BS-2830 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-0352 READY MIX CONCRETE M30 CUM 3 BHUMI VEHICLE
GJ16BS-2943 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-3827 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-2830 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 9 DANEV VEHICLE
GJ16BS-2830 READY MIX CONCRETE M30 CUM 1.5 DANEV VEHICLE
GJ16BS-0352 READY MIX CONCRETE M10 CUM 6 BD VEHICLE
GJ16BS-2696 READY MIX CONCRETE M30 CUM 8 BD VEHICLE
GJ16BS-0352 READY MIX CONCRETE M30 CUM 1 BD VEHICLE
GJ16BS-3646 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-1858 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-2623 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 7 DANEV VEHICLE
GJ16BS-1851 READY MIX CONCRETE M30 CUM 3 DANEV VEHICLE
GJ16BS-3827 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-1851 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-2696 READY MIX CONCRETE M30 CUM 4 DANEV VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 9 DANEV VEHICLE
GJ16BS-2696 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-2623 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-1891 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 9 DANEV VEHICLE
GJ16BS-2830 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-2696 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-1891 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-2830 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-3827 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-1850 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-3827 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 9 DANEV VEHICLE
GJ16BS-1851 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-3646 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-2830 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-1858 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-3646 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-1851 READY MIX CONCRETE M30 CUM 6 DANEV VEHICLE
GJ16BS-2623 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 9 DANEV VEHICLE
GJ16BS-1851 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-2830 READY MIX CONCRETE M30 CUM 3 DANEV VEHICLE
GJ16BS-1851 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-2943 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-1858 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-0352 READY MIX CONCRETE M30 CUM 4 BD VEHICLE
GJ16BS-0352 READY MIX CONCRETE M30 CUM 6 BD VEHICLE
GJ16BS-0352 READY MIX CONCRETE M30 CUM 6 BD VEHICLE
GJ16BS-0352 READY MIX CONCRETE M30 CUM 6 BD VEHICLE
GJ16BS-0352 READY MIX CONCRETE M30 CUM 4.5 BD VEHICLE
GJ16BS-0352 READY MIX CONCRETE M30 CUM 2.5 BD VEHICLE
GJ16BS-0352 READY MIX CONCRETE M30 CUM 4 BD VEHICLE
GJ16BS-0352 READY MIX CONCRETE M30 CUM 4 BD VEHICLE
GJ16BS-0352 READY MIX CONCRETE M30 CUM 6 BD VEHICLE
GJ16BS-0352 READY MIX CONCRETE M30 CUM 6 BD VEHICLE
GJ16BS-0352 READY MIX CONCRETE M30 CUM 6 BD VEHICLE
GJ16BS-0352 READY MIX CONCRETE M30 CUM 6 BD VEHICLE
GJ16BS-0352 READY MIX CONCRETE M30 CUM 8 BD VEHICLE
GJ16BS-0352 READY MIX CONCRETE M30 CUM 6 BD VEHICLE
GJ16BS-0352 READY MIX CONCRETE M30 CUM 6 BD VEHICLE
GJ16BS-0352 READY MIX CONCRETE M30 CUM 6 BD VEHICLE
GJ16BS-0352 READY MIX CONCRETE M30 CUM 6 BD VEHICLE
GJ16BS-0352 READY MIX CONCRETE M30 CUM 3 BD VEHICLE
GJ16BS-2696 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-2696 READY MIX CONCRETE M30 CUM 4 DANEV VEHICLE
GJ6BS-0352 READY MIX CONCRETE M30 CUM 4 BD VEHICLE
GJ6BS-0352 READY MIX CONCRETE M30 CUM 6 BD VEHICLE
GJ16BS-2830 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-0352 READY MIX CONCRETE M30 CUM 6 BD VEHICLE
GJ16BS-0352 READY MIX CONCRETE M30 CUM 4 BD VEHICLE
GJ16BS-1858 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-0352 READY MIX CONCRETE M30 CUM 6 BD VEHICLE
GJ16BS-1851 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-0352 READY MIX CONCRETE M30 CUM 5 BD VEHICLE
GJ16BS-0352 READY MIX CONCRETE M30 CUM 3 BD VEHICLE
GJ16BS-2696 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-1851 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-3646 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-1851 READY MIX CONCRETE M30 CUM 4 DANEV VEHICLE
GJ16BS-1851 READY MIX CONCRETE M30 CUM 2.5 DANEV VEHICLE
GJ16BS-2623 READY MIX CONCRETE M30 CUM 1.5 DANEV VEHICLE
GJ16BS-2623 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-2696 READY MIX CONCRETE M30 CUM 4 DANEV VEHICLE
GJ16BS-2623 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-3827 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-3827 READY MIX CONCRETE M30 CUM 2 DANEV VEHICLE
GJ16BS-3827 READY MIX CONCRETE M30 CUM 2.5 DANEV VEHICLE
GJ16BS-3827 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-2696 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-1858 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-2943 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 9 DANEV VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 9 DANEV VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 9 DANEV VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 9 DANEV VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 9 DANEV VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 9 DANEV VEHICLE
GJ16BS-1851 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-3827 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 9 DANEV VEHICLE
GJ16BS-1858 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-3827 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-2498 READY MIX CONCRETE M30 CUM 9 DANEV VEHICLE
GJ16BS-2943 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-2623 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-2074 READY MIX CONCRETE M30 CUM 9 DANEV VEHICLE
GJ16BS-1858 READY MIX CONCRETE M30 CUM 8 DANEV VEHICLE
GJ16BS-3646 READY MIX CONCRETE M30 CUM 2 DANEV VEHICLE
TOTAL= CUM 6722
LOCATION
PILE BHUMI CEMENT
PILE BHUMI CEMENT
FOOTING BHUMI CEMENT
FOOTING BHUMI CEMENT
FOOTING BHUMI CEMENT
FOOTING BHUMI CEMENT
PILE BHUMI CEMENT
FOOTING BHUMI CEMENT
FOOTING BHUMI CEMENT
CHALLAN NAHI HA
OK
790
CHALLAN PENDING
ROAD
ROAD
ROAD
PILE HH
PILE HH
PILE HH
PILE HH
PILE HH
PILE HH
PILE HH
ROAD
PILE HH
PILE HH
PILE HH
PILE HH
PILE HH
RMC PLANT
ROAD
PILE HH
PILE HH & EQS-3&B.PLANT-2
PILE HH
PILE HH
PILE HH
PILE HH
PIPE RACK
6
TOTAL AYA
HA182 170KA
CHALLAN MILA
HA 12CUM BAKI
HA
SLIP PENDING

SLIP PENDING

SLIP PENDING
SLIP PENDING
90
PASS DUE
PASS DUE

PASS DUE
PASS DUE
BD BUILDCON LLP
GUJARAT FLUORO CHEMICALS LTD, DAHEJ-B
ADY MIX CONCRETE M30 RECEIVED DETAILS
CHALLAN GATE
SR NO DATE SUPPLIER VEHICLE NO. UNIT RECD QTY REMARK
NO ENTRY NO
836 28.06.2023 DANEV BUILDCON 3146 4081 GJ16BS-2074 CUM 9 DANEV VEHICLE
837 28.06.2023 DANEV BUILDCON 3147 4082 GJ16BS-2498 CUM 9 DANEV VEHICLE
TOTAL= CUM 18.00
BD BUILDCON LLP
GUJARAT FLUORO CHEMICALS LTD, DAHEJ-B
DY MIX CONCRETE M30 RECEIVED DETAILS
GATE ENTRY
SR NO DATE SUPPLIER CHALLAN NO
NO
1 07.11.2020 DANEV BUILDCON 4337 1336
2 09.11.2020 DANEV BUILDCON 4401 1350
3 09.11.2020 DANEV BUILDCON 4421 1354
4 10.11.2020 DANEV BUILDCON 4455 1366
5 10.11.2020 DANEV BUILDCON 4473 1369
6 12.11.2020 DANEV BUILDCON 4582 1393
7 28.11.2020 DANEV BUILDCON 4950 1543
8 29.11.2020 DANEV BUILDCON 4967 1547
9 30.11.2020 DANEV BUILDCON 5001 1559
10 03.12.2020 DANEV BUILDCON 5105 1578
11 04.12.2020 DANEV BUILDCON 5120 1584
12 08.12.2020 DANEV BUILDCON 5273 1620
VEHICLE NO. MATERIAL UNIT RECD QTY REMARK
GJ16W-8529 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16W-8529 READY MIX CONCRETE M30 CUM 4 BHUMI VEHICLE
GJ16W-8529 READY MIX CONCRETE M30 CUM 2.5 BHUMI VEHICLE
GJ16W-8529 READY MIX CONCRETE M30 CUM 3 BHUMI VEHICLE
GJ16W-8529 READY MIX CONCRETE M30 CUM 5 BHUMI VEHICLE
GJ16W-8529 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16W-8529 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16W-8529 READY MIX CONCRETE M30 CUM 3.5 BHUMI VEHICLE
GJ16W-8529 READY MIX CONCRETE M30 CUM 4.5 BHUMI VEHICLE
GJ16W-8529 READY MIX CONCRETE M30 CUM 4 BHUMI VEHICLE
GJ16W-8529 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16W-8529 READY MIX CONCRETE M30 CUM 4.5 BHUMI VEHICLE
TOTAL= CUM 55.00
BD BUILDCON LLP
GUJARAT FLUORO CHEMICALS LTD, DAHEJ-B
DY MIX CONCRETE M10 RECEIVED DETAILS
CHALLAN GATE
SR NO DATE SUPPLIER VEHICLE NO.
NO ENTRY NO
1 30.09.2023 DANEV BUILDCON 6426 GJ16AF-9640
2 30.09.2023 DANEV BUILDCON 6447 GJ16AF-9640
3 02.10.2023 DANEV BUILDCON 6517 GJ16AF-9640
4 27.10.2023 DANEV BUILDCON 7857 251 GJ16BS-0352
5 26.03.2024 DANEV BUILDCON 14003 626 GJ16BS-3827
6 26.03.2024 DANEV BUILDCON 14008 627 GJ16BS-0352
7 26.03.2024 DANEV BUILDCON 14009 628 GJ16BS-0352
8 26.03.2024 DANEV BUILDCON 14012 629 GJ16BS-0352
9 27.03.2024 DANEV BUILDCON 14016 630 GJ16BS-0352
10 27.03.2024 DANEV BUILDCON 14020 GJ16BS-0352
11 27.03.2024 DANEV BUILDCON 14030 630 GJ16BS-2623
12 01.04.2024 DANEV BUILDCON 3 643 GJ16BS-0352
13 01.04.2024 DANEV BUILDCON 12 644 GJ16BS-0352
14 02.04.2024 DANEV BUILDCON 39 649 GJ16BS-0352
15 02.04.2024 DANEV BUILDCON 43 650 GJ16BS-0352
16 02.04.2024 DANEV BUILDCON 48 651 GJ16BS-0352
17 02.04.2024 DANEV BUILDCON 49 652 GJ16BS-0352
18 03.04.2024 DANEV BUILDCON 57 653 DD03L-9481
19 03.04.2024 DANEV BUILDCON 59 654 GJ16BS-1858
20 03.04.2024 DANEV BUILDCON 62 659 DD03L-9481
21 03.04.2024 DANEV BUILDCON 64 658 GJ16BS-1858
22 03.04.2024 DANEV BUILDCON 68 660 DD03L-9481
23 03.04.2024 DANEV BUILDCON 76 661 DD03L-9481
24 08.04.2024 DANEV BUILDCON 184 676 DD03L-9481
25 09.04.2024 DANEV BUILDCON 197 679 DD03L-9481
26 11.04.2024 DANEV BUILDCON 251 681 GJ16BS-2498
27 11.04.2024 DANEV BUILDCON 265 684 GJ16BS-2498
28 11.04.2024 DANEV BUILDCON 267 686 DD03L-9481
29 11.04.2024 DANEV BUILDCON 269 688 DD03L-9481
30 12.04.2024 DANEV BUILDCON 283 684 DD03L-9481
31 12.04.2024 DANEV BUILDCON 287 690 DD03L-9481
32 12.04.2024 DANEV BUILDCON 297 691 DD03L-9481
33 12.04.2024 DANEV BUILDCON 302 692 DD03L-9481
34 12.04.2024 DANEV BUILDCON 305 694 DD03L-9481
35 13.04.2024 DANEV BUILDCON 319 DD03L-9481
36 DANEV BUILDCON
37 DANEV BUILDCON
38 DANEV BUILDCON
39 DANEV BUILDCON
40 DANEV BUILDCON
41 DANEV BUILDCON
42 DANEV BUILDCON
TOTAL=
RECD
MATERIAL UNIT REMARK
QTY LOCATION
READY MIX CONCRETE M10 CUM 3 BD VEHICLE
READY MIX CONCRETE M10 CUM 3 BD VEHICLE
READY MIX CONCRETE M10 CUM 2 BD VEHICLE
READY MIX CONCRETE M10 CUM 3 BD VEHICLE
READY MIX CONCRETE M10 CUM 8 DANEV VEHICLE
READY MIX CONCRETE M10 CUM 4 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 8 DANEV VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 3.5 BD VEHICLE
READY MIX CONCRETE M10 CUM 8 DANEV VEHICLE
READY MIX CONCRETE M10 CUM 3.5 BD VEHICLE
READY MIX CONCRETE M10 CUM 8 DANEV VEHICLE
READY MIX CONCRETE M10 CUM 2.5 BD VEHICLE
READY MIX CONCRETE M10 CUM 3.5 BD VEHICLE
READY MIX CONCRETE M10 CUM 3 BD VEHICLE
READY MIX CONCRETE M10 CUM 1.5 BD VEHICLE
READY MIX CONCRETE M10 CUM 9 DANEV VEHICLE
READY MIX CONCRETE M10 CUM 9 DANEV VEHICLE
READY MIX CONCRETE M10 CUM 3.5 BD VEHICLE
READY MIX CONCRETE M10 CUM 3.5 BD VEHICLE
READY MIX CONCRETE M10 CUM 3.5 BD VEHICLE
READY MIX CONCRETE M10 CUM 3.5 BD VEHICLE
READY MIX CONCRETE M10 CUM 3.5 BD VEHICLE
READY MIX CONCRETE M10 CUM 3.5 BD VEHICLE
READY MIX CONCRETE M10 CUM 3.5 BD VEHICLE
READY MIX CONCRETE M10 CUM 3.5 BD VEHICLE SLIP PENDING.
READY MIX CONCRETE M10 CUM
READY MIX CONCRETE M10 CUM
READY MIX CONCRETE M10 CUM
READY MIX CONCRETE M10 CUM
READY MIX CONCRETE M10 CUM
READY MIX CONCRETE M10 CUM
READY MIX CONCRETE M10 CUM
CUM 170.5
BD BUILDCON LLP
GUJARAT FLUORO CHEMICALS LTD, DAHEJ-B
DY MIX CONCRETE M30 RECEIVED DETAILS
CHALLAN GATE
SR NO DATE SUPPLIER VEHICLE NO.
NO ENTRY NO
1 28.03.2024 DANEV BUILDCON 14063 634 GJ16BS-2074
2 02.04.2024 DANEV BUILDCON 27 640 DD03L-9481
3 03.04.2024 DANEV BUILDCON 81 662 DD03L-9481
4 04.04.2024 DANEV BUILDCON 89 664 DD03L-9481
5 08.04.2024 DANEV BUILDCON 176 674 DD03L-9481
6 11.04.2024 DANEV BUILDCON 261 683 GJ16BS-2498
7 15.04.2024 DANEV BUILDCON 353 697 GJ16BS-1891
8 23.04.2024 DANEV BUILDCON 596 712 DD03L-9481
9 23.04.2024 DANEV BUILDCON 599 713 DD03L-9481
10 22.04.2024 DANEV BUILDCON 566 710 GJ16BS-2623
11 12.05.2024 DANEV BUILDCON 1091 722 GJ16BS-1851
12
13
TOTAL=
RECD
MATERIAL UNIT REMARK
QTY LOCATION
READY MIX CONCRETE M25 CUM 9 DANEV VEHICLE
READY MIX CONCRETE M25 CUM 3.5 BD VEHICLE
READY MIX CONCRETE M25 CUM 3.5 BD VEHICLE
READY MIX CONCRETE M25 CUM 3.5 BD VEHICLE
READY MIX CONCRETE M25 CUM 3 BD VEHICLE
READY MIX CONCRETE M25 CUM 9 DANEV VEHICLE
READY MIX CONCRETE M25 CUM 6 DANEV VEHICLE
READY MIX CONCRETE M25 CUM 3.5 BD VEHICLE
READY MIX CONCRETE M25 CUM 1 BD VEHICLE
READY MIX CONCRETE M25 CUM 5 DANEV VEHICLE
READY MIX CONCRETE M25 CUM 5 DANEV VEHICLE

CUM 52
BD BUILDCON LLP
GUJARAT FLUORO CHEMICALS LTD, DAHEJ-B
DY MIX CONCRETE M30 RECEIVED DETAILS
CHALLAN GATE
SR NO DATE SUPPLIER VEHICLE NO.
NO ENTRY NO
1 10.10.2023 DANEV BUILDCON 6925 34 GJ16BS-0352
2 10.10.2023 DANEV BUILDCON 6906 21 GJ16BS-0352
3 11.10.2023 DANEV BUILDCON 6981 52 GJ16BS-0352
4 14.10.2023 DANEV BUILDCON 7146 85 GJ16BS-0352
5 17.10.2023 DANEV BUILDCON 7294 123 GJ16BS-0352
6 19.10.2023 DANEV BUILDCON 7424 158 GJ16BS-0352
7 20.10.2023 DANEV BUILDCON 7519 183 GJ16BS-0352
8 22.10.2023 DANEV BUILDCON 7624 202 GJ16BS-0352
9 27.10.2023 DANEV BUILDCON 7829 240 GJ16BS-0352
10 28.10.2023 DANEV BUILDCON 7933 268 GJ16BS-0352
11 01.11.2023 DANEV BUILDCON 8143 317 GJ16BS-0352
12 01.11.2023 DANEV BUILDCON 8129 304 GJ16BS-0352
13 03.11.2023 DANEV BUILDCON 8237 331 GJ16BS-0352
14 06.11.2023 DANEV BUILDCON 8416 357 GJ16BS-0352
15 07.11.20263 DANEV BUILDCON 8472 367 GJ16BS-0352
16 20.11.2023 DANEV BUILDCON 8870 415 GJ16BS-0352
17 24.11.2023 DANEV BUILDCON 9030 445 GJ16BS-0352
18 30.11.2023 DANEV BUILDCON 9298 463 GJ16BS-0352
19 30.11.2023 DANEV BUILDCON 9304 464 GJ16BS-0352
20 05.03.2024 DANEV BUILDCON 13243 579 GJ16BS-1858
21
22
TOTAL=
RECD
MATERIAL UNIT REMARK
QTY LOCATION
READY MIX CONCRETE M30 CUM 3 BD VEHICLE
READY MIX CONCRETE M30 CUM 4 BD VEHICLE
READY MIX CONCRETE M30 CUM 2 BD VEHICLE
READY MIX CONCRETE M30 CUM 4.5 BD VEHICLE
READY MIX CONCRETE M30 CUM 4.5 BD VEHICLE
READY MIX CONCRETE M30 CUM 3 BD VEHICLE
READY MIX CONCRETE M30 CUM 2 BD VEHICLE
READY MIX CONCRETE M30 CUM 4 BD VEHICLE
READY MIX CONCRETE M30 CUM 4 BD VEHICLE
READY MIX CONCRETE M30 CUM 2 BD VEHICLE
READY MIX CONCRETE M30 CUM 4 BD VEHICLE
READY MIX CONCRETE M30 CUM 6 BD VEHICLE
READY MIX CONCRETE M30 CUM 4 BD VEHICLE
READY MIX CONCRETE M30 CUM 1 BD VEHICLE
READY MIX CONCRETE M30 CUM 1 BD VEHICLE
READY MIX CONCRETE M30 CUM 2.5 BD VEHICLE
READY MIX CONCRETE M30 CUM 6 BD VEHICLE
READY MIX CONCRETE M30 CUM 5 BD VEHICLE
READY MIX CONCRETE M30 CUM 1 BD VEHICLE
READY MIX CONCRETE M30 CUM 4 DANEV VEHICLE

CUM 67.5
BD BUIOLDCON LLP
GUJARAT FLUORO CHEMICALS LTD, DAHEJ-B
SUB:- READY MIX CONCRETE RECEIVED DETAILS
S.NO DESCRIPTION UNIT M-10 M-20 M-25 M-30 M-30 REMARK

1 READY MIX CONCRETE RECEIVED CUM 1223.50 99.75 179.00 55.00 Err:509

READY MIX CONCRETE RECEIVED 15.00 RECEIVED AT GFL-1(THIS QTY


SHOW OUR SHEET INSTRUCTION
2 CUM OF BHAVIKA MADAM)
TOTAL QTY CUM 1223.50 99.75 194.00 55.00 Err:509 Err:509
CEMENT CONSUMPTION/CUM MT 0.16 0.32 0.36 0.38 0.385
TOTAL= MT 195.76 31.92 69.84 20.9 Err:509
TOTAL CEMENT CONSUMPTION= MT Err:509
TOTAL CEMENT UNLOADING= MT 666.687
BALANCE= MT Err:509
CEMENT UNLOADING AT DANAV BUILDCON

UNLOAD
DATE CHALLAN NO ING QTY VEHICLE NO
08.04.2021 7060171502 MT 24.097 GJ19X-7597
08.04.2021 7060171500 MT 23.928 GJ03AX-5171
08.04.2021 7060171517 MT 24.314 GJ05BX-7862
09.04.2021 7060171568 MT 24.126 GJ18AV-6250
09.04.2021 7060171545 MT 24.008 GJ21W-1964
10.04.2021 7060171677 MT 24.097 GJ06YY-9415
10.04.2021 7060171664 MT 23.998 GJ03AX-5171
13.04.2021 7060171908 MT 23.909 GJ08Y4693
14.04.2021 7060172000 MT 24.186
15.04.2021 8937184379 MT 28.364
15.04.2021 8937184387 MT 31.284
22.06.2021 7060178828 MT 23.76 GJ19X 2202
22.06.2021 7060178848 MT 24.314 GJ01CT 4011
23.06.2021 7060178945 MT 23.81 GJ18AX 3596
27.06.2021 7060179359 MT 24.918 GJ05BX 7862
26.06.2021 7060179175 MT 24.334
03.10.2021 1010197927 MT 24.32 GJ27U-0832
28.10.2021 7060191339 MT 24.33 GJ16W-1964
28.10.2021 7060191366 MT 24.04 GJ19X-2228
30.10.2021 7060191616 MT 24.41 GJ21T-7920
30.11.2021 7060191611 MT 24.41 GJ12AW-0896
19.11.2021 7320473315 MT 29.98 GJ02ZZ-7692
20.11.2021 7320473486 MT 29.84 GJ02XX-8510
20.11.2021 7060193159 MT 24.11 GJ19X-2228
23.11.2021 7320473846 MT 34.47 GJ08AU-6722
23.11.2021 7320473848 MT 29.33 GJ08AU-5274

TOTAL CEMENT UNLOADING= MT 666.687