Danav Buildcon (Main Sheet)
Danav Buildcon (Main Sheet)
1 READY MIX CONCRETE RECEIVED CUM 1223.50 6.00 99.75 179.00 55.00 6722.00
2 READY MIX CONCRETE RECEIVED FOR NEW PLOT CUM 170.50 52.00 67.50
3 CUM
TOTAL QTY CUM 1394.00 6.00 99.75 246.00 55.00 6789.50
CEMENT CONSUMPTION/CUM MT 0.16 0.24 0.32 0.36 0.38 0.385
TOTAL= MT 223.04 1.44 31.92 88.56 20.9 2614
TOTAL CEMENT CONSUMPTION= MT 2979.8175
TOTAL CEMENT UNLOADING= MT 3099.787
WASTAGE 1% MT 30.998
BALANCE(10+12-13)= MT 88.972
CEMENT UNLOADING AT DANAV BUILDCON
UNLOADI
DATE CHALLAN NO UNIT
NG QTY
08.04.2021 7060171502 MT 24.097
08.04.2021 7060171500 MT 23.928
08.04.2021 7060171517 MT 24.314
09.04.2021 7060171568 MT 24.126
09.04.2021 7060171545 MT 24.008
10.04.2021 7060171677 MT 24.097
10.04.2021 7060171664 MT 23.998
13.04.2021 7060171908 MT 23.909
14.04.2021 7060172000 MT 24.186
15.04.2021 8937184379 MT 28.364
15.04.2021 8937184387 MT 31.284
22.06.2021 7060178828 MT 23.76
22.06.2021 7060178848 MT 24.314
23.06.2021 7060178945 MT 23.81
27.06.2021 7060179359 MT 24.918
26.06.2021 7060179175 MT 24.334
03.10.2021 1010197927 MT 24.32
28.10.2021 7060191339 MT 24.33
28.10.2021 7060191366 MT 24.04
30.10.2021 7060191616 MT 24.41
30.11.2021 7060191611 MT 24.41
19.11.2021 7320473315 MT 29.98
20.11.2021 7320473486 MT 29.84
20.11.2021 7060193159 MT 24.11
23.11.2021 7320473846 MT 34.47
23.11.2021 7320473848 MT 29.33
13.01.2022 7060199531 MT 29.62
20.01.2022 7060200166 MT 28.37
21.01.2022 7060200404 MT 24.13
21.01.2022 7060200395 MT 24.22
23.01.2022 7060200745 MT 24.22
26.01.2022 1010202629 MT 33.71
26.01.2022 1010202627 MT 33.74
04.02.2022 7060202620 MT 29.21
11.02.2022 7008823791 MT 38.80
17.02.2022 7008842006 MT 40.31
31.03.2022 7320511760 MT 40.74
31.03.2022 7060209876 MT 29.27
01.04.2022 7320512185 MT 34.21
16.06.2022 1010210749 MT 23.18
18.06.2022 1001022945 MT 34.46
19.06.2022 1010210957 MT 22.52
19.06.2022 7320535149 MT 39.4
24.06.2022 7320536775 MT 34.38
24.06.2022 1010211142 MT 22.52
24.06.2022 7320536658 MT 34.51
24.06.2022 1001024659 MT 40.89
29.06.2022 1010211593 MT 24.74
29.06.2022 1010211589 MT 34.2
07.06.2022 7302531598 MT 34.07
01.04.2022 7320480479 MT 30.05
01.04.2022 7320480475 MT 29.58
01.04.2022 7060199031 MT 24.42
01.04.2022 7320487979 MT 29.44
30.07.2022 100212768 MT 25.13
03.08.2022 1010212947 MT 29.61
03.08.2022 1010212927 MT 30.03
13.08.2022 B10017059 MT 34.33
16.08.2022 B10017058 MT 34.2
16.08.2022 B10017056 MT 34.15
04.09.2022 1010214213 MT 25.03
04.09.2022 1010214215 MT 24.05
05.09.2022 7320559246 MT 34.15
17.09.2022 1010214648 MT 24.81
18.09.2022 1010214627 MT 24.67
11.12.2022 7320588196 MT 36.33
12.12.2022 101018355 MT 24.31
04.01.2023 7320597904 MT 36.54
19.01.2023 7060244366 MT 28.96
19.01.2023 7060244294 MT 28.97
28.01.2023 1010221386 MT 24.9
27.01.2023 7320604847 MT 34.51
30.01.2023 1010221482 MT 33.56
30.01.2023 1010221481 MT 33.29
12.04.2023 7320629038 MT 34.36
12.04.2023 7320629045 MT 34.55
13.04.2023 7320629051 MT 34.24
18.04.2023 1010225408 MT 24.13
19.04.2023 1010225428 MT 24.22
25.05.2023 1010227311 MT 28.8
21.07.2023 1010230458 MT 29.3
21.07.2023 1010230483 MT 29.7
23.07.2023 1010230440 MT 24.62
16.08.2023 9181119194 MT 34.3
24.09.2023 7060275223 MT 34.06
29.09.2023 7060275995 MT 29.18
15.01.2024 1001215984 MT 37.800
15.01.2024 1001215883 MT 35.370
16.01.2024 1001216338 MT 40.420
17.03.2024 8965381925 MT 41.370
18.03.2024 8937320077 MT 30.380
19.03.2024 8965382918 MT 41.990
18.04.2024 8965396990 MT 41.030
18.04.2024 8965396961 MT 41.210
19.04.2024 8937324515 MT 33.250
20.04.2024 8937324678 MT 29.890
20.04.2024 8937374665 MT 32.560
20.04.2024 8965397736 MT 40.980
20.04.2024 8937324858 MT 30.860
24.04.2024 8965398295 MT 41.340
28.04.2024 8965401337 MT 41.490
29.04.2024 8965401666 MT 41.26
TOTAL CEMENT UNLOADING= MT 3099.787
REMARK
VEHICLE NO
GJ19X-7597
GJ03AX-5171
GJ05BX-7862
GJ18AV-6250
GJ21W-1964
GJ06YY-9415
GJ03AX-5171
GJ08Y4693
GJ19X 2202
GJ01CT 4011
GJ18AX 3596
GJ05BX 7862
GJ27U-0832
GJ16W-1964
GJ19X-2228
GJ21T-7920
GJ12AW-0896
GJ02ZZ-7692
GJ02XX-8510
GJ19X-2228
GJ08AU-6722
GJ08AU-5274
GJ05BX-0202
GJ18BT-4406
GJ01CZ-4910
GJ21W-0748
GJ19X-1422
GJ08AU-6886
GJ08AU-6510
GJ05BV-2645
GJ08AU-4267
RJ22GB-0797
RJ22GB-0797
GJ01DY-0274
GJ08AU-8198
GJ08AU-1998
GJ08AU-8705
GJ08Y-0790
GJ08AU-4267
GJ08AU-7094
GJ08AU-1998
GJ08AU-8790
GJ38GA-2543
GJ18AX-5518
GJ08AU-6243
GJ08AU-8943
GJ08AU-5070
GJ08AU-5047
GJ07YY-2295
GJ08AU-4695
GJ27U-0832
GJ08AU-5145
GJ08AU-1826
GJ08AU-7637
GJ08AU-8140
GJ08AU-9336
GJ08BY-7178
GJ08Y-5312
GJ08AU-8705
GJ08AU-1998
GJ08AU-1304
RJ38GA-2609
GJ08Y-2575
GJ18BT3394
GJ16AV-7506
GJ25U-7362
GJ27U-0832
GJ08AU-8763
GJ08AU-8837
GJ08AU-8790
GJ 08 AU 8198
GJ 08 AU 8140
GJ 08 AU 7981
GJ 08 Y 7278
GJ 27 U 0375
GJ12BX-8141
GJ08AU-2465
GJ12BX-8141
GJ27U-0375
GJ14Z-6002
GJ08AU5453
GJ18AZ5694
RJ22GB-6498
GJ08AU-9202
GJ08AU-9202
GJ12CT-0837
GJ14X-1761
TN37DW-6320
GJ12CT-0877
GJ39T-1491
CG04LL-8261
GJ05BX-6005
GJ16AV-1804
TN37DY-4030
GJ16AU-5431
GJ39T-1271
TN37AW-6320
MH18BZ-0324
BD BUILDCON LLP
GUJARAT FLUORO CHEMICALS LTD, DAHEJ-B
DY MIX CONCRETE M10 RECEIVED DETAILS
GATE ENTRY
SR NO DATE SUPPLIER CHALLAN NO VEHICLE NO.
NO
1 07.11.2020 DANEV BUILDCON 4361 1338 GJ16W-8529
2 12.11.2020 DANEV BUILDCON 4604 1395 GJ16W-8529
3 12.11.2020 DANEV BUILDCON 4596 1394 GJ16W-8529
4 13.11.2020 DANEV BUILDCON 4629 1403 GJ16W-8529
5 28.11.2020 DANEV BUILDCON 4940 1540 GJ16W-8529
6 09.03.2021 DANEV BUILDCON 9253 2390 GJ16AF-9640
7 18.03.2021 DANAV BUILDCON 9674 2599 GJ16AF-9640
8 19.03.2021 DANAV BUILDCON 9760 2636 GJ16AF-9640
9 20.03.2021 DANAV BUILDCON 9791 2651 GJ16AF-9640
10 22.03.2021 DANAV BUILDCON 9875 2682 GJ16W-8529
11 15.04.2021 DANAV BUILDCON 526 327 GJ16AF-9640
12 12.06.2021 DANAV BUILDCON 2240 1947 GJ16AF-9640
13 01.07.2021 DANAV BUILDCON 3053 2922 GJ16BS-2645
14 03.07.2021 DANAV BUILDCON 3146 2989 GJ16BS-2645
15 21.07.2021 DANAV BUILDCON 3905 GJ16BS-1858
16 30.07.2021 DANAV BUILDCON 4181 4424 GJ16BS-2645
17 30.07.2021 DANAV BUILDCON 4188 4435 GJ16BS-2645
18 31.07.2021 DANAV BUILDCON 4207 4457 GJ03CL-9102
19 22.11.2021 DANAV BUILDCON 8336 9161 GJ16BS-2645
20 22.11.2021 DANAV BUILDCON 8344 9175 GJ03CL-9102
21 22.11.2021 DANAV BUILDCON 8332 9158 GJ03CL-9102
22 25.12.2021 DANAV BUILDCON 9604 11543 GJ16BS-2498
23 25.12.2021 DANAV BUILDCON 9606 11548 GJ16BS-2074
24 25.12.2021 DANAV BUILDCON 9634 11596 GJ16BS-2645
25 27.12.2021 DANAV BUILDCON 9717 11730 GJ16BS-2696
26 28.12.2021 DANAV BUILDCON 9739 11751 GJ16BS-2645
27 29.12.2021 DANAV BUILDCON 9831 11891 GJ03CL-9102
28 30.12.2021 DANAV BUILDCON 9847 11923 GJ16BS-2645
29 30.12.2021 DANAV BUILDCON 9860 GJ16BS-2645
30 03.01.2022 DANAV BUILDCON 10032 12179 GJ16BS-2645
31 05.01.2022 DANAV BUILDCON 10140 12294 GJ16BS-1851
32 07.01.2022 DANAV BUILDCON 10295 12520 GJ16BS-2645
33 08.01.2022 DANAV BUILDCON 10338 12615 GJ16BS-1851
34 08.01.2022 DANAV BUILDCON 10341 12620 GJ16BS-1851
35 08.01.2022 DANAV BUILDCON 10317 12562 GJ16BS-2105
36 08.01.2022 DANAV BUILDCON 10331 12595 GJ16BS-2623
37 09.01.2022 DANAV BUILDCON 10351 12657 GJ16BS-1813
38 10.01.2022 DANAV BUILDCON 10359 12689 GJ16BS-2943
39 13.01.2022 DANAV BUILDCON 10646 12862 GJ03CL-9102
40 19.01.2022 DANAV BUILDCON 10957 13166 GJ16BS-2645
41 19.01.2022 DANAV BUILDCON 10945 13160 GJ16BS-2645
42 26.05.2022 DANAV BUILDCON 2372 2482 GJ16BS-2498
43 26.05.2022 DANAV BUILDCON 2400 2526 GJ16BS-2074
44 26.05.2022 DANAV BUILDCON 2410 2538 GJ16BS-2074
45 27.05.2022 DANAV BUILDCON 2441 2576 GJ06DH-0156
46 04.06.2022 DANAV BUILDCON 2845 2995 GJ16BS-2645
47 04.06.2022 DANAV BUILDCON 2846 2997 GJ6AF-9640
48 23.06.2022 DANAV BUILDCON 3639 4275 GJ6BS-1858
49 23.06.2022 DANAV BUILDCON 3658 4303 GJ06DH-0156
50 23.06.2022 DANAV BUILDCON 3667 3667 GJ16AF-9640
51 25.06.2022 DANAV BUILDCON 3781 4448 GJ16AF-9640
52 27.06.2022 DANAV BUILDCON 3898 4572 GJ06DH-0156
53 15.07.2022 DANAV BUILDCON 4416 5276 GJ06DH-0156
54 16.07.2022 DANAV BUILDCON 4432 5288 GJ06DH-0156
55 16.07.2022 DANAV BUILDCON 4440 5293 GJ06DH-0156
56 16.07.2022 DANAV BUILDCON 4444 5297 GJ16BS-2645
57 16.07.2022 DANAV BUILDCON 4449 5301 GJ16AF-9640
58 18.07.2022 DANAV BUILDCON 4472 5343 GJ16AF-9640
59 19.07.2022 DANAV BUILDCON 4527 5402 GJ16AF-9236
60 20.07.2022 DANAV BUILDCON 4549 5429 GJ16AF-9640
61 21.07.2022 DANAV BUILDCON 4595 5473 GJ16AF-9236
62 27.07.2022 DANAV BUILDCON 4813 5726 GJ16BS-2645
63 30.07.2022 DANAV BUILDCON 4981 5916 GJ16BS-2498
64 30.07.2022 DANAV BUILDCON 4982 5918 GJ16BS-2074
65 30.07.2022 DANAV BUILDCON 4986 5922 GJ16AF-9236
66 30.07.2022 DANAV BUILDCON 4987 5923 GJ16BS-3646
67 30.07.2022 DANAV BUILDCON 4989 5925 GJ16BS-2498
68 01.08.2022 DANAV BUILDCON 5039 6042 GJ16BS-2943
69 01.08.2022 DANAV BUILDCON 5037 GJ16BS-3646
70 01.08.2022 DANAV BUILDCON 5038 6040 GJ16BS-3827
71 07.08.2022 DANAV BUILDCON 5273 GJ16BS-3646
72 27.08.2022 DANAV BUILDCON 5875 GJ16AF-9640
73 06.09.2022 DANAV BUILDCON 6290 GJ03CL-9102
74 11.11.2022 DANAV BUILDCON 8726 GJ01JT-4763
75 11.11.2022 DANAV BUILDCON 8727 4036 GJ16BS-2457
76 15.11.2022 DANAV BUILDCON 8847 11207 GJ16BS-2105
77 15.11.2022 DANAV BUILDCON 8849 GJ16BS-1789
78 15.11.2022 DANAV BUILDCON 8830 GJ16BS-2645
79 15.11.2022 DANAV BUILDCON 8848 11206 GJ16BS-2930
80 15.12.2022 DANAV BUILDCON 9831 GJ16BS-3827
81 15.12.2022 DANAV BUILDCON 9834 GJ16BS-1789
82 15.12.2022 DANAV BUILDCON 9842 GJ16AF-9640
83 15.12.2022 DANAV BUILDCON 9844 12871 GJ16BS-2645
84 15.12.2022 DANAV BUILDCON 9855 12883 GJ16BS-2645
85 19.12.2022 DANAV BUILDCON 9954 13065 GJ16BS-1891
86 20.12.2022 DANAV BUILDCON 9981 13097 GJ16BS-2498
87 10.4.2023 DANEV BUILDCON 319 398 GJ 16 AF 9640
88 10.4.2023 DANEV BUILDCON 328 405 GJ 16 AF 9640
89 10.4.2023 DANEV BUILDCON 343 410 GJ 16 AF 9640
90 13.4.2023 DANEV BUILDCON 441 556 GJ 16 BS 2645
91 13.4.2023 DANEV BUILDCON 449 570 GJ 16 AF 9640
92 13.4.2023 DANEV BUILDCON 436 549 GJ 16 AF 9640
93 13.4.2023 DANEV BUILDCON 435 546 GJ 01 JT 4763
94 13.4.2023 DANEV BUILDCON 452 575 GJ 01 JT 4763
95 13.4.2023 DANEV BUILDCON 463 585 GJ 16 AF 9640
96 14.4.2023 DANEV BUILDCON 484 623 GJ 16 AF 9640
97 14.4.2023 DANEV BUILDCON 514 649 GJ 16 AF 9640
98 15.4.2023 DANEV BUILDCON 555 698 GJ 01 JT 4763
99 18.4.2023 DANEV BUILDCON 624 776 GJ 01 JT 4763
100 18.4.2023 DANEV BUILDCON 632 806 GJ 01 JT 4763
101 19.4.2023 DANEV BUILDCON 673 869 GJ 16 BS 2645
102 19.4.2023 DANEV BUILDCON 645 835 GJ 16 AF 9640
103 19.4.2023 DANEV BUILDCON 669 865 GJ 01 JT 4763
104 20.4.2023 DANEV BUILDCON 704 916 GJ 16 BS 2645
105 20.4.2023 DANEV BUILDCON 711 930 GJ 16 BS 2645
106 21.4.2023 DANEV BUILDCON 721 947 GJ 16 AF 9640
107 21.4.2023 DANEV BUILDCON 736 966 GJ 16 BS 2645
108 21.4.2023 DANEV BUILDCON 719 945 GJ 01 JT 4763
109 21.4.2023 DANEV BUILDCON 725 949 GJ 01 JT 4763
110 22.4.2023 DANEV BUILDCON 759 996 GJ 16 BS 2645
112 22.4.2023 DANEV BUILDCON 764 1007 GJ 16 BS 2645
113 24.4.2023 DANEV BUILDCON 815 1068 GJ 01 JT 4763
114 24.4.2023 DANEV BUILDCON 802 1050 GJ 16 BS 2645
115 25.04.2023 DANEV BUILDCON 829 1100 GJ16BS-2645
116 26.4.2023 DANEV BUILDCON 869 1160 GJ 16 AF 9640
117 26.4.2023 DANEV BUILDCON 866 1152 GJ 16 BS 2645
118 11.07.2023 DANEV BUILDCON 3489 4568 GJ16BS-2830
119 14.07.2023 DANEV BUILDCON 3566 4669 GJ05AU-5442
120 15.07.2023 DANEV BUILDCON 3637 4620 GJ16BS-2943
121 15.07.2023 DANEV BUILDCON 3638 4621 GJ6BS-1858
122 15.07.2023 DANEV BUILDCON 3639 4619 GJ16BS-2623
123 15.07.2023 DANEV BUILDCON 3644 4625 GJ16BS-3827
124 15.07.2023 DANEV BUILDCON 3647 4628 GJ16BS-2074
125 16.07.2023 DANEV BUILDCON 3655 4638 GJ16BS-2696
126 17.07.2023 DANEV BUILDCON 3661 4549 GJ16BS-1822
127 17.07.2023 DANEV BUILDCON 3663 4562 GJ16BS-1853
128 17.07.2023 DANEV BUILDCON 3678 4674 GJ16BS-1851
129 17.07.2023 DANEV BUILDCON 3683 4675 GJ16BS-1853
130 17.07.2023 DANEV BUILDCON 3688 4681 GJ16BS-1822
131 10.08.2023 DANEV BUILDCON 4400 5467 GJ05AU-5442
132 10.08.2023 DANEV BUILDCON 4419 5486 GJ16BS-0352
133 10.08.2023 DANEV BUILDCON 4401 5468 GJ01JT-4763
134 10.08.2023 DANEV BUILDCON 4421 5489 GJ01JT-4763
135 11.08.2023 DANEV BUILDCON 4446 5520 GJ16BS-0352
136 11.08.2023 DANEV BUILDCON 4447 5521 GJ01JT-4763
137 11.08.2023 DANEV BUILDCON 4458 5538 GJ05AU-5442
138 11.08.2023 DANEV BUILDCON 4464 5542 GJ01JT-4763
139 11.08.2023 DANEV BUILDCON 4466 5549 GJ16BS-0352
140 11.08.2023 DANEV BUILDCON 4476 5556 GJ05AU-5442
141 18.08.2023 DANEV BUILDCON 4686 5763 GJ05AU-5442
142 28.08.2023 DANEV BUILDCON 5087 6074 GJ01JT-4763
143 28.08.2023 DANEV BUILDCON 5082 6070 GJ05AU-5442
144 29.08.2023 DANEV BUILDCON 5159 7046 GJ16BS-0352
145 15.09.2023 DANEV BUILDCON 5916 7644 GJ01JT-4763
146 23.09.2023 DANEV BUILDCON 6174 7842 GJ01JT-4763
147 23.09.2023 DANEV BUILDCON 6177 7848 GJ16BS-0352
148 03.10.2023 DANEV BUILDCON 6539 8087 GJ16BS-6851
149 18.10.2023 DANEV BUILDCON 7368 8645 GJ16BS-0352
150 20.10.2023 DANEV BUILDCON 7490 8701 GJ16BS-0352
151 28.10.2023 DANEV BUILDCON 7918 8932 GJ16BS-0352
152 30.10.2023 DANEV BUILDCON 7973 8974 GJ16BS-0352
153 30.10.2023 DANEV BUILDCON 7990 8985 GJ16BS-0352
154 31.10.2023 DANEV BUILDCON 8057 9015 GJ16BS-0352
155 31.10.2023 DANEV BUILDCON 8074 9024 GJ16BS-0352
156 31.10.2023 DANEV BUILDCON 8086 9037 GJ16BS-0352
157 02.11.2023 DANEV BUILDCON 8174 9095 GJ16BS-0352
158 02.11.2023 DANEV BUILDCON 8200 9120 GJ16BS-0352
159 03.11.2023 DANEV BUILDCON 8250 9158 GJ16BS-0352
160 03.11.2023 DANEV BUILDCON 8265 9162 GJ16BS-0352
161 04.11.2023 DANEV BUILDCON 8298 9173 GJ16BS-0352
162 DANEV BUILDCON 8316 9193 GJ16BS-0352
163 08.11.2023 DANEV BUILDCON 8550 9300 GJ16BS-0352
164 10.11.2023 DANEV BUILDCON 8674 9369 GJ16BS-0352
165 10.11.2023 DANEV BUILDCON 8678 9371 GJ18BS-2498
166 17.11.2023 DANEV BUILDCON 8797 9431 GJ16BS-0352
167 17.11.2023 DANEV BUILDCON 8810 9443 GJ16BS-0352
168 18.11.2023 DANEV BUILDCON 8826 9456 GJ16BS-0352
169 25.11.2023 DANEV BUILDCON 9094 9612 GJ16BS-0352
170 25.11.2023 DANEV BUILDCON 9115 9630 GJ16BS-0352
171 26.11.2023 DANEV BUILDCON 9140 9643 GJ16BS-0352
172 06.12.2023 DANEV BUILDCON 9602 9733 GJ16BS-0352
173 23.02.2024 DANEV BUILDCON 12768 13163 GJ16BS-1851
174 23.02.2024 DANEV BUILDCON 12782 13192 GJ16BS-2498
175 23.02.2024 DANEV BUILDCON 12792 13208 GJ16BS-2830
176 24.02.2024 DANEV BUILDCON 12819 13239 GJ16BS-0352
177 26.02.2024 DANEV BUILDCON 12892 13295 GJ16BS-2074
178 27.02.2024 DANEV BUILDCON 12910 13301 GJ16BS-0352
179 27.02.2024 DANEV BUILDCON 12922 13318 GJ16BS-0352
180 27.02.2024 DANEV BUILDCON 12931 13320 GJ16BS-3646
181 27.02.2024 DANEV BUILDCON 12937 13323 GJ16BS-0352
182 27.02.2024 DANEV BUILDCON 12940 13324 GJ16BS-3827
183 27.02.2024 DANEV BUILDCON 12947 13330 GJ16BS-0352
184 27.02.2024 DANEV BUILDCON 12948 13332 GJ16BS-2696
185 02.03.2024 DANEV BUILDCON 13129 13450 GJ16BS-2696
186 02.03.2024 DANEV BUILDCON 13144 13466 GJ16BS-1851
187 07.03.2024 DANEV BUILDCON 13279 13511 GJ16BS-0352
188 06.03.2024 DANEV BUILDCON 13254 13472 GJ16BS-0352
189 14.03.2024 DANEV BUILDCON 13504 13564 GJ16BS-1851
190 27.03.2023 DANEV BUILDCON 14027 13966 GJ16BS-0352
191 29.03.2024 DANEV BUILDCON 14071 13940 GJ16BS-0352
192 29.03.2024 DANEV BUILDCON 14086 13951 GJ16BS-0352
193 04.03.2024 DANEV BUILDCON 13179 13490 GJ16BS-2623
194 04.03.2024 DANEV BUILDCON 13185 13507 GJ16BS-3826
195 04.03.2024 DANEV BUILDCON 13193 13515 GJ16BS-1851
196 30.03.2024 DANEV BUILDCON 14125 13981 GJ16BS-0352
197 01.04.2024 DANEV BUILDCON 17 17 GJ16BS-0352
198 03.04.2024 DANEV BUILDCON 70 57 GJ16BS-0352
199 04.04.2024 DANEV BUILDCON 110 84 GJ16BS-1891
200 05.04.2024 DANEV BUILDCON 126 100 GJ16BS-2498
201 05.04.2024 DANEV BUILDCON 130 104 GJ16BS-1851
202 15.04.2024 DANEV BUILDCON 360 228 GJ16BS-3827
204 16.04.2024 DANEV BUILDCON 396 252 GJ16BS-1851
205 16.04.2024 DANEV BUILDCON 381 237 GJ16BS-2623
206 17.04.2024 DANEV BUILDCON 427 267 GJ16BS-2074
207 18.04.2024 DANEV BUILDCON 461 280 DD03CL-9481
208 13.05.2024 DANEV BUILDCON 1116 669 GJ16BS-2943
209 17.05.2024 DANEV BUILDCON 1238 734 GJ16BS-2943
210 18.05.2024 DANEV BUILDCON 1251 745 GJ16BS-1851
211 18.05.2024 DANEV BUILDCON 1257 752 GJ16BS-1822
212 18.05.2024 DANEV BUILDCON 1269 756 GJ16BS-3646
MATERIAL UNIT RECD QTY REMARK
READY MIX CONCRETE M10 CUM 3 Bhumi Developers
READY MIX CONCRETE M10 CUM 6 Bhumi Developers
READY MIX CONCRETE M10 CUM 6 Bhumi Developers
READY MIX CONCRETE M10 CUM 3.5 Bhumi Developers
READY MIX CONCRETE M10 CUM 3 Bhumi Developers
READY MIX CONCRETE M10 CUM 3.5 Bhumi Developers
READY MIX CONCRETE M10 CUM 3 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 3.5 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 3 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 2.5 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 9 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 9 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 3 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 5 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 3 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 5 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 8 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 7 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 8 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 8 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 8 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 5 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 6 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 3.5 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 4 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 9 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 9 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 9 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 8 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 5 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 4 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 2 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 3 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 0.5 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 2.5 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 2.5 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 4 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 5 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 2 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 8 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 9 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 8 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 9 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 8 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 8 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 8 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 5 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 3 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 8 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 7 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 5 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 8 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 8 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 7 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 5 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 8 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 8 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 4 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 4 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 5 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 3 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M10 CUM 6 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 6.5 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 6 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 6 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 6 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 6 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 6 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 6 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 7 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 7 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 8 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 7 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 5 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 7 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 2 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 3 BD VEHICLE
READY MIX CONCRETE M10 CUM 8 BD VEHICLE
READY MIX CONCRETE M10 CUM 2.5 BD VEHICLE
READY MIX CONCRETE M10 CUM 3 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 2 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 3 BD VEHICLE
READY MIX CONCRETE M10 CUM 5 BD VEHICLE
READY MIX CONCRETE M10 CUM 7 BD VEHICLE
READY MIX CONCRETE M10 CUM 8 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 7 BD VEHICLE
READY MIX CONCRETE M10 CUM 7 BD VEHICLE
READY MIX CONCRETE M10 CUM 5 BD VEHICLE
READY MIX CONCRETE M10 CUM 7 BD VEHICLE
READY MIX CONCRETE M10 CUM 7 BD VEHICLE
READY MIX CONCRETE M10 CUM 7 BD VEHICLE
READY MIX CONCRETE M10 CUM 7 BD VEHICLE
READY MIX CONCRETE M10 CUM 8 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 8 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 4.5 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 8 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 8 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 4 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 8 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 8 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 4 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 DANAV VEHICLE
READY MIX CONCRETE M10 CUM 4.5 BD VEHICLE
READY MIX CONCRETE M10 CUM 3 BD VEHICLE
READY MIX CONCRETE M10 CUM 4 BD VEHICLE
READY MIX CONCRETE M10 CUM 8 DANEV VEHICLE
READY MIX CONCRETE M10 CUM 8 DANEV VEHICLE
READY MIX CONCRETE M10 CUM 8 DANEV VEHICLE
READY MIX CONCRETE M10 CUM 2.5 BD VEHICLE
READY MIX CONCRETE M10 CUM 4.5 BD VEHICLE
READY MIX CONCRETE M10 CUM 2.5 BD VEHICLE
READY MIX CONCRETE M10 CUM 5 DANEV VEHICLE
READY MIX CONCRETE M10 CUM 6 DANEV VEHICLE
READY MIX CONCRETE M10 CUM 5 DANEV VEHICLE
READY MIX CONCRETE M10 CUM 8 DANEV VEHICLE
READY MIX CONCRETE M10 CUM 5 DANEV VEHICLE
READY MIX CONCRETE M10 CUM 4 DANEV VEHICLE
READY MIX CONCRETE M10 CUM 5 DANEV VEHICLE
READY MIX CONCRETE M10 CUM 2 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 DANEV VEHICLE
READY MIX CONCRETE M10 CUM 8 DANEV VEHICLE
READY MIX CONCRETE M10 CUM 7 DANEV VEHICLE
READY MIX CONCRETE M10 CUM 7 DANEV VEHICLE
READY MIX CONCRETE M10 CUM 8 DANEV VEHICLE
TOTAL= CUM 1223.50
BD BUILDCON LLP
GUJARAT FLUORO CHEMICALS LTD, DAHEJ-B
DY MIX CONCRETE M10 RECEIVED DETAILS
GATE ENTRY
SR NO DATE SUPPLIER CHALLAN NO VEHICLE NO.
NO
111 22.4.2023 DANEV BUILDCON 779 GJ 16 BS 2645
MATERIAL UNIT RECD QTY REMARK
READY MIX CONCRETE M10 CUM 6
TOTAL= CUM 6.00
BD BUILDCON LLP
GUJARAT FLUORO CHEMICALS LTD, DAHEJ-B
DY MIX CONCRETE M20 RECEIVED DETAILS
GATE ENTRY
SR NO DATE SUPPLIER CHALLAN NO VEHICLE NO.
NO
1 23.11.2021 DANAV BUILDCON 8375 9214 GJ16BS-2645
2 25.12.2021 DANAV BUILDCON 9602 11530 GJ03CL-9102
3 30.12.2021 DANAV BUILDCON 9845 11918 GJ03CL-9102
4 04.01.2022 DANAV BUILDCON 10084 12240 GJ03CL-9102
5 04.01.2022 DANAV BUILDCON 10062 12209 GJ03CL-9102
6 08.01.2022 DANAV BUILDCON 10315 12559 GJ16BS-2645
7 18.02.2022 DANAV BUILDCON 12348 14683 GJ16BS-2645
8 21.06.2022 DANAV BUILDCON 3536 GJ16BS-2074
9 23.06.2022 DANAV BUILDCON 3638 4273 GJ06DH-0156
10 23.06.2022 DANAV BUILDCON 3641 4279 GJ16BS-1851
11 27.06.2022 DANAV BUILDCON 3914 4609 GJ16BS-2498
12 27.06.2022 DANAV BUILDCON 3917 4612 GJ16AF-9640
13 27.06.2022 DANAV BUILDCON 3921 4617 GJ16BS-2074
14 18.07.2022 DANAV BUILDCON 4465 5326 GJ06DH-0156
15 19.09.2022 DANAV BUILDCON 6695 GJ03CL-9102
16 12.09.2023 DANAV BUILDCON 5718 7493 GJ01JT-4763
17 28.02.2024 DANAV BUILDCON 12968 13337 GJ16BS-0352
18 29.02.2024 DANAV BUILDCON 13030 13364 GJ16BS-2943
19 23.03.2024 DANAV BUILDCON 13973 13859 GJ16BS-0352
20 21.03.2024 DANAV BUILDCON 13882 13799 GJ16BS-0352
MATERIAL UNIT RECD QTY REMARK
READY MIX CONCRETE M20 CUM 4.5 BHUMI VEHICLE
READY MIX CONCRETE M20 CUM 3 BHUMI VEHICLE
READY MIX CONCRETE M20 CUM 2 BHUMI VEHICLE
READY MIX CONCRETE M20 CUM 3 BHUMI VEHICLE
READY MIX CONCRETE M20 CUM 3 BHUMI VEHICLE
READY MIX CONCRETE M20 CUM 6 BHUMI VEHICLE
READY MIX CONCRETE M20 CUM 1 BHUMI VEHICLE
READY MIX CONCRETE M20 CUM 9
READY MIX CONCRETE M20 CUM 6
READY MIX CONCRETE M20 CUM 8
READY MIX CONCRETE M20 CUM 9
READY MIX CONCRETE M20 CUM 6
READY MIX CONCRETE M20 CUM 9
READY MIX CONCRETE M20 CUM 4
READY MIX CONCRETE M20 CUM 2.5 BD VEHICLE
READY MIX CONCRETE M20 CUM 4 BD VEHICLE
READY MIX CONCRETE M20 CUM 6 BD VEHICLE
READY MIX CONCRETE M20 CUM 6 DANAV VEHICLE
READY MIX CONCRETE M20 CUM 1.75 BD VEHICLE
READY MIX CONCRETE M20 CUM 6 BD VEHICLE
TOTAL= CUM 99.75
BD BUILDCON LLP
GUJARAT FLUORO CHEMICALS LTD, DAHEJ-B
UB:- READY MIX CONCRETE M25 RECEIVED DETAILS
GATE ENTRY
SR NO DATE SUPPLIER CHALLAN NO VEHICLE NO. MATERIAL UNIT RECD QTY REMARK
NO
1 06.11.2020 DANEV BUILDCON 4313 1328 GJ16W-8529 READY MIX CONCRETE M25 CUM 6 BHUMI VEHICLE
2 06.11.2020 DANEV BUILDCON 4323 1329 GJ16BS-2498 READY MIX CONCRETE M25 CUM 9 DANAV VEHICLE
3 06.11.2020 DANEV BUILDCON 4324 1330 GJ16W-8529 READY MIX CONCRETE M25 CUM 6 BHUMI VEHICLE
4 10.11.2020 DANEV BUILDCON 4483 1374 GJ16W-8529 READY MIX CONCRETE M25 CUM 5 BHUMI VEHICLE
5 10.11.2020 DANEV BUILDCON 4482 1373 GJ16AF-9640 READY MIX CONCRETE M25 CUM 6 BHUMI VEHICLE
6 26.11.2020 DANEV BUILDCON 4868 1519 GJ16W-8529 READY MIX CONCRETE M25 CUM 6 BHUMI VEHICLE
7 08.12.2020 DANEV BUILDCON 5262 1618 GJ16W-8529 READY MIX CONCRETE M25 CUM 2.5 BHUMI VEHICLE
8 14.04.2021 DANEV BUILDCON 511 320 GJ16BS-2498 READY MIX CONCRETE M25 CUM 9 DANAV VEHICLE
9 15.04.2021 DANEV BUILDCON 546 336 GJ16BS-1858 READY MIX CONCRETE M25 CUM 8 DANAV VEHICLE
10 27.05.2022 DANEV BUILDCON 2452 2590 GJ16BS-2498 READY MIX CONCRETE M25 CUM 9 DANAV VEHICLE
11 27.05.2022 DANEV BUILDCON 2457 2593 GJ06DH-0156 READY MIX CONCRETE M25 CUM 6 BHUMI VEHICLE
12 13.07.2022 DANEV BUILDCON 4382 5230 GJ16BS-2074 READY MIX CONCRETE M25 CUM 9 DANAV VEHICLE
13 13.07.2022 DANEV BUILDCON 4383 5231 GJ16BS-2498 READY MIX CONCRETE M25 CUM 9 DANAV VEHICLE
14 18.07.2022 DANEV BUILDCON 4466 5329 GJ16AF-9640 READY MIX CONCRETE M25 CUM 6
15 18.07.2022 DANEV BUILDCON 4467 5331 GJ16BS-2645 READY MIX CONCRETE M25 CUM 6
16 18.07.2022 DANEV BUILDCON 4468 5334 GJ16AF-9236 READY MIX CONCRETE M25 CUM 6
17 18.07.2022 DANEV BUILDCON 4469 5335 GJ16BS-2105 READY MIX CONCRETE M25 CUM 8
18 18.07.2022 DANEV BUILDCON 4470 5336 GJ16BS-2498 READY MIX CONCRETE M25 CUM 8
19 18.07.2022 DANEV BUILDCON 4473 5344 GJ16AF-9236 READY MIX CONCRETE M25 CUM 6
20 18.07.2022 DANEV BUILDCON 4474 5345 GJ16BS-2645 READY MIX CONCRETE M25 CUM 6
21 18.07.2022 DANEV BUILDCON 4479 5348 GJ16AF-9236 READY MIX CONCRETE M25 CUM 6
22 18.07.2022 DANEV BUILDCON 4482 5353 GJ16BS-2645 READY MIX CONCRETE M25 CUM 6
23 18.07.2022 DANEV BUILDCON 4487 5361 GJ16AF-9236 READY MIX CONCRETE M25 CUM 6
24 18.07.2022 DANEV BUILDCON 4493 5365 GJ16AF-9640 READY MIX CONCRETE M25 CUM 6
25 18.07.2022 DANEV BUILDCON 4500 5367 GJ16AF-9236 READY MIX CONCRETE M25 CUM 2.5
26 07.08.2022 DANEV BUILDCON 5270 GJ16BS-2930 READY MIX CONCRETE M25 CUM 8
27 07.08.2022 DANEV BUILDCON 5272 GJ16BS-2074 READY MIX CONCRETE M25 CUM 8
SLIP PENDING
SLIP PENDING
SLIP PENDING
90
PASS DUE
PASS DUE
PASS DUE
PASS DUE
BD BUILDCON LLP
GUJARAT FLUORO CHEMICALS LTD, DAHEJ-B
ADY MIX CONCRETE M30 RECEIVED DETAILS
CHALLAN GATE
SR NO DATE SUPPLIER VEHICLE NO. UNIT RECD QTY REMARK
NO ENTRY NO
836 28.06.2023 DANEV BUILDCON 3146 4081 GJ16BS-2074 CUM 9 DANEV VEHICLE
837 28.06.2023 DANEV BUILDCON 3147 4082 GJ16BS-2498 CUM 9 DANEV VEHICLE
TOTAL= CUM 18.00
BD BUILDCON LLP
GUJARAT FLUORO CHEMICALS LTD, DAHEJ-B
DY MIX CONCRETE M30 RECEIVED DETAILS
GATE ENTRY
SR NO DATE SUPPLIER CHALLAN NO
NO
1 07.11.2020 DANEV BUILDCON 4337 1336
2 09.11.2020 DANEV BUILDCON 4401 1350
3 09.11.2020 DANEV BUILDCON 4421 1354
4 10.11.2020 DANEV BUILDCON 4455 1366
5 10.11.2020 DANEV BUILDCON 4473 1369
6 12.11.2020 DANEV BUILDCON 4582 1393
7 28.11.2020 DANEV BUILDCON 4950 1543
8 29.11.2020 DANEV BUILDCON 4967 1547
9 30.11.2020 DANEV BUILDCON 5001 1559
10 03.12.2020 DANEV BUILDCON 5105 1578
11 04.12.2020 DANEV BUILDCON 5120 1584
12 08.12.2020 DANEV BUILDCON 5273 1620
VEHICLE NO. MATERIAL UNIT RECD QTY REMARK
GJ16W-8529 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16W-8529 READY MIX CONCRETE M30 CUM 4 BHUMI VEHICLE
GJ16W-8529 READY MIX CONCRETE M30 CUM 2.5 BHUMI VEHICLE
GJ16W-8529 READY MIX CONCRETE M30 CUM 3 BHUMI VEHICLE
GJ16W-8529 READY MIX CONCRETE M30 CUM 5 BHUMI VEHICLE
GJ16W-8529 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16W-8529 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16W-8529 READY MIX CONCRETE M30 CUM 3.5 BHUMI VEHICLE
GJ16W-8529 READY MIX CONCRETE M30 CUM 4.5 BHUMI VEHICLE
GJ16W-8529 READY MIX CONCRETE M30 CUM 4 BHUMI VEHICLE
GJ16W-8529 READY MIX CONCRETE M30 CUM 6 BHUMI VEHICLE
GJ16W-8529 READY MIX CONCRETE M30 CUM 4.5 BHUMI VEHICLE
TOTAL= CUM 55.00
BD BUILDCON LLP
GUJARAT FLUORO CHEMICALS LTD, DAHEJ-B
DY MIX CONCRETE M10 RECEIVED DETAILS
CHALLAN GATE
SR NO DATE SUPPLIER VEHICLE NO.
NO ENTRY NO
1 30.09.2023 DANEV BUILDCON 6426 GJ16AF-9640
2 30.09.2023 DANEV BUILDCON 6447 GJ16AF-9640
3 02.10.2023 DANEV BUILDCON 6517 GJ16AF-9640
4 27.10.2023 DANEV BUILDCON 7857 251 GJ16BS-0352
5 26.03.2024 DANEV BUILDCON 14003 626 GJ16BS-3827
6 26.03.2024 DANEV BUILDCON 14008 627 GJ16BS-0352
7 26.03.2024 DANEV BUILDCON 14009 628 GJ16BS-0352
8 26.03.2024 DANEV BUILDCON 14012 629 GJ16BS-0352
9 27.03.2024 DANEV BUILDCON 14016 630 GJ16BS-0352
10 27.03.2024 DANEV BUILDCON 14020 GJ16BS-0352
11 27.03.2024 DANEV BUILDCON 14030 630 GJ16BS-2623
12 01.04.2024 DANEV BUILDCON 3 643 GJ16BS-0352
13 01.04.2024 DANEV BUILDCON 12 644 GJ16BS-0352
14 02.04.2024 DANEV BUILDCON 39 649 GJ16BS-0352
15 02.04.2024 DANEV BUILDCON 43 650 GJ16BS-0352
16 02.04.2024 DANEV BUILDCON 48 651 GJ16BS-0352
17 02.04.2024 DANEV BUILDCON 49 652 GJ16BS-0352
18 03.04.2024 DANEV BUILDCON 57 653 DD03L-9481
19 03.04.2024 DANEV BUILDCON 59 654 GJ16BS-1858
20 03.04.2024 DANEV BUILDCON 62 659 DD03L-9481
21 03.04.2024 DANEV BUILDCON 64 658 GJ16BS-1858
22 03.04.2024 DANEV BUILDCON 68 660 DD03L-9481
23 03.04.2024 DANEV BUILDCON 76 661 DD03L-9481
24 08.04.2024 DANEV BUILDCON 184 676 DD03L-9481
25 09.04.2024 DANEV BUILDCON 197 679 DD03L-9481
26 11.04.2024 DANEV BUILDCON 251 681 GJ16BS-2498
27 11.04.2024 DANEV BUILDCON 265 684 GJ16BS-2498
28 11.04.2024 DANEV BUILDCON 267 686 DD03L-9481
29 11.04.2024 DANEV BUILDCON 269 688 DD03L-9481
30 12.04.2024 DANEV BUILDCON 283 684 DD03L-9481
31 12.04.2024 DANEV BUILDCON 287 690 DD03L-9481
32 12.04.2024 DANEV BUILDCON 297 691 DD03L-9481
33 12.04.2024 DANEV BUILDCON 302 692 DD03L-9481
34 12.04.2024 DANEV BUILDCON 305 694 DD03L-9481
35 13.04.2024 DANEV BUILDCON 319 DD03L-9481
36 DANEV BUILDCON
37 DANEV BUILDCON
38 DANEV BUILDCON
39 DANEV BUILDCON
40 DANEV BUILDCON
41 DANEV BUILDCON
42 DANEV BUILDCON
TOTAL=
RECD
MATERIAL UNIT REMARK
QTY LOCATION
READY MIX CONCRETE M10 CUM 3 BD VEHICLE
READY MIX CONCRETE M10 CUM 3 BD VEHICLE
READY MIX CONCRETE M10 CUM 2 BD VEHICLE
READY MIX CONCRETE M10 CUM 3 BD VEHICLE
READY MIX CONCRETE M10 CUM 8 DANEV VEHICLE
READY MIX CONCRETE M10 CUM 4 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 8 DANEV VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 6 BD VEHICLE
READY MIX CONCRETE M10 CUM 3.5 BD VEHICLE
READY MIX CONCRETE M10 CUM 8 DANEV VEHICLE
READY MIX CONCRETE M10 CUM 3.5 BD VEHICLE
READY MIX CONCRETE M10 CUM 8 DANEV VEHICLE
READY MIX CONCRETE M10 CUM 2.5 BD VEHICLE
READY MIX CONCRETE M10 CUM 3.5 BD VEHICLE
READY MIX CONCRETE M10 CUM 3 BD VEHICLE
READY MIX CONCRETE M10 CUM 1.5 BD VEHICLE
READY MIX CONCRETE M10 CUM 9 DANEV VEHICLE
READY MIX CONCRETE M10 CUM 9 DANEV VEHICLE
READY MIX CONCRETE M10 CUM 3.5 BD VEHICLE
READY MIX CONCRETE M10 CUM 3.5 BD VEHICLE
READY MIX CONCRETE M10 CUM 3.5 BD VEHICLE
READY MIX CONCRETE M10 CUM 3.5 BD VEHICLE
READY MIX CONCRETE M10 CUM 3.5 BD VEHICLE
READY MIX CONCRETE M10 CUM 3.5 BD VEHICLE
READY MIX CONCRETE M10 CUM 3.5 BD VEHICLE
READY MIX CONCRETE M10 CUM 3.5 BD VEHICLE SLIP PENDING.
READY MIX CONCRETE M10 CUM
READY MIX CONCRETE M10 CUM
READY MIX CONCRETE M10 CUM
READY MIX CONCRETE M10 CUM
READY MIX CONCRETE M10 CUM
READY MIX CONCRETE M10 CUM
READY MIX CONCRETE M10 CUM
CUM 170.5
BD BUILDCON LLP
GUJARAT FLUORO CHEMICALS LTD, DAHEJ-B
DY MIX CONCRETE M30 RECEIVED DETAILS
CHALLAN GATE
SR NO DATE SUPPLIER VEHICLE NO.
NO ENTRY NO
1 28.03.2024 DANEV BUILDCON 14063 634 GJ16BS-2074
2 02.04.2024 DANEV BUILDCON 27 640 DD03L-9481
3 03.04.2024 DANEV BUILDCON 81 662 DD03L-9481
4 04.04.2024 DANEV BUILDCON 89 664 DD03L-9481
5 08.04.2024 DANEV BUILDCON 176 674 DD03L-9481
6 11.04.2024 DANEV BUILDCON 261 683 GJ16BS-2498
7 15.04.2024 DANEV BUILDCON 353 697 GJ16BS-1891
8 23.04.2024 DANEV BUILDCON 596 712 DD03L-9481
9 23.04.2024 DANEV BUILDCON 599 713 DD03L-9481
10 22.04.2024 DANEV BUILDCON 566 710 GJ16BS-2623
11 12.05.2024 DANEV BUILDCON 1091 722 GJ16BS-1851
12
13
TOTAL=
RECD
MATERIAL UNIT REMARK
QTY LOCATION
READY MIX CONCRETE M25 CUM 9 DANEV VEHICLE
READY MIX CONCRETE M25 CUM 3.5 BD VEHICLE
READY MIX CONCRETE M25 CUM 3.5 BD VEHICLE
READY MIX CONCRETE M25 CUM 3.5 BD VEHICLE
READY MIX CONCRETE M25 CUM 3 BD VEHICLE
READY MIX CONCRETE M25 CUM 9 DANEV VEHICLE
READY MIX CONCRETE M25 CUM 6 DANEV VEHICLE
READY MIX CONCRETE M25 CUM 3.5 BD VEHICLE
READY MIX CONCRETE M25 CUM 1 BD VEHICLE
READY MIX CONCRETE M25 CUM 5 DANEV VEHICLE
READY MIX CONCRETE M25 CUM 5 DANEV VEHICLE
CUM 52
BD BUILDCON LLP
GUJARAT FLUORO CHEMICALS LTD, DAHEJ-B
DY MIX CONCRETE M30 RECEIVED DETAILS
CHALLAN GATE
SR NO DATE SUPPLIER VEHICLE NO.
NO ENTRY NO
1 10.10.2023 DANEV BUILDCON 6925 34 GJ16BS-0352
2 10.10.2023 DANEV BUILDCON 6906 21 GJ16BS-0352
3 11.10.2023 DANEV BUILDCON 6981 52 GJ16BS-0352
4 14.10.2023 DANEV BUILDCON 7146 85 GJ16BS-0352
5 17.10.2023 DANEV BUILDCON 7294 123 GJ16BS-0352
6 19.10.2023 DANEV BUILDCON 7424 158 GJ16BS-0352
7 20.10.2023 DANEV BUILDCON 7519 183 GJ16BS-0352
8 22.10.2023 DANEV BUILDCON 7624 202 GJ16BS-0352
9 27.10.2023 DANEV BUILDCON 7829 240 GJ16BS-0352
10 28.10.2023 DANEV BUILDCON 7933 268 GJ16BS-0352
11 01.11.2023 DANEV BUILDCON 8143 317 GJ16BS-0352
12 01.11.2023 DANEV BUILDCON 8129 304 GJ16BS-0352
13 03.11.2023 DANEV BUILDCON 8237 331 GJ16BS-0352
14 06.11.2023 DANEV BUILDCON 8416 357 GJ16BS-0352
15 07.11.20263 DANEV BUILDCON 8472 367 GJ16BS-0352
16 20.11.2023 DANEV BUILDCON 8870 415 GJ16BS-0352
17 24.11.2023 DANEV BUILDCON 9030 445 GJ16BS-0352
18 30.11.2023 DANEV BUILDCON 9298 463 GJ16BS-0352
19 30.11.2023 DANEV BUILDCON 9304 464 GJ16BS-0352
20 05.03.2024 DANEV BUILDCON 13243 579 GJ16BS-1858
21
22
TOTAL=
RECD
MATERIAL UNIT REMARK
QTY LOCATION
READY MIX CONCRETE M30 CUM 3 BD VEHICLE
READY MIX CONCRETE M30 CUM 4 BD VEHICLE
READY MIX CONCRETE M30 CUM 2 BD VEHICLE
READY MIX CONCRETE M30 CUM 4.5 BD VEHICLE
READY MIX CONCRETE M30 CUM 4.5 BD VEHICLE
READY MIX CONCRETE M30 CUM 3 BD VEHICLE
READY MIX CONCRETE M30 CUM 2 BD VEHICLE
READY MIX CONCRETE M30 CUM 4 BD VEHICLE
READY MIX CONCRETE M30 CUM 4 BD VEHICLE
READY MIX CONCRETE M30 CUM 2 BD VEHICLE
READY MIX CONCRETE M30 CUM 4 BD VEHICLE
READY MIX CONCRETE M30 CUM 6 BD VEHICLE
READY MIX CONCRETE M30 CUM 4 BD VEHICLE
READY MIX CONCRETE M30 CUM 1 BD VEHICLE
READY MIX CONCRETE M30 CUM 1 BD VEHICLE
READY MIX CONCRETE M30 CUM 2.5 BD VEHICLE
READY MIX CONCRETE M30 CUM 6 BD VEHICLE
READY MIX CONCRETE M30 CUM 5 BD VEHICLE
READY MIX CONCRETE M30 CUM 1 BD VEHICLE
READY MIX CONCRETE M30 CUM 4 DANEV VEHICLE
CUM 67.5
BD BUIOLDCON LLP
GUJARAT FLUORO CHEMICALS LTD, DAHEJ-B
SUB:- READY MIX CONCRETE RECEIVED DETAILS
S.NO DESCRIPTION UNIT M-10 M-20 M-25 M-30 M-30 REMARK
1 READY MIX CONCRETE RECEIVED CUM 1223.50 99.75 179.00 55.00 Err:509
UNLOAD
DATE CHALLAN NO ING QTY VEHICLE NO
08.04.2021 7060171502 MT 24.097 GJ19X-7597
08.04.2021 7060171500 MT 23.928 GJ03AX-5171
08.04.2021 7060171517 MT 24.314 GJ05BX-7862
09.04.2021 7060171568 MT 24.126 GJ18AV-6250
09.04.2021 7060171545 MT 24.008 GJ21W-1964
10.04.2021 7060171677 MT 24.097 GJ06YY-9415
10.04.2021 7060171664 MT 23.998 GJ03AX-5171
13.04.2021 7060171908 MT 23.909 GJ08Y4693
14.04.2021 7060172000 MT 24.186
15.04.2021 8937184379 MT 28.364
15.04.2021 8937184387 MT 31.284
22.06.2021 7060178828 MT 23.76 GJ19X 2202
22.06.2021 7060178848 MT 24.314 GJ01CT 4011
23.06.2021 7060178945 MT 23.81 GJ18AX 3596
27.06.2021 7060179359 MT 24.918 GJ05BX 7862
26.06.2021 7060179175 MT 24.334
03.10.2021 1010197927 MT 24.32 GJ27U-0832
28.10.2021 7060191339 MT 24.33 GJ16W-1964
28.10.2021 7060191366 MT 24.04 GJ19X-2228
30.10.2021 7060191616 MT 24.41 GJ21T-7920
30.11.2021 7060191611 MT 24.41 GJ12AW-0896
19.11.2021 7320473315 MT 29.98 GJ02ZZ-7692
20.11.2021 7320473486 MT 29.84 GJ02XX-8510
20.11.2021 7060193159 MT 24.11 GJ19X-2228
23.11.2021 7320473846 MT 34.47 GJ08AU-6722
23.11.2021 7320473848 MT 29.33 GJ08AU-5274