HOME DEFECT INSPECTION REPORT
M
Client
SEPTEMBER 19, 2022
Inspector
HIM Inspector
+603-7651 7878
[email protected]
TABLE OF CONTENTS
1: Inspection Details 5
3: Entrance 7
4: Kitchen 11
5: Yard 18
7: Balcony 24
8: Hallway 27
E
9: Bedroom 30
10: Bathroom 35
PL
M
SA
SUMMARY
58
DEFECT ITEM
E
3.3.1 Entrance - Walls: Painted Wall - Damage
3.4.1 Entrance - Doors: Materials and Damages
PL
3.4.2 Entrance - Doors: Door Latch Alignment
4.2.1 Kitchen - Floors: Damages
4.2.2 Kitchen - Floors: Hollowness
4.2.3 Kitchen - Floors: Jointing
M
E
9.6.1 Bedroom - Windows: Joints and Gaps
9.6.2 Bedroom - Windows: Materials and Damages
PL
9.6.3 Bedroom - Windows: Accessories Defects
9.7.1 Bedroom - M&E Fittings: Functionality
10.2.1 Bathroom - Floors: Alignment and Evenness
10.2.2 Bathroom - Floors: Hollowness
M
1: INSPECTION DETAILS
section-NjNiNDhjYjAtZjhiNC00YWQ4LWI4OTItMTM4ZWU1ZDdlYWMw
Information
In Attendance Occupancy Type of Building
Client, Home Inspector Newly House Condominium
General Disclaimer
Disclaimer
Thank you for choosing Home Inspection Malaysia to conduct your property inspection. We made every reasonable effort to
determine the condition of the property inspected.
The inspection was conducted in accordance with the standards of practice established and outlined by CIDB QLASSIC which
includes:
E
1. Architectural works including flooring, wall, ceiling, doors, windows and fixtures.
PL
2. Mechanical, Electrical, and Plumbing including basic fittings.
The Home Defect Inspection Report was prepared by Home Inspection (M) Sdn Bhd for the specific purpose of assessing the
general condition of the property and identifying defects that are readily apparent at the time of inspection based on a limited
M
visual, non-invasive inspection. Contained in this report are general information items, defect details and repairs needed which
were noted during the inspection.
This inspection report is our professional opinion but not a guarantee or a warranty of property condition. The inspection was
SA
intended to add to your knowledge of the property and help you understand the defects and safety risks contained in the
property.
This inspection report is complete and thorough, but it is a general overview, not technically exhaustive. Specialists in each field
could provide a more detailed analysis of the building systems, but at considerably more cost and time. Our visual and limited
operational inspection provides the broadest overview of the property with less cost and time.
This report is limited to deficiencies present at the time of the inspection. A property’s roof, mechanical equipment, plumbing
and electrical systems often fail without warning. New deficiencies can develop in buildings at any time, especially in buildings
which may lie vacant for a long period of time.
No responsibility is accepted in the event that the Defect Report is used for any other purpose than to assist the property owner
in better understanding the condition of their property for the purpose of rectifying identified defects.
We hope the information conveyed in this report is clear and concise and will help you better understand the general condition
of the property. If you have any further questions, please do not hesitate to contact us.
Please take note it is your right to submit by soft or hard copy this Defect Report to your developer for further
rectification of identified defects according to your S&P Agreement under section “Defect Liability Period”.
E
PL
M
SA
PRIORITY DEFECTS
Our inspection identified the following items which require priority attention:
● Floor: Many hollow tiles on the floor at the Bedroom/Balcony/Bathroom
● Ceiling: Leak damage on the ceiling at the Bathroom
COMMON DEFECTS
Most Common Defects by Area (Top 3):
1. Kitchen
2. Bathroom
3. Bedroom
Most Common Defects by Item (Top 3):
1. Floor
2. Wall
3. Door
CONCLUSION
We hope the information detailed in this report was clear and concise to help you better understand the general condition of the property. If you
have any further questions, please do not hesitate to contact us. Thank you for the opportunity to serve you!
3: ENTRANCE
section-MTUxNGJjMzctOWQ2OS00YTIxLWE3MjItMWI1ZjlkZjUwNzll
Information
General: Overall Photo
E
PL
Observations
3.2.1 Floors
DAMAGES
M
Surface damage observed on the floor at the time of the inspection. Recommend to engage a qualified
flooring contractor to evaluate and repair, or replace.
SA
Chipping
3.2.2 Floors
HOLLOWNESS
Hollow tiles found present at the time of inspection. Recommend to engage a quali ed contractor to re-
attach and seal.
Hollow sound
3.2.3 Floors
JOINTING
E
PL
Visible grouting issues observed at the floor joints at the time of inspection. Recommend a qualified
contractor to remove grout and regrout the tiles.
Inconsistent joints
Visible gaps
M
SA
3.3.1 Walls
PAINTED WALL - DAMAGE
Wall found to have damages in some areas. Recommend to engage a quali ed contractor to evaluate and
repair.
Cracks
Chipping
Uneven patchwork
E
PL
3.4.1 Doors
MATERIALS AND DAMAGES
Visible damages observed on the door leaf. Recommend a contractor to evaluate and repair, or replace.
M
Cracks
Chipping
SA
3.4.2 Doors
DOOR LATCH ALIGNMENT
E
PL
M
SA
4: KITCHEN
section-NjljYTY2NTgtYzZhYi00ZWFhLTk5YzYtZWM5YjUyNDE3ZTVh
Information
General: Overall Photo
E
PL
Observations
4.2.1 Floors
DAMAGES
M
Surface damage observed on the floor at the time of the inspection. Recommend to engage a qualified
flooring contractor to evaluate and repair, or replace.
SA
Chipping
4.2.2 Floors
HOLLOWNESS
Hollow tiles found present at the time of inspection. Recommend to engage a quali ed contractor to re-
attach and seal.
Hollow sound
4.2.3 Floors
JOINTING
E
PL
Visible grouting issues observed at the floor joints at the time of inspection. Recommend a qualified
contractor to remove grout and regrout the tiles.
Inconsistent joints
Visible gaps
M
SA
4.2.4 Floors
LIPPAGE TILE
Lippage tile found at the time of the inspection. Recommend a qualified contractor evaluate & remedy.
Lippage tile
Sharp edge
4.3.1 Walls
WALL TILE - FINISHING
Wall tile found staining or discoloration at the time of inspection.
Recommend a qualified tiler contractor evaluate & remedy.
E
Stains
PL
M
SA
4.3.2 Walls
WALL TILE - DAMAGE
Wall tile have surface damage visible at the time of the inspection. Recommend a qualified contractor
evaluate & remedy.
Chipping
4.3.3 Walls
HOLLOWNESS/ DELAMINATION - TILE
Hollow tiles are present at time of inspection. Recommend a
qualified contractor re-attach and seal.
Hollow sound
4.3.4 Walls
JOINTING
Uneven/Inconsistent grouting for the joints. Recommend a qualified contractor remove grout and regrout
E
tile.
Inconsistent joints
PL
M
SA
4.4.1 Ceilings
MINOR DAMAGES
Minor damage or deterioration to the ceiling was visible at the time of the inspection. Recommend the
qualify contractor to rectify.
Dents
4.5.1 Fixtures
ALIGNMENT AND EVENNESS
Alignment/evenness issue observed at the cabinet door at the time of inspection. Recommend a qualified
contractor to evaluate and remedy.
E
Not aligned
PL
M
SA
4.5.2 Fixtures
JOINTS AND GAPS
Jointing issue observed at the basin joints at the time of inspection. Recommend to evaluate and reseal
the joints.
Improper seal
4.5.3 Fixtures
CABINETS DAMAGED
Cabinets had visible damage at time of inspection. Recommend
carpenter contractor evaluate and repair.
E
Chipping
PL
M
SA
4.5.4 Fixtures
CABINETS - JOINTING
Jointing issue on the cabinet joints. Recommend carpenter contractor re-seal cabinets jointing.
Inconsistent joints
Visible gaps
E
PL
M
SA
5: YARD
section-YjZkYzU1ZTgtNmJkZC00Mjg2LWIyYjctY2NjZjE0MzEzYjE5
Information
General: Overall Photo
E
PL
Observations
5.2.1 Floors
HOLLOWNESS
M
Hollow sound
5.2.2 Floors
JOINTING
Visible grouting issues observed at the floor joints at the time of inspection. Recommend a qualified
contractor to remove grout and regrout the tiles.
Inconsistent joints
Visible gaps
5.3.1 Walls
PAINTED WALL - DAMAGE
Wall found to have damages in some areas. Recommend to engage a qualified contractor to evaluate and
repair.
E
Cracks
Dents
PL
M
SA
5.4.1 Doors
MATERIALS AND DAMAGES
Visible damages observed on the door leaf. Recommend a contractor to evaluate and repair, or replace.
Cracks
Chipping
E
PL
M
SA
Information
General: Overall Photo
E
PL
Observations
6.2.1 Floors
HOLLOWNESS
M
Hollow sound
6.2.2 Floors
JOINTING
Visible grouting issues observed at the floor joints at the time of inspection. Recommend a qualified
contractor to remove grout and regrout the tiles.
Inconsistent joints
Visible gaps
Stain on the grouts
6.3.1 Walls
PAINTED WALL - DAMAGE
Wall found to have damages in some areas. Recommend to engage a qualified contractor to evaluate and
repair.
E
Dents
PL
M
SA
6.4.1 Ceilings
MINOR DAMAGES
Minor damage or deterioration to the ceiling was visible at the time of the inspection. Recommend the
qualify contractor to rectify.
Cracks
E
PL
M
SA
7: BALCONY
section-YThlMjM5YWMtYTAxNy00ZGYyLWJiZjctOTllZGI5NDYzMDNk
Information
General: Overall Photo
E
PL
Observations
7.2.1 Floors
HOLLOWNESS
M
Hollow sound
' X' refer to many hollow tiles on the whole floor
7.2.2 Floors
JOINTING
Visible grouting issues observed at the floor joints at the time of inspection. Recommend a qualified
contractor to remove grout and regrout the tiles.
Inconsistent joints
Visible gaps
7.3.1 Walls
PAINTED WALL - DAMAGE
Wall found to have damages in some areas. Recommend to engage a qualified contractor to evaluate and
repair.
E
Cracks
PL
M
SA
7.4.1 Ceilings
FINISHING
Poor finishing for the surface of ceiling. Recommend a qualified
painter evaluate and apply a new coat and repaint.
Stains
7.5.1 Fixtures
MATERIALS AND DAMAGES
Visible damages observed on the railing at the time of inspection.
Recommend to evaluate and repair, or replace.
Rusty
7.6.1 Doors
FINISHING
Sliding door finish found some issue. Recommend the contractor to
E
clean.
Stains
PL
M
SA
8: HALLWAY
section-NWU0NTM2NTUtYzE0OS00ZWU0LTkxZWMtOWJhMzFmMzJhOGQw
Information
General: Overall Photo
E
PL
Observations
8.2.1 Floors
DAMAGES
M
Surface damage observed on the floor at the time of the inspection. Recommend to engage a qualified
flooring contractor to evaluate and repair, or replace.
SA
Scratches
8.2.2 Floors
HOLLOWNESS
Hollow tiles found present at the time of inspection. Recommend to engage a quali ed contractor to re-
attach and seal.
Hollow sound
8.2.3 Floors
JOINTING
E
PL
Visible grouting issues observed at the floor joints at the time of inspection. Recommend a qualified
contractor to remove grout and regrout the tiles.
Visible gaps
M
SA
8.3.1 Walls
PAINTED WALL - DAMAGE
Wall found to have damages in some areas. Recommend to engage a qualified contractor to evaluate and
repair.
Cracks
8.4.1 Ceilings
MINOR DAMAGES
Minor damage or deterioration to the ceiling was visible at the time of the inspection. Recommend the
qualify contractor to rectify.
E
Cracks
PL
M
SA
9: BEDROOM
section-M2I2NTM0MzctODg0Yi00NDllLThmMmYtNmU1MDg4MWFiMDM1
Information
General: Overall Photo
E
PL
Observations
9.2.1 Floors
HOLLOWNESS
M
Hollow tiles found present at the time of inspection. Recommend to engage a qualified contractor to re-
attach and seal.
SA
Hollow sound
'X' refer to many hollow tiles on the whole floor
9.3.1 Walls
ALIGNMENT AND EVENNESS
Wall surface was found to have evenness/alignment issues at the time of inspection. Recommend a
qualified contractor to evaluate and rectify.
Unevenness
E
PL
9.3.2 Walls
PAINTED WALL - DAMAGE
Wall found to have damages in some areas. Recommend to engage a qualified contractor to evaluate and
repair.
M
Cracks
Dents
SA
9.4.1 Ceilings
MINOR DAMAGES
Minor damage or deterioration to the ceiling was visible at the time of the inspection. Recommend the
qualify contractor to rectify.
E
Cracks
PL
M
SA
9.5.1 Doors
MATERIALS AND DAMAGES
Visible damages observed on the door leaf. Recommend a contractor to evaluate and repair, or replace.
Dents
9.6.1 Windows
JOINTS AND GAPS
Jointing issue observed at/between the window frames. Recommend
the contractor to evaluate and reseal the joints.
E
Visible gaps
PL
M
SA
9.6.2 Windows
MATERIALS AND DAMAGES
Visible damage found on the surface of the window. Recommend to
rectify.
Cracks
9.6.3 Windows
ACCESSORIES DEFECTS
Visible damage on the window handle screws. Recommend the contractor to rectify.
Rusty
E
and rectify.
10: BATHROOM
section-YTAzZGFkYTItMDBkNi00MTU1LTljZGEtNjIzOWE2YzFkNjY1
Information
General: Overall Photo
E
PL
Observations
10.2.1 Floors
ALIGNMENT AND EVENNESS
M
Flooring observed to have severe unevenness at some areas. Recommend to engage a qualified flooring
contractor to evaluate & remedy.
SA
10.2.2 Floors
HOLLOWNESS
Hollow tiles found present at the time of inspection. Recommend to engage a qualified contractor to re-
attach and seal.
Hollow sound
' X' refer to many hollow tiles on the whole floor
E
PL
10.3.1 Walls
WALL TILE - DAMAGE
Wall tile have surface damage visible at the time of the inspection. Recommend a qualified contractor
M
Cracks
SA
10.3.2 Walls
HOLLOWNESS/ DELAMINATION - TILE
Hollow sound
10.4.1 Ceilings
LEAK DAMAGE
Stains on the ceiling appear to be the result of leaks. The source of leakage should be identified and
corrected, and the ceiling re-painted.
E
FLIR Thermal Imaging technology is used for scanning and finding out temperature differences in a dry
area that indicates a high possibility of water leakage.
PL
M
SA
10.5.1 Doors
MATERIALS AND DAMAGES
Visible damages observed on the door leaf & frame. Recommend a contractor to evaluate and repair, or
replace.
Chipping
Dents
10.6.1 Windows
FUNCTIONALITY
Windows found to have some practical functionality issues at the
time of inspection. Recommend to engage a qualified contractor to
E
evaluate and rectify.
10.7.1 Fixtures
POOR/MISSING CAULK
Bathroom basin was missing sufficient caulk/sealant at the wall. This
can lead to water damage. Recommend adding sealant at bottom
where basin touch wall.
Visible gaps
E
Loose
PL
M
SA
*Exterior
Windows
Area
• Functionality
• Joints & Gap • Car porch
• Alignment & • Finishing
Evenness • Alignment &
• Accessories unevenness
Defect • Materials &
• Materials & damage
Damages • Functionality
• Joint & gaps
Vacant Possesion
The property is handed over to you in a completely empty
and clean state.
On-site Inspection
Close examination conducted at the actual location.
Re-inspection
Provide softcopy (PDF) report If re-inspection is
Inspection report will be ready within 3 - 5 working days. required, additional
charges will apply.