Steel Qty

Uploaded by

Ajay M Mangalore
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
24 views34 pages

Steel Qty

Uploaded by

Ajay M Mangalore
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 34

PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)

CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC


MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

1 SH108424 7-Dec-19 89211 TOWER CRANE FOUNDATION - TC 7 18,030.43

2 SH108425 7-Dec-19 89211 1st BASEMENT SUMP PIT @GRID 3/KK(POUR -01)REINF 8,863.62

3 SH108426 7-Dec-19 89211 1st BASEMENT SUMP PIT & SAND TRAP @GRID 3/EE(POUR-01)REINF 10,913.57

4 SH108501 8-Dec-19 74831 LIFT PIT(TH4)FOUNDATION (POUR-01)GRID(CC-BB)(2-3)(1/3) 15,410.55

5 SH108498 8-Dec-19 74831 1ST BASEMENT SUMP PIT & SAND TRAP@GRID 6/DD(POUR-01)REINF 10,868.64

6 SH108497 8-Dec-19 74831 1ST BASEMENT SUMP PIT & SAND TRAP@GRID 1/AA(POUR-01)REINF 13,025.56

7 SH108499 8-Dec-19 69118 LIFT PIT(TH4)FOUNDATION (POUR-01)(GRID (CC-BB)/(2-3))(3/3) 37,460.13

8 SH108500 8-Dec-19 74831 REBAR STEEL FOR TESTING 96.70

9 SH108590 9-Dec-19 75789 LIFT PIT(TH4)FOUNDATION (POUR-01)(GRID(CC/BB)/(2-3))(2/3) 37,753.27

10 SH108631 10-Dec-19 66583 1ST BASEMENT RAFT SLAB B1(POUR-01)(3/3) 51,118.72

11 SH108632 10-Dec-19 25829 1ST BASEMENT RAFT SLAB B1 LAYER.REINF(POUR-01)(2/3) 51,287.30

12 SH108610 9-Dec-19 32027 1ST BASEMENT RAFT SLAB B1 LAYER.REINF(POUR-01)(1/3) 51,288.57

13 SH108630 10-Dec-19 37297 1ST BASEMENT RAFT SLAB B2 LAYER REINF(POUR-01)(1/4) 47,481.47

14 SH108633 10-Dec-19 91740 CORE WALL STARTER {POUR-01(GRID(CC-BB)/(2-3) 11,858.14

15 SH108634 10-Dec-19 91740 CORE WALL STARTER {POUR-01(GRID(NN-MM)/(2-3)&(BB-CC)/(6-7) 13,215.20

16 SH108669 10-Dec-19 91740 TOWER CRANE FOUNDATION-TC-8(7800x7800) 13,409.17

17 SH108668 10-Dec-19 91740 1ST BASEMENT CHAIR REINF(POUR-01) 163.79

18 SH108713 11-Dec-19 37962 1ST BASEMENT RAFT SLAB B2 LAYER REINF(POUR-01)(2/4) 47,489.88

19 SH108712 11-Dec-19 19740 1ST BASEMENT RAFT SLAB B2 LAYER REINF(POUR-01)(3/4) 47,499.19

20 SH108747 11-Dec-19 39312 1ST BASEMENT RAFT SLAB B2 LAYER REINF(POUR-01)(4/4) 22,915.25

21 SH108748 11-Dec-19 39312 1ST BASEMENT RAFT SLAB SIDE BAR REINF.(POUR-01) 6,628.37

22 SH108749 11-Dec-19 39312 1ST BASEMENT RAFT SLAB RAMP STARTER REINF.(POUR-01) 331.80

23 SH108750 11-Dec-19 39312 1ST BASEMENT RAFT SLAB STAIR STARTER REINF.(POUR-01) 130.82

24 SH108774 12-Dec-19 98764 1ST BASEMENT RAFT SLAB B3,B4 ADDL LAYER REINF(POUR-01)(3/3) 51,851.02

25 SH108773 12-Dec-19 74831 1ST BASEMENT RAFT SLAB B2 LAYER REINF (POUR -01) 24,487.35

26 SH108776 12-Dec-19 37076 1ST BASEMENT RAFT SLAB B3,B4 ADDL LAYER REINF(POUR-01)(1/3) 51,997.03

27 SH108775 12-Dec-19 66583 2nd BASEMENT RAFT SLAB B3,B4 ADDL LAYER REINF(POUR-01)(2/3) 51,996.37
1ST BASEMENT RETAINING WALL STARTER & FOLDING BEAM
28 SH108953 15-Dec-19 74831 30,987.78
(POUR-01)(2/3)
PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

29 SH108952 15-Dec-19 74831 ADDL STRAIGHT BARS 8,027.69

30 SH108951 15-Dec-19 74831 1ST BASEMENT SUMP PIT@ GRID 3/KK (POUR-01) REINF. 5,365.06

31 SH108950 15-Dec-19 74831 1ST BASEMENT (POUR-01) SUMP PIT & SAND TRAP @ GRID 3/EE 5,313.35

32 SH108973 15-Dec-19 47878 1ST BASEMENT LEVEL COLUMN & WALL STARTER REINF. (POUR-01) 2,868.36

33 SH108971 15-Dec-19 47878 1ST BASEMENT LEVEL COLUMN & WALL STARTER REINF. (POUR-01) 4,706.37

34 SH108970 15-Dec-19 47878 1ST BASEMENT LEVEL COLUMN & WALL STARTER REINF. (POUR-01) 7,523.44

35 SH108969 15-Dec-19 47878 1ST BASEMENT LEVEL COLUMN & WALL STARTER REINF. (POUR-01) 3,219.86
1ST BASEMENT LEVEL WATER TANK STARTER HOR BAR REINF.
36 SH108968 15-Dec-19 47878 2,248.70
(POUR-01)
1ST BASEMENT LEVEL WATER TANK STARTER VER BAR REINF.
37 SH108967 15-Dec-19 47878 14,031.27
(POUR-01)
38 SH108982 16-Dec-19 75789 1ST BASEMENT WALL STARTER & FOLDING BEAM (POUR-01)(1/3) 31,611.82

39 SH108983 16-Dec-19 37729 1ST BASEMENT WALL STARTER & FOLDING BEAM (POUR-01)(3/3) 28,543.91

40 SH109077 17-Dec-19 69118 LIFT PIT (TH4)FOUDATION (GRID(CC-BB)/(12-13))(POUR -02)(2/2) 44,463.20

41 SH109078 17-Dec-19 32076 LIFT PIT (TH4)FOUDATION (GRID(CC-BB)/(12-13))(POUR -02)(1/2) 45,401.60

42 SH109221 19-Dec-19 72160 ADDL STRAIGHT BARS 12,013.71

43 SH109222 19-Dec-19 72160 CORE WALL STARTER (GRID(NN-MM)/(12-13)7(BB-CC)/(8-9))(POUR-02) 12,789.34

44 SH109223 19-Dec-19 72160 CORE WALL STARTER (GRID (CC-BB)/(2-3))(POUR-02) 5,616.79

45 SH109218 19-Dec-19 71166 1ST BASEMENT SUMP PIT &SAND TRAP @GRID 1/AA (POUR -01) 6,646.13

46 SH109219 19-Dec-19 71166 1ST BASEMENT SUMP PIT &SAND TRAP @GRID 6/DD (POUR -01) 5,418.02

47 SH109220 19-Dec-19 71166 CORE WALL STARTER (POUR-01)GRID(CC-BB)/(2/3) 11,446.42

48 SH109327 21-Dec-19 82882 1ST BASEMENT RAFT SLAB T3,T4ADDL LAYER (POUR-01)(1/3) 42,088.98

49 SH109324 21-Dec-19 19957 CORE WALL STARTER (GRID(CC-BB)/(2-3))(POUR-02) 11,161.58

50 SH109325 21-Dec-19 19957 1ST BASEMENT SUMP PIT -05@GRID 12 /DD(POUR-02) 19,029.57

51 SH109326 21-Dec-19 72160 1ST BASEMENT RAFT SLAB T3,T4ADDL LAYER (POUR-01)(2/3) 42,086.14

52 SH109364 21-Dec-19 39312 1ST BASEMENT RAFT SLAB T3,T4ADDL LAYER (POUR-01)(3/3) 41,946.15

53 SH109365 21-Dec-19 47878 1ST BASEMENT RAFT SLAB T2 LAYER (POUR-01)(3/3) 43,691.29

54 SH109366 21-Dec-19 76469 1ST BASEMENT RAFT SLAB T2 LAYER (POUR-01)(2/3) 43,686.63

55 SH109401 22-Dec-19 32076 1ST BASEMENT RAFT SLAB T1 LAYER (POUR-01)(1/3) 46,488.68

56 SH109402 22-Dec-19 72406 1ST BASEMENT RAFT SLAB T2 LAYER (POUR-01)(3/3) 43,596.30
PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

57 SH109444 22-Dec-19 75789 1ST BASEMENT RAFT SLAB B1 LAYER (POUR-02)(1/3) 47,489.37

58 SH109445 22-Dec-19 37962 1ST BASEMENT RAFT SLAB T1 LAYER (POUR-01)(3/3) 46,238.59

59 SH109446 22-Dec-19 97237 1ST BASEMENT RAFT SLAB T1 LAYER (POUR-01)(2/3) 46,468.75

60 SH109472 23-Dec-19 26811 1ST BASEMENT RAFT SLAB B1 LAYER (POUR-02)(3/3) 47,058.05

61 SH109473 23-Dec-19 66583 1ST BASEMENT RAFT SLAB B1 LAYER (POUR-02)(2/3) 47,494.00

62 SH109499 23-Dec-19 78044 1ST BASEMENT RAFT SLAB B2 LAYER (POUR-02)(1/5) 41,844.01

63 SH109500 23-Dec-19 69118 1ST BASEMENT RAFT SLAB B2 LAYER (POUR-02)(2/5) 46,414.69

64 SH109501 23-Dec-19 39312 1ST BASEMENT RAFT SLAB B2 LAYER (POUR-02)(3/5) 46,412.14

65 SH109576 24-Dec-19 66583 1ST BASEMENT RAFT SLAB BOTTOM ADDL LAYER (POUR-02)(1/4) 48,878.91

66 SH109577 24-Dec-19 92373 1ST BASEMENT RAFT SLAB B2 LAYER (POUR-02)(5/5) 40,214.56

67 SH109578 24-Dec-19 75789 1ST BASEMENT RAFT SLAB B2 LAYER (POUR-02)(4/5) 46,359.95
1ST BASEMENT RETAINING WALL STARTER & FOLDING BEAM (POUR-02)
68 SH109644 25-Dec-19 39312 37,794.96
(1/2)
1ST BASEMENT RETAINING WALL STARTER & FOLDING BEAM (POUR-02)
69 SH109645 25-Dec-19 91799 36,412.86
(2/2)
70 SH109729 26-Dec-19 75789 1ST BASEMENT RAFT SLAB BOTTOM ADDL LAYER (POUR-02)(2/4) 48,892.87

71 SH109728 26-Dec-19 26811 1ST BASEMENT RAFT SLAB BOTTOM ADDL LAYER (POUR-02)(3/4) 48,883.88

72 SH109968 29-Dec-19 47878 1ST BASEMENT RAFT SLAB BOTTOM ADDL LAYER (POUR-02)(4/4) 48,839.92

73 SH109974 30-Dec-19 25283 1ST BASEMENT LEVEL COLUMN & WALL STARTER (POUR-02) 6,525.37

74 SH109973 30-Dec-19 25283 1ST BASEMENT LEVEL COLUMN & WALL STARTER (POUR-02) 4,269.29

75 SH109975 30-Dec-19 25283 1ST BASEMENT LEVEL COLUMN & WALL STARTER (POUR-02) 8,051.57

76 SH109976 30-Dec-19 25283 1ST BASEMENT LEVEL COLUMN & WALL STARTER (POUR-01) 4,014.31

77 SH109977 30-Dec-19 25283 1ST BASEMENT RAFT SLAB SIDE BAR (POUR-02) 10,077.16

78 SH110056 30-Dec-19 91799 ADDL STRAIGHT BARS 10,015.78

79 SH110057 30-Dec-19 91799 1ST BASEMENT RAFT SLAB B2 LAYER(POR-01)REINF 3,083.20

80 SH110058 31-Dec-19 91799 TOWER CRANE TC-6 (7100x7100) REINF. 9,049.96

81 SH110059 30-Dec-19 91799 TOWERCRANE FOUNDATION TC-5(7800X7800)REINF 13,409.17

82 SH110206 4-Jan-20 72160 1ST BASEMENT RAFT SLAB T3,T4 ADDL LAYER(POUR-02)(2/2) 45,390.02

83 SH110205 4-Jan-20 74831 1ST BASEMENT RAFT SLAB T3,T4 ADDL LAYER (POUR-02)(1/2) 45,488.56

84 SH110314 5-Jan-20 32084 1ST BASEMENT RAFT SLAB T2 LAYER(POUR-02)(2/3) 46,724.16


PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

85 SH110313 5-Jan-20 22435 1ST BASEMENT RAFT SLAB T2 LAYER (POUR-02) (1/3) 46,689.03

86 SH110328 5-Jan-20 47878 1ST BASEMENT RAFT SLAB T2 LAYER (POUR-02)(3/3) 46,775.53

87 SH110360 6-Jan-20 74831 1ST BASEMENT RAFT SLAB T1 LAYER (POUR-02)(1/3) 45,393.38

88 SH110361 6-Jan-20 76469 1ST BASEMENT RAFT SLAB T1 LAYER (POUR-02)(2/3) 45,381.81

89 SH110443 6-Jan-20 66675 1ST BASEMENT RAFT SLAB T1 LAYER (POUR-02)(3/3) 45,440.75

90 SH110625 9-Jan-20 66675 1ST BASEMENT TO LOWER GROUND VERTICAL (POUR-01)REINF(1/5) 35,199.05

91 SH110626 9-Jan-20 66675 ADDITIONAL STRAIGHT BARS REINF 8,089.34

92 SH110695 11-Jan-20 91799 1ST BASEMENT TO LOWER GROUND VERTICAL (POUR -01)REINF-(2/5) 35,196.68

93 SH110694 11-Jan-20 91740 1ST BASEMENT TO LOWER GROUND VERTICAL (POUR -01)REINF-(3/5) 35,188.15

94 SH110717 12-Jan-20 69118 1ST BASEMENT TO LOWER GROUND VERTICAL (POUR -01)REINF-(5/5) 34,666.64

95 SH110727 12-Jan-20 69118 1ST BASEMENT TO LOWER GROUND VERTICAL (POUR -01)REINF 10,976.10

96 SH110718 12-Jan-20 66675 1ST BASEMENT TO LOWER GROUND VERTICAL (POUR -01)REINF.(4/5) 35,196.20

97 SH111039 16-Jan-20 75789 ADDITIONAL STRAIGHT BARS REINF 50,094.48

98 SH111268 20-Jan-20 74831 1ST BASEMENT TO LOWER GROUND-RW1(POUR-02) (1/2) 33,881.48

99 SH111267 20-Jan-20 74831 1ST BASEMENT TO LOWER GROUND RW1(POUR -02)(2/2) 17,547.31

100 SH111248 20-Jan-20 66675 1ST BASEMENT TOWER CRANE&DEWATERING REINF 4,670.47

101 SH111249 20-Jan-20 66675 LOWER GROUND LEVEL SUMP PIT-06 REINF(POUR-03) 19,712.94

102 SH111250 20-Jan-20 66675 LOWER GROUND LEVEL SUMP PIT-07 REINF(POUR-03) 12,016.85

103 SH111310 21-Jan-20 47878 LIFT PIT(TH4)FOUNDATION (GRID(B-C)(12-13)-POUR-03(1/3) 30,187.34

104 SH111325 21-Jan-20 33987 LIFT PIT(TH4)FOUNDATION (GRID(B-C)(12-13)-POUR-03(3/3) 32,905.71

105 SH111324 21-Jan-20 39312 LIFT PIT(TH4)FOUNDATION (GRID(B-C)(12-13)-POUR-03(2/3) 36,260.21

106 SH111323 21-Jan-20 39312 1ST BASEMENT TO LOWER GROUND VERTICAL(POUR-01)- REINF 1,285.72

107 SH111513 23-Jan-20 74831 BASEMENT-01 TO LOWER GROUND LEVEL COLUMN & WALL (POUR-02) 16,864.85
BASEMENT-01 TO LOWER GROUND CORE WALL (POUR-02) (GRID(NN-
108 SH111514 23-Jan-20 74831 11,298.74
MM)/(12-13))
COREWALL BASEMENT-1 TO LOWER GROUND
109 SH111515 23-Jan-20 74831 15,893.85
(POUR-02)(GRID(CC-BB)/(12-13))
110 SH111516 23-Jan-20 74831 1ST BASEMENT TO LOWER GROUND W.T WALL (RW3) (P-02) 10,221.46

111 SH111511 23-Jan-20 72406 BASEMENT-01 TO LOWER GROUND LEVEL COLUMN & WALL (POUR-02) 29,956.26

112 SH111509 23-Jan-20 72406 BASEMENT-1 TO LOWER GROUND STAIR-03 CW (POUR-02) 13,271.48
PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

113 SH111510 23-Jan-20 72406 BASEMENT-01 LOWER GROUND LEVEL COLUMN & WALL (POUR-02) 5,484.76

114 SH111581 25-Jan-20 91740 LOWER GROUND LEVEL COLUMN & WALL STARTER (POUR-03) 6,103.25

115 SH111583 25-Jan-20 91740 LOWER GROUND LEVEL COLUMN & WALL STARTER (POUR-03) 8,159.49

116 SH111580 25-Jan-20 91740 LOWER GROUND LEVEL RETAINING WALL STARTER (POUR-03) 16,574.72

117 SH111597 25-Jan-20 91740 TOWER CRANE FOUNDATION TC-2(7100x7100) REINF 10,508.14

118 SH111582 25-Jan-20 42080 LOWER GROUND LEVEL COLUMN & WALL STARTER (POUR-03) 6,713.44

119 SH111584 25-Jan-20 42080 CORE WALL STARTER (GRID(M-N)/(12-13)&(B&C)/(8-9)) REINF (POUR-03) 13,332.28

120 SH111585 25-Jan-20 42080 CORE WALL STARTER (GRID(B-C)/(12-13)) REINF (POUR-03) 17,880.78

121 SH111846 28-Jan-20 53002 LOWER GF RAFT SLAB B1 LAYER (POUR-03) REINF (1/3) 50,598.34

122 SH111847 28-Jan-20 92371 LOWER GF RAFT SLAB B1 LAYER (POUR-03) REINF (2/3) 50,582.36

123 SH111848 28-Jan-20 72406 LOWER GF RAFT SLAB B1 LAYER (POUR-03) REINF (3/3) 50,581.82

124 SH111967 29-Jan-20 84195 1ST BASEMENT TO LOWER GROUND W.T WALL (HOOKS) 876.90

125 SH111919 29-Jan-20 84195 LOWER GF RAFT SLAB B2 LAYER (POUR-03) REINF (1/4) 48,068.82
PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

126 SH111918 29-Jan-20 17962 LOWER GF RAFT SLAB B2 LAYER (POUR-03) REINF (2/4) 48,072.87

127 SH112027 30-Jan-20 17035 LOWER GF RAFT SLAB B2 LAYER (POUR-03) REINF (3/4) 48,088.13

128 SH112026 30-Jan-20 93483 LOWER GF RAFT SLAB B2 LAYER (POUR-03) REINF (4/4) 47,814.44

129 SH111994 30-Jan-20 47878 LOWER GF RAFT SLAB BOTTOM ADDL (POUR-03) REINF (1/3) 46,690.95

130 SH111995 30-Jan-20 72160 LOWER GF RAFT SLAB BOTTOM ADDL (POUR-03) REINF (2/3) 46,692.05

131 SH111996 30-Jan-20 32027 LOWER GF RAFT SLAB BOTTOM ADDL (POUR-03) REINF (3/3) 46,534.59

132 SH112090 30-Jan-20 26811 LOWER GF RAFT SLAB T2 LAYER (POUR-03) REINF (3/3) 43,307.72

133 SH112091 30-Jan-20 42080 LOWER GF RAFT SLAB T2 LAYER (POUR-03) REINF (2/3) 43,594.89

134 SH112087 30-Jan-20 47878 LOWER GF RAFT SLAB FOLDING BEAM & UPSTAND (POUR-03) REINF 12,677.43

135 SH112093 30-Jan-20 47878 LOWER GF RAFT SLAB T3,T4,T5,T6 LAYER (POUR-03) REINF (2/3) 38,180.00

136 SH112094 30-Jan-20 76469 LOWER GF RAFT SLAB T3,T4, T5, T6 LAYER (POUR-03) REINF (1/3) 38,184.60

137 SH112088 30-Jan-20 76469 LOWER GF RAFT SLAB SIDE BAR (POUR-03) REINF 9,424.33

138 SH112092 30-Jan-20 30316 LOWER GF RAFT SLAB T2 LAYER (POUR-03) REINF (1/3) 43,572.07

139 SH112175 2-Feb-20 72406 LOWER GF RAFT SLAB T1 LAYER (POUR-03) REINF (1/3) 48,060.94

140 SH112177 2-Feb-20 76469 LOWER GF RAFT SLAB T1 LAYER (POUR-03) REINF (3/3) 47,857.85

141 SH112176 2-Feb-20 72160 LOWER GF RAFT SLAB T1 LAYER (POUR-03) REINF (2/3) 48,082.84

142 SH112253 3-Feb-20 25283 LOWER GF RAFT SLAB T3,T4,T5,T6 LAYER (POUR-03) REINF (3/3) 37,995.52

143 SH112508 8-Feb-20 18169 LOWER GROUND RAFT SLAB B1 LAYER (POUR-04) REINF (1/3) 47,083.12

144 SH112509 8-Feb-20 26848 LOWER GROUND RAFT SLAB B1 LAYER (POUR-04) REINF (2/3) 47,097.99

145 SH12510 8-Feb-20 82488 LOWER GROUND RAFT SLAB B2 LAYER (POUR-04) REINF (1/3) 49,959.50

146 SH12511 8-Feb-20 26714 ADDITIONAL STRAIGHT BARS 44,106.94

147 SH112551 8-Feb-20 33987 BASEMENT-1 TO LOWER GROUND RAMP SLAB & UPSTAND REINF 17,442.28

148 SH112552 8-Feb-20 33987 LOWER GROUND RAFT SLAB SIDE BAR (POUR-04) REINF 8,158.85

149 SH112561 8-Feb-20 47878 ADDITIONAL STRAIGHT BARS (1/2) 45,164.40

150 SH112584 8-Feb-20 78044 ADDITIONAL STRAIGHT BARS (1/2) 44,857.92

151 SH112625 9-Feb-20 26811 LOWER GROUND RAFT SLAB B2 LAYER (POUR-04) REINF (3/3) 48,832.17

152 SH112626 9-Feb-20 26811 LOWER GROUND RAFT SLAB B2 LAYER (POUR-04) REINF (2/3) 49,934.31

153 SH112627 9-Feb-20 88436 LOWER GROUND RAFT SLAB B1 LAYER (POUR-04) REINF(3/3) 46,935.45
PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

154 SH112733 11-Feb-20 80791 TOWER CRANE FOUNDATION TC-4 (7100 X 7100) 10,508.14

155 SH112734 11-Feb-20 80791 LOWER GROUND RAFT SLAB T1 LAYER (POUR-04) REINF (1/3) 43,658.11

156 SH112766 11-Feb-20 88436 LOWER GROUND RAFT SLAB BOT ADDL (POUR-04) REINF (3/3) 47,753.08

157 SH112767 11-Feb-20 80661 LOWER GROUND RAFT SLAB BOT ADDL (POUR-04) REINF (2/3) 47,986.39

158 SH112768 11-Feb-20 72406 LOWER GROUND RAFT SLAB BOT ADDL (POUR-04) REINF(1/3) 47,982.77

159 SH112780 11-Feb-20 72406 ADDITIIONAL SPIRAL 3,193.90

160 SH112806 12-Feb-20 74831 LOWER GROUND RAFT SLAB TOP ADDL (POUR-04) REINF (1/2) 46,151.87

161 SH112805 12-Feb-20 98764 LOWER GROUND RAFT SLAB TOP ADDL (POUR-04) REINF (2/2) 46,099.57

162 SH112822 12-Feb-20 69118 LOWER GROUND RAFT SLAB T2 LAYER (POUR-04) REINF(1/3) 45,893.43

163 SH112823 12-Feb-20 72406 LOWER GROUND RAFT SLAB T2 LAYER (POUR-04) REINF(2/3) 45,883.68

164 SH112824 12-Feb-20 30316 LOWER GROUND RAFT SLAB T2 LAYER (POUR-04) REINF (3/3) 45,635.25

165 SH112825 12-Feb-20 99250 LG PT SLAB ADDL LAYER,LIVE, DEAD END & PANS (P-01) 5,932.51
LOWER GROUND FLR PT SLAB POUR STRIP BAR & TRIMMER BAR (POUR-
166 SH112826 12-Feb-20 99250 13,372.96
01)
167 SH112827 12-Feb-20 99250 LG LEVEL PT SLAB PUNCHING SHEAR (POUR-01) 2,112.24

168 SH112865 13-Feb-20 78044 LOWER GROUND RAFT SLAB T1 LAYER (POUR-04) REINF (2/3) 43,688.94

169 SH112866 13-Feb-20 88436 LOWER GROUND RAFT SLAB T1 LAYER (POUR-04) REINF (3/3) 43,485.09

170 SH112914 13-Feb-20 17035 ADDITIONAL STRAIGHT BARS (3/3) 40,066.56

171 SH112917 13-Feb-20 72406 ADDITIONAL STRAIGHT BARS (1/3) 44,979.30

172 SH112863 13-Feb-20 34422 LG LEVEL RC SLAB B2, T2 LAYER & PUNCHING SHEAR (P-02) 20,638.00

173 SH112864 13-Feb-20 34422 LG RC SLAB B1, T1 LAYER TRIMMER BAR, TOWER CRANE & BEAM (P-02) 17,881.34

174 SH112916 13-Feb-20 18492 ADDITIONAL STRAIGHT BARS (2/3) 44,979.30

175 SH112927 13-Feb-20 73173 LG PT SLAB X-DIR ADDL, LIVE, DEAD END & PAN (P-02)3 4,628.71

176 SH112928 13-Feb-20 73173 LOWER GROUND FLOOR PT SLAB POUR STRIP BOTTOM LAYER (POUR-02) 7,163.36

177 SH112926 13-Feb-20 73173 LGF PT SLAB ADDL LAYER & TRIMMER BAR (POUR-02) 9,340.01
LGF PT SLAB POUR STRIP TOP LAYER & COREWALL CORNER BAR (POUR-
178 SH112929 13-Feb-20 73173 6,448.78
02)
179 SH112930 13-Feb-20 73173 LG LEVEL PT SLAB PUNCHING SHEAR (POUR-02) 1,803.70

180 SH112931 13-Feb-20 73173 LG LEVEL PT SLAB PUNCHING SHEAR (POUR-02) 3,184.26

181 SH113002 15-Feb-20 26811 ADDITIONAL STRAIGHT BARS 30,175.20


PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

182 SH113023 16-Feb-20 19957 LIFT PIT (TH4) FOUNDATION (GRID (B-C)/((2-3)) (POUR-04) REINF (2/3) 39,094.63

183 SH113024 16-Feb-20 76469 LIFT PIT (TH4) FOUNDATION (GRID (B-C)/((2-3)) (POUR-04) REINF (1/3) 39,075.17

184 SH113025 16-Feb-20 76469 TOWER CRANE FOUNDATION TC-1 (7100 x 7100) REINF 10,508.14

185 SH113035 16-Feb-20 26811 LG RC SLAB B1, B2, T1 & T2 LAYER & PUNCHING SHEAR REINF 15,021.22

186 SH113036 16-Feb-20 26811 CORE WALL STARTER (GRID(B-C)/(2-3)) (POUR-04) REINF 17,261.95

187 SH113037 16-Feb-20 26811 CORE WALL STARTER (GRID(M-N)/(2-3)&(B&C)/(6-7)) REINF (POUR-04) 13,539.28

188 SH113038 16-Feb-20 34422 LIFT PIT (TH4) FOUNDATION (GRID(B-C)/(2-3)) (POUR-04) REINF (3/3) 38,863.64

189 SH113083 17-Feb-20 26848 LOWER GROUND LEVEL COLUMN & WALL STARTER (POUR-04) REINF 6,955.74

190 SH113084 17-Feb-20 26848 LOWER GROUND LEVEL COLUMN & WALL STARTER (POUR-04) REINF 5,666.24

191 SH113085 17-Feb-20 26848 LOWER GROUND LEVEL COLUMN & WALL STARTER (POUR-04) REINF 6,609.99

192 SH113087 17-Feb-20 26848 LOWER GROUND LEVEL COLUMN & WALL STARTER (POUR-04) REINF 3,478.87

193 SH113088 17-Feb-20 26848 LOWER GROUND LEVEL RETAINING WALL STARTER (POUR-04) REINF 19,093.58

194 SH113132 17-Feb-20 33987 LOWER GROUND LEVEL TO GROUND LEVEL COLUMN (POUR-03) 12,108.13

195 SH113133 17-Feb-20 33987 LOWER GROUND TO GROUND FLOOR (POUR-03) (GRID(C-B)/(12-13)) 19,466.86

196 SH113161 18-Feb-20 73173 LOWER GROUND TO GROUND FLOOR RW1 (POUR-03) 31,614.91

197 SH113163 18-Feb-20 91799 LOWER GROUND LEVEL TO GROUND LEVEL (POUR-03) 11,844.24

198 SH113174 18-Feb-20 91799 LOWER GROUND LEVEL TO GROUND LEVEL COLUMN & WALL (POUR-03) 19,386.95

199 SH113184 18-Feb-20 76469 LGF-GF COLUMN & WALL (POUR-04) REINF 11,648.97

200 SH113185 18-Feb-20 47878 LGF-GF COLUMN & WALL (POUR-04) REINF 19,881.54

201 SH113186 18-Feb-20 76469 LGF-GF (POUR-04) REINF 18,630.53

202 SH113187 18-Feb-20 47878 LGF-GF WALL (POUR-04) REINF 12,409.18

203 SH113188 18-Feb-20 91740 LGF-GF (GRID (B-C)/(2-3)0(POUR-04) REINF 18,810.64

204 SH113189 18-Feb-20 91740 LGF-GF CORE WALL (POUR-04) (GRID(N-M)(2-3)) REINF 12,854.07

205 SH113232 19-Feb-20 39312 LOWER GF LEVEL TO GF COLUMN & WALL (PART B) 13,286.21

206 SH113231 19-Feb-20 39312 LOWER GF TO GROUND LEVEL COLUMN & WALL (PART B) 14,617.93

207 SH113230 19-Feb-20 39312 LOWER GF TO GROUND FLOOR COLUMN (PART B) 7,087.39

208 SH113229 19-Feb-20 39312 LOWER GF TO GROUND LWEVEL COLUMN & WALL PART B 8,082.68

209 SH113248 19-Feb-20 37729 LGF~GF COLUMN & WALL PART C 6,548.46
PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

210 SH113247 19-Feb-20 37729 COLUMN & WALL LGF~GF PART C 7,299.25

211 SH113246 19-Feb-20 37729 CORE WALL LGF~GF PART C GRID CC-BB/12-13 17,015.76

212 SH113245 19-Feb-20 73173 LOWER GROUND LEVEL TO GROUND FLOOR PART B 11,800.84
LOWER GROUND TO GROUND FLOOR CORE WALL (PART B) (GRID (NN-
213 SH113244 19-Feb-20 73173 10,781.80
MM)/(2-3))
CORE WALL LOWER GROUND TO GROUND FLOOR
214 SH113243 19-Feb-20 73173 16,687.47
(PART-B)(GRID(CC-BB)/(2/3))
215 SH113277 19-Feb-20 6975 COLUMN LGF-GF (PART-C) (GRID(CC-BB)/(12-13)) 17,149.75

216 SH113278 19-Feb-20 6975 LGF~GF COLUMN & WALL PART C 14,594.94

217 SH113299 20-Feb-20 47878 LG PT SLAB PUNCHING SHEAR (P-04) 2,270.73

218 SH113300 20-Feb-20 47878 LG PT SLAB PUNCHING SHEAR (P-04) 2,115.17

219 SH113301 20-Feb-20 47878 LG PT SLAB POUR STRIP TOP BAR, TC &TRIMMER BAR (P-4) 7,839.30

220 SH113302 20-Feb-20 47878 LG PT SLAB POUR STRIP BOTTOM BAR & TRIMMER BAR (P-04) 9,785.57

221 SH113303 20-Feb-20 47878 LG PT SLAB ADDL,LIVE,DEAD END & PAN (P-04) 13,935.39

222 SH113304 20-Feb-20 47878 LG LEVEL PT SLAB PUNCHING SHEAR (POUR 03) 1,475.63

223 SH113305 20-Feb-20 47878 LG PT SLAB POUR STRIP BAR & TRIMMER BAR (POUR 03) 7,945.54

224 SH113306 20-Feb-20 47878 LG PT SLAB ADDL,BEAM & LIVE, DEAD END & PAN (P-03) 6,040.32

225 SH113399 22-Feb-20 26811 ADDITIONAL STRAIGHT BARS 26,107.58

226 SH113923 3-Mar-20 89265 LOWER GROUND FLOOR (PART-B)(GRID(NN-MM)/(2-3) 10,781.80

227 SH113924 3-Mar-20 89265 LOWER GROUND LEVEL TO GROUND FLOOR PART B 11,799.83

228 SH113925 3-Mar-20 89265 LOWER GROUND LEVEL TO GROUND LEVEL RW1 (PART-C) 19,441.33

229 SH114102 7-Mar-20 25283 LGF (PART B) RETAINING WALL & WALL & UPSTAND 13,654.90

230 SH114101 7-Mar-20 25283 ADDITIONAL REINF(2/2), B BLOCK 9,995.40

231 SH114111 7-Mar-20 34422 ADDITIONAL REINF, B BLOCK 39,981.60

232 SH114169 8-Mar-20 75381 ADDITIONAL REINF, B BLOCK 50,083.20

233 SH114254 9-Mar-20 75469 ADDITIONAL REINF, C BLOCK 50,083.20

234 SH114298 10-Mar-20 28985 LOWER GROUND TO GROUND FLOOR RW1 (PART A) 13,052.31

235 SH114299 10-Mar-20 28985 LOWER GROUND LEVEL (PART A) RW & UPSTAND 17,101.86

236 SH114312 10-Mar-20 69118 ADDITIONAL REINF, D BLOCK 50,255.04

237 SH114324 10-Mar-20 62737 LGF~(PART c)RETAINING WALL & UPSTAND 4,214.49
PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

238 SH114325 10-Mar-20 62737 ADDITIONAL REINF, C BLOCK 50,083.20

239 SH114427 12-Mar-20 28985 ADDITIONAL REINF, D BLOCK 50,083.20

240 SH114428 12-Mar-20 78044 ADDITIONAL REIF, D BLOCK 30,175.20

241 SH114429 12-Mar-20 78044 LG PT SLAB LIVE & DEAD END REIF (SPIRAL & CHAIR FOR BLOCK B,C,&D) 15,719.12

242 SH114446 12-Mar-20 53002 ADDITIONAL REIF ( C BLOCK) 50,164.80

243 SH114451 12-Mar-20 81734 ADDITIONAL REIF ( B BLOCK) 50,316.00

244 SH114452 12-Mar-20 82488 ADDITIONAL REIF ( B BLOCK) 25,041.60

245 SH114453 12-Mar-20 82488 ADDITIONAL REIF ( D BLOCK) 25,041.60

246 SH114454 12-Mar-20 91527 ADDITIONAL REIF ( D BLOCK) 50,398.56

247 SH114589 16-Mar-20 34422 CHAIR REINFORCEMENT 1,358.64

248 SH114596 16-Mar-20 34422 CHAIR REINFORCEMENT 6,793.20

249 SH114600 16-Mar-20 34422 STRAIGHT BARS(BLOCK-A) 27,153.69

250 SH114601 16-Mar-20 47878 GF VERT.REIF (BLOCK-A) 28,242.67

251 SH114602 16-Mar-20 47878 GF VERT.REIF (BLOCK-B) 23,614.35

252 SH114603 16-Mar-20 51776 GF VERT.REIF (BLOCK-C) 28,838.05

253 SH114604 16-Mar-20 82601 GF VERT.REIF (BLOCK-D) 28,242.67

254 SH114668 18-Mar-20 73173 GF TO 1ST FLOOR CORE WALL (PART B)@((CC-BB)/(2-3) 23,134.31

255 SH114669 18-Mar-20 73173 GF TO FF COLUMN (PART-B) 4,203.85

256 SH114667 18-Mar-20 25829 GF TO FF STAIR-01 COREWALL(PART-B)@(NN-MM)/(2-3) 16,975.66

257 SH114670 18-Mar-20 25829 GF TO FF COLUMN & WALL (PART-B) 6,396.74

258 SH114671 18-Mar-20 25829 GF TO FF COLUMN & WALL (PART-B) 4,782.94

259 SH114672 18-Mar-20 25829 GF TO FF COLUMN & WALL (PART-B) 3,472.23

260 SH114706 18-Mar-20 37729 STRAIGHT BARS 32,307.07

261 SH114717 19-Mar-20 69118 GF LEVEL TO FIRST FLOOR COLUMN & WALL (PART-C) 4,096.63

262 SH114718 19-Mar-20 69118 GF TO FF COREWALL (PART-C)@GRID (CC-BB)/(12-13) 23,521.74

263 SH114720 19-Mar-20 91799 GF TO FIRST FLOOR COLUMN & WALL (PART-C) 5,301.02

264 SH114721 19-Mar-20 91799 GF TO FF ST-03 COREWALL(PART-C)@(BB-CC)/(8-9) 17,837.10

265 SH114722 19-Mar-20 91799 GF TO FIRST FLOOR COLUMN & WALL (PART-C) 2,164.93
PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

266 SH114723 19-Mar-20 91799 GF LEVEL TO FIRST FLOOR LEVEL COLUMN (PART-C) 3,344.57

267 SH114727 19-Mar-20 69118 GF LEVEL TO FIRST FLOOR LEVEL COLUMN & WALL(PART-C) 3,992.29

268 SH114754 21-Mar-20 33987 GF TO FF STAIR-04 COREWALL (PART-C)@(NN-MM)/(12-13) 15,600.06

269 SH114755 21-Mar-20 33987 GF LEVEL TO FIRST FLOOR LEVEL COLUMN & WALL (PART-D) 16,761.08

270 SH114796 22-Mar-20 33987 LOWER GROUND TO GROUND RAMP SLAB & UPSTAND 23,002.47

271 SH114797 22-Mar-20 33987 STRAIGHT BAR (BLOCK B & C) 20,155.20

272 SH114800 22-Mar-20 33987 STRAIGHT BAR (BLOCK A) 50,083.20

273 SH114996 26-Mar-20 89211 FIRST FLOOR TO SECOND STAIR -06 CW(PART D) 21,289.22

274 SH114998 26-Mar-20 17035 GF~1F CORE WALL (PART D)GRID(C-B)/(12-13))REIF 25,798.35

275 SH114999 26-Mar-20 89211 GF~1F ST-05 CORE WALL (PART D)(GRID(N-M)/(12-13))REIF 19,510.37

276 SH115046 26-Mar-20 19957 GROUND FLOOR SLAB ADDITIONAL LAYER (POUR-A1) 35,472.89

277 SH115047 26-Mar-20 76469 TRIMMER BAR,LIVE END,DEAD END &PAN BOX(P-A1) 7,233.12

278 SH115048 26-Mar-20 76469 G.FLOOR (PART A)(POUR-A1)UPSTAND WALL & BEAMS 6,308.49

279 SH115049 26-Mar-20 76469 GF PT SLAB PUNCHING SHEAR (POUR-A1)REIF 2,669.65

280 SH115050 26-Mar-20 76469 GF PT SLAB PUNCHING SHEAR (POUR-A1)REIF 2,123.33

281 SH115051 26-Mar-20 76469 GF TO 1ST FLOOR-02 CW@(BB-CC)/(7-8) PART-B 17,750.63

282 SH115212 31-Mar-20 27744 GF TO FIRST FLOOR LEVEL COLUMN & WALL (PART-A) 6,114.84

283 SH115214 31-Mar-20 27744 GF TO FIRST FLOOR LIFT COREWALL (PART-A)(GRID(B-C)/(2-3)) 25,509.89

284 SH115209 31-Mar-20 76774 GF TO FIRST FLOOR COLUMN & WALL (PART-A) 4,031.92

285 SH115210 31-Mar-20 76774 GF LEVEL TO FIRST FLOOR COLUMN (PART-A) 6,467.89

286 SH115211 31-Mar-20 76774 GF LEVEL TO FIRST FLOOR COLUMN (PART-A) 3,102.90

287 SH115213 31-Mar-20 76774 GF TO FIRST FLOOR STAIR-7 COREWALL @ (B-C)/(6-7)(PART-A) 20,305.82

288 SH115333 4-Apr-20 39312 1st TO 2ND FLOOR (PART-D)(GRID(C-B)/(12-13)) 19,574.49

289 SH115334 4-Apr-20 39312 FF TO SF ST-05 COREWALL (PART-D)(GRID(N-M)/(12-13)) 11,833.14

290 SH115335 4-Apr-20 39312 FF TO SF ST-06 COREWALL (PART-D)(B-C)(8-9) 13,367.66

291 SH115336 4-Apr-20 42080 FF TO SF COREWALL(PART-C)@ GRID(CC-BB)/(12-13)) 16,586.86

292 SH115337 4-Apr-20 42080 FF TO SF ST-03 COREWALL (PART-C)(BB-CC)(8-9) 9,869.62

293 SH115338 4-Apr-20 42080 FF TO SF ST-04 COREWALL (PART-C)(NN-MM)(12-13) 8,810.25


PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

294 SH115339 4-Apr-20 61004 F FLOOR TO SECOND FLOOR LEVEL COLUMN & WALL (PART C) 14,669.40

295 SH115340 4-Apr-20 61004 F FLOOR TO SECOND FLOOR LEVEL COLUMN & WALL (PART C) 14,436.88

296 SH115348 5-Apr-20 34422 F FLOOR TO SECOND FLOOR LEVEL COLUMN & WALL (PART D) 21,009.33

297 SH115349 5-Apr-20 34422 F FLOOR TO SECOND FLOOR LEVEL COLUMN & WALL (PART D) 9,151.84

298 SH115352 5-Apr-20 78044 F FLOOR TO SECOND FLOOR COREWALL (PART B) @ ((CC-BB)/(2-3)) 7,316.68
F FLOOR TO SECOND FLOOR STAIR-01 COREWALL (PART B) @
299 SH115353 5-Apr-20 78044 8,966.63
((NN-MM)/(2-3))
F FLOOR TO SECOND FLOOR STAIR-02 COREWALL (PART B) @
300 SH115354 5-Apr-20 78044 9,769.64
((BB-CC)/(6-7))
301 SH115355 5-Apr-20 26811 F FLOOR TO SECOND FLOOR LEVEL COLUMN & WALL (PART B) 8,566.51

302 SH115356 5-Apr-20 26811 F FLOOR TO SECOND FLOOR LEVEL COLUMN & WALL (PART B) 12,725.50

303 SH115357 5-Apr-20 26811 F FLOOR TO SECOND FLOOR LEVEL COLUMN & WALL (PART B) 16,586.86

304 SH115523 8-Apr-20 89211 LOWER GROUND RAFT SLAB B1 LAYER (POUR 05)REIF(1/2) 43,428.73

305 SH115524 8-Apr-20 39312 LOWER GROUND RAFT SLAB B1 LAYER (POUR 05)REIF(1/2) 9,548.24

306 SH115525 8-Apr-20 39312 LOWER GROUND RAFT SLAB BOT(B3&B5) ADD'L LAYER (POUR 05)REIF 34,573.02

307 SH115565 9-Apr-20 69118 ADDITIONAL REIF 14,108.64

308 SH115566 9-Apr-20 69118 LOWER GROUND RAFT SLAB BOT(B4)ADD'L LAYER (POUR-05) REIF 15,027.93

309 SH115567 9-Apr-20 69118 LOWER GROUND RAFT SLAB B2 L LAYER (POUR-05) REIF(2/2) 8,784.01

310 SH115568 9-Apr-20 47878 LOWER GROUND RAFT SLAB B2 L LAYER (POUR-05) REIF(1/2) 44,240.24

311 SH115577 11-Apr-20 10581 ADDITIONAL REIF 41,993.42

312 SH115578 11-Apr-20 25283 BLOCK B POUR 1 FIRST FLOOR BEAM REIF 1,150.46

313 SH115579 11-Apr-20 25283 BLOCK B POUR 1 FIRST FLOOR UPSTAND REIF 7,917.83

314 SH115580 11-Apr-20 25283 BLOCK B POUR 1 FIRST FLOOR SLAB REIF 8,403.26

315 SH115581 11-Apr-20 25283 BLOCK B POUR 1 FIRST FLOOR SLAB REIF 12,352.80

316 SH115582 11-Apr-20 33987 BLOCK B POUR 2 FIRST FLOOR BEAM REIF 3,010.63

317 SH115583 11-Apr-20 33987 BLOCK B POUR 2 FIRST FLOOR SLAB UPSTAND REIF 10,145.35

318 SH115584 11-Apr-20 33987 BLOCK B POUR 2 FIRST FLOOR SLAB REIF 26,650.04

319 SH115605 11-Apr-20 34422 LOWER GROUND RAFT SLAB SUMP PI,SIDE BAR & SECTION (POUR 5) REIF 8,811.98
LOWER GROUND RAFT SLAB SUMP PIT,SIDE BAR & SECTION (POUR 5)
320 SH115606 11-Apr-20 34422 5,242.96
REIF
321 SH115607 11-Apr-20 34422 LOWER GROUND RAFT SLAB TOP(T3&T4)ADDL LAYER (POUR 5) REIF 18,673.24
PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

322 SH115608 11-Apr-20 32084 LOWER GROUND RAFT SLAB TOP T2 LAYER (POUR 5) REIF 48,505.30

323 SH115622 12-Apr-20 37939 LOWER GROUND RAFT SLAB T1 LAYER (POUR 5) REIF 44,458.99

324 SH115625 12-Apr-20 91740 BLOCK B & C ATTIC SLAB REIF 8,013.31

325 SH115627 12-Apr-20 25283 BLOCK A FIRST FLOOR SLAB MESH REIF 35,983.44

326 SH115628 12-Apr-20 91740 BLOCK D FIRST FLOOR SLAB MESH REIF 35,983.44

327 SH115661 13-Apr-20 18169 BLOCK C FIRST FLOOR SLAB MESH REIF 35,983.44

328 SH115701 14-Apr-20 72882 BLOCK C POUR 2 FIRST FLOOR BEAM REIF 5,978.98

329 SH115702 14-Apr-20 81734 BLOCK C POUR C1 FIRST FLOOR SLAB REIF 22,597.74

330 SH115703 14-Apr-20 72882 BLOCK C POUR 2 FIRST FLOOR SLAB REIF 29,159.06

331 SH115739 15-Apr-20 74831 LOWER GOUND RAFT SLAB B2 LAYER (POUR-06) REINF .(1/2) 45,393.44

332 SH115740 15-Apr-20 69118 LOWER GOUND RAFT SLAB B1 LAYER (POUR-06) REINF 46,908.08

333 SH115741 15-Apr-20 37962 LOWER GROUD RAFT SLAB B2 LAYER (POUR-06) REINF (2/2) 18,172.88

334 SH115742 15-Apr-20 37962 LOWER GROUND RAFT SLAB B3 ADD'L LAYER (POUR-06) REINF 6,377.98

335 SH115743 15-Apr-20 37962 LOWER GROUND RAFT SLAB B4& T4 ADD'L LAYER (POUR-06)REINF 5,408.76

336 SH115744 15-Apr-20 37962 LOWER GOUND RAFT SLAB SIDE BAR (POUR-06) REINF 10,909.57

337 SH115778 15-Apr-20 78044 LOWER GROUND RAFT SLAB T1 LAYER (POUR-06) REINF 41,822.08

338 SH115787 16-Apr-20 75789 CHAIR REINFORCEMENT FOR B & C 18,892.20

339 SH115788 16-Apr-20 75789 FIRST FLOOR PUNCHING SHEAR DETAILS (PART-D) (POUR-D1) REINF 2,276.75

340 SH115789 16-Apr-20 75789 FIRST FLOOR PT BEAMS PART-D (POUR-D1) REINF 2,579.11

341 SH115790 16-Apr-20 75789 FIRST FLOOR PART-D PT SLAB TRIMMAR BAR DETAILS (POUR-D1) REINF 3,345.32

342 SH115791 16-Apr-20 75789 FIRST FLOOR PT SLAB (PART-D) (POUR-D1) REINF 10,726.69

343 SH115792 16-Apr-20 34422 LOWER GROUND RAFT SLAB T2 LAYER (POUR-06) REINF 36,211.10

344 SH115954 21-Apr-20 28985 FIRST FLOOR PART D POUR D2 B1 & T1 ADDL LAYERS 8,048.01

345 SH115955 21-Apr-20 28985 FIRST FLOOR PT SLAB POUR D-2,PART D B2 & T2 ADD'L LAYERS 10,455.40

346 SH115956 21-Apr-20 28985 FIRST FLOOR PT SLAB POUR D-TRIMMER BARS POUR D2 1,097.54
FIRST FLOOR PT SLAB POUR D-TRIMMER BARS & CW CORNER BAR
347 SH115957 21-Apr-20 28985 1,934.73
DETAILSPOUR D2
348 SH115958 21-Apr-20 28985 FIRST FLOOR PT SLAB PUNCHING SHEAR POUR D2 2,625.59
PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

349 SH115959 21-Apr-20 28985 FIRST FLOOR PT BEAMS POUR D2 5,625.64

350 SH115962 21-Apr-20 66583 LOWER GROUND LEVEL COLUMN STARTER POUR 5 REIF 8,032.14

351 SH115963 21-Apr-20 66583 LOWERGROUND LEVEL COLUMN STARTER POUR 05 REIF 15,402.62

352 SH115964 21-Apr-20 66583 LOWERGROUND LEVEL COLUMN STARTER POUR 06 REIF 22,300.16

353 SH115965 21-Apr-20 61004 LOWERGROUND LEVEL COLUMN STARTER POUR 06 REIF 26,823.92

354 SH115966 21-Apr-20 61004 LOWERGROUND SWIMMING POOL WALL STARTER (POUR-05) 8,028.68

355 SH115984 21-Apr-20 91740 ADDITIONAL BARS 32,059.80

356 SH115985 21-Apr-20 91740 FIRST LEVEL TO SECOND FLOOR LEVEL COLUMN 11,285.84

357 SH115986 21-Apr-20 91740 FIRST LEVEL TO SECOND FLOOR LEVEL COLUMN & WALL 2,002.89

358 SH116000 22-Apr-20 91799 FIRST FLOOR SECOND FLOOR STAIR 07 CORE WALL @(B-C)/(6-7) 13,252.29

359 SH116006 22-Apr-20 91799 ADDITIONAL REIF 8,039.04

360 SH116007 22-Apr-20 91799 FIRST FLOOR SECOND FLOOR LIFT CORE WALL GRID (B-C)/(2-3) 19,596.72

361 SH116070 25-Apr-20 89211 BLOCK A POUR 02 FIRST FLOOR UPSTAND REIF 10,268.26

362 SH116071 25-Apr-20 89211 BLOCK A POUR 02 FIRST FLOOR SLAB REIF 24,244.61

363 SH116072 25-Apr-20 89211 BLOCK A POUR 02 FIRST FLOOR BEAM REIF 3,708.70

364 SH116144 27-Apr-20 91740 BLOCK BADDITIONAL REIF 34,983.90

365 SH116152 27-Apr-20 72160 SECOND FLOOR PART B AREA PT BEAMS (POUR B1) REIF 1,101.05

366 SH116153 27-Apr-20 72160 SECOND FLOOR PT SLAB ADDL LAYERS (POUR B1) (PART-B) REIF 12,989.13

367 SH116154 27-Apr-20 72160 SECOND FLOOR PT SLAB POUR STRIP BAR & TRIMMER BAR (P-B1) REIF 8,573.74

368 SH116155 27-Apr-20 72160 2ND FLOOR SLAB PUNCHING SHEAR (POUR-B1) REIF 1,891.35

369 SH116163 27-Apr-20 72160 REBAR STEEL FOR TESTING 59.35

370 SH116181 28-Apr-20 91799 BLOCK C ADIITIONAL REIF 34,983.90

371 SH116182 28-Apr-20 74831 SECOND FLOOR PUNCHING SHEAR POUR C1 REIF 2,002.83

372 SH116183 28-Apr-20 74831 SECOND FLOOR POUR STRIP BAR TRIMMER BAR (P-C1) REIF 8,138.26

373 SH116184 28-Apr-20 74831 SECOND FLOOR PT SLAB ADDL PART C(POUR C1) REIF 14,392.95

374 SH116185 28-Apr-20 74831 SECOND FLOOR BEAM ADDL PART C(POUR C1) REIF 1,444.69

375 SH116211 28-Apr-20 72406 ADDITIONAL BARS 34,983.90

376 SH116201 28-Apr-20 25283 SECOND FLOOR BEAMS PART D (POUR D1)REIF 3,859.32
PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

377 SH116202 28-Apr-20 25283 SECOND FLOOR SLAB TRIMMER BAR PART D (POUR D1)REIF 3,765.72

378 SH116203 28-Apr-20 25283 SECOND FLOOR PART D POUR STRIP, CORNER BAR REIF 2,645.57

379 SH116204 28-Apr-20 25283 SECOND FLOOR PUNCHING SHEAR DETAILS PART D POUR D1 REIF 1,622.07

380 SH116212 28-Apr-20 25283 SECOND FLOOR PT SLAB PART D POUR D1 ADDL LSYERS REIF 17,923.02

381 SH116264 30-Apr-20 47878 SECOND FLOOR BEAMS PART B (POUR B2) REIF 4,221.36

382 SH116265 30-Apr-20 47878 SECOND FLOOR PT SLAB PART B (POUR B1) ADDL LAYERS REIF 18,100.20

383 SH116266 30-Apr-20 47878 SECOND FLOOR PT SLAB TRIMMER BAR POUR B2 (PART B) REIF 8,601.44

384 SH116267 30-Apr-20 47878 SECOND FLOOR PT SLAB PUNCHING SHEAR (POUR B2)(PART B)REIF 2,040.12

385 SH116268 30-Apr-20 91799 SECOND FLOOR BEAMS (POUR-C2) REIF 3,922.60

386 SH116269 30-Apr-20 91799 SECOND FLOOR PT SLAB ADDL LAYER PART C (POUR C2) REIF 17,685.15

387 SH116270 30-Apr-20 91799 SF PT SLAB TRIMMER BAR (POUR-C2) REIF 8,422.10

388 SH116271 30-Apr-20 91799 SECOND FLOOR PUNCHING SHEAR (POUR-C2) REIF 1,846.78

389 SH116263 30-Apr-20 42080 BLOCK D & A CHAIR REIF 16,428.00

390 SH116272 30-Apr-20 42080 SECOND FLOOR BEAMS (POUR-D2) REIF 1,384.10

391 SH116274 30-Apr-20 42080 SECOND FLOOR SLAB TRIMMER BAR PART D (POUR D2)REIF 3,974.50

392 SH116275 30-Apr-20 42080 SF PT SLAB CORNER BAR, TENDON, POUR STIP BAR (POUR-D2) REIF 2,495.77

393 SH116276 30-Apr-20 42080 SECOND FLOOR PUNCHING SHEAR DETAILS (PART D) POUR D2 REIF 1,984.96

394 SH116273 30-Apr-20 42080 SECOND FLOOR PT SLAB (POUR-D2) ADDL LAYERS REIF 13,303.60

395 SH116321 4-May-20 27744 SF TO 3RD FLOOR ST-05 CW (PART-D) GRID(N-M)/(12-13)) REIF 9,738.47

396 SH116322 4-May-20 27744 2ND FLOOR 3RD FLOOR STAIR 06 COREWALL (B-C)(8-9) REIF 11,310.61

397 SH116304 4-May-20 39312 SF TO TF CORE WALL @GRID (CC-BB)/(12-13)) REIF 13,288.30

398 SH116305 4-May-20 39312 SF TO TF STAIR-03 COREWALL (BB-CC)/(8-9) REIF 8,720.89

399 SH116306 4-May-20 39312 SF TO THIRD FLOOR COLUMN & WALL REIF 5,551.60

400 SH116307 4-May-20 39312 SF TO THIRD FLOOR COLUMN & WALL REIF 8,499.40

401 SH116308 4-May-20 73173 SF TO THIRD FLOOR COREWALL @ ((CC-BB)/(2-3)) REIF 13,288.80

402 SH116309 4-May-20 73173 SF TO THIRD FLOOR ST01 CW @ (NN-MM)/(2-3) REIF 8,013.43

403 SH116310 4-May-20 73173 SF TO THIRD FLOOR STAIR 02 COREWALL (BB-cc)/(6-7) REIF 8,849.77

404 SH116311 4-May-20 73173 SF TO THIRD FLOOR COLUMN & WALL REIF 7,861.63
PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

405 SH116320 4-May-20 27744 SF TO THIRD FLOOR GRID (C-B).(12-13)) REIF 14,593.82

406 SH116323 4-May-20 75789 SF TO THIRD FLOOR COLUMN & WALL REIF 10,282.91

407 SH116324 4-May-20 75789 SF TO THIRD FLOOR COLUMN & WALL REIF 12,383.20

408 SH116325 4-May-20 75789 SF TO THIRD FLOOR ST-04 CW @(NN-MM)/(12-13) REIF 7,909.75

409 SH116312 4-May-20 72406 SF PT SLAB (POUR-A1) ADDL LAYERS REIF 18,954.02

410 SH116313 4-May-20 72406 SECOND FLOOR TRIMMER BAR POUR-A1 REIF 3,963.38

411 SH116314 4-May-20 72406 SF PT SLAB POUR-A1 POUR STRIP, CORNER BAR REIF 2,673.46

412 SH116315 4-May-20 72406 SECOND FLOOR PUNCHING SHEAR DETAILS POUR A1 REIF 1,883.63

413 SH116316 4-May-20 72406 ADDITIONAL REIF (MESH) 19,990.80

414 SH116317 4-May-20 74831 SECOND FLOOR TO THIRD FLOOR LEVEL COLUMN & WALL REIF 17,112.22

415 SH116318 4-May-20 74831 SECOND FLOOR TO THIRD FLOOR LEVEL COLUMN & WALL REIF 5,770.80

416 SH116319 4-May-20 74831 SECOND FLOOR BEAMS POUR-A1REIF 4,496.62

417 SH116408 7-May-20 83067 ADDITIONAL REIF 44,161.92

418 ADJUSTED QTY 1.08

419 SH116409 7-May-20 83067 RAFT POUR8 ADDITIONAL PART A 10,227.06

420 SH116437 7-May-20 66583 RAFT POUR8 ADDITIONAL PART A 50,872.80

421 SH116581 12-May-20 26811 SECOND FLOOR TO THIRD FLOOR LIFT CORE WALL GRID(B-C)/(2-3)) REIF 14,601.65

422 SH116582 12-May-20 26811 SECOND FLOOR TO THIRD FLOOR COLUMN REIF 8,768.81

423 SH116583 12-May-20 26811 SECOND FLOOR TO THIRD FLOOR WALL REIF 1,753.01

424 SH116596 12-May-20 26811 SECOND FLOOR TO THIRD FLOOR STAIR 07 CORE WALL @(B-C)/(6-7) REIF 11,230.96

425 SH116584 12-May-20 75789 LOWER GROUND LEVEL SUMP PIT-08 REIF 20,823.62

426 SH116585 12-May-20 75789 UPSTAND FF ADDITIONAL STRAIGHT BAR 25,436.40

427 SH116597 12-May-20 75789 TOWER CRANE FOUNDATION TC-03 (7100X7100) REIF 10,293.00

428 SH116631 13-May-20 75789 LGF~GF COLUMN POUR05 REIF 23,605.88

428 SH116638 13-May-20 75789 LGF~GF COLUMN POUR06 REIF 22,300.16

429 SH116641 13-May-20 75789 TOWER CRANE FOUNDATION TC-03 (7100X7100) REIF 214.30

429 SH116653 14-May-20 33987 LGF-GF COLUMN (POUR 5) REIF 34,862.18

430 SH116654 14-May-20 89211 LGF-GF COLUMN (POUR 6) REIF 26,823.92


PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

430 SH116655 14-May-20 89211 LGF-GF SWIMMING POOL WALL (POUR 5) REIF 18,666.18

431 SH116673 16-May-20 91740 LOWER GROUND LEVEL GREASE TRAP PIT POUR 6 REIF 3,623.56

431 SH116674 16-May-20 91740 LOWER GROUND LEVEL GREASE TRAP PIT POUR06 REIF 2,750.36

432 ADJUSTED QTY 1.34

432 SH116675 16-May-20 91740 ADDITIONAL REIF 40,130.88

433 SH116707 17-May-20 69118 SLAB MESH THIRD FLOOR 34,983.90

434 SH116708 17-May-20 37729 SLAB MESH THIRD FLOOR 34,983.90

435 SH116721 17-May-20 26811 LOWER GROUND RAFT SLAB B2 LAYER (POUR 05) REIF 40,212.09

436 SH116722 17-May-20 26811 LOWER GROUN RAFT SLAB BOT(B4) ADDL LAYER (POUR 05) REIF 12,654.03

437 SH116723 17-May-20 75789 LOWER GROUND RAFT SLAB B1 LAYER POUR 05 REIF 39,229.27

438 SH116724 17-May-20 75789 LOER GROUND RAFT SLAB BOT (B3&B5) ADDL LAYER POUR 05 REIF 13,849.03

439 SH116738 17-May-20 72882 LOWER GROUND RAFT SLAB B3 ADD'L LAYER (POUR-06) REINF 4,827.32

440 SH116740 17-May-20 72882 LOWER GROUND RAFT SLAB B1 LAYER POUR 06 REIF 32,368.03

441 SH116706 17-May-20 25283 THIRD FLOOR SLB MESH 34,983.90

442 SH116726 17-May-20 78044 LOWER GROUND RAFT SLAB T2 LAYER (POUR05) REIF 41,358.21

443 SH116749 18-May-20 39312 LOWER GROUND RAFT SLAB B4 & T4 ADDL LAYERS (POUR 06) REIF 6,607.38

444 SH116750 18-May-20 39312 LOWER GROUND RAFT SLAB T1 LAYER (POUR06) REIF 28,867.68

445 SH116781 19-May-20 25283 LOWER GROUND RAFT SLAB B2 LAYER (POUR 06) REIF 13,103.90

446 SH116782 19-May-20 69118 LOWER GROUND RAFT SLAB TOP (T3 & T4)ADDL LAYER (POUR 05) REIF 14,953.07

447 SH116783 19-May-20 69118 LOWER GROUND RAFT SLAB T1 LAYER (POUR 05) REIF 37,311.89

448 SH116784 19-May-20 25283 LOWER GROUND RAFT SLAB T2 LAYER (POUR 06) REIF 27,214.10

449 SH116828 20-May-20 17035 GF-FIRST FLOOR COLUMN & WALL REIF 6,969.39

450 SH116829 20-May-20 17035 GF-FIRST FLOOR COLUMN REIF 1,658.36

451 SH116830 20-May-20 17035 GF-FIRST FLOOR COLUMN REIF 7,461.27

452 SH116831 20-May-20 17035 GF-FIRST FLOOR COLUMN & WALL REIF 6,532.24

453 SH116832 20-May-20 17035 GF-FIRST FLOOR STAIR 08 CORE WALL @ (N-M)/(2-3) POUR 04 REIF 17,742.61

454 SH116837 20-May-20 72406 GF PT SLAB ADDL LAYER POUR A2 REIF 15,406.31

455 SH116833 20-May-20 72406 GF PT SLAB PUNCHING SHEAR (POUR-A2)REIF 1,766.83


PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

456 SH116834 20-May-20 72406 GF PT SLAB PUNCHING SHEAR (POUR-A2)REIF 3,028.88

457 SH116835 20-May-20 72406 GF PT SLAB TRIMMER BAR POUR A2 REIF 4,093.50

458 SH116836 20-May-20 72406 GF PT SLAB POUR STRIP POUR A2 REIF 5,243.37

459 SH116924 27-May-20 91799 LOWER GROUND RAFT SLAB B1 LAYER POUR 4 REIF 5,917.96

460 SH116925 27-May-20 91799 3F~4F COREWALL @ ((CC-BB)/(2-3))REIF 13,004.96

461 SH116926 27-May-20 91799 3F~4F STAIR-02 COREWALL (BB-CC)/(6-7) REIF 8,676.69

462 SH116927 27-May-20 26811 3F~ 4F ST-01 CW @(NN-MM)/(2-3) REIF 7,824.94

463 SH116928 27-May-20 26811 3F~ 4F COLUMN & WALL REIF 8,661.98

464 SH116929 27-May-20 26811 3F~ 4F COLUMN & WALL REIF 8,150.79

465 SH116930 27-May-20 26811 3F~ 4F COLUMN & WALL REIF 5,529.05

466 SH116998 28-May-20 89211 3F BEAMS POUR C1 REIF 1,466.96

467 SH116999 28-May-20 89211 3F PT SLAB POUR STRIP BAR & TRIMMER BAR C1 REIF 14,465.32

468 SH117000 28-May-20 89211 3F PT SLAB POUR STRIP BAR & TRIMMER BAR C1 REIF 8,165.08

469 SH117001 28-May-20 89211 3F PUNCHING SHEAR POUR C1 REIF 1,957.33

470 SH117002 28-May-20 73173 3F AREA PT BEAMS (POUR B1) REIF 1,123.77

471 SH117003 28-May-20 73173 3F~PT SLAB ADDL LAYERS POUR B1 REIF 13,183.62

472 SH117004 28-May-20 73173 3F PT SLAB POURB STRIP BAR & TRIMMER BAR (P-B1) REIF 8,578.00

473 SH117005 28-May-20 73173 3F PT SLAB PUNCHING SHEAR POUR B1 REIF 1,891.35

474 SH117042 30-May-20 72160 ADDITIONAL REIF 23,635.87

475 SH117043 30-May-20 33987 PUNCHING SHAER DETAILS POUR D1 REIF 1,622.07
3F PT SLAB POUR D1 POUR STRIP, CORNER BAR, LIVE & DEAD END & PAN
476 SH117044 30-May-20 33987 2,756.03
BOX REIF
477 SH117045 30-May-20 33987 3F SLAB TRIMMER BAR POUR D1 REIF 3,765.65

478 SH117046 30-May-20 33987 3F PT SLAB POUR D1 ADDL LAYERS REIF 17,008.57

479 SH117047 30-May-20 33987 3F BEAMS POUR D1 REIF 3,858.25

480 SH117125 31-May-20 37729 THIRD FLOOR SLAB PUNCHING SHEAR POUR B2 REIF 2,040.00

481 SH117126 31-May-20 37729 THIRD FLOOR TRIMMER BAR POUR B2 REIF 8,697.36

482 SH117127 31-May-20 37729 THIRD FLOOR PT SLAB POUR B2 ADDL LAYERS REIF 17,083.18

483 SH117128 31-May-20 37729 THIRD FLOOR BEAMS POUR B2 REIF 4,221.70
PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

484 SH117172 2-Jun-20 32084 THIRD FLOOR BEAMS POUR C2 REIF 3,918.98

485 SH117173 2-Jun-20 32084 THIRD FLOOR PT SLAB ADDL LAYER POUR C2 REIF 16,719.98

486 SH117174 2-Jun-20 32084 THIRD FLOOR PT SLAB TRIMMER BAR POUR C2 REIF 8,459.22

487 SH117175 2-Jun-20 32084 THIRD FLOOR PUNCHING SHEAR POUR C2 REIF 1,812.57

488 SH117176 2-Jun-20 33987 THIRD FLOOR BEAMS POUR D2 REIF 1,378.23

489 SH117177 2-Jun-20 33987 THIRD FLOOR PT SLAB POUR D2 ADDL LAYERS REIF 13,539.40

490 SH117178 2-Jun-20 33987 THIRD FLOOR PT SLAB TRIMMER BAR POUR D2 REIF 4,062.01

491 SH117179 2-Jun-20 33987 THIRD FLOOR POUR D2 PT SLAB CORNER, TENDON, POUR STRIP REIF 2,507.84

492 SH117180 2-Jun-20 33987 THIRD FLOOR PUNCHING SHEAR DETAILS POUR D2 REIF 1,971.35

493 SH117181 2-Jun-20 61004 3F~4F COLUMN & WALL REIF 23,769.38

494 SH117182 2-Jun-20 61004 3F~4F ST-05 CW REIF 9,407.36

495 SH117183 2-Jun-20 72882 LGF COLUMN STARTER POUR 05 REIF 19,836.80

496 SH117184 2-Jun-20 72882 3F~4F ST-04 CW @(NN-MM)/(12-13) REIF 7,734.23

497 SH117185 2-Jun-20 72882 3F~4F STAIR 03 COREWALL (BB-CC)/(8/9) REIF 8,540.39

498 SH117186 2-Jun-20 74831 3F~4F COLUMN & WALL REIF 23,025.23

499 SH117187 2-Jun-20 74831 3F~4F COREWALL @(CC-BB)/(12-13) REIF 13,008.52

500 SH117258 3-Jun-20 71166 3F~4F COREWALL @(B-C)/(8-9) REIF 10,972.49

501 SH117266 3-Jun-20 71166 3F~4F COREWALL @(C-B)/(12-13)) REIF 14,282.94

502 SH117289 3-Jun-20 91799 SWIMMINGPOOL ADDITIONAL BARS 28,163.97

503 SH117314 4-Jun-20 42080 GF PT SLAB PUNCHING SHEAR (POUR-C3) REIF 2,039.11

504 SH117315 4-Jun-20 42080 GF PT SLAB PUNCHING SHEAR (POUR-C3) REIF 1,512.34

505 SH117316 4-Jun-20 42080 GF PT SLAB PUNCHING SHEAR (POUR-C3) REIF 2,892.32

506 SH117317 4-Jun-20 42080 GF UPSTAND WALL REIF 6,084.00

507 SH117318 4-Jun-20 42080 GF PT SLAB (POUR-C3) POUR STRIPS REIF 5,314.55

508 0.46

509 SH117319 4-Jun-20 42080 GF SLAB ADDITIONAL LAYER (POUR-C3)REIF 21,346.67

509 SH117407 6-Jun-20 42080 GF SLAB ADDITIONAL Y DIRECTION POUR D3 REIF 24,039.900

510 SH117442 7-Jun-20 42080 GF SLAB ADDITIONAL Y DIRECTION POUR D3 REIF 15,810.15
PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

511 SH117479 7-Jun-20 16624 GF SLAB ADDITIONAL Y DIRECTION POUR A3 REIF 15,655.51

512 SH117480 7-Jun-20 16624 GF SLAB ADDITIONAL X DIRECTION POUR A3 REIF 10,742.18

513 SH117472 7-Jun-20 74831 GF POUR B3 SLAB TOP ADDITIONAL LAYER Y-DIRECTION REIF 18,809.94

514 SH117473 7-Jun-20 74831 GF POUR B3 UPSTAND WALL REIF 9,811.91

515 SH117474 7-Jun-20 74831 GF PT SLAB POUR B3 POUR STRIPS REIF 6,443.33

516 SH117475 7-Jun-20 74831 GF PT SLAB POUR B3 UPSTAND WALL REIF 7,140.21

517 SH117476 7-Jun-20 74831 GF PT SLAB PUNCHING SHEAR POUR B3 REIF 1,881.21

518 SH117477 7-Jun-20 74831 GF PT SLAB PUNCHING SHEAR POUR B3 REIF 2,500.80

519 SH117509 8-Jun-20 32084 GF PT SLAB ADDITIONAL X-DIRECTION REIF 7,260.61

520 SH117510 8-Jun-20 32084 GF POUR STRIP BOT BAR & TRIMMER BAR (P-D3) REIF 3,999.29

521 SH117511 8-Jun-20 32084 GF POUR TOP BAR & DEAD, LIVE END, PAN BOX(P-D3) REIF 2,906.50

522 SH117513 8-Jun-20 32084 GF PT SLAB PUNCHING SHEAR POUR D3 REIF 2,813.30

523 SH117514 8-Jun-20 32084 GF PT SLAB PUNCHING SHEAR POUR D3 REIF 1,342.13

524 SH117515 8-Jun-20 32084 GF PT SLAB PUNCHING SHEAR POUR D3 REIF 1,612.80

525 SH117516 8-Jun-20 72882 ADDITIONAL REIF 38,318.50

526 SH117539 8-Jun-20 32027 FOURTH FLOOR SLAB MESH 34,983.90

527 SH117503 8-Jun-20 69118 GF POUR STRIP BOT BAR & TRIMMER BAR (P-D3) REIF 5,214.72

528 SH117504 8-Jun-20 69118 GF POUR STRIP TOP BAR & DEAD END, PAN BOX (P-A3) REIF 2,783.90

529 SH117505 8-Jun-20 69118 GF POUR A3 UPSTAND WALL REIF 10,933.49

530 SH117506 8-Jun-20 69118 PUNCHING SHEAR REIFPSTAND WALL REIF 4,305.57

531 SH117507 8-Jun-20 69118 GF PT SLAB PUNCHING SHEAR POUR A3 REIF 1,728.30

532 SH117508 8-Jun-20 69118 GF PT SLAB POUR A3 PUNCHING SHAER REIF 304.17

533 SH117517 8-Jun-20 42080 PART E & F MESH REIFORCEMENT 34,983.90

534 SH117518 8-Jun-20 78044 PART E & F MESH REIFORCEMENT 51,084.86

535 SH117594 8-Jun-20 47878 FOURTH FLOOR SLAB MESH B1 34,983.90

536 SH117519 8-Jun-20 25283 GROUND FLOOR SLAB CHAIR REIF 14,565.51

537 SH117550 9-Jun-20 27744 GF SWIMMING POOL SLAB LAYERS POUR 05 REIF 30,477.50

538 SH117562 9-Jun-20 91799 4TH FLOOR BEAMS PART C POUR C1 REIF 1,446.57
PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

539 SH117563 9-Jun-20 91799 4TH FLOOR PT SLAB ADDL LAYER POUR C1 REIF 14,851.82

540 SH117564 9-Jun-20 91799 4TH FLOOR PT SLAB POUR STRIP BAR & TRIMMER BAR (P-C1) REIF 8,576.40

541 SH117565 9-Jun-20 91799 4TH FLOOR PUNCHING SHEAR (POUR C1) PART C REIF 1,977.50

542 SH117617 10-Jun-20 25283 4TH FLOOR PT SLAB PUNCHING SHEAR POUR B1 REIF 1,902.95

543 SH117618 10-Jun-20 25283 4TH FLOOR PT SLAB POUR STRIP BAR & TRIMMER BAR (P-B1) REIF 8,656.77

544 SH117619 10-Jun-20 25283 4TH FLOOR PT SLAB ADDL LAYER POUR B1 REIF 13,459.26

545 SH117620 10-Jun-20 25283 4TH FLOOR PT SLAB BEAMS POUR B1 REIF 1,101.54

546 SH117621 10-Jun-20 72160 4TH-5TH FLOOR COLUMN & WALL- PART-B 7,419.50

547 SH117622 10-Jun-20 72160 4TH-5TH FLOOR COLUMN-PART-B 10,388.36

548 SH117623 10-Jun-20 72160 4TH-5TH FLOOR CW ST-01 - PART-B 6,548.88

549 SH117624 10-Jun-20 72160 4TH-5TH FLOOR CW ST-02 - PART-B 7,301.84

550 SH117625 10-Jun-20 72160 4TH-5TH FLOOR CW - PART-B 10,957.50

551 SH117626 10-Jun-20 89211 4TH-5TH FLOOR CW-ST-04 - PART-C 6,475.76

552 SH117627 10-Jun-20 89211 4TH-5TH FLOOR CW-ST-03 - PART-C 7,237.73

553 SH117628 10-Jun-20 89211 4TH-5TH FLOOR CW - PART-C 10,965.32

554 SH117629 10-Jun-20 89211 4TH-5TH FLOOR CW & WALL - PART-C 8,562.19

555 SH117630 10-Jun-20 89211 4TH-5TH FLOOR COLUMN - PART-C 9,834.92

556 SH117687 11-Jun-20 72406 FOURTH FLOOR SLAB MESH-PART-D 34,983.90

557 SH117708 11-Jun-20 47878 4TH-5TH FLOOR STAIR-06 COREWALL- PART-D 7,450.35

558 SH117709 11-Jun-20 47878 4TH-5TH FLOOR STAIR-05 COREWALL- PART-D 6,367.28

559 SH117710 11-Jun-20 47878 4TH-5TH FLOOR COLUMN & WALL- PART-D 19,829.31

560 SH117711 11-Jun-20 47878 4TH-5TH FLOOR COREWALL- PART-D 12,002.46

561 SH117712 11-Jun-20 37729 4F PUNCHING SHEAR DETAILS PART-D (POUR-D1) REIF 1,628.14

562 SH117713 11-Jun-20 37729 4FSLAB PART-D (POUR-D1) POUR STRIP, CORNER BAR & PAN REIF 2,813.38

563 SH117714 11-Jun-20 37729 4F PT SLAB TRIMMER BAR PART-D (POUR-D1) REIF 4,640.77

564 SH117715 11-Jun-20 37729 4F PT SLAB PART D POUR D1 ADDL LAYERS REIF 17,936.92

565 SH117716 11-Jun-20 37729 4F BEAMS POUR D1 REIF 4,437.36

566 SH117717 11-Jun-20 27744 4F FLOOR PT SLAB PUNCHING SHEAR POUR B2 PART-B REIF 2,042.58
PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

567 SH117718 11-Jun-20 27744 4F FLOOR PT SLAB TRIMMER BAR REIF DETAILS POUR B2 PART B REIF 8,426.30

568 SH117719 11-Jun-20 27744 4F FLOOR PT SLAB PART B POUR B2 ADDL LAYERS REIF 17,842.73

569 SH117720 11-Jun-20 27744 4F FLOOR BEAMS PART-B POUR-B2 REIF 4,229.31

570 SH117721 11-Jun-20 73173 4F FLOOR PUNCHING SHEAR DETAILS PART-D POUR-D2 REIF 1,990.71

570 SH117722 11-Jun-20 73173 4F FLOOR PART D POUR D2 PT SLAB CORNER BAR, TENDON, POUR STRIP 2,586.44

571 SH117723 11-Jun-20 73173 4F PT SLAB TRIMMER BAR PART-D (POUR-D2) REIF 6,340.86

571 SH117724 11-Jun-20 73173 4F PT SLAB PART D POUR D2 ADDL LAYERS REIF 13,890.86

571 SH117725 11-Jun-20 73173 4F BEAMS POUR D2 REIF 1,355.06

572 SH117749 13-Jun-20 66583 4F BEAMS POUR C2 REIF 4,454.50

572 SH117750 13-Jun-20 66583 4F PT SLAB PART C POUR C2 ADDL LAYERS REIF 18,055.06

573 SH117751 13-Jun-20 66583 4F PT SLAB TRIMMER BAR PART-C (POUR-C2) REIF 8,069.86

573 SH117752 13-Jun-20 66583 4F FLOOR PUNCHING SHEAR DETAILS PART-C POUR-C2 REIF 1,855.33

573 SH117777 14-Jun-20 33987 FIFTH FLOOR SLAB MESH REIF 32,984.82

574 SH117805 14-Jun-20 89211 FIFTH TO SIXTH FLOOR COREWALL PART B @ (CC-BB)/(2-3) REIF 10,965.32

574 SH117806 14-Jun-20 89211 FIFTH TO SIXTH FLOOR STAIR 02 COREWALL PART B @ (BB-CC)/(6-7) REIF 7,301.84
FIFTH TO SIXTH FLOOR STAIR 01 COREWALL PART B @ (NN-MM)/(2-3)
574 SH117807 14-Jun-20 89211 6,548.88
REIF
575 SH117808 14-Jun-20 89211 FIFTH TO SIXTH FLOOR COLUMN PART B REIF 10,393.99

575 SH117809 14-Jun-20 89211 FIFTH TO SIXTH FLOOR COLUMN & WALL REIF 7,419.50

576 SH117778 14-Jun-20 32027 GROUND FLOOR A2 POUR 08 MESH REIF 34,056.58

577 SH117810 14-Jun-20 37729 FIFTH FLOOR PT SLAB PUNCHING SHAER POUR B1 PART B REIF 1,902.95

578 SH117811 14-Jun-20 37729 FIFTH FLOOR PT SLAB POUR STRIP BAR & TRIMMER BAR P-B1 REIF 8,772.65

579 SH117812 14-Jun-20 37729 FIFTH FLOOR PT SLAB ADDL LAYERS POUR B1 REIF 13,381.85

580 SH117813 14-Jun-20 37729 FIFTH FLOOR PT BEAMS POUR B1 REIF 1,101.54

581 SH117824 15-Jun-20 99250 GROUND LEVEL POUR B3 UPSTAND WALL REIF 1,921.01

582 SH117825 15-Jun-20 99250 GROUND FLOOR PT SLAB PART B POUR-B3 POUR STRIP REIF 1,353.67

583 SH117826 15-Jun-20 99250 GROUND LEVEL POUR A3 UPSTAND WALL REIF 1,380.66

584 SH117827 15-Jun-20 99250 POUR STRIP BOT BAR & TRIMMER BAR (P-A3) REIF 3,308.46

585 SH117828 15-Jun-20 99250 FIFTH FLOOR SLAB MESH REIF 32,984.82
PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

586 SH117856 15-Jun-20 75789 FIFTH FLOOR BEAMS PART C POUR C1 REIF 1,446.57

587 SH117857 15-Jun-20 75789 FIFTH FLOOR POUR STRIP BAR & TRIMMER BAR P-C1 REIF 8,576.40

588 SH117858 15-Jun-20 75789 FIFTH FLOOR PUNCHING SHEAR POUR C1 REIF 1,977.50

589 SH117863 15-Jun-20 75789 FIFTH FLOOR PT SLAB ADDL LAYER POUR C1 REIF 14,851.82

590 SH117888 16-Jun-20 47878 FIFTH TO SIXTH FLOOR ST04 CW @(NN-MM)(12-13) REIF 6,483.07

591 SH117886 16-Jun-20 47878 FIFTH TO SIXTH FLOOR ST03 CW @(BB-CC)(8-9) REIF 7,237.73

592 SH117885 16-Jun-20 47878 FIFTH TO SIXTH FLOOR COREWALL PART C @(CC-BB)(12-13) REIF 10,965.32

593 SH117884 16-Jun-20 47878 FIFTH TO SIXTH FLOOR COLUMN & WALL REIF 8,562.19

594 SH117883 16-Jun-20 47878 FIFTH TO SIXTH FLOOR COLUMN REIF 9,834.92

595 SH117944 17-Jun-20 34422 FIFTH FLOOR PT SLAB PUNCHING SHEAR (POUR B2) REIF 2,042.58

596 SH117945 17-Jun-20 34422 FIFTH FLOOR PT SLAB TRIMMER BAR REIF POUR B2 8,561.83

597 SH117946 17-Jun-20 34422 FIFTH FLOOR PT SLAB ADDL LAYER REIF POUR B2 17,843.04

598 SH117947 17-Jun-20 34422 FIFTH FLOOR BEAMS POUR B2 REIF 4,229.31

599 SH117975 18-Jun-20 71166 FIFTH FLOOR BEAMS POUR C2 REIF 4,454.50

600 SH117976 18-Jun-20 71166 FIFTH FLOOR PT SLAB ADDLY LAYER POUR C2 REIF 18,055.06

601 SH117977 18-Jun-20 71166 FIFTH FLOOR PT SLAB TRIMMER BAR REIF POUR C2 8,069.86

602 SH117978 18-Jun-20 71166 FIFTH FLOOR PT SLAB PUNCHING SHEAR (POUR C2) REIF 1,855.33

603 SH117997 18-Jun-20 71166 5TH FLOOR TO ROOF ADDITIONAL (PARAPET) 42,392.21

604 SH117990 18-Jun-20 72160 THIRD FLOOR BEAMS POUR A1 4,474.66

605 SH117991 18-Jun-20 72160 THIRD FLOOR PT SLAB PART-A (POUR A1) ADDL LAYERS REIF 19,231.12

606 SH117992 18-Jun-20 72160 3F TRIMMER BAR PART A POUR A1 REIF 5,087.20

607 SH117993 18-Jun-20 72160 3F PT SLAB PART A POUR A1 POUR STRIP, CORNER BAR REIF 2,757.51

608 SH117994 18-Jun-20 72160 3F PUNCHING SHEAR DETAILS PART A POUR A1 1,892.71

609 SH117996 18-Jun-20 72160 3F ADDITIONAL MESH POUR REIF 15,992.64

610 SH118151 23-Jun-20 25283 PART F GF SLAB ADDL & CHAIRS PART A3 & B3 33,365.93

611 SH118152 23-Jun-20 89265 ADDITIONAL-PART B-PARAPET,PAN BOX OPENING REIF 24,192.00

612 SH118153 23-Jun-20 89265 6F PART B AREA PT BEAMS POUR B1 REIF 1,101.75

613 SH118154 23-Jun-20 89265 6F PT SLAB ADDL LAYERS POUR B1 PART B 13,381.11
PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

614 SH118155 23-Jun-20 89265 6F PT SLAB POUR STRIP BAR & TRIMMER BAR (P-B1) REIF 8,766.61

615 SH118156 23-Jun-20 89265 6F PT SLAB PUNCHING SHEAR POUR B1 PART B REIF 1,902.95

616 SH118174 24-Jun-20 72160 6F~7F COREWALL PART B @ CC-BB/2-3 REIF 10,957.50

617 SH118175 24-Jun-20 72160 6F~7F STAIR 02 COREWALL PART B BB-CC/6-7 REIF 7,169.44

618 SH118176 24-Jun-20 72160 6F~7F STAIR 01 CW PART B @ NN-MM/2-3 REIF 6,440.20

619 SH118177 24-Jun-20 72160 6F~7F COLUMN PART B REIF 12,127.86

620 SH118178 24-Jun-20 72160 6F~7F COLUMN & WALL PART B REIF 7,652.39

621 SH118179 24-Jun-20 27744 SIXTH FLOOR BEAMS PART B POUR B2 REIF 4,229.31

622 SH118180 24-Jun-20 27744 6TH FLOOR PT SLAB PART B POUR B2 ADDL LAYER REIF 17,843.04

623 SH118181 24-Jun-20 27744 6TH FLOOR PT SLAB PART B POUR B2 TRIMMER BAR DETAILS REIF 8,491.83

624 SH118182 24-Jun-20 27744 6TH FLOOR PT SLAB PUNCHING SHEAR POUR B2 PART B REIF 2,042.58

625 SH118192 24-Jun-20 17035 ADDITIONAL PART D PARAPET WORKS REIF 24,192.00

626 SH118193 24-Jun-20 17035 5TH FLOOR PT SLAB PART D POUR D1 ADDL LAYERS REIF 17,936.92

627 SH118211 25-Jun-20 33987 5TH FLOOR BEAMS POUR D2 REIF 1,355.06

628 SH118212 25-Jun-20 33987 FIFTH FLOOR PT SLAB PART D POUR D2 ADDL LAYERS REIF 13,890.86

629 SH118213 25-Jun-20 33987 FIFTH FLOOR PT SLAB TRIMMER BAR PART D POUR D2 REIF 6,340.86
FIFTH FLOOR PT SLAB CORNER BAR, TENDON, POUR STRIP BAR PART D
630 SH118214 25-Jun-20 33987 2,586.44
POUR D2 REIF
631 SH118215 25-Jun-20 33987 FIFTH FLOOR PUNCHING SHEAR DETAILS PART D POUR D2 REIF 1,990.71

632 SH118216 25-Jun-20 88436 FIFTH FLOOR BEAMS POUR D1 REIF 4,437.36

633 SH118217 25-Jun-20 88436 5TH FLOOR PT SLAB TRIMMER BAR PART D POUR D1 REIF 4,640.77

634 SH118218 25-Jun-20 88436 5TH FLOOR PT SLAB POUR STRIP, CORNER BAR PART D POUR D1 REIF 2,813.38

635 SH118219 25-Jun-20 88436 5TH FLOOR PUNCHING SHEAR DETAILS PART D POUR D1 REIF 1,628.14

636 SH118222 25-Jun-20 73173 3F~4F STAIR-07 @(B-C)/(6-7) PART A REIF 10,878.32

637 SH118223 25-Jun-20 73173 3F~4F LIFT CW PART A GRID (B-C)/(2-3) REIF 14,282.94

638 SH118226 25-Jun-20 88436 PART D1 FIFTH FLOOR SLAB MESH REIF 32,984.82

639 SH118230 25-Jun-20 73173 3F~4F COLUMN & WALL REIF 10,270.55

640 SH118224 25-Jun-20 89821 5TH TO 6TH FLOOR STAIR 06 COREWALL (B-C)(8-9) REIF 7,450.35

641 SH118225 25-Jun-20 89821 5TH TO 6TH FLOOR ST-05 CW REIF 6,367.28
PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

642 SH117512 8-Jun-20 32084 GF POUR D3 UPSTAND WALL REIF 17,713.74

643 SH118259 27-Jun-20 72406 6TH TO 7TH FLOOR COREWALL @GRID(CC-BB)/(12-13) REIF 10,965.32

644 SH118260 27-Jun-20 72406 6TH TO 7TH FLOOR ST-03 CW (BB-CC)/(8-9) REIF 7,107.31

645 SH118261 27-Jun-20 72406 6TH TO 7TH FLOOR ST-04 CW (NN-MM)/(12-13) REIF 6,374.39

646 SH118262 27-Jun-20 72406 6TH TO 7TH FLOOR COLUMN REIF 7,684.82

647 SH118263 27-Jun-20 72406 6TH TO 7TH FLOOR COLUMN & WALL REIF 7,019.24

648 SH118264 27-Jun-20 37729 SIXTH FLOOR BEAMS POUR C1 REIF 1,307.01

649 SH118265 27-Jun-20 37729 SIXTH FLOOR PT SLAB ADDL LAYER REIF 14,251.00

650 SH118266 27-Jun-20 37729 SIXTH FLOOR PT SLAB POUR STRIP, TRIMMER BAR REIF 6,650.56

651 SH118267 27-Jun-20 37729 SIXTH FLOOR PUNCHING SHEAR POUR C1 REIF 1,438.00

652 SH118522 6-Jul-20 73173 UPSTAND PARAPET & LAP ADDITIONAL REINF 10,111.40

653 SH118523 6-Jul-20 73173 SIXTH TO SEVENTH FLOOR COLUMN & WALL (PART-C) REINF 3,022.58

654 SH118524 6-Jul-20 73173 SIXTH FLOOR TO SEVENTH FLOOR COLUMN (PART-C) REINF 2,698.28

655 SH118525 6-Jul-20 73173 6F BEAMS PART-C (POUR-C2) REINF 4,258.37

656 SH118526 6-Jul-20 73173 6F PT SLAB ADDL LAYER PART-C (POUR-C2) REINF 17,536.72

657 SH118527 6-Jul-20 73173 6F PT SLAB TRIMMER BAR (POUR-C2) (PART-C) REINF 6,882.46

658 SH118528 6-Jul-20 73173 6F PUNCHING SHEARS (POUR-C2) (PART-C) REINF 1,342.35

659 SH118559 6-Jul-20 69118 RAFT F & STAIRCASE ADDITIONAL 50,359.20

660 SH117995 18-Jun-20 72160 3F ADDITIONAL MESH POUR A1 REIF 15,992.64

661 SH118220 25-Jun-20 89821 5TH TO 6TH FLOOR PART D GRID(C-B)/(12-13) REIF 12,010.28

662 SH118221 25-Jun-20 89821 5TH TO 6TH FLOOR COLUMN & WALL REIF 19,829.31

663 SH118728 11-Jul-20 33987 LANDSCAPE RAFT PART-F (A3 PORTION) ADDITIONAL 18,103.10

664 SH118729 12-Jul-20 16624 4TH FLOOR PART-A (POUR-A1) MESH 14,993.10

665 SH118731 12-Jul-20 16624 4TH FLOOR PT SLAB PART-A(POUR-A1) ADD'L LAYERS REINF 19,231.12

666 SH118730 12-Jul-20 16624 4TH FLOOR BEAMS (POUR-A1) REINF 4,474.66

667 SH118732 12-Jul-20 16624 4TH FLOOR PT SLAB TRIMMER BAR PART-A (POUR-A1) REINF 5,047.48

668 SH118733 12-Jul-20 16624 4TH FLOOR PT SLAB PART-A (POUR-A1) POUR STRIB, CORNER BAR REINF 2,757.51

669 SH118734 12-Jul-20 16624 4TH FLOOR PUNCHING SHEAR DETAILS (PART-A) (POUR-A1) REINF 1,823.66
PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

670 SH118735 11-Jul-20 33987 FOURTH TO FIFTH AND FLOOR COLUMN AND WALL (PART-A) REINF 8,944.00

671 SH118736 11-Jul-20 33987 4TH TO 5TH FLOOR LIFT CW PART-A GRID (B-C) /(2-3) REINF 12,002.46

672 SH118737 11-Jul-20 33987 4TH TO 5TH FLOOR STAIR -7 CW @ (B-C) /(6-7) (PART-A) REINF 7,394.08

673 SH118759 13-Jul-20 99250 6F-7F COLUMN & WALL (PART-D) REINF 19,857.22

674 SH118760 13-Jul-20 99250 6F-7F LIFT CORE WALL (PART-D) (GRID(C-B)/(12-13) REINF 12,002.46

675 SH118761 13-Jul-20 99250 6F-7F ST-05 CW (PART-D) REINF 6,345.92

676 SH118762 13-Jul-20 99250 6F-7F STAIR -06 CW (PART-D) (B-C) (8-9) REINF 7,450.35

677 SH118764 12-Jul-20 91799 6TH FLOOR BEAMS (POUR-D2) REINF 1,306.95

678 SH118765 12-Jul-20 91799 6TH FLOOR PT SLAB PART-D (POUR-D2) ADD'L LAYERS REINF 13,890.86

679 SH118766 12-Jul-20 91799 6TH FLOOR PT SLAB TRIMMER BAR PART-D (POUR-D2) REINF 6,340.86

680 SH118767 12-Jul-20 91799 6TH FLOOR PART-D (POUR-D2) PT SLAB CORNER BAR, TENDOON REINF 2,586.44

681 SH118768 12-Jul-20 91799 6TH FLOOR PUNCHING SHEARS DETAILS (PART-D)(POUR-D2) REINF 1,990.71

682 SH118769 12-Jul-20 69118 6F BEAMS (POUR-D1) REINF 4,437.36

683 SH118770 12-Jul-20 69118 6F PT SLAB PART-D (POUR-D1) ADD'L LAYERS REINF 17,936.92

684 SH118771 12-Jul-20 69118 6F PT SLAB TRIMMER BAR PART-D (POUR-D1) REINF 4,640.77

685 SH118772 12-Jul-20 69118 6F PT SLAB PART-D (POUR-D1) POUR STRIB,CORNER ,BAR ,LIVE REINF 2,813.38

686 SH118773 12-Jul-20 69118 6F PUNCHING SHEARS DETAILS (PART-D) (POUR-D1) REINF 1,628.14

687 SH118774 12-Jul-20 69118 6F (PART-D) (POUR-D1) MESH 19,990.80

688 SH118828 14-Jul-20 50859 SEVENTH FLOOR PART-B AREA PT BEAMS (POUR-B1) REINF 1,101.54

689 SH118829 14-Jul-20 50859 7TH FLOOR PT SLAB ADDL LAYERS (POUR-B1) (PART-B) REINF 9,725.75

690 SH118830 14-Jul-20 50859 7F PT SLAB POUR STRIP BAR & TRIMMER BAR (P-B1) REINF 8,449.91

691 SH118831 14-Jul-20 50859 7TH FLOOR PT SLAB PUNCHING SHEAR (POUR-B1) (PART-B) REINF 1,296.40

692 SH118832 14-Jul-20 89211 7TH FLOOR BEAMS (PART-C) (POUR-C1) REINF 1,428.23

693 SH118833 14-Jul-20 89211 7TH FLOOR PT SLAB ADD'L PART-C (POUR-C1) REINF 10,942.46

694 SH118834 14-Jul-20 89211 7TH FLR SLAB POUR STRIP BAR & TRIMMER BAR (P-C1) REINF 7,519.33

695 SH118835 14-Jul-20 89211 7TH FLOOR PUNCHING SHEARS (POUR-C1) (PART-C) REINF 1,106.07

696 SH118836 14-Jul-20 89211 SEVENTH FLOOR C1 POUR-BLOCK C MESH REINF 23,988.96

697 SH118837 14-Jul-20 90859 SEVENTH FLOOR B1 POUR-BLOCK B MESH REINF 23,988.96
PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

698 SH118858 15-Jul-20 34422 SEVENTH FLOOR BEAMS PART-B(POUR-B2)REINF 4,125.82

699 SH118859 15-Jul-20 34422 7TH FLOOR PT SLAB PART-B (POUR-B2) ADD'L LAYER REINF 13,603.30

700 SH118860 15-Jul-20 34422 7TH FLOOR PT SLAB TRIMMER BAR REINF(POUR-B2)(PART-B) 7,366.44

701 SH118861 15-Jul-20 34422 7TH FLOOR PT SLAB PUNCHING SHEAR (POUR-B2) (PART-B) REINF 1,444.64

702 SH118997 18-Jul-20 66583 BLOCK A POUR A2 FIRSDT FLOOR BEAM REIF 2,531.12

703 SH118998 18-Jul-20 66583 BLOCK A POUR A2 FIRSDT FLOOR BEAM REIF 1,471.03

704 SH118999 18-Jul-20 66583 BLOCK A POUR A2 FIRSDT FLOOR SLAB REIF 12,147.34

705 SH119000 18-Jul-20 66583 BLOCK A POUR A2 FIRSDT FLOOR SLAB REIF 14,309.40

706 SH119001 18-Jul-20 66583 BLOCK A POUR A2 FIRSDT FLOOR UPSTANSD REIF 711.50

707 SH119002 18-Jul-20 66583 BLOCK A POUR A2 FIRSDT FLOOR UPSTANSD REIF 11,753.64

708 SH119054 20-Jul-20 76469 1F~2F STAIR 08 COREWALL @(N-M)/(2-3) (PART A) REIF 11,079.06

709 SH119055 20-Jul-20 76469 1F~2FCOLUMN (PART A) REIF 9,710.73

710 SH119056 20-Jul-20 76469 1F~2FCOLUMN & WALL (PART A) REIF 5,097.61

711 SH119057 20-Jul-20 42080 7TH FLOOR BEAMS (POUR-D1) REINF 4,309.77

712 SH119058 20-Jul-20 42080 7TH FLOOR D1 BLOCK D MESH REIF 23,988.96

713 SH119059 20-Jul-20 42080 7TH FLOORPUNCHING SHEAR DETAILS PART D POUR D1 1,103.01

7TH FLOOR PT SLAB PART D POUR D1 POUR STRIP, CORNER BAR LIVE
714 SH119060 20-Jul-20 42080 2,432.32
END

715 SH119061 20-Jul-20 42080 7TH FLOOR PT SLAB TRIMMER BAR REINF(POUR-D1)(PART-D) 3,990.19

716 SH119062 20-Jul-20 42080 7TH FLOOR PT SLAB REINF(POUR-D1)(PART-D) ADDL LAYERS REIF 13,759.60

717 SH119140 21-Jul-20 72406 5F~FLOOR BEAMS POUR A1 REIF 4,085.64

718 SH119141 21-Jul-20 72406 5F PT SLAB PART A (POUR 1) ADD L LAYERS REIF 16,694.19

719 SH119142 21-Jul-20 72406 5F PT SLAB TRIMMERBAR PART A(POUR A1) REIF 4,414.73
PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)
5F PT SLAB POUR STRIP,CORNER BAR, LIVE & DEAD END PART A(POUR
720 SH119143 21-Jul-20 72406 2,177.19
A1) REIF

721 SH119144 21-Jul-20 72406 5F PUNCHING SHEAR DETAILS PART A POUR A1 REIF 1,314.79

722 SH119147 21-Jul-20 72406 5F MESH POUR A1 REIF STRAIGHT BAR 13,993.56

723 SH119153 21-Jul-20 72160 7TH FLOOR TO ROOF ST01 CW PART B @ NN-MM/2-3 REIF 4,512.61

724 SH119125 21-Jul-20 75789 7F ROOF CORE WALL PART C @ BRID (CC-BB)/(12-13) REIF 11,769.50

725 SH119126 21-Jul-20 75789 7F LOWER ROOF ST-04 CW (PART C) @ (NN-MM) /(12-13) REIF 4,436.02

726 SH119127 21-Jul-20 75789 7F~ROOF STAIR 03 COREWALL PART CREIF 5,168.13

727 SH119128 21-Jul-20 75789 7F~ROOF COLUMN & WALL REIF 2,185.78

728 SH119129 21-Jul-20 75789 7F~ROOF COLUMN REIF 7,376.50

729 SH119130 21-Jul-20 75789 7F~ROOF COLUMN & WALL REIF 7,361.99

730 SH119132 21-Jul-20 75789 7F~ROOF COLUMN REIF 7,034.88

731 SH119152 21-Jul-20 72160 7TH FLOOR TO ROOF COREWALL PART B @ ((CC-BB)/(2-3) REIF 12,046.86

732 SH119154 21-Jul-20 72160 7TH FLOOR TO ROOF ST02 CW PART B @ NN-MM/2-3 REIF 5,220.92

733 SH119155 21-Jul-20 72160 7TH FLOOR TO ROOF COLUMN & WALL PART BREIF 4,803.03

734 SH119156 21-Jul-20 72160 7TH FLOOR TO ROOF COLUMN PART B REIF 7,216.72

735 SH119157 21-Jul-20 72160 7TH FLOOR TO ROOF COLUMN PART B REIF 5,480.20

736 SH119158 21-Jul-20 72160 7TH FLOOR TO ROOF COLUMN PART B REIF 7,116.40

737 SH119366 27-Jul-20 26811 PART A UPSTAND & STAIRCASE REIF STRAIGHT BAR 30,082.08

738 SH119367 27-Jul-20 26811 7TH FLOOR BEAMS POUR D2 REIF 1,291.86

739 SH119368 27-Jul-20 26811 7TH FLOOR PT SLAB PART D ADDL LAYERS POUR D2 REIF 9,401.23

740 SH119369 27-Jul-20 26811 7TH FLOOR PT SLAB TRIMMER BAR PART D POUR D2 REIF 4,556.64

7TH FLOOR PT SLAB POUR D2, CORNER BAR, TENDON, POUR STRIP
741 SH119370 27-Jul-20 26811 2,008.86
TRIMMER BAR PART D POUR D2 REIF
PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

742 SH119371 27-Jul-20 26811 7TH FLOOR PT SLAB PUNCHING SHEAR PART D POUR D2 REIF 1,355.91

743 SH119372 27-Jul-20 76469 5F~6F COLUMN & WALL PART A REIF 8,944.00

744 SH119373 27-Jul-20 76469 5F~6F LIFT CW PART A GRID(B-C)/(2-3) REIF 11,366.08

745 SH119374 27-Jul-20 76469 5F~6F STAIR 07 CW @(B-C)/(6-7) REIF 6,714.14

746 SH119411 28-Jul-20 32076 PART A LANDSCAPE GROUND FLOOR SLAB STRAIGHT BAR 19,990.80

747 SH119412 28-Jul-20 32076 PART C 7 TH FLOOR SLAB C2 POUR REIF STRAIGHT BAR 20,065.44

748 SH119438 29-Jul-20 26811 7TH FLOOR LIFT COREWALL PART D REIF 12,236.76

749 SH119439 29-Jul-20 26811 7TH FLOOR ROOF FLOOR ST-05 CW PART D@ (N-M)/(12-13) REIF 5,220.84

750 SH119441 29-Jul-20 26811 7F~RF COLUMN & WALL PART-D REIF 6,790.04

751 SH119442 29-Jul-20 26811 7F~RF COLUMN PART-D REIF 8,842.95

752 SH119443 29-Jul-20 26811 7F~RF COLUMN & WALL PART-D REIF 7,030.05

753 SH119444 29-Jul-20 26811 7F~RF STAIR 06 CW PART-D REIF 6,035.37

754 SH119507 4-Aug-20 89211 PART A3 GROUND FLOOR SLAB & PARAPPET REINF(STRAIGHT BAR) 40,066.56

755 SH119551 5-Aug-20 72406 SECOND FLOOR BEAMS PART-A (POUR-A2) REINF 1,294.65

756 SH119552 5-Aug-20 72406 SF PT SLAB PART-A (POUR-A2) ADD'L LAYERS REINF 10,472.75

757 SH119553 5-Aug-20 72406 SECOND FLOOR SLAB TRIMMER BAR PART-A (POUR-A2) REINF 6,007.70

SF PART-A (POUR-A2) PT SLAB CORNER BAR,TENDON ,POUR STRIB BAR


758 SH119554 5-Aug-20 72406 2,465.52
REINF

759 SH119555 5-Aug-20 72406 SECOND FLOOR PUNCHING SHEAR DETAILS (PART-A) (POUR-A2) REINF 1,450.14

760 SH119561 5-Aug-20 72406 PART A2 SECOND FLOOR MESH REINF STRAIGHT BAR 9,995.40

761 SH119602 8-Aug-20 89211 ROOF FLOOR PT SLAB BEAMS PART-B (POUR-B2) REINF 1,424.15

762 SH119603 8-Aug-20 89211 ROOF FLOOR PT SLAB BEAMS PART-B (POUR-B2) REINF 2,520.94

763 SH119604 8-Aug-20 89211 ROOF FLOOR PT SLAB ADDL LAYER PART-B (POUR-B2) REINF 16,317.16
PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

764 SH119605 8-Aug-20 89211 RF FLR PT SLAB STRIP BOTTOM BAR & TRIMMER BAR PART-B (POUR-B2) 2,982.55

RF FLR PT SLAB POUR STRIP TOP BAR & PUNCHING SHEAR PART-B (POUR-
765 SH119606 8-Aug-20 89211 2,159.02
B2)

766 SH119608 8-Aug-20 89211 PART B2 ROOF FLOOR MESH REINF STRAIGHT BAR 21,989.88

767 SH119618 8-Aug-20 69118 ROOF FLOOR PT SLAB BEAMS PART-C (POUR-C2) REINF 2,069.32

768 SH119619 8-Aug-20 69118 ROOF FLOOR PT SLAB BEAMS PART-C (POUR-C2) REINF 2,744.46

769 SH119620 8-Aug-20 69118 ROOF FLOOR PT SLAB ADDL LAYER PART-C (POUR-C2) REINF 15,649.16

RF PT SLAB POUR STRIP BOT BAR & TRIMMER BAR PART-C (POUR -C2)
770 SH119621 8-Aug-20 69118 3,450.89
REINF

771 SH119622 8-Aug-20 69118 RF PT SLAB POUR STRIP TOP BAR & PUNCHING SHER PART-C (POUR-C2) 2,019.05

772 SH119623 8-Aug-20 69118 POUR C2 ROOF FLOOR MESH REINF STRAIGHT BAR 21,989.88

773 SH119630 9-Aug-20 75789 ROOF PT SLAB BEAMS PART-B (POUR-B1) REINF 2,977.66

774 SH119631 9-Aug-20 75789 ROOF PT SLAB ADDL LAYERS (POUR-B1) (PART-B) REINF 13,699.35

RF PT SLAB POUR STRIP BOTTOM BAR & TRIMMER BAR PART-B (POUR-B1)
775 SH119632 9-Aug-20 75789 1,224.20
REINF

776 SH119633 9-Aug-20 75789 RF PT SLAB POUR STRIP TOP BAR & PS PART-B (POUR-B1) REINF 1,691.09

777 SH119634 9-Aug-20 75789 ROOF FLOOR BEAMS PART-C (POUR-C1) REINF 3,831.10

778 SH119635 9-Aug-20 75789 ROOF FLOOR PT SLAB ADDL LAYERS (POUR-C1) ( PART -C) REINF 14,156.61

RF FLR PT SLAB POUR STRIP BOTTOM BAR & TRIMMER BAR PART-C
779 SH119636 9-Aug-20 75789 2,951.34
(POUR-C1)
RF FLR PT SLAB POUR STRIP TOP BAR & PUNCHING SHEAR PART-C
780 SH119637 9-Aug-20 75789 1,670.88
(POUR-C1)

781 SH119760 9-Aug-20 25283 6F BEAMS POUR A1 REIF 4,158.39

782 SH119761 9-Aug-20 25283 6F PT SLAB PART A POUR A1 ADDL LAYERS REIF 17,757.69

783 SH119762 9-Aug-20 25283 6F PT SLAB PART A POUR A1 POUR STRIP, CORNER BAR REIF 2,001.72

784 SH119763 9-Aug-20 25283 6 F PUNCHING SHEAR DETAILS PART A POUR A1 1,303.96

785 SH119738 11-Aug-20 91740 2F-3F STAIR 8 CORE WALL @ (N-M)/(2-3) PART A REIF 9,873.01
PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

786 SH119739 11-Aug-20 91740 2F~3F COLUMN PART A REIF 8,260.80

787 SH119740 11-Aug-20 91740 2F~3F WALL PART A REIF 3,208.28

788 SH119741 11-Aug-20 91740 RF UPSTAND & PARAPET PART B (POUR B1) REIF 11,210.21

789 SH119742 11-Aug-20 91740 RF UPSTAND & PARAPET PART C (POUR C1) REIF 11,219.84

790 SH119743 11-Aug-20 37729 6F~7F COLUMN & WALL PART A REIF 8,944.00

791 SH119744 11-Aug-20 37729 6F~7F CW PART A GRID(B-C)/(2-3) REIF 11,366.08

792 SH119745 11-Aug-20 37729 6F~7F STAIR 7 CW @ (B-C)/(9-7) PART A REIF 6,714.14

793 SH119750 12-Aug-20 47878 ROOF FLOOR UPSTAND & PARAPET PART B POUR B2 RIF 13,680.87

794 SH119751 12-Aug-20 47878 RF FLR PT UPSTAND & PARAPET PART C POUR C2 REIF 14,516.81

795 SH119809 13-Aug-20 83069 LANDSCAPE UPSTAND & STAIRCASE STRAIGHT BARS 36,128.64

796 SH119939 17-Aug-20 74831 ROOF FLOOR BEAMS PART-D (POUR-D1) REINF 3,768.57

797 SH119940 17-Aug-20 74831 ROOF FLOOR PT SLAB ADDL LAYER POUR D1 PART D REIF 13,119.06

RF PT SLAB POUR STRIP BOTTOM BAR & TRIMMER BAR PART-D (POUR-D1)
798 SH119941 17-Aug-20 74831 1,937.54
REINF

799 SH119942 17-Aug-20 74831 RF FLOOR PT SLAB POUR STRIP TOP BAR & PUNCHING SHEAR PART D 1,689.20

800 SH119943 17-Aug-20 74831 PART D1 ROOF SLAB MESH REIF 19,990.80

801 SH119944 17-Aug-20 37729 ROOF FLOOR PT SLAB BEAMS PART D POUR D2 2,033.50

802 SH119945 17-Aug-20 37729 ROOF FLOOR PT SLAB BEAMS PART D POUR D2 3,034.70

803 SH119946 17-Aug-20 37729 ROOF FLOOR PT SLAB ADDL LAYERS PART D POUR D2 13,926.79

804 SH119947 17-Aug-20 37729 RF PT SLAB POUR STRIP BOTOM BAR & TRIMMER BAR PART D POUR D2 2,782.94

RF PT SLAB POUR STRIP BOTOM BAR & PUNCHING SHEAR PART D POUR
805 SH119948 17-Aug-20 37729 2,214.46
D2

806 SH119975 17-Aug-20 37729 ROOF FLOOR UPSTAND & PARAPET PART D POUR D1 RIF 10,543.21

807 SH119976 17-Aug-20 32027 ROOF FLOOR UPSTAND & PARAPET PART D POUR D2 REIF 14,529.93
PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

808 SH120037 20-Aug-20 78044 ROOF FLOOR ADDITIONAL STRAIGHT BAR 32,022.96

809 SH120061 20-Aug-20 33987 7TH FLOOR BEAMS POUR A1 REIF 4,198.20

810 SH120062 20-Aug-20 33987 7TH FLOOR PT SLAB PART A POUR A1 ADDL LAYERS REIF 14,686.13

811 SH120063 20-Aug-20 33987 7TH FLOOR PT SLAB TRIMMER BAR PART A POUR A1 REIF 4,372.16

7TH FLOOR PT SLAB PART A POUR A1, POUR STRIP, CORNER BAR, LIVE
812 SH120064 20-Aug-20 33987 2,438.37
&DEAD REIF

813 SH120065 20-Aug-20 33987 7TH FLOOR PUNCHING SHEAR DETAILS PART A POUR A1 1,303.96

814 SH120066 20-Aug-20 33987 7TH FLOOR MESH STRAIGHT BAR 9,995.40

815 SH120067 20-Aug-20 32084 3RD TO 4TH FLOOR STAIR 8 COREWALL @(N-M)/(2-3) PART AREIF 9,260.38

816 SH120068 20-Aug-20 32084 3RD TO 4TH FLOOR COLUMN PART AREIF 8,260.80

817 SH120069 20-Aug-20 32084 3RD TO 4TH FLOOR WALL PART AREIF 3,208.28

818 SH120070 20-Aug-20 32084 3RD FLOOR BEAMS POUR 2 1,294.65

819 SH120071 20-Aug-20 32084 3RD FLOOR PT SLAB PART A POUR A2 ADDL LAYERS REIF 10,465.21

820 SH120072 20-Aug-20 32084 3RD FLOOR PT SLAB PART A POUR A2 TRIMMER BAR REIF 5,586.76

3RD FLOOR PT SLAB PART A POUR A2 CORNER BAR,TENDON,POUR STRIP


821 SH120073 20-Aug-20 32084 2,277.01
REIF

822 SH120074 20-Aug-20 32084 3RD FLOOR PT SLAB PART A POUR A2 PUNCHING SHEAR REIF 1,303.96

823 SH120075 20-Aug-20 32084 3RD FLOOR MESH STRAIGHT BAR 7,996.32

824 SH120278 29-Aug-20 76469 LANDSCAPE AREA ADDITIONAL REINF 20,155.20

825 SH120279 29-Aug-20 76469 ADDITIONAL REINF 10,048.80

826 SH120280 30-Aug-20 16624 7F-ROOF LIFT CW PART-A GRID (B-C)/(2-3) REINF 14,884.11

827 SH120281 30-Aug-20 16624 7F- LOWER ROOF STAIR -7 CW (PART-A) REINF 7,238.35

828 SH120282 30-Aug-20 16624 7F-ROOF COLUMN & WALL (PART-A) REINF 1,888.12

829 SH120283 30-Aug-20 16624 7F-ROOF COLUMN & WALL (PART-A) REINF 2,463.50
PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

830 SH120284 30-Aug-20 16624 7F - ROOF COLUMN (PART-A) REINF 3,944.70

831 SH120285 30-Aug-20 16624 7F- ROOF COLUMN & WALL (PART-A) REINF 5,111.32

832 SH1202468 6-Sep-20 32027 ROOF FLOOR PT SLAB BEAMS PART A POUR A1 REIF 2,159.10

833 SH1202469 6-Sep-20 32027 ROOF FLOOR PT SLAB BEAMS PART A POUR A1 REIF 3,186.54

834 SH1202470 6-Sep-20 32027 ROOF FLOOR PT SLAB ADDL LAYER PART A POUR A1 REIF 14,370.48

ROOF FLOOR PT SLAB POR STRIP BOTTOM & TRIMMER PART A POUR A1
835 SH1202471 6-Sep-20 32027 4,357.64
REF

836 SH1202472 6-Sep-20 32027 ROOF FLOOR PT SLAB POR STRIP TOP & PS PART A POUR A1 REF 2,338.19

837 SH1202473 6-Sep-20 32027 PART A POUR A1 ADDITIONAL STRAIGHT BAR 12,994.02

838 SH120617 9-Sep-20 72160 ADDITIONAL STRAIGHT BAR 46,205.18

839 SH120698 12-Sep-20 37729 4TH FLOOR BEAMS POUR A2 REIF 1,294.65

840 SH120699 12-Sep-20 37729 4TH FLOOR PT SLAB PART A POUR A2 ADDL LAYER REIF 10,490.13

4TH FLOOR PART A POUR A2 PT SLAB CORNER BAR, TENDON, POUR STRIP
841 SH120701 12-Sep-20 37729 1,264.21
BAR

842 SH120700 12-Sep-20 37729 4TH FLOOR PT SLAB TRIMMER BAR PART A POUR A2 REIF 4,877.77

843 SH120703 12-Sep-20 37729 4TH FLOOR PUNCHING SHEAR DETAILS (PART-A) (POUR-A2) REINF 1,495.45

844 SH120704 12-Sep-20 37729 4TH FLOOR SLAB PART A2 ADDITIONAL STRAIGHT BAR 9,995.40

845 SH120734 12-Sep-20 66583 ROOF FLOOR UPSTAND AND PARAPET PART A POUR A2 REIF 17,096.88

846 SH120735 12-Sep-20 66583 PARTY HALL & GYM VERTICAL ADDITIONAL STRAIGHT BAR 8,139.65

847 SH120857 12-Sep-20 66583 4TH TO 5TH FLOOR COLUMN & WALL PART A REIF 10,007.51

848 SH120858 12-Sep-20 66583 4TH TO 5TH FLOOR STAIR-8 CW @ (N-M)/(2-3) PART A REIF 5,920.50

849 SH120859 12-Sep-20 66583 5TH FLOOR BEAMS POUR A2 REIF 1,294.65

850 SH120860 12-Sep-20 66583 5TH FLOOR PT SLAB PART A POUR A2 ADDL LAYER REIF 10,776.46

851 SH120860 12-Sep-20 66583 5TH FLOOR PT SLAB PART A POUR A2 ADDL LAYER REIF 10,776.46
PROJECT: BASEMENT+LOWER GROUND FLOOR + GROUND FLOOR + 7 FLOORS + ROOF - COMMERCIAL & RESIDENTIAL BUILDINGS (LAWNZ BY DANUBE)
CLIENT: M/s DANUBE PROPERTIES DEVELOPMENT LLC
MAIN CONTARCTOR: GULF ASIA CONTRACTING CO LLC
CONSULTANT: NATIONAL ENGINEERING BUREAU

SUMMARY OF REBAR DELIVERY DETAILS

Total
Sl.No. Shipment No Date Vehicle No Description
(Kg)

852 SH120861 12-Sep-20 66583 5TH FLOOR PT SLAB TRIMMER BAR PART A POUR A2 REIF 6,062.92

5TH FLOOR PART A POUR A2 PT SLAB CORNER BAR, TENDON, POUR STRIP
853 SH120862 12-Sep-20 66583 1,813.79
DETAILS

854 SH120863 12-Sep-20 66583 5F PUNCHING SHEAR DETAILS PART A POUR A2 REIF 1,495.45

855 SH120864 12-Sep-20 66583 5F SLAB PART A2 MESH REIF 9,995.40

GROSS TOTAL 13,457,917.15