Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Sign in
Sign in
Download free for days
0 ratings
0% found this document useful (0 votes)
105 views
Time and Work
Exercise on time and work
Uploaded by
Akansha Akansha
AI-enhanced title
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save 9. TIME AND WORK For Later
Download
Save
Save 9. TIME AND WORK For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
0 ratings
0% found this document useful (0 votes)
105 views
Time and Work
Exercise on time and work
Uploaded by
Akansha Akansha
AI-enhanced title
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save 9. TIME AND WORK For Later
Carousel Previous
Carousel Next
Download
Save
Save 9. TIME AND WORK For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
Download now
Download
You are on page 1
/ 20
Search
Fullscreen
qunpten TIME AND WORK CONCEPT OF EFFICIENCY Efficiency means rate of doing work. This means that more the efficiency, less will be the number of days required to complete a certain work and less the efficiency, more will be the number of days required to complete a certain work. Aliza is twice as efficient as Binny. = Aliza does twice as much work as Binny in the same time interval = Aliza will require half the time as required by Binny to do the same work. CONCEPT OF NEGATIVE WORK ‘Suppose two persons 4 and B are working to build a wall while Cis ‘working to demolish the wall. Ifwe consider the work asthe build~ ing of the wall, then breaking the wall (by C) is negative work. ‘The concept of negative work generally appears in the problems based on pipes and cisterns, where there are inlet pipes and outlet pipes‘leaks, which are working against each other. If.we consider the work of filling a tank, the inlet pipe does positive work while the outlet pipe/leaks does negative work. Illustration 1: 4 can build a wall in 15 days and B can build it in 10 days, while C can completely demolish the wall in 12 days, Ifthey start working at the same time, in how many days will the work be completed. Solution: Work per day by A = 1 Work per day by B = + per day by B= 75 Work per day by C= = prey 2 (negative sign is taken for negative work) The net combined work per day by 4, B and C rot iait = 441-1. Isto 1212 Total work done = (Work done per day) x (No. of days required to complete the work) Since, No. of days required to complete the work Total workdone 1, Work done perday I *” 2 CONCEPT OF MAN-DAYS If MF men working together can complete a work in *D* days, then the product of number of men (.M) and number of days (D) i.e. M » Dis known as the number of MAN-DAYS. Number of man days to complete a specific task always remains constant, Suppose 30 persons working together for 20 days to complete a job, then the total work done is equal to (30 * 20 = 600) man-days. If we change the number of days in which the work is to be completed, then the other factor ie. the number of persons will change accordingly, so that the product ofthe factors becomes equal to 600 man-days. WORK DONE Consider a whole work as the unit work 1, Work Done by Two Persons Let 4 can do a whole work in x days and B can do the same one unit work in y days 1 Hence work done by 4 in one day = — y rs and work done by B in one day = y ‘Then work done in one day when 4 and B work together yee or y y Whole work = (Work done in one day) * (Number of days, required to complete the whole work)158 © Time and Work Hence, number of days required to complete the whole work Whole work Work done in one day = Number of days required to complete the whole work when 4 and B are working together 1 y - 2 because a whole work is considered as one ety rey » unit of work Illustration 2: 1f4 can do a work in 10 days and B can do the same work in 15 days, then how many days will they take to complete the work both while working together? 1 Solution: Work done by 4 in one day = => 10 Work done by iin one day = 15 Work done in one day when 4 and B work together 11 342 5 1 “1071S 30 30 6 1 T 6 We can find the required number of days directly by using the formula, Hence required number of days x» Number of days = =? derived above 10x15 _ 150 1o+15 25 Illustration 3: “4° completes a work in 12 days. ‘B’ completes the same work in 15 days. ‘4” started working alone and after 3 days B joined him. How many days will they now take \gether to complete the remainit (a) 5 © 6 Lal! Solution: (a) Work done by ‘A’ in 3 days = Lx 3= 1. Solution: (a) Work done by “A° in 3 days = 75% 3= 7 Remaining work = 1-+=2 . e 44 Work done by A and B together = +2415. 20 ork done by 4 and 2 together => = 5 ~ Remaining work done by A and B together in 3,20 Sda as 2. Work Done by Three Persons ‘As we derived the formula for two persons, you can also derived the formula for three persons in the same way, If, B, C can do a work in-x, y and z days respectively, then all of them working together can finish the work in days. ax istration 4: If 4, B, C can do a work in 12, 15 and 20 days respectively, then how many days will they take to complete the work when all the three work together. Soh we Required number of days = ——“=—_ “a SS ye yehee 12x15 20 12x 15-+19x 20-4 2012 3600 3600 _ © 18043004240 720 3. If Aand B Together Can do a Work in x Days and A Alone can do it in y Days, then B alone can do the Work in ye Days Illustration 5: A and B can do a work in 8 days and A alone can do it in 12 days. In how many days can B alone do it? Solutio, 1 Work done by 4 and B working together in one day = Work done by 4 in one day = 7 Work done by B in one day = 2-4 = 32-1 fork done by B in one day = 5 — 55 = "34° = 34 Hence number of days in which B alone can do the whole work You can find required number of days directly by using the above formula as ay _ 8xI2_ 8x12 n-sa Required number of days = yox EXTENSION OF THE CONCEPT OF TIME AND WORK Problems related to Pipes and Cistens are almost the same as those of Time and Work. Statement ‘pipes 4 and B can fill a tank in 2 hours and 3 hours working individually’ is similarto the state~ ment ‘4 and B can do a work in 2 hours and 3 hours respectively working individually’ IF pipe fills tank in 3 hours, then the pipe fills 1rd ofthe same tank in 1 hour. 3 ‘The only difference with the pipes and cisterns problems is that there are inlets as well as outlets. Inlet is a pipe connected with a tank (or a cistern or a reservoir) that fills it. Outlet is 4 pipe connected with a tank (or a cistern or a reservoir) that empties it, Hence, if we consider filling the tank by inlet as positive work, then empting the tank by outlet will be considered as negative work,(a) Let a pipe fill a tank in x hours and another pipe can empty the full tank in y hours. Then the net part of the tank filled in 1 hour, when both the pipes are opened, if x is less than y. x yoy ‘time taken to fill the tank, when both the pipes are opened (b) Lota pipe fill atank in.x hours while another fills the same tank in y hours but a third one empties the full tank in = hours. If all the three pipes are opened together, then the net part ofthe tank filled in 1 hour= ++ 1-1 x yz yeter—ay 3. time taken to fill the tank = —=— jet ernay (6) Let a pipe fill a tank in x hours but due to the leak in the bottom, the tank is filled in y hours and when the tank is filled, the time taken by the leak to empty the tank is z hours. Net part of the tank filled in | hour by the pipe when there is the leak in the bottom Since the tank will be filled completely in y hours by the pipe when there isthe leak in the bottom, therefore (josie ye 2Q-)=y > Hence, if a pipe can fill a tank in x hours but due to the leak in the bottom, the tank is filled in y hours, then the » fully filled tank will be emptied in hours. (@) Let a pipe 4 fill a tank in x hrs while pipe B can fill the tank in y hrs alone. When both the pipes are opened to- gether, then time required to fill the tank = Yo hrs. (e) Let pipes 4, B and C fill a tank alone in x, y and = hrs respectively. When all the three pipes open together, then Dz aye yet ae Milustration 6: If pipe fills a tank in 4 hrs and another pipe can empty the full tank in 6 hrs. When both the pipes are opened together, then find the time required to completely fill the tank. time required to fill the tank = hrs, Time and Work © 159 Sol mm: Required time Here x 12 hrs Required time Mlustration 7: Pipe A can fill tank in 6 hrs while pipe B alone can fill it in $ hrs and pipe C can empty the full tank in 8 hrs. If all the pipes are opened together, how much time will be needed to completely fill the tank? Solution: Required time "ye 6x58 Deven SXEHEXG- OS = 845x820 44 ys 5829 29 S Illustration 8: 4 pipe can filla tank in 10 hrs. Due to a leak in the bottom, it is filled in 15 hrs. If the tank is full, how much time will the leak take to empty xy__ 10x15 yox 15-10 IMlustration 9: If three pipes 4, B and Can fill the tank alone in 5, 6 and 8 hrs, then when all the three pipes are opened together, find the time to fill the tank completely. Solution: Required time Sol Required tim 30 hrs. yz SKOXS apt yet ax SXO+OKR+RXS 240 _ 240, 2 30448440" 118-59" 3. Alternate Work In some problems two or more people of different efficiencies work alternatively or in some particular pattern. You can under- stand the method to solve these types of problems through the following illustration. Illustration 10: Sanjeev can build a wall in 20 days and Parveen can demolish the same wall in 30 days. If they work on alternate days with Sanjeev starting the job on the Ist day, then in how many days will the wall be built for the first time Solution: Let us assume the total units of work = 60 units (ie. LCM of 20 and 30) So, the wall built by Sanjeev in one day = 3 units ‘And wall demolished by Parveen in one day = 2 units So, effectively in two days, total wall built = 1 unit Now, they work on alternate days, so days taken to built $7 units = 57 days ‘On 58th day Sanjeev will add another 3 units and so completing the construction of wall in 58 days. (This problem can be understood well with another very traditional problem—A frog climbs up a pole 3 inches in | minute and slips 2 inches in next minute. If height of the pole is 120 inches, then how much time is taken by the frog to reach the top ofthe pole 2)160 © Time and Work Practice Exercise Level-I 3 9. A and B together can doa job in 12 days, B alone can finish it in 28 days. In how many days can 4 alone finish the work? (a) 21 days (b)_ 19 days (©) 20 days (4) None of these 4 can do 3 of work in 12a. In how many days can he finish + ofthe work? @ 6 bys (b) 5 days (©) 3 days (d) 2 days A can finish a work in 18 daysand B can do the same work in half the time taken by 4. Then, working together, what, part of the same work they can finish in a day? i 1 2 2 @ 5 Ws © F @ 5 A man is twice as fast as a woman, Together the man and the woman do the piece of work in 8 days. In how many days each will do the work if engaged alone? (a) man-14 days, woman-28 days (b)_man-12 days, woman-24 days (©) man-10 days, woman-20 days (@)_ None of these Ais 30% more efficient than B. How much time will they, ‘working together, take to complete a job which 4 along could have done in 23 days? (a) 11 days (b) 13 days 3 © 205 days (A) None of these A contractor undertakes to built a walls in 50 days. He employs 50 peoples for the same. However after 25 days he finds that only 40% of the work is complete. How many more man need to be employed to complete the work in time? (@ 25 () 30 35) 20 12:men complete a work in 18 days. Six days after they had started working, 4 men joined them. How many days will, all of them take to complete the remaining work? (a) 10 days (b) 12 days (©) 15 days (A). 9 days A man, a woman or a boy can do a job in 20 days, 30 days, ‘or 60 days respectively. How many boys must assist 2 men ‘and 8 women to do the work in 2 days? (a). 15 boys (b)_ 8 boys (©) 10 boys (d)_ None of these 10 men can complete a piece of work in 15 days and 15 women can complete the same work in 12 days. If all the 10 men and 15 women work together, in how many days will the work get completed? i 2 %) 6 © 6 @ 6 oF 10. 12. 13, 4 16. 1 ‘After working for 8 days, Anil finds that only = ofthe work hhas been done. He employs Rakesh who is 60% efficient as Anil, How many more days will Anil take to complete the job? (a) 15 days (b) 12 days (©) 10 days () 8 days 4 can knit a pair of socks in 3 days. B can knit the same thing in 6 days. Ifthey are knitting together, in how many days will they knit two pairs of socks? (a) 4 days (b) 2 days (@) 3 days 1 ©) 44 day © 45 days A can build up a wall in 8 days while B can break it in 3 days. A has worked for 4 days and then B joined to work with 4 for another 2 days only. In how many days will A alone build up the remaining part of wall? @ 13% days () 7} days © 6 days (a) 7 days Sakshi can do a piece of work in 20 days. Tanya is 25% more efficient than Sakshi, The number of days taken by ‘Tanya to-do the same piece of work is @ 15 O16 © @ 2s ‘Three men, four women and six children can complete a work in seven days. A woman does double the work a man does and a child does half the work a man does, How many ‘women alone can complete this work in 7 days? @ 7 ) 8 © 2 (@) Cannot be determined Sunil and Pradeep can complete a work in 5 days and 15 days respectively. They both work for one day and then Sunil leaves. In how many days in the remaining work completed by Pradeep ? (@) 11 days () 12 days (©) 15 days (d) 8 days Suresh can finish a piece of work by himself in 42 days. 1 Mahesh, who is = times more efficient as Suresh, requires X days to finish the work by working all by himself, Then what is the value of ¥? (a) 25 days (b) 30 days (©) 35 days (@ 20 days If 6 BSF or 10 CRPF companies can demolish a terrorist ‘outfit in Kashmir in 2 days, find how long will 4 BSF and 9 ‘CRPF companies take to do the same ? (a) 1.27 days (b) 2.27 days (©) 3.27 days (@ 4.27 days18, 19. 20. 2. 2. 23. 24, 25. 26. 2 men and 3 boys can doa piece of work in 10 days while 3 men and 2 boys can do the same work in 8 days. In how many days can 2 men and 1 body to the work ? (@ 124 days ©) ut days 1 I is Be (©) 155 days (@) 135 days ‘Three pumps working 8 hours a day can empty a tank in, 2 days. How many hoursa day must 4 pumps work to empty the tank in 1 day. (@) 10 hours (b)12hours (©) Shouts (d)_ None of these If 18 binders bind 900 books in 10 day's, how many binders, will be required to bind 660 books in 12 days @4 OB ©2 Wil 1f 27 men take 15 days to mow 225 hectares of grass, how Tong will 33 men take to mow 165 hectare ? (a) 9 days, (b)_ 18 days (©) 6 days (d)_ 12 days Xand ¥ can doa piece of work in 72 days. Y¥ and Zcan do it in 120 days..X and Z can do it in 90 days. In how many days, all the three together can do the work ? (a) 100 days (b)_ 150 days (©) 60 days (@)_ 80 days 1f6 men and 8 boys can do a piece of work in 10 days and, 26 men and 48 boys can do the same work in 2 days, the time taken by 15 men and 20 boys to do the same type of work will be (a) 6 days (b) 4 days (© 8 days (d) 7 days ‘The work done by man, a woman and a boy are in the ratio 3:2: 1. There are 24 men, 20 women and 16 boys in a factory whose weekly wages amount to & 224, What will be the yearly wages of 27 men, 40 women and 15 boys? (a) % 16366 (b) 16466 (©) % 16066 (@) % 16016 ‘Two pipes can fill a cistern in 6 minutes and 7 minutes respectively. Both the pipes are opened alternatively for 1 minute each. In what time will they fill the cistern 2 (@) 6minutes (b) 6 minutes 3 1 (©) 6 minutes 35; minutes ©) 65 minutes © 3;minutes ‘Three pipes 4, B and C can filla tank from empty to full in 30 minutes, 20 minutes and 10 minutes respectively. When, the tank is empty, all the three pipes are opened. 4, Band C discharge chemical solutions P, and R respectively. What is the proportion of solution R in the liquid in the tank after, 3 minutes? 3 6 @y OF © @ 4 1 1 W 27. 28, 29. 3i. 32, 33. Time and Work @ 161 A and B can finish a work in 10 days while B and C can do it in 18 days. A started the work, worked for $ days, then B worked for 10 days and the remaining work was finished by C in 15 days, In how many days could C alone have finished the whole work ? (a) 30 days (b) 15 days (©) 45 days (@) 24 days A certain number of men can doa work in 60 days. Ifthere ‘were 8 men more it could be finished in 10 days less. How many men are there ? (@) 75men (b) 40 men (©) 48men (@) 45 men A and B can doa job in 16 days and 12 days respectively B has started the work alone 4 days before finishing the job, 4 joins B. How many days has B worked alone? (a) 6 days (b) 4 days (©) 3 days (@) 7 days ‘Two pipes 4 and B when working alone can fill a tank in 36 min. and 45 min, respectively. 4 waste pipe C can empty the tank in 30 min, First A and B are opened. After 7 min., C is also opened. In how much time will the tank be full ? (@) 1/60 () 1/30 (©) 720 @ 13720 can doa piece of work in 25 days and B in 20 days. They work together for 5 days and then 4 goes away. In how ‘many days will B finish the remaining work ? (@) 17 days (b) 11 days (©) 10 days (15 days 12 men complete a work in 18 days. Six days after they had started working, 4 men joined them. How many days will, all of them take to complete the remaining work ? (a) 10 days (b) 12 days (©) 15 days (9 days A cant doa piece of work in 10 days, while B alone can do it in 15 days. They work together for 5 days and the rest of the work is done by C in 2 days. If they get & 450 for the ‘whole work, how should they divide the money ? (a) 25,2 150,275 (b) F250, F100, F 100 (©) %200,% 150% 100 (4) 2175,% 175, 100 A can do some work in 24 days, B can do it in 32 days and can do it in 60 days. They start working together. 4 left after 6 days and B left after working for 8 days. How many ‘more days are required to complete the whole work? @ 30 2 =6@) 2 @ 20 Mayank can do 30% more work than Shishu in the same time, Shishu alone can do apiece of work in 30 hours. Shishu starts working and he had already worked for 12 hours when, Mayank joins him. How many hours should Shishu and, Mayank work together to complete the remaining work? @ 6 () 12 © 48 @ 96 In a fort there was sufficient food for 200 soldiers for 31 days. After 27 days 120 soldiers left the fort. For how many extra days will the rest of the food last for the remaining soldiers? (@) 12 days (©) 8 days (0) 10 days (@) 6 days162 @ Time and Work 37. Sambhu can do 1/2 of the work in 8 days while kalu can do 1/3 of the work in 6 days. How long will ittake for both of them to finish the work? 88 ua @ Baays ) Mays © Taays (d) 8 days 38. 4 and B can do a piece of work in 45 and 40 days respectively. They began the work together, but 4 leaves after some days and 8 finished the remaining work in 23 days, Aer how many days did 4 leave (@ Tdays (b) 8 days (©) 9 days (@) Mi days 39, There is sufficient food for 400 men for 31 days. After 28 days, 280 men leave the place, For how many days will the rst ofthe food lst for the rst ofthe men? (@) 10 days (b) 12 days (©) 16 days (@)_20 days 40, A tyre has two punctures. The first puncture along would have made the fyre flat in 9 minutes and the second alone ‘would have done it in 6 minutes, fair leaks out ata constant rate, how long, does it ke both the punctures together to make it fat? 1 1 @ 1 minutes (0) 34 minutes 3 1 (© 32 minutes (@ 44 minutes 41, 12 men and 16 boys can do a piece of work in 5 days, 15 men and 24 boys can do i in 4 days. Then th ratio of daily work done by a man to that of a boy is @ 21 O) 3:1 © 3:2 @ S:4 42, Twotaps can fills tank in 12 and 18 minutes respectively. Both are kept open for? minutes andthe first is tumed off. In how many minutes more will the tank be filed ? @) 15min, (b) 20min, © Min, @) 13min, 43, A cistern normally takes 6 hours to be filled by a tap but because ofa Teak, 2 hours more, In how many hours will the leak empty’ full cistern ? @) 20h (b) 24hrs (©) 26hrs (@)_ None ofthese 44, 1F3 men or4 women can reap afield in 43 days, how long will 7 men and 5 wornen take to reap i? (@) Tdays (b). 1 days (© 12 days @) 16 days 45, fm man can doa work in r days, then the numberof days taken by (m+n) men to doit is min 4 mtn mr (msrp @ ) © Gm om 46, Pipes Aand B can fillatank in 5 and 6 hours, respectively Pipe C can empty it in 12 hours. The tank ishalf full. All the. three pipes are in operation simultaneously. After how much, time, the tank will be full 2 [SBIClerk-2014] 47. 49, §, @ Bh 24y Oy 7 9 3 hb) Uh @ 358® (e) None of these If 10 men or 18 boys can do a work in 15 days, then the number of days required by 15 men and 33 boys to dotwice the work is [S9C-Sub, Ins.-20/2] @ 4 © 9 Ina fort, there was sufficient food for 200 soldiers for 31 days. After 27 days, 120 soldiers left the fort. For how many extra days will be rest of the food last for the remaining () 8 @ 36 soldiers? [SSC-Sub. Ins.-2012] (a) 10 days (b) 6 days (©) 4 days (@ 12 days Aan do.as much work as B and C together can do. A and B. can together do a piece of work in 9 hours 36 minutes and C-can do it in 48 hours. The time (in hours) that B needs to do the work alone, is [SSC-Sub. Ins.-20/3] @ 8 2% ©3 @ 2 3 men and 7 women can doa job in 5 days. While 4 men and 6 women can do it in 4 days. The number of days required for a group of 10 women working together, at the same rate as before, to finish the same job is: [S9C-Sub, Ins.-2013] fa) 30 (b) 36 © 40 (@) 20 7 A can do. of work in 28 days, B ean do 8 of the same work in 20 days. ‘The number of days they will take to complete if they do it together is [SSC-Swh, Ins.-2014] 3 3 153 3 (@) 155 days ) 175 days 5 3 wad Bd (© M4 days (135 days Seventy-five men are employed to lay down a railway line in 3 months, Dueto certain emergency conditions, the work ‘was to be finished in 18 days. How many more men should be employed to complete the work in the desired time ? [SSC-Sub. Ins.-2014] (a) 300 (b) 325 ©) 350d) 375 ‘Two pipes A and B can fill a tank in 6 hours and 4 hours respectively. If they are opened on alternate hours and if pipe A is opened first, then the tank shall be full in [s9C-M7-2013] @ abs () Shs ©) shins @ 6hrs A, Band C can do a piece of work in 10, 12 and 15 days, respectively. A leaves 5 days before the completion of the work and B leaves 2 days after A. The whole work lasts for [ssc-Mr-2013] (a) 7 days (©) 12 days (©) 6 days (13 daysTime and Work @ 163 55. A can doa piece of work in 20 days which B can do in 12 60. Two pipes A and B can fill a tank in 36 min, and 45 min. days. B worked at it for 9 days. A can finish the remaining respectively. Another pipe C can empty the tank in 30 min. work in [SSC 102-2012] First A and Bare opened. Afler 7 minutes, C is also opened. (@) 5 days (b) 7 days The tank is filled up in [SSC 10+2-2014] (©) days (d) 3 days (@) 39min. (b) 46min. 56. Aman walks ‘a’ km in “b’ hours. The time taken to walk (© 40min, (@ 45min, 200 metres is [SSC.10+2-2012] 61, 9 women can complete a piece of work in 19 days. How 2000 ‘many days will 18 women take to complete the same piece (a) — hours ous, of work? [BPS Clerk-2012) b » (@) 12 days (b) 6.5 days (©) 2hours (@) “hours (©) 9 days (@)_ 8.5 days 51. Aistriceagooa wrkmanas Band kes 60 sles gg ©, Newari . A'isthrice as good a workman as B and takes 60 days less 9 TW pipes can fill a tank in 10h and 16 h respectively. A than B for doing a job. The time in which they can do it third pipe can empty the tank in 32h, IFall the thre pipes together is ag SC 1042-20121 function simultaneously, then in how much time the tank (a) 15 days (b) 30 days will be full? (in hours) [BPS Clerk-2013] 1 ©) 224 day (d) 60 days u B 5 © By da 0Gex ® y OTF © & w 6 $8. A. can doa work in 20 days and B can do the same work in 30 days. In how many days can A and B together do the 9 work? [SSC 102-2013] © 8y @ls 6 @w @2 - 59, and B working separately ean do a piese of work in 9 © 56 wrkers can finish a pice of work in M4 days. If the work is to be completed in 8 days, then how many extra ‘and 15 days respectively. Ifthey work fora day alternatively, wrorkers are requited? {ras Clerk 2013] with A beginning, then the work will completed in © ° SSC 1042-2014) (@) 36 () 48 (a) 10 days (b) 11 days © 44 @ 42 (© 9 days (d) 12 days © 2 Level - II 1. Apipe can fill a tank in 15 minutes and another one in 4, 1 man or 2 women or 3 boys can do a work in 44 days. 10 minutes. A third pipe can empty the tank in $ minutes. Then, in how many days will 1 man, 1 woman and 1 boy do The first two pipes are kept open for 4 minutes in the the work? beginning and then the third pipe is also opened. In what (@) 12 days (b) 24 days time will the tank be emptied ? (©) 18 days (a) 36 days (@) 35min (b) 15min SA, Band Ccan doa work in 8, 16 and 24 days respectively. © 20min (A) Cannot be emptied Theyall begin together. 4 continues to work tilts finished, 2. Filling pipe, ifopened alone, takes 5 minutes to filla cistern C leaving off 2 days and B one day before its completion Suddenly, during the course of filling, the waste pipe (which In what time isthe work finished? is of similar size and flow as of fill pipe) is opened for (a) 3 days (b) 4 days 2 minutes, then the cistern willbe filled in (©) 5 days (A) Bdays 6 TWo pipes 4 and B can fill a tank in 24 minutes and @ 3 (e) 34 min 32 minutes respectively. If both the pipes are opened 7 3 simultaneously, after how much time should 8 be closed so (© Smin (a) 7min that the tank is full in 18 minutes? 3. Threetaps 4, Band C can fila tank in 12, 15 and 20 hours (a) 6min (b) 8min respectively. If is open all the time and B and C are open (©) 12min, (@) min. for one hour each alternately, then the tank will be full in © brs (6) 62 bs (© Thrs. @ % hrs. 7. Acontractor undertook to do a piece of work in 9 days. He employed certain number of laboures but 6 of them were absent from the very first day and the rest could finish the work in only 15 days. Find the number of men originally employed @ 15 & 6 © 13 (@ 9164 @ Time and Work 1 8. After working for 8 days, Anil findsthat only = ofthe work has been done, He employs Rakesh who is 60 % efficient, as Anil. How many more days will Anil take to complete the job? (a) 15 days (b) 12 days (©) 10 days (d) 8 days 9. Acan build up a wall in 8 days while B can break it in 3 days. A has worked for 4 days and then B joined to work, with A for another 2 days only. In how many days will A alone build up the remaining part of wall? han © th ays 1 (© SF days (@) 7 days 10, Acistern has two taps which fill it in 12 minutes and 15 minutes respectively. There is also a waste pipe in the cistern, When all the three are opened, the empty cistern is, full in 20 minutes. How long will the waste pipe take to cempiy the full cistern ? (@) 10min (b) 12min (©) 1Smin (d) None of these 11. A pump can be operated both for filling a tank and for ‘emptying it. The capacity of tank is 2400 m9. The emptying capacity of the pump is 10 m* per minute higher than its filling capacity. Consequently, the pump needs 8 minutes less to empty the tank to fill it. Find the filling capacity of pump. (a) 50min (6) 60m/min (©) 58m3imin (d) None of these 12. A tank is filled in 5 hours by three pipes 4, B and C. The pipe Cis twice as fast as B and B is twice as fast as 4. How much time will pipe 4 alone take to fill the tank ? (a) 20hrs (b) 25hrs (©) 35hrs (4) Cannot be determind 13. Two pipes 4 and B can fill a tank in 15 hours and 20 hours respectively while a third pipe C can empty the full tank in 25 hours. All the three pipes are opened in the begining After 10 hours, Cis closed. In how much time, will the tank be full? (a) 12hrs (b) 13hrs (© l6hrs (&) 18hrs 14, 4men and 6 women finish a job in 8 days, while 3 men and 7 women finish in 10 days. In how many days will 10 women finish it? (a) 20 days (b) 30 days (© 40 days (@) 50 days 15. A can doa work in 25 days and B can do the same work in 20 days. They work together for 5 days and then A goes away. In how many days will B finish the work? (a) 9 days (b) 11 days (©) 15 days (A) 20 days 16. 19, 20. 24. 22, 23. ‘There is leak in the bottom of a tank. This leak can empty a full tank in 8 hours. When the tank is full, a tap is opened into the tank which admits 6 litres per hour and the tank is, now emptied in 12 hours. What is the capacity of the tank? (a) 28.8 litres (©) 36 litres (©) 144 litres (@ Can't be determined A company has a job to prepare certain no. of cans and, thereare three machines 4, B & C for this job. A can complete the job in 3 days, B can complete the job in 4 days and C can complete the job in 6 days. How many days the company will take to complete job if all the machines are used simultaneously? (a) 4 days (b) 43 days (©) 3 days (@ 12 days 3 small pumps and a large pump are filling a tank, Each of the three small pumps works at 2/3rd the rate of the lange pump. Ifall 4 pumps work at the same time, they should fill, the tank in what fraction of the time that it would have taken, the lange pump alone? @ 47 18° ©2238 @ 34 A and B can doa job in 15 days and 10 days, respectively. They began the work together but 4 leaves after some dayss and B finished the remaining job in $ days. After how many days did 4 leave? (a) 2 days (b) 3 days (© 1 day (A) None of these If 12 men or 15 women or 18 boys can do a piece of work, in 15 days of 8 hours each, find how many men assisted by 5 women and 6 boys will finish the same work in 16 days, of 9 hours each. (a) 6men () 2men (© 8men @ 4men ‘The work done by a man, a woman and a child is in the ratio of3 :2: 1. Thereare20 men, 30 women and 36 children, a factory. Their weekly wages amount to & 780, which is divided in the ratio of work done by the men, women and children. What will be the wages of 1S men, 21 women and 30 children for 2 weeks? (a) %585 (b) %292.5 (© @1170 (@ 900 xis 3 times as faster as y and is able to complete the work in 40 days less than y. Then the time in which they can complete the work together? (a). 15 days (b) 10 days © 1 days (@) 5 days ‘The Bubna dam has four inlets. Through the first three inlets, the dam can be filled in 12 minutes; through the second, the third and the fourth inlet, itcan be filled in 15 minutes: and through the first and the fourth inlet, in 20 minutes. How ‘much time will it take all the four inlets to fill up the dam? (a) 8min () 10min (©) 12min (&) None of these24. 25. 26. 27. 28, 29. 30. 3 32. ‘Two pipes can fill a cistern in 14 and 16 hours respectively. ‘The pipes are opened simultaneously and it is found that
x= 12 days rman takes 12 days and woman 2x = 24 days Ratio of times taken by A and B= 100 : 130= 10:13. Suppose B takes x days to do the work. 23x13 299 => x=. 10 10 Then, 10: 13::23:x => x ( 10 .. a ae - A's | day’s work = 353 B's | days work ~ 55 "5 1 day’s work = (+22. |= 3 (A+ By’ I day's work = | 53+395 |" 99 “75 A and B together can complete the job in 13 days. 50 men complete 0.4 work in 25 days. Applying the work rule, ™* 4d, x 1x dy Wi, wwe have, 50% 25x 0,6 = m, x 25x 0.4 50% 25%0. 25x04 Number of additional men required = (75 ~ 50) = 25 = 75men 7 a dd) () © In I da In 6 days, work done by 12 men = 75 == 2 Remaining work = — Now, mx d,x 043 =m, x dy, or 12182 =16xd,x1 5 = 16x dy 2182 _ 16 or 9days L 1 lan’s two day's work = 2*——th work =—th work Man’s wo day's work = 2% 25 10 Woman’s two days’s work Ath work =Lth work 5 5 1 1 ns ’s work = 2x th work = <-th work Boy's two day's work = 2x => th work 35 Now, let 2 men, 8 women and x boys can complete work in 2 days. Then , 2 men’s work + 8 women’s work + x boy's work =1 “i tise) oe(t ! 2 }.30 =2x= 8 boys 15 5 10 men's I day's work = 733 1 15 women's I day's work = 1 . 2 (10 men + 15 womeny’s I day's work -(441).2-3 i512)" 60" 20 10 men and 15 women will complete the work in 6 days 3(Anil and Rakesh)’s one day's work 2 3 14 work is done by them in 15x = 10 days rd work 1. (a) 4’s one day’s work 3 Bs one day's work th work 6 1,1 1 na work (A+ By’s one day’s work 36 2 Aaand B together can complete the work (knit a pair of socks) in 2 days. ‘They together knit two pair of socks in 4 days. 1 12, (b)_4’s one day’s work = 1th work Bis one day's work fd ‘work 11 A's 4 day's work= 4x1 = nd work 82 ©. In next two days, total wall Lena =tin 2B Remaining wall n ny! My alli pth 72 days, jit all is built up by Ain 8: 75 = 75, day 1 13, (b)_ Sakshi’s one day's work = 35th work Tanya's one day's work = 2.425% of 1 = thwork 20 20" 16 Henee, Tanya takes 16 days to complete the work. 14, (a) Let 1 woman’s I day’s work =x. ‘Then, 1 man’s 1 day's work = 5 and 1 child’s 1 day’s work = } Time and Work @ 167 3x br) 1 Lay $0, Str to ral 4} 7 2 ay 7 7 28) 49 1. woman alone can complete the work in 49 days So, to complete the work in 7 days, women required 49, =(2 )e7 (7) Sunil takes 5 days and Pradeep takes 15 days to do the work, & rat. ey would complete =+ ie, 2 w Ina day they wouldcomplete =+7¢ i.e. 75 work ‘The remaining 11/15" work would be completed by u Pradeep in 7515 i.e. 11 days, Suresh, working alone 42 days = 1 unit of work. Mahesh is 1/5 times more efficient that Suresh. So Mahesh is 6/5 times as efficient as Suresh. Hence Mahesh should require 5/6th of thetime, the time taken by Suresh. ‘Therefore time taken by Mahesh = 5/6 = 42 = 35 days. Given 6 BSF =10CRPF => 4 BSF +9 CRPF 94 = 4+ (9 6/10) BSF = 7) BSF 94 Now work = 6 « 2 BSF days = 15% BSF days 94 Wehave 6 «2= 9x" = X= 1.27 days Let I man’s 1 days’ work =, and 1 boy’s 1 day's work=y 1 1 Then, 2x-+3y= 75 and 3x4 2p 7 1 Solving, we get: = 355 and Y= 75 (2 men + 1 boy)’s | day’s work - (x Seen 2 200° "100/200 25 So, 2 men and 1 boy together can finish the work in 1 wt 3 days Let the required number of working hours/day =. More pumps, less working hrs per day (Indirect) Less days, more working hrs per day (Indirect) Pumps 4: ps 4:3] Days 1: 4x1 x x=3x2H8 Bx 2K8 4 Let required number of binders be ‘x’ Less books, less binders (direct) 2168 © 21. 22, 23. 24, Time and Work More days, less binders (indirect) Books 900 :660] Days 12:10 900 » 12 « x= 660 * 10 18 18: (660% 10% 18 _ ‘900%12 27 men mow 225 hectares in 15 days Iman mow 225 hectares in (15 » 27)days (indirect) 25, (¢) @ 27 225 ~ Iman mow | hectares in days (direct) 5x27 | man mow 165 hectares in 4 225 165 days (direct) 33 men mow 165 hectares in 15*27*165 _ 9 days 25x33 ai (© (+ 1's one day work = = +2) vy (+ 2) one day work = 155 Z + X's one day work = <— (Z + AYs one day work = 55 26. (b) roid 2+ V4 Zs one day work = 554735 +55 S344 12 1 ~ ~ 360 30, Lia 30 60 ‘They will complete the work in 60 days. Given (6 M+8 B) x 10= (26 M+ 48.8) x2 => 60 M+ 80 B=52.M+96B = 8M=16B = 1M=28 15. M+20B=30B+20B =50B 6M+8B=12B+8B=20B Now — Boys Days 20 10 50y x(Let) 360 (V+ ¥+Z)'sone day work (b) 27. © (@)_ 1 Man =3 Boys and 1 Woman = 2 Boys 24 Men +20 Women + 16 Boys = (243) +(20*2)+16 12+ 40+ 16 = 128 Boys 27 Men + 40 Women + 15 Boys = (27 = 3) + (40 «2)-+ 15 =81 + 80+ 15 = 176 Boys. 28. (b) Now, No. of Boys Duration Wages My 224 2 (Let) x98 16,016 Part ofthe cistern filled by frst pipe in 1 minute = 2 Parte cistern illady second pipein 2 minutes Part ofthe cistern filed in rst 2 minutes = 2+ = 13 Part ofthe cistern filled in 6 minutes~ 213 = 3 ransiiagpat= 1 2a Sot i 1 -£ Time taken to fill parts = 75= 5 3 — minutes 7 Part filled by (4 + B+ C) in 3 minutes 1 a 20 3 . = 6+= Total time= 6+ Part filled by ~ Required ratio= Let C completes the work in x days. 1 Work done by (4 + 8) in I day = 75 Work done by (B+ C) in 1 day = z As 5 days’ work + B's 10 days? work + C’s IS days? work= 1 or (A+ BY's5 days? work + (B+ Cy's 5 days’ work + C's 10 days’ work = 1 x men to the work in 60 days and (x + 8) men do the work in (60-10 =) 50 days.29. 30. 31. 32. © @) (b) @ ‘Then by “basie formula”, 60x = SO(x + 8) 50x8 10 = 40 men. 1 A’s one day's work = j¢th work 1 B's one day's work = —th work ‘sone day's work = 75 Let the number of days B has worked alone = x days. Then, A’s amount of work + 1 1 aah rova( Det Loxed 's amount of work = 1 2). 20)” 20 Part filled by (4+ B + C) in 1 min, Remaining part = ( (eris-a0)- 3 36° a5 30) 60° (4+ BY’s 5 days’ work 459 100 2)n 20)” 20 z of the work would be finished by B in Raining wrk = ( a 20 = 1days. 20 In I day, work done by 12 men = In 6 days, work done by 12 men = Remaining work Now, md, = mx dx, or 12«18x2=16xd,x1 33. 3 38. 37. 39. Al. (a) © @ (@) (b) © @) © @) Time and Work © 169 s 1 Work done by 4 and B in 5 days = | —- » * ( 15s i 6 6 C alone ean do the work in 6 x 2= 12 days Work remaining = Ratio of their share work Share of wages = % 225, 150, 8 75. In 6 days A would do 25% of the work and in 8 days B would do 25% of the work himself. So C has to complete 50% of the work by himself Inall C would require 30 days to do 50% of the work. So, he would require 22 more days. Ratio of efficiency of Mayank and Shishu = 3/2 So ratio of time taken by Mayank and Shishu = 2/3 So if Shishu takens 30 hours, then Mayank will take 20 hours Shishu in 6 hours Remaining work US the work. = 1/5 = 4/Sthe work, 1 20°30 hours Shishu and Mayank together = ais So required time = -5= Afier 27 days, food left = 4 « 200 = 800 soldier days worth of food. Since, now there are only 80 soldiers, this food would last for 800/80 = 10 days. Number of | extra days for which the food lasts = 10 ~ 4 = 6 days. Sambhu requires 16 days to do the work while Kalu requires 18 days to do the work (1/16 + 1/18)
n= 288/34 = 144/17 (45 + 1/40) 423/40 = 1 > n=9 The rest of the food will last for (31 - 28 =) 3 days if nobody leaves the place. Tho te et oft ad wt as (2) ds 120. for the 120 men left 400) (ip) “9% 11) 5 1 minute's work of both the punctures = (3 + 4) is So, both the punctures will make the tyre flat in 18 S= 32min, 35 Let | man’s 1 days work =x 1 boy's I day's work = y 12x + ley170 @ Time and Work Solving these two equation we get, 1 1 100"? ~ 200 Required ratio= 2:1 42. (d) Part filled by first tap in one min “ie Par filled by second tap in one min = Eth Loo) Now, 2) 144) = ‘ow, 2f bh sum pa 1 13 = unfilled part= Sn pes a part of tank is filled by second tap in min, 33 sy part of tank is filled by second tap in 1 min, 18 Be #183 min = 7 13 min. (b) + Cistern fill in 6 hours. ~ in { hour, filled par Now, due to leakage, filled part in 1 hout zm Part ofthe cistern emptied, due to lekage in 1 hour sth ar “The leakage will empty the fll eistern in 24 hrs 44. (©) 3men reap t rd of the field in 1 day. Ss 1d of the field in 1 day. | man reaps 4B. sven ap edie ei ay | woman reaps 43th of the field in 1 day. 433 73 Tmen and $ women reap (7325 gal 1 th of the field in 1 day “12 7 men and 5 women will reap the whole field in 12 days. 45. (©) M,*D,=My*D, mera (men) * Dy mr Ps Cen) 46. (d) Part of the tank filled by the three pipes working iii simultaneously in one hour is = 5+ 5-75" gy 47. 49, © () ) ice. it takes 2 hours to fill up the tank completely. Now, ; ofthe tank is filled with all the pipes open, 18 7 simultaneously together in hours 72” 10 men in 15 days = 1 man can do the work in 150 days = 1 man can do twice the work in 300 days Similarly, 18 boys in 15 days = I boy can do the work in 270 days = | boy can do twice the work in 540 days Now, iff there are 15 men and 33 boys trying to do twice the work then (55 a0) 9411_ 20 80 180 180 9 = It will take 9 days for 15 men and 33 Boys to do twice the work. Ratio of new number of persons in fort : original ‘number of persons in fort = 80 = 200=2 : 5 Hence the food will last for 5/2 days of the original (4 days = 31 days ~ 27 days) =Sd=10days 2 So, extra days = 6 days 9 hours 36 minutes 48. hours = > hours 5 (A+ By's | hour's work 34 5 os ascysthorsvek- Seba! a ( y's 1 hour’s work aaa 8 (1) A’s | hours work = (B + C)’s | hour’s work w(2) 1 2 «A's | hour’s work = = 8 43 1 hour's work = 1 's 1 hour's work = 75 . 5 1 5-3 B's I hour's work = 5-76 = “Fy . Balone will finish the work in 24 hours50. (a) 51. @) 52. (a) 53. (b) 54. (a) 3 « Smen +7 $ women =4 x 4men + 6 4 women => 16 men — 15 men = 35 women — 24 women => Iman = 11 women 3 men +7 women = 40 women Now, My Dy = M, Ds 240 «5=10*D, => D, = 20 days ‘A can complete whole work in Be 8 = 32 days Bean complete whole work in 226 = 24 days A and B together can complete whole work in 32424 _ 3242496 155 gag 324 567 More the no, of men less time they take to complete work. Let x men are added 5 _18 W5+x 90 8 (Inverse Proportion) A’s work in I hour = z 1 B’s work in 1 hour = (A+ y's 2 hour’s work when opened alternately ( ‘) 3 =(L 4b) S 64) 2 (A+ By’s 4 hour’s work when opened alternately = 26 Remaining part = (! l Now, itis A’s turn and | part is filled by Ain | hour. +. Total time taken to fill the tank = (4-+ 1) hrs, = 5 hrs. Suppose, the work was finished in x days. Then, A's (x —5) day's work + B’s (x ~3) day’s work + C's x day’s work = 1 = 6x —5) + S(x-3) +44 = 60. => 6x30 + 5x—15 4x = 60 => 1Sr= 60+ 30+ 15 = 1Sr= 105 x= 7 days. (a) 57. © @ Time and Work @ = 171 . 1 B's I day work = 75 12 B's 9 day's work = Remaining work = 20 Aan finish this work in > days ~ 5 days 1. km = 1000 m D=s«T akm=S*bhr _ a 1000 b Now, D= 200m D ‘Time taken = = Ss = 2b Ps ax 1000 * Sa IFA can finish a work = x days B will do this work = 3x days From question, A~ B= 3x x= 60=>x=30 A= 30 days, B= 90 days ti4 30°90 90 So, A and B working together can complete work A's | day work + B’s 1 day work = =2en5 7 722.5 days A's I day's work = 55 BSs | day's work = 1 day's work = 55 iol a (A+ Bys 1 day's work = (55 +35 |= oo 60 Both A and B will finish the work in = 12 days Two d: k 58 $ Wo days work g "15" 45 as 8_40_8 45 4s 9 Ten days work = 5* Remaining work = | 1 ‘g which is done by A on 11th day. Hence, the work bbe completed in 11 days.172 @ l 60. (a) Inoneminute(A + B)ean together fill 3¢ 61. 62. 63. Time and Work part. - 7 In 7 minutes part of tank filled 35 13 20°20 In 8th minutes, part filled by A, B and C altogether totlt 20 30 60 remaining part 13 Sp Pattof tank filled by (A+B + ©) = 60x 13 39 minutes 20 (©) M,D,=M,D, I8D, (b) 10hr Apipe 1 16 br B pipe 1 32 hr pipe 1 tot ta th 1016 32 160 160 _ 513, 2 21 Here, M, = 56, D = 14, My Using MyD,=M2Da, 56x 14=M, x8 > M,=98 Hence, extra workers to be required 98-56 = 42 @ (©) Proportion of the volume of the tank filled by both the 1.1)_2 aa 3 1d ofthe tank Volume of the tank filled by all the pipes working, pipes in 4 min = { Loii- together= L411 = is" 10 5 30 1 ie, 2 tank is emptied in 1 min. 30 n 4 Hof the tank can be emptied in =20min 4 6 ) © b) (@) Since, flow of waste pipe = flow of filling pipe. = Filled part in one min = emptied part in one min. ~_ After opening the waste pipe for 2 min, cistern will be full in (5 +2)=7 min. ae 4,1) .9 23 (4+ ays thour's work= [heb = = 5 40s tbour'swork= (5+ |e #2 sot howrswore= (bo) $2 3,2) 7 Part filled in 2 hrs 20 o Part filled in 6 hrs = ( Rmsining part 3 Now, its the tum of 4 and B and => parti filled by A and Bin | hour. Total time taken to fill the tank = (6 + 1) hrs= Ths, Thus, by our extended formula, number of required days 1 Mod23 yy ~ TT 63g OS Wax1 x2 xs Let the work be finished in x days. ‘Then, A’sx day's work + B's (x 1) day's work +C’s (x=2) day's work = 1 i or, He x= 5 days Let B be closed after x minutes. ‘Then, part filled by (4+ B) in.x min, + part filled by 4 in (18—x) min = 1 (AZ S)ras-oxF = Tx 18x > =I or, 7x + 4(18 =x) = % or gg tag nt on Te + 418—x) = 96 or, 3x=24 0 8. So, B should be closed after 8 min, Direct Formula: B)ex =8 min. 2 Pipe B should be closed after C Let the number of men originally employed be x. 9x = 150-6) or x= 15& (©) InB days, Anil does =p work, 10. u CO) @) @) 1 in 1 day he does =; th work. 1 +, Rakesh’s one day’s work = 60% of = 1 th work » 2 40 2 Remaining work 7 (Anil and Rakesh)'s one day’s work toad = tat = Lh work 24° 4015 Now, ie th work is done by them in one day. 2 3! work is done by them in 15 4’s one day's work =! th work Bs one day's work ted work 2. A’s4 day's work = 4% Remaining wall ‘Now, 5th wall is built up by 4 in one day. 1 ; in gel Din x jth valli built up by 4 in 8x 7 Work done by the waste pipe in I minutes 1 {9 [ve sign means emptying] Apt 20 215 <2. Waste pipe will empty the full cistern in 10 minutes. Let the filling capacity of pump be x m°/min, ‘Then, emptying capacity of pump = (x + 10)m3 /min. 2400 2400 x eel0 =x2+10x~3000=0 => (x—50)(x + 60) = 0.x = 50. m/min, 2. 13. 4, 16. (@) © © Time and Work @ 173 Suppose pipe 4 alone takes hours to fill the tank. ‘Then, pipes B and C will take 3 and ; hours respectively to fill the tank. 12,415, Par ited in 10 hous = 1 9) 2 15°20 25) 30 Rei -( 3) Z maining part ={!-5 =. (A+ Bys 1 hour’s work = (5 ‘The tank will be full in (10 + 2) hrs = 12 hrs. Method I. Considering one day’s work: 1 amt 6v= + 1 ove 5 « 3m+ w= ©) ne Tm wo (1) * 3-(@)* 4 gives 3.4 1 18w—28w= 9-75 or, 10w= 3 10 women can do the work in 40 days, Method IT. We find that 8(4m + 6) 10 (3m + Tw) or, 2m = 22w :. dm = 44 -. 4:men+ 6 women = 50 women do in 8 days 5 10 women do in 252 ~ 40 days 70 A+ B-can do the work in 5 days = iz _ seas 9 25x20 20 u Rest of the work 20 u 8 will do the rest ofthe work in 20> = 11 days Let the capacity of tank be x litres In one hour tank empties = ; ofr In one hour, tap admits 6 litres after opening tap tank is emptied in 12 hours, So in one hour tank empties by $ ofx= titres174 @ 17. 18. 19. 20. (b) (b) (b) (b) Time and Work Let work done by 4 in one day be a, and for C,¢ So, 3a= 1, 46= 1, 6¢= 1 [Total work be | unit] So, Total work done by the 3 Machines in one day boat 3 tytyt 37476 4 Therefore, time taken to complete the work is 14 a3 Suppose large pump takes ¢ hours to fill a tank imilarly, for B, b -. L hour work of large pump fills = part 1 hour work of each small pump fill T hour work of all 4 pumps fi bass 3 ‘Therefore, > part is filled by all 4 pumps in 1 hour 1 24. © Whole tank would be filled in bee 4h this is. 23 (b) 1/3 ofthe time taken by large pump i.e., ¢hour l 4's one day's work = 7th work. 1 B's one day's work = 5th work . . \ (4+ By’s one day’s work = Ly 1 <1 yy work. is*i0- 6 Let Alef after x days, (A+ BYs x days’ work a work Remaining work =1-% Say work. ‘Now, in 5 days, work done by at work. In 1 day work done by a work and =* 1 3010 x23 days Given 12 men = 15 women = 18 boys 1 Man = 1.5 boys, | woman = 6/5 boys Now, 51+ 6B = 128. Required answer is calculated as follows Total no, of boys reqd. = 18 » {(15/16) * (8/9)] = 15 boys The number of boys already present = 12, 24. 2s. () @ Hence, 3 boys more required. But 3 boys = 2 men, So, 2 men are required Men Women Children Work 3 2 1 Numbers 20 30 36 Ratio of wages = (3 « 20): (2 « 20): (I «36)=5:5:3 5 Total wages of men = 75780 =% 300 Wages ofa man = 15 Similarly, wages of woman = 10 and wages of child = 5 ‘Total waves of 15 men, 21 women and 30 children 15x 15421 10430 ‘Total wages for 2 weeks = 1170 Ifx complete a work in x days. y will do the same task in 3x day 3r-x=40 = x=20 _y will finish the task in 60 days (e+ y's | days work riot 20°60 15 Both of them will complete the work in 15 days. Let the inlets be 4, B, Cand D. A+B+C=8.33% 85 BYC+D=6.66% A+D=5% Thus 24 +2B4+2C+2D=20% and A+B+C+D=10% > 10 minutes would be required to fill the tank: completely. ‘The 32 minutes extra represents the extra time taken by the pipes due to the leak Normal time for the pipes > m « (1/14 + 1/16) = 1 n= 112/15 = 7 hrs 28 minutes. ‘Thus, with 32 minutes extra, the pipes would take 8 hours to fill the tank. Thus, 8(1/14 + 1/16)—8 « (W/L) = 1 > 8/L =8(15/112)—1 VL =15/112— 8 =u. Thus, = 112 hours. Let x = Number of days it rained in the morning and, had clear afternoons. y= Number of days it rained in the afternoon and had ‘lear mornings. = = Number of days it rained in the morning or afternoon So according to question, xtye7 xtEes yrr=6 xtyt Adding all three equations, So, d= 9 days26. 27. 28, 29. 30. ai. a) (b) (b) (b) © @) Given 6 BSI 1OCRPF => 4 BSF +9 CRPF 4 = 4+ 9» 6/10) BSF= 5 BSF 4 Now work = 6 2 BSF days = 75% X BSF days We have 6 «2 wax => X=1.27 days Let the required number of working hours/day =x More pumps, less working hrs per day (Indirect) Less days, more working hrs per day (Indirect) Pumps 4 aes . Days 1:2) Ax 1x x=3 x 2x8 oy pe 2B Go through option 140 = 4 = (140+ 120 + 100+ 560 = 560 Alternatively: Let 1 be the initial number of worker then n®4= n+ (1-20) + (1-40) + 4n=Tn—420 => 3n=420 = n= 140 workers Ratio of number of men, women and children 18 10.12 +20) + (n= 120) Egy w Be dard 2 Gx+2e+ 4x) = 18, xed Therefore, number of women = 4 Share of all women = 12. 4000 = & 1000 (1810+ 12=40) Share ofeach woman = 1208 g 250 Raju=10%, Vicky = 8.33% and Tinku = 6.66%. Hence, total work for a day if all three work = 25%, In 2 days they will complete, 50% work. On the third day onwards Raju doesn’t work. The rate of work will become 15%. Also, since Vicky leaves 3 days before the actual completion of the work, Tinku works alone for the last 3 days (and must have done the last 6.66 * 3 = 20% work alone). This would mean that Vicky leaves after 80% work is done. Thus, Vicky and Tinku must be doing 30% work together over two days. Hence, total time required = 2 days all three) +2 days (Vicky and Tinku) +3 days (Tinku alone). 100 Time taken by B= 10x 100-8 days ¥ ps 8x10_ 44 4A days 18 oo Required answer = 32. @ > > (@) Time and Work © 175 Alternatively : Regd. days=10+ (+125) = 555 a (A+B) 1 day's work = x “ (B+ 0) 1 day's work = 55 .Q) (C+A) day's work = + 6) Adding eqs. (1), (2) and (3) 1 L 2U+B+O= 35435499 64443 120 2AtBEO= 13 >(4s eC) I day gether = ‘ I day work together = 355 AP Alone 1 day's work = (4 + B+ C) 1 day's work — (B+ 0) 1 day's work Boo 240 30 Bess 240 ~ 240 Number of days taken by 4= 22 days Alone 1 day's work = (4+ B+ C) 1 day's work — (4+ B) I’ day's work boa eB, 24030 Number of days taken by C= 249 gays Required Ratio 35 IM=2w (8M + 4W) « (6 days —2 days) = (4M + 8W) x days [M,D, = M,D3] (8 « 2W 4 4W) « (6-2) days = (4 * 2W + 8W) » x days (16 + 4)W 4 days = 16W = x days 20%4 16 days 1 tye w= (5) 1 Remaining work = ( -4) 5 4 Now, = 3 work is done by y in 32 days. Whole work will be done by y in (2%176 @ 35. (©) 36. (0) 37. (b) © Time and Work s *s work =--; C’s Iday’s work = (A+ By’s I day's work = 755 C's Iday's work = <5 Arpt oystaysvok (bot) 6-5 10°50) 10 25 (1) Also, A’s | day’s work =(B+C)'s I day's work...) From (1) and (2), we get: 2 » (A’s | day's work) = 3 = A's 1 day's work = 50 So, B alone could do the work in 25 days. BYs I day’s work Ns | day's work = and B's I day's work = 4 Y's 1 day’ fii (A+By’s | day’s work -% +} So both together will finish the work in 6 days. Let the required number of days be x. ‘Then, more men, more km (Direct proportion) ‘more days, more km (Direct proportion) men 8 Ls:12 Men 12 : 2 Days 7: x 12% 7 12=28 «xx 15 12x 712 * 3815 1 6 a (A+B+0)s 1 day's work = (4) part of whole work 2 of whole work 16 + B+) work = —© (A+ B+ Os 16 days work = 0 = 5 (B+ C) completes remaining work in 40 days (B +C) : : 39, © © 40x _ 200 200 days. 3 (B+ C) completes whole work in (A+ B+) can do 2.1 part of work in 2 days, Remaining work 1 c c C= 14 hours Let Pratibha can finish the work in x days then, Sonia can finish the same work in 3x days According to question 3x-x=60 2x = 60 = x=30 Pratibha and Sonia can individually complete the work in 30 days and 90 days respectively. Let 10 men left the work after 10 days. ‘Then, Mx D = Mx x +(M~ 10) (70x) 40x 60 = 40x +30 (70 ~x) = 2400 = 2100 + 10x =>10x = 300 => x= 10 days
You might also like
Time and Work
PDF
No ratings yet
Time and Work
20 pages
Problems On Time and Work
PDF
90% (10)
Problems On Time and Work
148 pages
Time and Work
PDF
No ratings yet
Time and Work
20 pages
Ch 6 - Time and Work
PDF
No ratings yet
Ch 6 - Time and Work
8 pages
Time and Work-BBA
PDF
No ratings yet
Time and Work-BBA
5 pages
Workbook of Advanced Analytical Skills-II
PDF
No ratings yet
Workbook of Advanced Analytical Skills-II
110 pages
Workbook
PDF
No ratings yet
Workbook
78 pages
WorkbookPEA306
PDF
No ratings yet
WorkbookPEA306
86 pages
Time, Men - Work - 230602 - 164730
PDF
No ratings yet
Time, Men - Work - 230602 - 164730
29 pages
2023 12 08 0.10295338185690661
PDF
No ratings yet
2023 12 08 0.10295338185690661
55 pages
13 time & work
PDF
No ratings yet
13 time & work
8 pages
Time and Work Problems for RRB NTPC
PDF
No ratings yet
Time and Work Problems for RRB NTPC
12 pages
Unit 1 Pea306
PDF
No ratings yet
Unit 1 Pea306
118 pages
Time and Work All Previous Year Questions PYQs Asked in SSC 2018
PDF
No ratings yet
Time and Work All Previous Year Questions PYQs Asked in SSC 2018
37 pages
1 PEA 306 Time and Work
PDF
No ratings yet
1 PEA 306 Time and Work
73 pages
Time Work Reading Material
PDF
No ratings yet
Time Work Reading Material
3 pages
Chapter 13 Time and Work
PDF
No ratings yet
Chapter 13 Time and Work
7 pages
Preparation - Interview - Time and Work
PDF
No ratings yet
Preparation - Interview - Time and Work
2 pages
GPSC Paper - Time & Work
PDF
No ratings yet
GPSC Paper - Time & Work
16 pages
Unit 1 Pea306
PDF
No ratings yet
Unit 1 Pea306
107 pages
Chapter 6 Time and Work
PDF
No ratings yet
Chapter 6 Time and Work
14 pages
Time and Work
PDF
No ratings yet
Time and Work
25 pages
Time and Work
PDF
No ratings yet
Time and Work
62 pages
Time & Work 1
PDF
No ratings yet
Time & Work 1
19 pages
Time & Work ....
PDF
No ratings yet
Time & Work ....
6 pages
SSC CGL Numeric Aptitude (Time and Work)
PDF
No ratings yet
SSC CGL Numeric Aptitude (Time and Work)
4 pages
Time & Work - 1
PDF
No ratings yet
Time & Work - 1
37 pages
Smart QUE AND Answers
PDF
No ratings yet
Smart QUE AND Answers
38 pages
Time Work SSC Cds Mba
PDF
No ratings yet
Time Work SSC Cds Mba
9 pages
Time & work
PDF
No ratings yet
Time & work
6 pages
Maths by Mohan Sir
PDF
No ratings yet
Maths by Mohan Sir
4 pages
Time and Work Aptitude
PDF
No ratings yet
Time and Work Aptitude
7 pages
Number Ability For Best
PDF
No ratings yet
Number Ability For Best
32 pages
Cheat Sheet - Time and Work
PDF
No ratings yet
Cheat Sheet - Time and Work
5 pages
1 PEA 306 time and work HU 13 August
PDF
No ratings yet
1 PEA 306 time and work HU 13 August
73 pages
T&W-theory, CRQ, 6(a)
PDF
No ratings yet
T&W-theory, CRQ, 6(a)
9 pages
Chapter-10 Time and Work
PDF
No ratings yet
Chapter-10 Time and Work
4 pages
Time
PDF
No ratings yet
Time
8 pages
Time & Work Pipe and Cisterns.
PDF
No ratings yet
Time & Work Pipe and Cisterns.
23 pages
1 Afcat Mathematics Protected-Qf8rr5-1-Unlocked
PDF
No ratings yet
1 Afcat Mathematics Protected-Qf8rr5-1-Unlocked
149 pages
TIME N WORK Event by Sibanand Pattnaik
PDF
No ratings yet
TIME N WORK Event by Sibanand Pattnaik
8 pages
Mission To Crack Application Sums - Time and Work - Pipes and Cisterns
PDF
No ratings yet
Mission To Crack Application Sums - Time and Work - Pipes and Cisterns
17 pages
Quant and Reasoning
PDF
No ratings yet
Quant and Reasoning
30 pages
Time and Work
PDF
No ratings yet
Time and Work
8 pages
Time and Work
PDF
0% (1)
Time and Work
28 pages
Time+And+Work+-+LOD+02 (2)
PDF
No ratings yet
Time+And+Work+-+LOD+02 (2)
7 pages
Time and Work
PDF
No ratings yet
Time and Work
34 pages
Time and work
PDF
No ratings yet
Time and work
32 pages
Time and Work
PDF
No ratings yet
Time and Work
7 pages
TW Present 12
PDF
No ratings yet
TW Present 12
47 pages
Six Phrase Aptitude Training Short Cuts I
PDF
100% (4)
Six Phrase Aptitude Training Short Cuts I
17 pages
1 X 1 X 1 X 1 y Xy (X+y) Total Work To Be Done Work Done in One Day
PDF
No ratings yet
1 X 1 X 1 X 1 y Xy (X+y) Total Work To Be Done Work Done in One Day
3 pages
Bank Math
PDF
No ratings yet
Bank Math
17 pages