PV System Design
PV System Design
1
Outline
• Legal Framework in Jordan
• Introduction to Solar Radiation & PV Fundamentals
• Design Steps of On-grid PV System
• Design Steps of Off-grid PV System
• Economical Evaluation of PV Projects
2
Legal Framework in Jordan
GAM
3
Energy Conversion
Energy
Energy Input Conversion Energy Output
Device
4
5
• The unit of energy is joule (J).
6
Net Metering vs Feed-in Tariff
7
Solar Radiation & PV Fundamentals
8
Azimuth Angle
9
Azimuth Angle
10
Elevation Angle
11
Tilt Angle
12
Air Mass
1
cos Ө
13
Sun Path (3D Sun Path)
14
Solar Cell Working Principle
15
IV-Curve & MPPT
IMPP
VMPP
16
17
Module Circuit Design
18
Shading Effect
19
Bypass Diodes
20
Standard Test Conditions (STC)
21
Peak Sun Hours
22
Nominal Operating Cell Temp. (NOCT)
23
Types of Solar Panels
24
Types of Solar Panels
25
Concentrating Photovoltaics
(CPV)
26
Cell, Module (Panel), Array
27
Mounting Structure
28
Types of Mounting Systems
(According to orientation type)
Fixed
Tracking
Adjustable
29
Roof Mounted
Ground Mounted
BIPV
Mounting
Structure Car Port
Single Axis
Tracking &
Adjustable
Double Axis
30
Roof Mounted
31
Ground Mounted
32
Self-Ballasted Arrays
33
Direct-Mounted Arrays
34
Pole-Mounted Arrays
35
Shade Structure
36
Building Integrated Photovoltaics (BIPV)
37
Car Ports
38
Temperature Effect
Mounting Type Increase in Cell Temperature [°C]
Facade +35
BIPV +45
39
Single Axis Tracking
40
Double Axis Tracking
41
42
Key factors in Mechanical Design
and Module Layout
43
Module physical characteristics.
44
Thermal characteristics of modules
and effects of mounting system.
45
Weather sealing of building
penetrations and attachments.
46
Materials and hardware
compatibilities with the application
environment.
47
Materials and hardware compatibilities
with the application environment.
48
Aesthetics and appearance.
49
Aesthetics and appearance.
50
Aesthetics and appearance.
51
Optimizing Array Performance
52
Optimum Tilt & Azimuth
53
Good Ventilation
54
Installing all modules in series
yellow area: almost no shading
source circuits in the same plane.
blue area: shaded in the mornings (left) or evenings (right)
red area: temporary shading
55
The point at which the array generates
maximum electrical power
MPPT
range
56
Combiner box (if necessary)
57
58
59
60
Design of On-grid System
61
Design Steps of On-grid PV System
1. Energy Consumption 9. String Configuration
2. System Sizing (DC & AC) 10. Wires and electrical
3. Site Planning components sizing
4. Mounting Structure 11. Losses Estimation
5. Components selection 12. Energy Yield
6. Shading Analysis 13. BOQ
7. Module Layout 14. Economical Evaluation
8. Solar panel selection
62
Energy Consumption
• Calculate the yearly energy consumption in kWh, or the average monthly
consumption
• If the facility is not built yet, estimate the energy consumption for all loads
• Consumption = Wattage ✕ Operational time
• Example:
• The yearly energy consumption for a house in Amman is 16000 kWh
63
64
System Sizing
• Divide the yearly consumption by 1560 kWh/kWp/y or the
average monthly consumption by 130 kWh/kWp/y
• Example:
!
• Max. AC System size = = 10.25 kWp
"
#.!
65
System Sizing
• Selected inverter is: SMA STP 10000-TL kW
66
System Sizing
• Max. DC System size = 10.2 kWp
• This is according to manufacturers specifications
67
DC / AC Ratio
• PV designer may choose to oversize the inverter in order to
maximize the power production, due to the following:
68
DC / AC Ratio
69
Site Planning
• Suitable roof for switchboards
mounting? • Coordinates of the project
• Solar access for the site? • Pictures for the location
• Shading objects (location • Available area
and dimensions)
• Horizon shading
• Orientation and tilt of the
roof • Connection voltage
• Suggested location of the • CB data
inverter • Elec. Room pictures
• Location of AC
70
Suitable roof for mounting?
71
Solar access for the site?
72
Orientation and tilt of the roof
73
Location of AC switchboards
74
Coordinates of the project
75
Connection voltage
Single Phase or 3-Phase?
76
CB data
77
Mounting Structure
Fixed? Steel?
Tracking? Aluminum?
78
Components selection
• Solar panels
• Mounting structure
• DC & AC cables
• Protection devices
79
Shading Analysis
h
θ
D = 2h
80
Shading Analysis
D’ = h / tan(ɑ)
D’ = Maximum shadow length
h = height of obstruction
α = solar altitude angle (at 9:00 AM or 3:00 PM in 21th December)
α = 23.5˚ in Amman at 9:00 in 21th December
81
Shading Analysis
D = D’ x cos(180 – ψ)
• D = Minimum array row spacing
• ψ = solar azimuth angle (at 9:00 AM or 3:00 PM)
• Ψ = 141˚ in Amman at 9:00 AM 82
Shading Analysis
• Example:
• If the solar panels mounted in landscape (x=1m) layout and 30˚ tilt
angle
• h = 1 x sin(30) = 0.5m
• D’ = 0.5/ tan (23.5) = 1.15 m
• D = 1.15 x Cos(180 - 141) = 0.9m
• ﺑﻌﺽ ﺗﻌﻠﻳﻣﺎﺕ ﺗﺭﻛﻳﺏ ﺍﻟﻭﺍﺡ ﺍﻟﺧﻼﻳﺎ ﺍﻟﺷﻣﺳﻳﺔ ﻋﻠﻰ ﺃﺳﻁﺢ ﺍﻟﻣﺑﺎﻧﻲ ﺣﺳﺏ ﺍﻟﻘﺭﺍﺭ ﺭﻗﻡ 19
ﺍﻟﺻﺎﺩﺭ ﻋﻥ ﻣﺟﻠﺱ ﺍﻷﻣﺎﻧﺔ ﺑﺗﺎﺭﻳﺦ 2015-2-25
91
Jehad Adeeb & Alaa Farhan 92
Jehad Adeeb & Alaa Farhan 93
Jehad Adeeb & Alaa Farhan 94
Jehad Adeeb & Alaa Farhan 95
Jehad Adeeb & Alaa Farhan 96
Jehad Adeeb & Alaa Farhan 97
String Configuration
98
String Configuration
99
String Configuration
100
String Configuration
Mounting Type Increase in Cell Temperature [°C]
Facade +35
BIPV +45
• 800 / 50 = 16.1
103
String Configuration
11 Module
+ -
1 6 Module
+
104
String Configuration
• String configuration:
• Input A: 1 x 16 Module
• Input B: 1 x 16 Module
105
Wires and electrical
components sizing
• DC cables (Module’s Isc x 1.56 ) = 9 x 1.56 = 14 A
106
107
Losses Estimation
• Shading losses ≈ 3%
• Soiling losses ≈ 3% (with continuous cleaning)
• Voltage drop ≈ 2%
108
Energy Yield
Optimum PV System Energy Yield in Amman, kWh/kWp/year
• Energy yield = Optimum energy yield – Total Losses
20˚ SE 15˚ SE 10˚ SE 5˚ SE 0˚ 5˚ SW 10˚ SW 15˚ SW 20˚ SW
10˚ -4.9% -4.7% -4.6% -4.5% -4.5% -4.5% -4.6% -4.7% -4.8%
15˚ -3.0% -2.8% -2.6% -2.5% -2.4% -2.5% -2.6% -2.7% -3.0%
20˚ -1.7% -1.4 -1.2% -1.1% -1.0% -1.0% -1.2% -1.3% -1.6%
25˚ -0.9% -0.6% -0.4% -0.3% -0.2% -0.2% -0.3% -0.5% -0.8%
30˚ -0.8% -0.4% -0.2% -0.1% 1820 -0.0% -0.1% -0.3% -0.7%
35˚ -1.3% -0.9% -0.6% -0.5% -0.4% -0.5% -0.6% -0.8% -1.2%
40˚ -2.3% -2.0% -1.7% -1.5% -1.5% -1.5% -1.6% -1.9% -2.2%
45˚ -4.0% -3.6% -3.4% -3.2% -3.1% -3.2% -3.3% -3.5% -3.8%
50˚ -6.2 -5.9% -5.6% -5.5% -5.4% -5.5% -5.5% -5.7% -6.0%
109
Economical Evaluation
• Simple Payback Period
• Levelized Cost of Energy (LCOE)
110
Simple Payback Period
2 3 4
Simple Payback Period
5 6 768
111
CAPEX
• PV Modules
• Inverter
• Mounting Structure
• DC & AC Cables
• Installation
• Permissions
112
Levelized Cost of Energy (LCOE)
2 3 4: 3 4
92
;< 6 5 =
113