Vadura, ZP Shala Vadura To Pravin Bhujade.
Vadura, ZP Shala Vadura To Pravin Bhujade.
40 4.00 3.00
No No L
Main 8 MM ф 40 10 2.90 - 1160.00 - - - -
Distt 8 MM ф 40 8 3.90 - 1248.00 - - - -
over lap 8 MM ф 9 2 0.45 - 8.10 - - - -
16 4.00 3.30
No No L
Main 8 MM ф 0 10 2.95 - 0.00 - - - -
Distt 8 MM ф 0 8 3.95 - 0.00 - - - -
over lap 8 MM ф 0 2 0.45 - 0.00 - - - -
942.280 0.942
Construction Of CC Road at #REF!
#REF!
#REF!
1 MB No #REF!
1422969.00
1
I.No Item of work Quantity Rate Unit Amount
#REF!
#REF!
4 Royalty charges.(Sand) 0.00 #REF! #REF!
Rs #REF!
Say Rs #REF!
2
I.No Item of work Quantity Rate Unit Amount
#REF!
#REF!
3 Royalty charges.(Sand) 5.29 237.45 1256.00
#REF!
Say Rs #REF!
3
I.No Item of work Quantity Rate Unit Amount
172728.00
22454.00
12 Royalty charges.(Sand) 20.30 237.45 4820.00
200002.00
Say Rs 200000.00
4
I.No Item of work Quantity Rate Unit Amount
#REF!
#REF!
12 Royalty charges.(Sand) #REF! 237.45 #REF!
Rs #REF!
Say Rs #REF!
5
I.No Item of work Quantity Rate Unit Amount
174922.00
22740.00
12 Royalty charges.(Sand) 9.86 237.45 2341.00
Rs 200003.00
Say Rs 200000.00
6
I.No Item of work Quantity Rate Unit Amount
174922.00
22740.00
12 Royalty charges.(Sand) 9.86 237.45 2341.00
Rs 200003.00
Say Rs 200000.00
7
I.No Item of work Quantity Rate Unit Amount
#REF!
#REF!
12 Royalty charges.(Sand) #REF! 237.45 #REF!
Rs #REF!
Say Rs #REF!
8
I.No Item of work Quantity Rate Unit Amount
I.No Item of work Quantity Rate Unit Amount
#REF!
#REF!
3 Tesring Charges
Standard Consistency Fineness,
Specific Gravity, Setting Time (Initial
1 3370.00 3370.00
and Final), Compressive Strength.
Soundness
Compressive Strength OF C.C.
6 690.00 4140.00
Cube(Set of 3 cubes).
#REF!
Say Rs #REF!
MB No #REF! Page No.
Name of Work #REF! Place Detail : #REF!
Agency 3788 MREGS
1 E Muster No. #REF! Period of Muster #REF! to #REF!
Previous Reference TMB P.No.
Measurement recorded by: Designnation Sect.ER
11 #REF!
Avg w 0 0.00
2B 1 7.00 2.50 17.50
0.00
17.50 407.00 7123.00
Rmt
9 #REF!
Avg w 0 0.00
Maximum Qnty 0 2C 1 0.90 901.60 811.44
0.00
811.44 4.00 3246.00
Cum
2 #REF!
Avg w MEASUREMENT: 1 1000.00 3.30 0.20 660.00
Maximum Qnty, 660.00 1 141 3.00 1.95 0.55 453.34
2D 1 1 3.10 2.10 0.50 3.255
1 1 3.00 1.95 0.55 3.218
1 1 3.20 1.85 0.55 3.256
0.00
453.34 187.64 85064.00
cum
10 #REF!
C) For Hard Murum Compaction:
Avg w 0.00 3C 1 1000.00 3.30 3300.00
0.00
3300.00 3.00 9900.00
sqm
3 #REF!
10 #REF!
A)For 200mm loose (80mm/HM Layer).
Avg w 0.00 5D 1 1000.00 3.30 3300.00
3300.00 4.00 13200.00
sqm
4 #REF!
5 #REF!
Avg w 0.00 6C 1 61 2.50 1.60 0.40 97.60
Maximum Qnty, 99.58 1 1 2.50 1.60 0.40 1.60
Stack, 1 1 2.45 1.50 0.45 1.654
1 1 2.60 1.80 0.35 1.638
0.00
97.60 137.22 13393.00
cum
7 #REF!
Avg w 0.00 0.00 6D Qtty. Collected VTMB P.No. 97.60
Qtty. Balance after spreading 0.00
Qtty. Spread 97.60 43.52 4248.00
sqm
10 #REF!
B)For 100mm loose (40mm/S.M layer).
Avg w 0.00 6E 1 1000.00 3.00 3000.00
0.00
3000.00 3.00 9000.00
cum
2 #REF!
Avg w 0.00
For Side shoulder: 6F 1 2 1000.00 0.55 0.20 220.00
Maximum Qnty, 220.00 1 200 5.00 0.55 0.40 218.90
Stacks, 1 1 5.00 0.55 0.40 1.100
1 1 5.20 0.50 0.45 1.170
1 1 4.90 0.45 0.50 1.103
0.00
218.90 187.64 41074.00
cum
10 #REF!
C) For Hard Murum Compaction:
Avg w 0.00 6H 2 1000.00 0.55 1.00 1100.00
0.00
1100.00 3.00 3300.00
cum
12 #REF!
Avg w 0.00 0.00 0 1.00 0.00
0.00
0.00 262.00 0.00
Nos
794298.00
0.00
Total
Total Amount of labour work 794298.00
M/days as per NMR 102
Hence wages per day 7787.235
Say, 256
Total Amount of labour work, 26112
Allocation : MREGS
Ch.to.: #REF!
Rs. 26112.00
TESTING FREQUENCY STATEMENT (PART-B) MREGS
SR.
ITEM OF WORK TESTS REQUIRED SHORT Amount
NO
1 Supplying 80mm Water absorbtion,impact/crushing value Flakiness index. 1 2600.00
Water absorbtion,impact/crushing value, Sieve analysis Flakiness
2 Supplying 40mm 1 2600.00
index.
3 Supplying of Hard murum Liquid limit/ Plastic limit 2 2760.00
4 Supplying of Sift murum Liquid limit/ Plastic limit 2 2760.00
Rs. 10720.00
Actual
SN Material Qtty Ratio Unit Rate Amount
Quantity
P.W.Sub
TESTING FREQUENCY STATEMENT (PART-B) MREGS
SR.
ITEM OF WORK TESTS REQUIRED SHORT Amount
NO
1 Murum Liquid/Plastic limit 0 0.00
Rs. 0.00
P.W.Sub
RECOVERY STATEMENT FOR BILL
1. As per Royalty Statement.
2. As per Testing frequency Statement
CERTIFICATE :
Certified that the Supplier use private
machinary and material purchase to his own
cost to work site hence recovery of Govt
machinery and material T & P is Nil.
P.W.Sub
Sub Divisional Engineer,
P.W.Sub Division, Chandur Bazar