0% found this document useful (0 votes)
33 views16 pages

Vadura, ZP Shala Vadura To Pravin Bhujade.

Uploaded by

Mirza Rahil
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
33 views16 pages

Vadura, ZP Shala Vadura To Pravin Bhujade.

Uploaded by

Mirza Rahil
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 16

MB No:

Name of Work: ZP Shala Vadura To Pravin Bhujale.


Place: Vadura
Work Code:

SN NMR No. M/Day From To Rate Amount


4823 42 6/6/2023 6/12/2023 273 11466.00
1
4824 60 6/6/2023 6/12/2023 273 16380.00
14425 60 11/5/2023 11/11/2023 273 16380.00
14426 60 11/5/2023 11/11/2023 273 16380.00
14427 60 11/5/2023 11/11/2023 273 16380.00
14428 60 11/5/2023 11/11/2023 273 16380.00
14429 60 11/5/2023 11/11/2023 273 16380.00
2 14430 59 11/5/2023 11/11/2023 273 16107.00
14431 60 11/5/2023 11/11/2023 273 16380.00
14432 40 11/5/2023 11/11/2023 273 10920.00
14433 60 11/5/2023 11/11/2023 273 16380.00
14434 60 11/5/2023 11/11/2023 273 16380.00
14435 12 11/5/2023 11/11/2023 273 3276.00
14436 70 11/12/2023 11/18/2023 273 19110.00
14437 70 11/12/2023 11/18/2023 273 19110.00
14438 70 11/12/2023 11/18/2023 273 19110.00
14439 70 11/12/2023 11/18/2023 273 19110.00
14440 70 11/12/2023 11/18/2023 273 19110.00
3 14441 70 11/12/2023 11/18/2023 273 19110.00
14442 70 11/12/2023 11/18/2023 273 19110.00
14443 70 11/12/2023 11/18/2023 273 19110.00
14444 70 11/12/2023 11/18/2023 273 19110.00
14445 70 11/12/2023 11/18/2023 273 19110.00
14446 14 11/12/2023 11/18/2023 273 3822.00
15234 43 11/21/2023 11/27/2023 273 11739.00
15235 60 11/21/2023 11/27/2023 273 16380.00
15236 60 11/21/2023 11/27/2023 273 16380.00
15237 53 11/21/2023 11/27/2023 273 14469.00
15238 60 11/21/2023 11/27/2023 273 16380.00
4 15239 58 11/21/2023 11/27/2023 273 15834.00
15240 59 11/21/2023 11/27/2023 273 16107.00
15241 54 11/21/2023 11/27/2023 273 14742.00
15242 47 11/21/2023 11/27/2023 273 12831.00
15243 59 11/21/2023 11/27/2023 273 16107.00
15244 12 11/21/2023 11/27/2023 273 3276.00
15245 49 11/28/2023 12/4/2023 273 13377.00
15246 70 11/28/2023 12/4/2023 273 19110.00
15247 70 11/28/2023 12/4/2023 273 19110.00
15248 63 11/28/2023 12/4/2023 273 17199.00
15249 70 11/28/2023 12/4/2023 273 19110.00
5 15250 70 11/28/2023 12/4/2023 273 19110.00
15251 69 11/28/2023 12/4/2023 273 18837.00
15252 65 11/28/2023 12/4/2023 273 17745.00
15253 55 11/28/2023 12/4/2023 273 15015.00
15254 70 11/28/2023 12/4/2023 273 19110.00
15255 14 11/28/2023 12/4/2023 273 3822.00
16358 70 12/7/2023 12/13/2023 273 19110.00
16359 70 12/7/2023 12/13/2023 273 19110.00
16360 70 12/7/2023 12/13/2023 273 19110.00
16361 70 12/7/2023 12/13/2023 273 0.00
6
16362 70 12/7/2023 12/13/2023 273 19110.00
16363 70 12/7/2023 12/13/2023 273 19110.00
16364 70 12/7/2023 12/13/2023 273 0.00
16365 70 12/7/2023 12/13/2023 273 0.00
16366 56 12/7/2023 12/13/2023 273 15288.00

0 P/Days 3253 TOTAL 830739.00


Page 2
STEEL N N L 6 MM ф 8 MM ф 10 MM ф 12 MM ф 16 MM ф 20 MM ф
12 Jali 6MM ф 8MM ф 10MM ф 12MM ф 16MM ф 20MM ф

40 4.00 3.00
No No L
Main 8 MM ф 40 10 2.90 - 1160.00 - - - -
Distt 8 MM ф 40 8 3.90 - 1248.00 - - - -
over lap 8 MM ф 9 2 0.45 - 8.10 - - - -

16 4.00 3.30
No No L
Main 8 MM ф 0 10 2.95 - 0.00 - - - -
Distt 8 MM ф 0 8 3.95 - 0.00 - - - -
over lap 8 MM ф 0 2 0.45 - 0.00 - - - -

0.00 2416.10 0.00 0.00 0.00 0.00


Wt Factor 0.22 0.39 0.62 0.89 1.58 2.47
0 942.28 0 0 0 0 942.28 0.942

942.280 0.942
Construction Of CC Road at #REF!
#REF!
#REF!

1 MB No #REF!

Sana Const Ch Bzr Bill Amount


1 9 200000.00
2 10 200000.00
3 11 200000.00
4 12 200000.00
5 13 200000.00
6 14 200000.00
7 15 200000.00
8 16 22969.00

1422969.00
1
I.No Item of work Quantity Rate Unit Amount

1 Supplying HM/ kankar #REF! 738.69 Cum #REF!

2 Compacting the HM #REF! 19.00 Cum #REF!

GSB - Grading I (Using Screening


3 14.235 2793.35 Cum 39763.00
Type A (13.2) mm Aggregate

#REF!

GST 12.00% #REF!


Insurance 1.00% #REF!

#REF!
4 Royalty charges.(Sand) 0.00 #REF! #REF!

Royalty charges.(Gravel / Murum) #REF! #REF! #REF!


#REF!

Rs #REF!
Say Rs #REF!

2
I.No Item of work Quantity Rate Unit Amount

GSB - Grading I (Using Screening


1 #REF! 2793.35 Cum #REF!
Type A (13.2) mm Aggregate

2 DLC Sub base 11.251 3999.54 Cum 44999.00

#REF!

GST 12.00% #REF!


Insurance 1.00% #REF!
I.No Item of work Quantity Rate Unit Amount

#REF!
3 Royalty charges.(Sand) 5.29 237.45 1256.00

Royalty charges.(Gravel / Murum) #REF! 216.25 #REF!


#REF!

#REF!
Say Rs #REF!

3
I.No Item of work Quantity Rate Unit Amount

1 DLC Sub base 43.19 3999.54 Cum 172728.00

172728.00

GST 12.00% 20727.00


Insurance 1.00% 1727.00

22454.00
12 Royalty charges.(Sand) 20.30 237.45 4820.00

Royalty charges.(Gravel / Murum) 0.00 216.25 0.00


4820.00

200002.00
Say Rs 200000.00
4
I.No Item of work Quantity Rate Unit Amount

1 DLC Sub base #REF! 3999.54 Cum #REF!

2 CC M-30 PCC Rigid pavement 15.776 7449.50 Cum 117523.00

#REF!

GST 12.00% #REF!


Insurance 1.00% #REF!

#REF!
12 Royalty charges.(Sand) #REF! 237.45 #REF!

Royalty charges.(Gravel / Murum) 216.25 0.00


#REF!

Rs #REF!
Say Rs #REF!
5
I.No Item of work Quantity Rate Unit Amount

2 CC M-30 PCC Rigid pavement 23.481 7449.50 Cum 174922.00


I.No Item of work Quantity Rate Unit Amount

174922.00

GST 12.00% 20991.00


Insurance 1.00% 1749.00

22740.00
12 Royalty charges.(Sand) 9.86 237.45 2341.00

Royalty charges.(Gravel / Murum) 216.25 0.00


2341.00

Rs 200003.00
Say Rs 200000.00
6
I.No Item of work Quantity Rate Unit Amount

1 CC M-30 PCC Rigid pavement 23.481 7449.50 Cum 174922.00

174922.00

GST 12.00% 20991.00


Insurance 1.00% 1749.00

22740.00
12 Royalty charges.(Sand) 9.86 237.45 2341.00

Royalty charges.(Gravel / Murum) 216.25 0.00


2341.00

Rs 200003.00
Say Rs 200000.00
7
I.No Item of work Quantity Rate Unit Amount

1 CC M-30 PCC Rigid pavement #REF! 7449.50 Cum #REF!

2 Cutting transverse contraction joints #REF! 72.00 Rmt #REF!

3 Contraction joints Sealent #REF! 166.00 Rmt #REF!

#REF!

GST 12.00% #REF!


Insurance 1.00% #REF!

#REF!
12 Royalty charges.(Sand) #REF! 237.45 #REF!

Royalty charges.(Gravel / Murum) 216.25 0.00


#REF!

Rs #REF!
Say Rs #REF!
8
I.No Item of work Quantity Rate Unit Amount
I.No Item of work Quantity Rate Unit Amount

1 Contraction joints Sealent 6.39 166.00 Rmt 1061.00


2 Informatory sign board #REF! 9284.00 Nos #REF!

#REF!

GST 12.00% #REF!


Insurance 1.00% #REF!

#REF!
3 Tesring Charges
Standard Consistency Fineness,
Specific Gravity, Setting Time (Initial
1 3370.00 3370.00
and Final), Compressive Strength.
Soundness
Compressive Strength OF C.C.
6 690.00 4140.00
Cube(Set of 3 cubes).

Water Absorption, Specific Gravity.


1 2600.00 2600.00
Impact Value Crushing Value.

Liquid limit and plastic Limit 1 1170.00 1170.00


11280.00

#REF!
Say Rs #REF!
MB No #REF! Page No.
Name of Work #REF! Place Detail : #REF!
Agency 3788 MREGS
1 E Muster No. #REF! Period of Muster #REF! to #REF!
Previous Reference TMB P.No.
Measurement recorded by: Designnation Sect.ER

It.No Perticulars of Work N L B D/H Qtty. Rate Amount

1 Excavati for Catch /side water gutter in sort of soil.


Avg w 0 0.00 1 2 297.50 1.00 0.45 0.00
2 695.00 1.00 0.45 0.00
2A
For Pipe NP-2 1000mm: 1 2.90 7.20 0.40 0.00
0.00
0.00 104.00 0.00
Cum

11 #REF!
Avg w 0 0.00
2B 1 7.00 2.50 17.50
0.00
17.50 407.00 7123.00
Rmt

9 #REF!
Avg w 0 0.00
Maximum Qnty 0 2C 1 0.90 901.60 811.44
0.00
811.44 4.00 3246.00
Cum

2 #REF!
Avg w MEASUREMENT: 1 1000.00 3.30 0.20 660.00
Maximum Qnty, 660.00 1 141 3.00 1.95 0.55 453.34
2D 1 1 3.10 2.10 0.50 3.255
1 1 3.00 1.95 0.55 3.218
1 1 3.20 1.85 0.55 3.256
0.00
453.34 187.64 85064.00
cum

3A 1 64 2.90 2.00 0.55 204.55


1 1 3.10 2.10 0.50 3.255
1 1 2.90 2.00 0.55 3.190
1 1 3.00 2.15 0.50 3.225
0.00
204.55 187.64 38382.00
cum

1 0 2.50 1.70 0.40 0.00


0 0 3.10 2.00 0.60 0.000
0 0 3.20 2.10 0.55 0.000
0 0 3.20 2.15 0.55 0.000
It.No Perticulars of Work N L B D/H Qtty. Rate Amount
0.00
0.00 187.64 0.00
cum

8 #REF! 3B Qtty. Collected VTMB P.No. 657.89


Avg w 0.00 Qtty. Balance after spreading 0.00
Qtty. Spread 657.89 43.52 28631.00
cum

10 #REF!
C) For Hard Murum Compaction:
Avg w 0.00 3C 1 1000.00 3.30 3300.00
0.00
3300.00 3.00 9900.00
sqm

3 #REF!

Avg w Soling 80mm: 3D 1 72 2.90 1.95 0.550 224.06


Maximum Qnty, 495.00 1 1 3.15 2.00 0.50 3.150
1 1 3.00 1.90 0.55 3.135
1 1 2.90 1.95 0.550 3.110
0.00
224.06 526.60 117990.00
cum

4A 1 95 2.85 2.00 0.500 270.75


1 1 3.00 2.00 0.50 3.000
1 1 3.10 2.00 0.55 3.410
1 1 3.00 1.95 0.500 2.925
0.00
270.75 526.60 142577.00
cum

1 0 3.00 1.95 0.500 0.00


1 1 3.00 2.00 0.50 3.000
1 1 3.10 2.00 0.55 3.410
1 1 3.00 1.95 0.500 2.925
0.00
0.00 526.60 0.00
cum

1 0 3.05 1.95 0.498 0.00


1 1 3.00 2.00 0.50 3.000
1 1 3.10 2.00 0.55 3.410
1 1 3.00 1.95 0.500 2.925
0.00
0.00 526.60 0.00
cum

1 0 3.00 1.90 0.50 0.00


1 1 3.00 2.00 0.50 3.000
It.No Perticulars of Work N L B D/H Qtty. Rate Amount
1 1 3.10 2.00 0.55 3.410
1 1 3.00 1.95 0.500 2.925
0.00
0.00 526.60 0.00
cum
It.No Perticulars of Work N L B D/H Qtty. Rate Amount
6 Spreading 80mm Metal for road work including sectioning ect.
Avg w 0.00
4B 214 Qtty. Collected VTMB P.No. 494.81
5A 280.81 Qtty. Balance after spreading 0.00
Qtty. Spread 494.81 54.52 26977.00
cum

2 Supplying HM/ Kankar at road site.


Avg w 0.00
For WBM Road 80mm Metalling: 1 71 2.90 1.80 0.50 185.31
Maximum Qnty, 185.55 1 1 2.90 1.80 0.50 2.610
Stacks: 5B 1 1 2.90 1.90 0.50 2.755
1 1 2.70 2.00 0.55 2.970
0.00
185.31 187.64 34772.00
cum

1 0 2.90 1.80 0.50 0.00


1 1 2.90 1.80 0.50 2.610
1 1 2.90 1.90 0.50 2.755
1 1 2.70 2.00 0.55 2.970
0.00
0.00 187.64 0.00
cum

8 #REF! 5C Qtty. Collected VTMB P.No. 185.31


Avg w 0.00 Qtty. Balance after spreading 0.00
Qtty. Spread 185.31 43.52 8065.00
cum

10 #REF!
A)For 200mm loose (80mm/HM Layer).
Avg w 0.00 5D 1 1000.00 3.30 3300.00
3300.00 4.00 13200.00
sqm

4 #REF!

Avg w Soling 40mm: 5E 1 63 2.95 1.80 0.55 184.01


Maximu Qnty, 300.00 1 1 3.00 2.00 0.50 3.000
Stacks, 1 1 2.95 1.80 0.55 2.921
1 1 3.10 1.90 0.50 2.945
0.00
184.01 598.52 110133.00
cum

6A 1 37 2.90 1.95 0.55 115.02


1 1 3.15 2.00 0.50 3.150
1 1 3.00 1.90 0.55 3.135
1 1 3.10 2.10 0.50 3.255
0.00
115.02 598.52 68843.00
It.No Perticulars of Work N L B D/H Qtty. Rate Amount
cum
It.No Perticulars of Work N L B D/H Qtty. Rate Amount
1 0 2.95 1.90 0.50 0.00
1 1 3.15 2.00 0.50 3.150
1 1 3.00 1.90 0.55 3.135
1 1 3.10 2.10 0.50 3.255
0.00
0.00 598.52 0.00
cum

6 Spreading 40mm Metal for road work including sectioning ect.


Avg w 0.00
6B Qtty. Collected VTMB P.No. 299.03
Qtty. Balance after spreading 0.00
Qtty. Spread 299.03 54.52 16303.00
cum

5 #REF!
Avg w 0.00 6C 1 61 2.50 1.60 0.40 97.60
Maximum Qnty, 99.58 1 1 2.50 1.60 0.40 1.60
Stack, 1 1 2.45 1.50 0.45 1.654
1 1 2.60 1.80 0.35 1.638
0.00
97.60 137.22 13393.00
cum

7 #REF!
Avg w 0.00 0.00 6D Qtty. Collected VTMB P.No. 97.60
Qtty. Balance after spreading 0.00
Qtty. Spread 97.60 43.52 4248.00
sqm

10 #REF!
B)For 100mm loose (40mm/S.M layer).
Avg w 0.00 6E 1 1000.00 3.00 3000.00
0.00
3000.00 3.00 9000.00
cum

2 #REF!
Avg w 0.00
For Side shoulder: 6F 1 2 1000.00 0.55 0.20 220.00
Maximum Qnty, 220.00 1 200 5.00 0.55 0.40 218.90
Stacks, 1 1 5.00 0.55 0.40 1.100
1 1 5.20 0.50 0.45 1.170
1 1 4.90 0.45 0.50 1.103
0.00
218.90 187.64 41074.00
cum

1 0 5.00 0.55 0.40 0.00


1 1 5.00 0.55 0.40 1.100
1 1 5.20 0.50 0.45 1.170
1 1 4.90 0.45 0.50 1.103
0.00
0.00 187.64 0.00
It.No Perticulars of Work N L B D/H Qtty. Rate Amount
cum

8 #REF! 6G Qtty. Collected VTMB P.No. 218.90


Avg w 0.00 Qtty. Balance after spreading 0.00
Qtty. Spread 218.90 43.52 9527.00
cum

10 #REF!
C) For Hard Murum Compaction:
Avg w 0.00 6H 2 1000.00 0.55 1.00 1100.00
0.00
1100.00 3.00 3300.00
cum

12 #REF!
Avg w 0.00 0.00 0 1.00 0.00
0.00
0.00 262.00 0.00
Nos

13 #REF! 6I 1 1.00 1.00 1.00


0.00
1.00 2550.00 2550.00
nos

794298.00
0.00
Total
Total Amount of labour work 794298.00
M/days as per NMR 102
Hence wages per day 7787.235
Say, 256
Total Amount of labour work, 26112

Allocation : MREGS
Ch.to.: #REF!
Rs. 26112.00
TESTING FREQUENCY STATEMENT (PART-B) MREGS

SR.
ITEM OF WORK TESTS REQUIRED SHORT Amount
NO
1 Supplying 80mm Water absorbtion,impact/crushing value Flakiness index. 1 2600.00
Water absorbtion,impact/crushing value, Sieve analysis Flakiness
2 Supplying 40mm 1 2600.00
index.
3 Supplying of Hard murum Liquid limit/ Plastic limit 2 2760.00
4 Supplying of Sift murum Liquid limit/ Plastic limit 2 2760.00

Rs. 10720.00

Sub Divisional Engineer,


P.W.Sub Division, Chandur Bazar
RECOVERY STATEMENT FOR BILL
1. As per Royalty Statement.
2. As per Testing frequency Statement
#REF!
ROYALTY STATEMENT (PART-B)

Actual
SN Material Qtty Ratio Unit Rate Amount
Quantity

1 Badri,kankar,roda #REF! 1.150 #REF! Sqm 237.45 #REF!

2 Murim #REF! 1.00 #REF! Cum 216.25 #REF!

Total Amount Rs. 0.00

P.W.Sub
TESTING FREQUENCY STATEMENT (PART-B) MREGS

SR.
ITEM OF WORK TESTS REQUIRED SHORT Amount
NO
1 Murum Liquid/Plastic limit 0 0.00
Rs. 0.00

P.W.Sub
RECOVERY STATEMENT FOR BILL
1. As per Royalty Statement.
2. As per Testing frequency Statement
CERTIFICATE :
Certified that the Supplier use private
machinary and material purchase to his own
cost to work site hence recovery of Govt
machinery and material T & P is Nil.

P.W.Sub
Sub Divisional Engineer,
P.W.Sub Division, Chandur Bazar

Sub Divisional Engineer,


P.W.Sub Division, Chandur Bazar

Sub Divisional Engineer,


P.W.Sub Division, Chandur Bazar

You might also like