Maintenence of Double Line Block Instrument Used in Indian Railways
Maintenence of Double Line Block Instrument Used in Indian Railways
INTRODUCTION
This instrument is used for double line block working. One station will have
two block instruments, one for station in advance and another for station in
rear. The instrument is simple, compact and robust in design. It requires
simple regular maintenance and scheduled overhauling to ensure its trouble-
free working. It shows three positions of block section for each line namely
LINE CLOSED, LINE CLEAR and TRAIN ON LINE.
In NON-RE area, it requires 3 wires (min.) along with earth return for its
working. One for Top indicator, One for Bottom indicator and One for Block
bell and Telephone.
In DC traction area instead of earth return, metallic return is used to avoid
interference from stray current.
In AC RE area, it requires two Phantom lines along with earth return, one
phantom for Top indicator and another phantom for Bottom indicator and two
pair of cable, one for bell code exchange and other for block telephone.
MAIN COMPONENTS
The block instrument mainly consists of following parts :
1. Top Indicator (Upper Needle)
2. Bottom Indicator (Lower Needle)
3. Bell Plunger
4. Commutator & Commutator segment
5. Door Lock Assembly
6. Bell Unit consisting of Block Bell, Bell Relay and Bell Coil
7. SM’s Key
The top portion consists of Top and Bottom indicators. The bottom portion is
made up of cast iron and consists of Commutator, Bell plunger and S.M’s key.
Sealing & double locking arrangements are provided on the back side of the
block instrument. A telephone is also connected as an external part of Block
Instrument. A separate three position polarised relay is wired in series with
the top indicator and housed inside an apparatus case/Relay room through
which Last stop signal is controlled .