Technical Objects: SAP Certified Application Associate - SAP S/4HANA Asset Management-C - TS413 - 1909
Technical Objects: SAP Certified Application Associate - SAP S/4HANA Asset Management-C - TS413 - 1909
Technical Objects
1 of 80
Which actions can you perform with the SAP Fiori app Create Technical Object?
9 of 80
A. The user must decide whether the functional location is assigned to a new superior functional
location.
B. The user must define a new labelling system for the new primary key.
C. Changing the superior functional location via alternative labeling ts not possible.
D. The functional location is immediately assigned to a new superior functional location when the
new label is entered.
22 of 80
Which of the following can you assign to an equipment category via a view profile?
A. Serial data
B. Configuration
C. Warranty
D. Manufacturer data
24of 8O
25 of 80
A. Create a new measurement document and assign a valuation code for counter replacement.
B. Replace the defective piece of equipment to which a counter is assigned.
C. Create a new measurement document marked as a counter replacement.
D. Deactivate the current counter and create a new counter.
34 of 8O
You are analyzing the data transfer of the cost center of an equipment.
53 of 80
A. Assign a view profile to the combination of fleet object type and usage type.
B. Assign a view profile to the combination of fleet object type and equipment category
C. Define the field selection for the vehicle equipment master data.
D. Assign a view profile to an equipment category for fleet equipment.
54 of BO
A. Purchasing organization
B. Purchasing group
C. Vendor (external)
D. Business partner (gen.)
57 of 8O
68 of 8O
Which material type is the best choice if you only want to create a structure element within the BOM?
Which objects have been enhanced with linear data in maintenance processes?
74 of 80
You have created a new equipment category, "linear", with the corresponding view profile,
A. Type of offset
B. Object network
C. Start marker
D. Unit of measure
E. Segment
78 of 80
What do you need to configure to enable entries in the action log of an equipment?
You want to display additional document information within the document flow of a maintenance order.
A. Invoice
B. Service entry sheet
C. Purchase order
D. Goods movement
10 of 80
A. For the combination of order type and planner group you can decide when reservations are
created.
B. Reservations are created only after a material availability check has been performed.
C. All open reservations are closed when the maintenance order is set to TECO.
D. Open reservations can be cleared when 4 maintenance order operation is finally confirmed.
13 of 80
Which of the following statements about orders with operation account assignment (OAA) are correct?
17 of 80
Which activities can the planner perform by using the Maintenance Planning Overview app with the
default filters?
A. Display approved purchase requisitions for which purchase orders have been generated.
B. Analyze maintenance orders that are still in planning and have NOT been released.
C. Display approved purchase requisitions for which NO purchase orders have been generated,
D. Analyze overdue maintenance orders that have NOT been finally confirmed.
E. Analyze confirmed maintenance orders that have NOT been settled.
23 of 80
Which functions are available in the Resource Scheduling for Maintenance Planners app?
33 of 80
‘You want to create a maintenance order with an external order operation with service items.
36 of 80
Which of the following statements regarding the purchasing process are correct?
A. A goods receipt can ONLY be posted for a maintenance order with status REL.
B. A purchase order is created automatically as soon as the order is saved.
C. A goods receipt can be posted after the maintenance order is technically completed
D. A purchase requisition can be created automatically as soon as the order Is saved.
E. The maintenance order can be set to TECO before the invoice is created.
40 of 8O
Which of the following statements regarding material planning in the maintenance order are correct?
46 of 80
Which operations are possible when you cancel the technical completion of a maintenance order?
52 of 80
Which statement is correct when planning maintenance work that is to be carried out by an external
company?
A. In the control key assigned to the order operation, the "Service" indicator must always be
activated.
B. If you assign a control key for an external order operation, the actual values must always be
entered as a goods receipt in the system.
C. If you assign a control key with indicator "Service" for an external service, you have to enter the
actual values via the service entry sheet.
D. A service master record must always be assigned to the external order operation.
59 of 80
A. When an order is created based on a single notification, this notification becomes the header
notification
B. The long text of the reference notification can be automatically copied as the long text of the
order
C. The document within the document management system can be assigned only at operational
level
D. The assignment of the header notification to an order CANNOT be deleted.
65 of 60
Where can you see the results of the material availability check for maintenance orders?
The maintenance technician wants to document the finished work steps for a technical object in a
notification
76 of BO
Which statements regarding a maintenance order with status REL are correct?
3 of 80
A. Work center
B. Maintenance order header
C. Notification activity
D. Maintenance order operation
E. Organizational Units and Master Data
4 of 80
Which of the following statements are correct regarding a cross-plant planning scenario?
Which of the following objects can you directly assign when you define the work center?
Which of the following statements are correct for SAP S/4HANA Cloud - Asset Management?
29 of 80
Which of the following are components of cloud-based SAP Intelligent Asset Management?
35 of 80
A. Location
B. Maintenance planner groups
C. Controlling area
D. Maintenance work center
E. 42 of 80
A. Work center
B. Business partner
C. Planner group
D. Equipment
63 of 60
How does the work center influence cost calculation in the maintenance order?
49 of 80
During the implementation project you need to define the organizational units relevant for Plant
Maintenance.
Which of the following objects can you directly assign to a maintenance plant?
A. Business partner
B. Maintenance work center
C. Maintenance planner group
D. Storage location
Breakdown Maintenance
5 of 80
Which activities can the technician perform with the Repair Malfunction SAPUI5 app?
Complete
Close Report
Release
Put in Process
Schedule
Release
Start Work
14 of 80
Which operations can the responsible person perform after a maintenance order is technically
completed?
44 of 60
Which steps support the maintenance technician in the Report and Repair Malfunction Fiori app (3
tiles)?
62 of 80
Which steps are available for the maintenance technician when using the Report Malfunction tile?
7 of 80
You want to set up a general maintenance task list for inspection rounds using the overall time
confirmation as a simplified way to record measurement documents.
8 of 80
Which parameter in a maintenance strategy do you use to set the start/end date of the maintenance
order?
A. Initial/subsequent buffer
B. Call horizon
C. Package offset
D. Package hierarchy
16 of 60
Which of the following parameters are available when you define a new maintenance plan category?
A. Order type
B. Call abject
C. Change documents
D. Maintenance activity type
E. Completion date
18 of 80
The technical completion of the current maintenance order was posted with a delay of 5 days.
What happens to the next planned date if you set the shift factor for early completion to 100%?
A. It is not shifted.
B. It is postponed by 5 days.
C. It will be 5 days earlier.
D. Its postponed by a full cycle (100%).
19 of 80
How does a performance-based maintenance plan calculate the interval between start date and planned
date?
20 of 80
You want to create a single cycle plan with a cycle of 12 months. You use the Time - key date scheduling
indicator.
45 of 80
You want to set up a scenario for regular maintenance. The first event should take place after 1 year,
after that, it is a regular cycle of 6 months.
A. Scheduling indicator
B. Shift factor
C. Maintenance package offset
D. Maintenance plan category
55 of 80
A. Scheduling indicator
B. Scheduling period
C. Lead float
D. Call horizon
E. 56 of 60
The maintenance engineer creates a strategy plan with the call object maintenance order. Shift factors
are set to 100%.
Which date is relevant for the calculation of future planned dates if the maintenance work is delayed?
60 of 80
You want to assign components to an equipment task list. There is no BOM assigned to the equipment.
61 of 60
A. Factory calendar
B. Scheduling indicator
C. Start date
D. Scheduling period
66 of 80
A. Shift factors
B. Start counter reading
C. Estimated annual performance
D. Scheduling period
E. Preventive Maintenance
79 of 80
You create two maintenance packages and only one package should be executed at a time.
A. Hierarchy
B. Offset
C. Subsequent buffer
D. Package sequence
Which SAP Ul! technology is used for the technician's job list?
Web Dynpro
A. SAPUIS
B. SAP GUI for HTML
C. SAP GUI for Windows.
D. User Interface and User Experience
26 of 80
Which statements are correct about Ul technologies in SAP S/4HANA Asset Management?
8O of 80
How do you set up the visible tiles for a specific user in SAP Fiori launchpad?
What is the correct receiver object type for the settlement of a refurbishment order?
64 of 80
72 of 80
A. Condition-based
B. Retail
C. Origin
D. In-house/external procurement
Mobile Maintenance
21 of 80
In which component do you have to perform most of the configuration to set up SAP Asset Manager.
A. SAP S/4HANA
B. SAP ERP
C. SAP Mobile Platform
D. SAP Cloud Platform
27 of 80
Which functionalities are available in the SAP Asset Manager for a maintenance worker?
Schedule resources
Display maps
Change BOM
Attach documents
47 of 80
A. ESRI maps
B. Breakdown analytics
C. Cost analytics
D. Work orders and operations
E. Technical objects
50 of 80
Which of the following statements about SAP Asset Manager are true?
Project-oriented Maintenance
26 of 80
In which cases are projects (P'S) used in the area of SAP S/4HANA Asset Management?
A. Condition-based maintenance
B. Investments
C. External refurbishment
D. Shutdowns and overhaul
39 of 80
Which statements are correct for standard processes in PM/PS cost control?
73 of 80
Analytics
38 of 80
Which functionalities belong to the current portfolio of SAP BusinessObjects Business Intelligence?
43 of 80
‘You want to view transactional and analytical processing data in the Technical Object Breakdowns SAP
Fiori app
A. BW query
B. BW InfoCube
C. Core Data Services (CDS view)
D. InfoSet for SAP Query
E. TS of BO
You want to see historical information relating to the phases when equipment was installed at a
functional location