Technical Objects: SAP Certified Application Associate - SAP S/4HANA Asset Management-C - TS413 - 1909

Uploaded by

Ram Kumar
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
185 views

Technical Objects: SAP Certified Application Associate - SAP S/4HANA Asset Management-C - TS413 - 1909

Uploaded by

Ram Kumar
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 23

SAP Certified Application Associate - SAP S/4HANA Asset Management- C_TS413_1909

Technical Objects

1 of 80

You need to create a new functional location.

Which actions can you perform with the SAP Fiori app Create Technical Object?

Note: There are 3 correct answers to this question.

A. Assign a subordinate piece of equipment


B. Edit classification data and characteristics.
C. Create a measuring point.
D. Assign documents.
E. Change a reference location.

9 of 80

What happens if you change the primary key of a functional location?

A. The user must decide whether the functional location is assigned to a new superior functional
location.
B. The user must define a new labelling system for the new primary key.
C. Changing the superior functional location via alternative labeling ts not possible.
D. The functional location is immediately assigned to a new superior functional location when the
new label is entered.

22 of 80

Which of the following can you assign to an equipment category via a view profile?

Note: There are 2? correct answers to this question.

A. Serial data
B. Configuration
C. Warranty
D. Manufacturer data
24of 8O

What are the prerequisites to serialize a piece of equipment?

Note: There are 3 correct answers to this question.

A. Maintain a serial number for an existing equipment master.


B. Assign a serial number profile to the equipment category.
C. Assign a serial number profile to the related material master.
D. Add a serialized material to the construction type field of the equipment master.
E. Add a serialized material to the equipment serial data view.

25 of 80

How do you map a counter replacement in SAP S/4HANA Asset Management?

A. Create a new measurement document and assign a valuation code for counter replacement.
B. Replace the defective piece of equipment to which a counter is assigned.
C. Create a new measurement document marked as a counter replacement.
D. Deactivate the current counter and create a new counter.

34 of 8O

You are analyzing the data transfer of the cost center of an equipment.

What are the possible data origins?

Note: There are 2 correct answers to this question.

A. The reference functional location of the superior functional location


B. The individual maintenance of the cost center in the equipment master record
C. The cost center of the related maintenance work center
D. The cost center of the superior equipment
37 of 8O

Which statements about the structure indicator are correct?

Note: There are 2 correct answers to this question.

A. It defines hierarchy levels of the functional location structure.


B. It defines the allowed characters for a functional location.
C. It can have a maximum length of 50 characters
D. It defines which data is transferred to the lower levels of the hierarchy.

53 of 80

You want to display vehicle-specific data for a piece of equipment.

How do you proceed?

A. Assign a view profile to the combination of fleet object type and usage type.
B. Assign a view profile to the combination of fleet object type and equipment category
C. Define the field selection for the vehicle equipment master data.
D. Assign a view profile to an equipment category for fleet equipment.

54 of BO

What is a valid partner type within the partner determination procedure?

A. Purchasing organization
B. Purchasing group
C. Vendor (external)
D. Business partner (gen.)

57 of 8O

You want to create a new functional location

Which configuration steps are required?

Note: There are 2 correct answers to this question.

A. Define the functional location category


B. Define the structure indicator.
C. Define the number range for the functional location category.
D. Define the reference functional location.

68 of 8O

Which material type is the best choice if you only want to create a structure element within the BOM?

A. Spare part (ERSA)


B. Maintenance assembly (IBAU)
C. Non-valuated material (UNBW)
D. Operating supplies (HIBE)
69 of 8O

Which objects have been enhanced with linear data in maintenance processes?

Note: There are 3 correct answers to this question.

A. Equipment task list


B. Measurement document
C. Maintenance plan header
D. Work order confirmation
E. Maintenance plan item

74 of 80

You have created a new equipment category, "linear", with the corresponding view profile,

Which fields appear in the equipment linear data tab?

Note: There are 3 correct answers to this question.

A. Type of offset
B. Object network
C. Start marker
D. Unit of measure
E. Segment

78 of 80

What do you need to configure to enable entries in the action log of an equipment?

A. Define an additional business view for the equipment category.


B. Activate the change documents for the equipment category.
C. Define the corresponding history-related field for the equipment reference category.
D. Select the time segment check box for the equipment category.
E. Corrective Maintenance
2 of 80

You want to display additional document information within the document flow of a maintenance order.

For which type of document must this be customized?

A. Invoice
B. Service entry sheet
C. Purchase order
D. Goods movement

10 of 80

The planner adds stock materials in the maintenance order.

Which statements regarding reservations in maintenance orders are correct?

Note: There are 2 correct answers to this question.

A. For the combination of order type and planner group you can decide when reservations are
created.
B. Reservations are created only after a material availability check has been performed.
C. All open reservations are closed when the maintenance order is set to TECO.
D. Open reservations can be cleared when 4 maintenance order operation is finally confirmed.

13 of 80

Where can the maintenance planner perform a material availability check?

Note: There are 2 correct answers to this question.

A. Within the SAP Fiori-based background job


B. Via the multi-level order list (SAP GUI)
C. Via the Manage Maintenance Order List SAP Fiori app
D. Via the Change Maintenance Order SAP Fiori app
15 of 8O

Which of the following statements about orders with operation account assignment (OAA) are correct?

Note: There are 3 correct answers to this question.

A. Overall costs are dynamically summed up on header level.


B. Purchase requisitions have the operation as account assignment.
C. The settlement rule is maintained on header level.
D. A technical object must be assigned to an order operation.
E. Costs are only stored for the operation object.

17 of 80

Which activities can the planner perform by using the Maintenance Planning Overview app with the
default filters?

Note: There are 3 correct answers to this question.

A. Display approved purchase requisitions for which purchase orders have been generated.
B. Analyze maintenance orders that are still in planning and have NOT been released.
C. Display approved purchase requisitions for which NO purchase orders have been generated,
D. Analyze overdue maintenance orders that have NOT been finally confirmed.
E. Analyze confirmed maintenance orders that have NOT been settled.

23 of 80

Which functions are available in the Resource Scheduling for Maintenance Planners app?

Note: There are 2 correct answers to this question.

A. Schedule and dispatch maintenance operations by shifts.


B. Cancel dispatched maintenance order operations.
C. Print job papers from a maintenance order.
D. Monitor maintenance order operations due in the next 4 weeks.
30 of 80

You cancel the technical completion of a work order

What are the effects?

Note: There are 2 correct answers to this question.

A. Open purchase requisitions are recompiled


B. Open reservations are recompiled.
C. Open purchase orders are recompiled.
D. Referenced notifications are put In Process again.

33 of 80

‘You want to create a maintenance order with an external order operation with service items.

Which of the following statements are correct?

Note: There are 3 correct answers to this question.

A. The assignment of a service master record is mandatory.


B. The assignment of a control key with the service indicator set is mandatory.
C. The usage of a model service specification is mandatory.
D. The actual value entry can only be recorded via the service entry sheet.
E. The assignment of service master records to an order operation is optional.

36 of 80

The planner adds non-stock material in a released maintenance order.

Which of the following statements regarding the purchasing process are correct?

Note: There are 3 correct answers to this question.

A. A goods receipt can ONLY be posted for a maintenance order with status REL.
B. A purchase order is created automatically as soon as the order is saved.
C. A goods receipt can be posted after the maintenance order is technically completed
D. A purchase requisition can be created automatically as soon as the order Is saved.
E. The maintenance order can be set to TECO before the invoice is created.
40 of 8O

You require stock material to carry out maintenance tasks.

Which of the following statements regarding material planning in the maintenance order are correct?

Note: There are 3 correct answers to this question.

A. A goods receipt can be entered for a technically completed maintenance order


B. A control key for internal workforce is required when assigning stock material to an order
operation.
C. Material can be assigned at order header level.
D. The pick list for materials can be printed before order release.
E. Material can be assigned at order operation level

46 of 80

Which operations are possible when you cancel the technical completion of a maintenance order?

Note: There are 2 correct answers to this question.

A. Change the priority.


B. Cancel status Released.
C. Book a goods receipt.
D. Change the estimated costs.

52 of 80

What can you assign in a notification item?

Note: There are 2 correct answers to this question.

A. Only one cause of damage


B. One or more object parts
C. Only one object part
D. One or more causes of damage
58 of 80

Which statement is correct when planning maintenance work that is to be carried out by an external
company?

A. In the control key assigned to the order operation, the "Service" indicator must always be
activated.
B. If you assign a control key for an external order operation, the actual values must always be
entered as a goods receipt in the system.
C. If you assign a control key with indicator "Service" for an external service, you have to enter the
actual values via the service entry sheet.
D. A service master record must always be assigned to the external order operation.

59 of 80

Which statements related to the creation of maintenance orders are correct?

Note: There are 2 correct answers to this question.

A. When an order is created based on a single notification, this notification becomes the header
notification
B. The long text of the reference notification can be automatically copied as the long text of the
order
C. The document within the document management system can be assigned only at operational
level
D. The assignment of the header notification to an order CANNOT be deleted.

65 of 60

Where can you see the results of the material availability check for maintenance orders?

Note: There are 2 correct answers to this question.

A. Within a maintenance order


B. In the report Maternal: Where-Used List
C. In the single-level list editing function for maintenance orders
D. In the material reservation list in inventory management67 of 60

Which objects can you use in the safety measure list?

Note: There are 2? correct answers to this question.

A. Work clearance documents


B. Permits
C. Work approval
D. Documents
70 of 20

The maintenance technician wants to document the finished work steps for a technical object in a
notification

Which catalog-based option in the notification can be used?

A. An activity in the notification header


B. A text in the subject long text screen
C. An entry in the object list
D. A task in the notification item

76 of BO

Which statements regarding a maintenance order with status REL are correct?

Note: There are 3 correct answers to this question.

A. Shop papers can only be printed after the order release.


B. Goods receipts for external services can be entered.
C. The planner can change planned costs at operation level.
D. The controller can determine actual cost surcharges
E. The planner can change estimated costs only at header level.

Organizational Units and Master Data

3 of 80

In which maintenance object can you use an activity type?

Note: There are 2 correct answers to this question.

A. Work center
B. Maintenance order header
C. Notification activity
D. Maintenance order operation
E. Organizational Units and Master Data

4 of 80

Which of the following statements are correct regarding a cross-plant planning scenario?

A. Multiple planning plants are assigned to a maintenance plant.


B. Multiple maintenance plants are assigned to a planning plant.
C. It is not supported in SAP S/4HANA.
D. It combines maintenance plants in different controlling areas.
6 of 80

Which of the following objects can you directly assign when you define the work center?

Note: There are 2 correct answers to this question.

A. Organizational unit (HR)


B. Fixed price of the activity type
C. Capacity category
D. Calculation key
E. 12 of 80

Which of the following statements are correct for SAP S/4HANA Cloud - Asset Management?

Note: There are 2 correct answers to this question.

A. You have access to the SAP S/4HANA back end system.


B. You do NOT have access to the SAP S/4HANA back end system
C. You can configure SAP S/4HANA Cloud via the SAP Asset Intelligence Network
D. You can configure SAP S/4HANA Cloud via the self-service configuration UI.

29 of 80

Which of the following are components of cloud-based SAP Intelligent Asset Management?

Note: There are 2 correct answers to this question.

A. SAP Work Manager


B. SAP Asset Manager
C. Worker safety applications
D. SAP Predictive Maintenance and Service

35 of 80

You want to assign a maintenance planning plant directly to an organizational unit

Which of the following units can you use?

A. Location
B. Maintenance planner groups
C. Controlling area
D. Maintenance work center
E. 42 of 80

Which objects can a personnel number be assigned to directly?

Note: There are 2 correct answers to this question.

A. Work center
B. Business partner
C. Planner group
D. Equipment
63 of 60

How does the work center influence cost calculation in the maintenance order?

Note: There are 2 correct answers to this question.

1. Via cost center and activity type


2. Via activity type and hourly rate
3. Via organizational unit and personal hourly rate
4. Via business partner and hourly price
5. Organizational Units and Master Data

49 of 80

During the implementation project you need to define the organizational units relevant for Plant
Maintenance.

Which of the following objects can you directly assign to a maintenance plant?

Note: There are 2 correct answers to this question.

A. Business partner
B. Maintenance work center
C. Maintenance planner group
D. Storage location
Breakdown Maintenance
5 of 80

Which activities can the technician perform with the Repair Malfunction SAPUI5 app?

Note: There are 2 correct answers to this question.

Complete

Close Report

Release

Print

Put in Process

Schedule

Release

Start Work

14 of 80

Which of the following statements about breakdown maintenance are correct?

Note: There are 3 correct answers to this question.

A. Orders and notifications can be utilized in combination.


B. Notifications are used for documentation of technical findings and activities performed.
C. More than one operation must always be maintained in the maintenance order
D. Maintenance orders can be created as immediate orders without any planning.
E. Orders always need to be combined with notifications.
32 of 80

Which operations can the responsible person perform after a maintenance order is technically
completed?

Note: There are 3 correct answers to this question.

A. Lock or unlock the order.


B. Update the estimated costs
C. Create an invoice receipt for delivered materials.
D. Change the settlement rule.
E. Change the planned costs.

44 of 60

Which steps support the maintenance technician in the Report and Repair Malfunction Fiori app (3
tiles)?

Note: There are 3 correct answers to this question.

A. Complete the malfunction report.


B. Find malfunction records already created in a list.
C. Assign production resource tool (PRT) to operation
D. Plan repair work for responsible work center.
E. Verify planned and actual costs.

62 of 80

Which steps are available for the maintenance technician when using the Report Malfunction tile?

Note: There are 3 correct answers to this question.

A. Display the current location of the technical object.


B. View details of the technical abject by navigating to the Asset Viewer.
C. Add a URL to provide further information
D. Input estimated costs for repair malfunction.
E. Select and print the maintenance order shop papers.
Preventive Maintenance

7 of 80

You want to set up a general maintenance task list for inspection rounds using the overall time
confirmation as a simplified way to record measurement documents.

What do you need to do?

Note: There are 2 correct answers to this question.

A. Assign an inspection document as PRT to the task list operation.


B. Assign a measuring point as 4 production resources/tools (PRT) to a task list operation.
C. Assign an inspection lot to the task list header.
D. Assign a piece of equipment with an allocated measuring point to a task list operation.

8 of 80

Which parameter in a maintenance strategy do you use to set the start/end date of the maintenance
order?

A. Initial/subsequent buffer
B. Call horizon
C. Package offset
D. Package hierarchy

16 of 60

Which of the following parameters are available when you define a new maintenance plan category?

Note: There are 3 correct answers to this question.

A. Order type
B. Call abject
C. Change documents
D. Maintenance activity type
E. Completion date

18 of 80

The technical completion of the current maintenance order was posted with a delay of 5 days.

What happens to the next planned date if you set the shift factor for early completion to 100%?

A. It is not shifted.
B. It is postponed by 5 days.
C. It will be 5 days earlier.
D. Its postponed by a full cycle (100%).
19 of 80

How does a performance-based maintenance plan calculate the interval between start date and planned
date?

A. Cycle length divided by (annual performance / 365)


B. Cycle length divided by ((scheduling period) x (cycle modification factor))
C. Cycle length divided by monthly performance

Cycle length divided by annual performance

20 of 80

What can be determined using the offset within a maintenance strategy?

A. The start date of the maintenance order


B. The first due date of a maintenance package
C. The cycle duration
D. The call date for the maintenance order31 of 80

You want to create a single cycle plan with a cycle of 12 months. You use the Time - key date scheduling
indicator.

The orders should be called 3 months before the planned date.

How can you set up the maintenance plan?

Note: There are 2 correct answers to this question.

A. Set the call horizon to 90 days.


B. Set the offset to 3 months.
C. Set the call horizon to 25%
D. Set the call horizon to 75%.

45 of 80

You want to set up a scenario for regular maintenance. The first event should take place after 1 year,
after that, it is a regular cycle of 6 months.

Which parameter do you have to use to map this in the system?

A. Scheduling indicator
B. Shift factor
C. Maintenance package offset
D. Maintenance plan category
55 of 80

You want to have several plan dates calculated in a maintenance plan.

Which scheduling parameter do you use?

A. Scheduling indicator
B. Scheduling period
C. Lead float
D. Call horizon
E. 56 of 60

The maintenance engineer creates a strategy plan with the call object maintenance order. Shift factors
are set to 100%.

Which date is relevant for the calculation of future planned dates if the maintenance work is delayed?

A. Date of the final time confirmation


B. Planned date of the next call, independent of maintenance order dates
C. Technical completion date of the maintenance order
D. Planned end date of the maintenance order

60 of 80

You want to assign components to an equipment task list. There is no BOM assigned to the equipment.

What Is the prerequisite for using the free assignment of material’?

A. Free assignment of material is always possible without any prerequisites.


B. Assign the header material of a material BOM as assembly to a task list operation.
C. Assign the BOM usage for free assignment of maternal in Customizing
D. Assign the header maternal of a material BOM to the equipment task list header.

61 of 60

Which scheduling parameters are used in a multiple-counter plan?

Note: There are 2 correct answers to this question.

A. Factory calendar
B. Scheduling indicator
C. Start date
D. Scheduling period
66 of 80

You want to schedule a performance-based maintenance plan.

Which parameters are mandatory?

Note: There are ? correct answers to this question.

A. Shift factors
B. Start counter reading
C. Estimated annual performance
D. Scheduling period
E. Preventive Maintenance

79 of 80

You create two maintenance packages and only one package should be executed at a time.

Which parameter determines this?

A. Hierarchy
B. Offset
C. Subsequent buffer
D. Package sequence

User Interface and User Experience


41 of 80

Which SAP Ul! technology is used for the technician's job list?

Web Dynpro

A. SAPUIS
B. SAP GUI for HTML
C. SAP GUI for Windows.
D. User Interface and User Experience

26 of 80

Which statement is correct about the SAP Fiori tile group?

Note: There are 2 correct answers to this question.

A. It is based on an SAP Fiori tile catalog.


B. It is assigned via a portal role.
C. It can be assigned directly to the user via personalization.
D. It provides only SAPUI5-based apps.
51 of 60

Which statements are correct about Ul technologies in SAP S/4HANA Asset Management?

Note: There are 2 correct answers to this question.

A. SAP GUI transactions can be used in the SAP Fiori launchpad.


B. SAP Fiori launchpad only supports SAP UI5 apps
C. The cloud version can also use SAP GUI for Windows
D. Web Dynpro apps can be used in the SAP Fiori launchpad.

8O of 80

How do you set up the visible tiles for a specific user in SAP Fiori launchpad?

Note: There are 2 correct answers to this question.

A. By assigning a PFCG role with an SAP Fiori catalog


B. By assigning a PFCG role with an SAP Fiori tile group
C. By assigning the tiles directly
D. By assigning a portal role with an SAP Fiori catalog

Refurbishment of Spare Parts


41 of 80

What is the correct receiver object type for the settlement of a refurbishment order?

A. The WBS element


B. The cost center
C. The fixed asset
D. The material

64 of 80

Which parameter in the material master is a prerequisite for refurbishment?

A. Valuation class 6000


B. Valuation category B (in-house/external procurement)
C. Valuation type H (origin)
D. Valuation category C (condition-based)

72 of 80

Which of the following is a prerequisite for external refurbishment?

A. Activate the subcontracting indicator in an external activity.


B. Select the material group for externally refurbished materials.
C. Create the purchasing info record for the external provider.
D. Define the order type for external refurbishment
77 of 80

Which valuation category do you use to refurbish a material?

A. Condition-based
B. Retail
C. Origin
D. In-house/external procurement

Mobile Maintenance
21 of 80

In which component do you have to perform most of the configuration to set up SAP Asset Manager.

A. SAP S/4HANA
B. SAP ERP
C. SAP Mobile Platform
D. SAP Cloud Platform

27 of 80

Which functionalities are available in the SAP Asset Manager for a maintenance worker?

Note: There are 2 correct answers to this question.

Schedule resources

Change task list

Display maps

Display and maintain technical objects

Change BOM

Create a work order on the ESRI map

Confirm time sheets

Attach documents
47 of 80

Which of the following are standard functionalities of SAP Asset Manager?

Note: There are 3 correct answers to this question.

A. ESRI maps
B. Breakdown analytics
C. Cost analytics
D. Work orders and operations
E. Technical objects

50 of 80

Which of the following statements about SAP Asset Manager are true?

Note: There are 3 correct answers to this question.

A. SAP Asset Manager provides single sign-on functionality.


B. SAP Asset Manager can run on smart watches
C. SAP Asset Manager is available for SAP S/4HANA and SAP ERP.
D. SAP Asset Manager can be used offline.
E. SAP Asset Manager is available for Windows platform.

Project-oriented Maintenance

26 of 80

In which cases are projects (P'S) used in the area of SAP S/4HANA Asset Management?

Note: There are 2 correct answers to this question.

A. Condition-based maintenance
B. Investments
C. External refurbishment
D. Shutdowns and overhaul

39 of 80

Which statements are correct for standard processes in PM/PS cost control?

Note: There are 2 correct answers to this question.

A. Budget can be assigned to a WBS element.


B. Maintenance costs can be settled to a network operation.
C. Maintenance order costs can be settled to a WBS element
D. Budget can be assigned to a maintenance plan.
48 of 60

You create a revision for a maintenance event builder (MEB) scenario.

Which of the following statements are correct?

Note: There are 2 correct answers to this question.

A. You must assign maintenance notifications to the revision.


B. You can assign a hierarchical task list to the revision.
C. You can assign a network to a revision.
D. You must use hierarchical task lists for the MEB scenario.

73 of 80

You want to assign your maintenance orders to a WBS element.

Which of the following statements are correct?

Note: There are 2 correct answers to this question.

A. The assignment is always made to a network activity of the WBS element


B. The assignment can be made automatically.
C. The assignment always has to be made manually.
D. The settlement receiver WBS element can be determined automatically.

Analytics
38 of 80

Which functionalities belong to the current portfolio of SAP BusinessObjects Business Intelligence?

Note: There are 2 correct answers to this question.

A. Plant Maintenance Information Systems (PMIS)


B. SAP Crystal Reports
C. SAP QuickViewer
D. SAP Lumira

43 of 80

What is the goal of embedded analytics in SAP S/4HANA?

A. Combine transactional and analytical processing.


B. Integrate SAP BusinessObjects Business Intelligence into SAP S/4HANA.
C. Integrate SAP BW into SAP S/4HANA.
D. Combine the HANA database with SAP BW InfoProviders.
71 of 80

‘You want to view transactional and analytical processing data in the Technical Object Breakdowns SAP
Fiori app

What is the source of the information?

A. BW query
B. BW InfoCube
C. Core Data Services (CDS view)
D. InfoSet for SAP Query
E. TS of BO

You want to see historical information relating to the phases when equipment was installed at a
functional location

Where can you find this information?

A. Location Analysis list


B. Usage list
C. Historical Orders list
D. Structure Display