QA QC Production Flow Chart
QA QC Production Flow Chart
13.
Site Erecting
of Elements as
per GFC
1.
12.
Identification
Dispatch of & checking of 2.
Elements as Raw Batching of
per materials Concrete in
requirement
IS-12269, IS-12089, IS-383 RMC Plant
11. 3.
10. SSRPL 4.
9.
5.
Demoulding of
Element once Preparation and
cube strength Inspection of
achieved Reinforcement
12MPA as per GFC
8.
6.
Curing of 7.
Concrete Fixing of
Pouring of MEP as per
Concrete GFC