RM 25
RM 25
0.175
13/ 0.23
0.38
1.136
4/ 0.12
0.3
0.144 1.455m2
2/ 0.23 0.45
0.38 0.15 - topsoil
0.33
0.35
0.058 0.050 + hardcore
0.4
13/ 0.23
0.38
0.33
0.375
4/ 0.13
0.3
0.35
0.055 0.488m3
2/ 0.23
0.38
0.38
0.066
13/ 0.23
0.38
0.375
0.426
4/ 0.12
0.3
0.3
0.043 0.535m3
CONCRETE WORK
2/ 0.23 0.45
0.38 0.38 - ground beam
0.40 0.07
0.069 0.400 - footing
0.47
13/ 0.23
0.38
0.40
0.45
4/ 0.12 0.45
0.3 0.3 - ground beam
0.40 0.15
0.400 - footing
0.55
0.576 1.095m3
FORMWORK
Rough surface
formwork for footings
2/4/ 0.225
0.40
0.72
13/4/ 0.225
0.40
4.68
4/4/ 0.125
0.40
0.8 6.2m2
3.84
13/4/ 1.20
0.40
24.96
4/4/ 1.20
0.40
7.68 36.48m2
REINFORCEMENT
reinforcement for footing
reinforcement for T1
footing 225x375x375
2.4
0.060 - cover 2/0.03
2.34
0.176 + bends 2/5.5d @ 2/5.5/0.016
2/2/7 2.52 2.516 2.52
70.56 MR of Y16 ø steel bar
reinforcement for T3
footing 225x375x375
3.15
0.060 - cover 2/0.03
3.09
0.176 + bends 2/5.5d @ 2/5.5/0.016
3.266 3.27
13/2/7 3.27
reinforcement for T4
footing 125x300x450
2.4
0.060 - cover 2/0.03
2.34
0.176 + bends 2/5.5d @ 2/5.5/0.016
2.516 2.52
4/2/7 2.52
141.12 MR of Y16 ø steel bar
Reinforcement For Stump
2/4 3.241
25.928 MR of Y16 ø steel bar
0.16
0.060 - cover 2/0.030
0.1
4/0.1 = 0.4
0.144 + hook 24d
0.544
Distance that require link
2.513 (Length of steel bar from (i))
0.375 - Ground beam
2.138
No. of links = 2.138/0.16 +1
= 14.36, say 15
2/15/ 0.544
16.32 MR of M6 ø link
0.230
0.060 - cover 2/0.030
0.17
4/0.17 = 0.68
= 0.144 + hook 24d
= 0.824
13/17/ 0.824
182.104 MR of M6 ø link
0.160
0.060 - cover 2/0.030
0.1
4/0.1 = 0.4
0.144 + hook 24d
0.544
Slab T1
Slab T1
Concrete Work
Mass Concrete
2.4
0.150
0.05
0.018 m
3
Reinforcement
Reinforcement Reinforcement
( bottom - Y (bottom - X direction)
direction)
R16-160
R12-139
Add Add
Bend 2/5d= Bend 2/5d
2×5×0.016= 2×5×0.010 =
0.16 0.10
2.70 0.19
Slab T4
Slab T4
Concrete Work
Mass Concrete
2.4
0.355
0.05
0.43 3
m
Reinforcement
Reinforcement Reinforcement
(bottom - Y (bottom - X direction)
direction)
R12-168
R10-161
Add Add
Bend 2/5d= Bend 2/5d
2×5×0.012= 2×5×0.010 =
0.12 0.10
2.46 0.325
Slab T3
Concrete Work
Mass Concrete
3.0
0.23
0.05
0.035 m
3
Reinforcement
Reinforcement Reinforcement
(bottom - Y (bottom - X direction)
direction)
R20-166
R10-162
Add Add
Bend 2/5d= Bend 2/5d
2×5×0.020= 2×5×0.010 =
0.20 0.10
3.14 0.27
Slab T3
Concrete Work
Mass Concrete
3.15
0.23
0.05
0.0.036 3
m
Reinforcement
Reinforcement Reinforcement
(bottom - Y (bottom - X direction)
direction)
R20-167
R10-162
Length = 0.23
Length = 3.15
Less (-) cover
Less (-) cover
2/0.030 =
2 / 0.03 =
0.06
0.06
0.17
3.09
Add
Add
Bend 2/5d
Bend 2/5d=
2×5×0.010 =
2×5×0.012=
0.10
0.12
0.27
3.21
Total length required
Total length
steel
required steel
(3210-30-30)
(270-30-30)
= 3150
= 210
No. Of steel
No. of steel
3210/162= 19.81
210/167 =
1.26
Say, 20
Say, 2
2/ 3.21 20/ 0.27 5.40 m, R10
6.42
m, R20