0% found this document useful (0 votes)
13 views

Brickwork Mortar Calculations

This document provides calculations for the amount of mortar needed for brickwork, including the number of bricks in 1 cubic meter of brickwork, the volume of mortar in 1 cubic meter accounting for brick volume, adding 15% extra for wastage, and converting the wet mortar volume to dry mortar volume.

Uploaded by

Sakina Faiz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
13 views

Brickwork Mortar Calculations

This document provides calculations for the amount of mortar needed for brickwork, including the number of bricks in 1 cubic meter of brickwork, the volume of mortar in 1 cubic meter accounting for brick volume, adding 15% extra for wastage, and converting the wet mortar volume to dry mortar volume.

Uploaded by

Sakina Faiz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Brickwork Mortar Calculations

For 1 cum. of brickwork no of bricks required = 500

Mortar in 1 cum of concrete = 1- (500*0.19*0.09*0.09)

=0.23 cum

Adding 15% extra for frog filling and wastage

Mortar in 1 cum of concrete= 1.15*0.23= 0.265 cum

Volume of dry mortar = Volume of wet mortar* 1.25

=0.265*1.25

=0.33 cum